Accidents hurt – safety doesn’t.
“Defensive Driving”
![Page 2: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/2.jpg)
FOR INTERNAL USE ONLY
RISERLESS MUD RECOVERY SYSTEM
By Asif & Aziz
![Page 3: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/3.jpg)
3FOR INTERNAL USE ONLY
Preview
▌ What is RMR?▌ Advantages▌ Components▌ Dual Gradient Drilling▌ Case Study▌ RMR Track Record▌ Limitations▌ Pioneers▌ Conclusions
![Page 4: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/4.jpg)
4FOR INTERNAL USE ONLY
RMR® - Riserless Mud Recovery
Safer, faster, cleaner top-hole drilling.
• Drill stable top hole section
• Less impact on environment.
•No “Pump & Dump”.
![Page 5: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/5.jpg)
5FOR INTERNAL USE ONLY
Less Casing
Well Control
Engineered Fluid
Loss & Gain
IndicatorsReal time Monitoring
Mud Volume Control
Cement Job
Shallow Hazard
What RMR can do for you?
Zero Discharge
What are we concerned with?
![Page 6: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/6.jpg)
6FOR INTERNAL USE ONLY
Dual Gradient Drilling
• Optimized drilling
• Better well control
•Fewer Casing Point.
• Larger mud weight window
![Page 7: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/7.jpg)
7FOR INTERNAL USE ONLY
Components
1. Suction Module (SMO)
2. