Route 29 Solutions
November 6, 2014 Rt. 29 Project Delivery Advisory Panel Meeting
Route 29 Solutions
2
Agenda item 1: Introductions
• Project Delivery Advisory Panel
• Technical Team
Route 29 Solutions
3
Agenda item 2: Interaction and Feedback
Live Streaming
• Viewers: 41 viewers
• Streams: 69 streams
• Average minutes per stream: 37 minutes
Route 29 Solutions
4
Agenda item 2: Interaction and Feedback (continued)
• 4 comments submitted through route29solutions.org Oct 20 - Nov 3 • 40 total Share Your View postings on route29solutions.org
11 new postings since Oct 23
General Summary of Comments submitted through website • 1 representing 440 apartments off Georgetown Road
• concerned about cut-through traffic during Rio and 29 Widening • review & appropriately adjust signal timing at Hydraulic and Barracks
Route 29 Solutions
Agenda item 2: Interaction and Feedback (continued)
• 1 supports all projects with the exception of the Rio GSI
• 1 supports a traffic circle at Berkmar Extended and Hilton Heights intersection and applauds Berkmar bike lanes
• Merchant’s Tire concerned about access for daily operations during and post-construction
5
Route 29 Solutions
Agenda item 3: Panel Feedback and Suggestions
• Open period for Panel Discussion
6
Route 29 Solutions
7
Agenda item 4: RFQ and RFP Update
Request for Qualifications • RFQ advertised: Jul 24 ✔ • RFQ Information Meeting: Jul 31 ✔ • Deadline to submit questions: Aug 7 ✔ • VDOT response to questions: Aug 14 ✔ • SOQs submitted by contractors: Aug 28 ✔ • SOQ evaluations complete: Sep 18 ✔ • Berkmar Location Public Hearing: Sep 18 ✔ • CEs comment period expiration: Sep 24 ✔ • Shortlist of top three firms: Sep 25 ✔ (Sep 19)
Route 29 Solutions
8
Agenda item 4: RFQ and RFP Update (continued)
Request for Proposals - 2014 NOTE: New procurement dates in 2014 - 2015
• RFP issued to top three firms: Oct 2 ✔ • Mandatory Pre-proposal Meeting: Oct 9 ✔ • Utility Meeting: Oct 9 ✔ • Design Public Hearings: Oct 14 ✔ • Berkmar Location Approval: Oct 15 ✔ • Proprietary meetings: Oct 23 (rev Oct 21-22) ✔ • RFP addendum: Nov 6 (Nov 5) ✔ • Proprietary meetings: Nov 19 and 20
Route 29 Solutions
9
Agenda item 4: RFQ and RFP Update (continued)
Request for Proposals - 2015
• Technical proposals due Jan 6 (previously Dec 4) • Price proposals submitted: Jan 20 (previously Jan 13) • Open price proposals: Jan 21 • Notice of intent to award: Jan 23 • FHWA review and approval: Jan 26 - Jan 30 • To CTB for approval: Feb 18 • Notice to proceed: Mar 4
Route 29 Solutions
10
Agenda item 5: Report on PDAP Recommendations and Requests
• Consider boat launch access at the new Rivanna River bridge on Berkmar Extended
• Add agenda item for Panel feedback and suggestions as part of Standing Agenda items
• Provide volumes for Average Daily Traffic (ADT), AM peak, Woodbrook and Twentyninth intersections (not requested, but added Albemarle Sq.)
Route 29 Solutions
11
Agenda item 6: October 14 Design-Build Public Hearing Update
• 201 attended
• 115 who attended provided comments
• 199 total comments 98 written comments left at public hearing 63 comments by email 36 comments by US mail 2 oral comments recorded at public hearing
Route 29 Solutions
12
Agenda item 7: Hillsdale Update
• (Jim called to Richmond. Will move to Nov 20 agenda.)
Route 29 Solutions
13
Agenda item 8: Rt. 29 Widening Graphic with Multi-Use Path
Route 29 Solutions
14
Agenda item 9: Business Assistance Program Update
• Public forum held Oct 23
• Follow-up meeting with BOS held Oct 30
Route 29 Solutions
15
Agenda item 10: Traffic Projection Graphics
• Average Daily Traffic at Rio (pg. 16 - 19) • AM Peak (pg. 20 - 23) • PM Peak (pg. 24 - 27) • Twentyninth intersection (pg. 28 - 30) • Woodbrook intersection (pg. 31 - 33) • Albemarle Square (pg. 34 - 36)
16
2014 Average Daily Traffic (ADT) Existing
➢N
Rio Rd
1400 3500 2100
↓! 1900
26300 ← ← 21600 ← 30200
Route 29 " 6700
2200
25500 → 20600 → → 29100
2700
↑3300 3400 6400
#
"
$%
$%
17
2014 Average Daily Traffic with Rio Grade Separated Intersection
➢N
Rio Rd
1400 3500 2100
↓1900
← 10800 Local ← 4000 Local ← 14300 Local
← 27000 ← 16200 Through ← 16200 Through ← 30500
6700
Route 291700
700
2200
→ 26200 Through 17300 → Through 17300 → → 30800
Local 8900 → Local 3300 → Local 13500 →2700
↑4700 3400 6400
!
"
# $
%
!
&
'#$
The above indicates how Average Daily Traffic, based on 2014 Fall counts,
would be distributed if the Rio Grade Separated Intersection were operating
today.
18
2018 Average Daily Traffic with Rio Grade Separated Intersection
➢N
Rio Rd
1500 3600 2200
↓2000
← 11300 Local ← 4200 Local ← 15000 Local
← 28100 ← 16800 Through ← 16800 Through ← 31800
7000
Route 291800
700
2300
→ 27200 Through 18000 → Through 18000 → → 32100
Local 9200 → Local 3400 → Local 14100 →2800
↑4900 3400 6700
!
"
# $
%
!
&
'#$
19
2040 Average Daily Traffic with Rio Grade Separated Intersection
➢N
Rio Rd
1800 4500 2700
↓2500
← 14000 Local ← 5200 Local ← 18500 Local
← 34900 ← 20900 Through ← 20900 Through ← 39400
8600
Route 292200
900
2800
→ 33800 Through 22300 → Through 22300 → → 39800
Local 11500 → Local 4300 → Local 17500 →3500
↑6100 4400 8300
!
"
# $
%
!
&
'#$
20
2014 AM Peak Hour Volumes Based on 2014 Fall Counts
➢N
Rio Rd
123 278 149
↓! 147
← 2343 ← 1936 ← 2563
Route 29 " 480
148
1364→ 1025 → 1594 →191
↑284 301 420
#
"
$%
$%
21
2014 AM Peak Hour Volumes with Rio Grade Separated Intersection
➢N
Rio Rd
123 278 149
↓147
← 656 Local ← 135 Local ← 890 Local
← 1759 Through ← 1759 Through
480
Route 29128
72
148
Through 907 → Through 907 →Local 529 → Local 118 → Local 815 →
191
↑326 301 420
!
"
# $
%
!
&
'#$
The above indicates how traffic, based on 2014 Fall counts, would be distributed during the AM peak if the Rio Grade Separated Intersection were operating today.
22
2018 AM Peak Hour Volumes Rio Grade Separated Intersection
➢N
Rio Rd
128 290 156
↓153
← 684 Local ← 141 Local ← 929 Local
← 1836 Through ← 1836 Through
501
Route 29134
75
155
Through 947 → Through 947 →Local 552 → Local 123 → Local 851 →
199
↑340 314 438
!
"
# $
%
!
&
'#$
23
2040 AM Peak Hour Volumes Rio Grade Separated Intersection
➢N
Rio Rd
158 358 192
↓189
← 844 Local ← 174 Local ← 1144 Local
← 2262 Through ← 2262 Through
! 617
Route 29 164
93
190
Through 1166 → Through 1166 →Local 681 → Local 152 → Local 1048 →
246
↑419 387 540
"
#
$ %
&
!
'$%
24
2014 PM Peak Hour Volumes Based on 2014 Fall Counts
➢N
Rio Rd
110 384 197
↓! 160
← 2008 ← 1633 ← 2307
Route 29 " 514
177
2413 → 1981 → 2806 →255
↑265 364 628
#
"
$%
$%
25
2014 PM Peak Hour Volumes with Rio Grade Separated Intersection
➢N
Rio Rd
110 384 197
↓160
← 951 Local ← 370 Local ← 1197 Local
← 1126 Through ← 1126 Through
514
Route 29153
69
177
Through 1624 → Through 1624 →Local 858 → Local 357 → Local 1335 →
255
↑402 364 628
!
"
# $
%
!
&
'#$
The above indicates how traffic, based on 2014 Fall counts, would be distributed if the Rio Grade Separated Intersection were operating today.
26
2018 PM Peak Hour Volumes Rio Grade Separated Intersection
➢N
Rio Rd
115 401 206
↓167
← 992 Local ← 385 Local ← 1249 Local
← 1176 Through ← 1176 Through
537
Route 29160
72
185
Through 1696 → Through 1696 →Local 895 → Local 372 → Local 1393 →
266
↑420 380 656
!
"
# $
%
!
&
'#$
27
2040 PM Peak Hour Volumes Rio Grade Separated Intersection
➢N
Rio Rd
141 494 253
↓206
← 1221 Local ← 474 Local ← 1539 Local
← 1449 Through ← 1449 Through
! 661
Route 29 198
89
228
Through 2089 → Through 2089 →Local 1103 → Local 459 → Local 1718 →
328
↑517 468 808
"
#
$ %
&
!
'$%
28
2014 PM Peak Twentyninth Existing
➢N
Twentyninth
137 15 110
↓! 98
2146 ← ← 1879 ← 2021
Route 29 " 44
149
2512 → 2219 → → 2369
144
↑130 22 40
#
"
$%
$%
29
2014 PM Peak Hour Volumes Twentyninth with Rio Grade Separated Intersection
➢N
Twentyninth
137 15 110
↓98
← 2170 ← 1841 ! 24
← 2097
134 " 80
Route 2924
149
2512→ 2219 → 2393→144
↑192 22 40
#
$
% &
'
#
(%
&
The above indicates how traffic, based on 2014 Fall counts, would be distributed at Twentyninth during the PM peak if the Rio Grade Separated Intersection were operating today.
30
2040 PM Peak Hour Volumes Twentyninth with Rio Grade Separated Intersection
➢N
Twentyninth
176 19 141
↓126
← 2789 ← 2366 ! 31
← 2696
173 " 102
Route 2931
192
3231→ 2854 → 3077 →185
↑247 28 51
#
$
% &
'
#
(%
&
31
2014 PM Peak Woodbook Existing
➢N
Woodbrook
260 34 192
↓! 229
2078 ← ← 1686 ← 1993
Route 29 " 78
376
2853 → 2355 → → 2617
122
↑132 35 70
#
"
$%
$%
32
2014 PM Woodbrook Peak Hour Volumes with Rio Grade Separated Intersection
➢N
Woodbrook
260 34 192
↓229
← 2115 ← 1686 ← 1993
78
Route 29
37
111 ! 376
2890→123 " 2355 → 2617 →
122
↑132 35 70
#
$
% &
'
#
(%&
The above indicates how traffic, based on 2014 Fall counts, would be distributed at Woodbrook if the Rio Grade Separated Intersection were operating today.
33
2040 PM Woodbrook Peak Hour Volumes with Rio Grade Separated Intersection
➢N
Woodbrook
334 44 247
↓294
← 2720 ← 2168 ← 2562
100
Route 29
48
142 ! 484
3718→158 " 3029 → 3366 →
157
↑170 45 90
#
$
% &
'
#
(%&
34
2014 PM Peak Hour Volumes at Albemarle Sq Based on 2014 Fall Counts
➢N
34 3 0
↓! 15
← 2343 ← 2172 ← 2337
Route 29 " 150
33
2806 → 2625 → 2793 →148
↑Albemarle Sq Shopping Center 137 4 168
#
"
$%
$%
35
2014 PM Peak Hour Volumes at Albemarle Sq with Rio Grade Separated Intersection
➢N
37 0 0
↓! 52
← 1233 Local ← 1196 Local ← 1248 Local
← 1126 Through ← 1126 Through
Route 29 " 0
0
Local 1335 → Local 1034 → 1206 → Local
Through 1624 → 1624 → Through
301
↑Albemarle Sq Shopping Center 0 0 172
#
"
$%
$%
The above indicates how traffic, based on 2014 Fall counts, would be distributed at Albemarle Sq during the PM peak if the Rio Grade Separated Intersection were operating today.
36
2040 PM Peak Hour Volumes at Albemarle with Rio Grade Separated Intersection
➢N
48 0 0
↓! 67
← 1586 Local ← 1538 Local ← 1605 Local
← 1449 Through ← 1449 Through
Route 29 " 0
0
Local 1718 → Local 1331 → 1552 → Local
Through 2089 → 2089 → Through
387
↑Albemarle Sq Shopping Center 0 0 221
#
"
$%
$%
Route 29 Solutions
Agenda item 11: 2015 Meeting Calendar - Q1 and Q2
• Jan 8 Jan 22
• Feb 5 Feb 19
• Mar 5 Mar 19
• Apr 2 Apr 16 Apr 30
• May 14 May 28
• Jun 11 Jun 25
37
Route 29 Solutions
Agenda item 12: Revised Rio Road Rendering and Video
• (If Available)
38
Agenda item 13: New Business and Wrap Up
39
Route 29 Solutions
November 6, 2014 Rt. 29 Project Delivery Advisory Panel Meeting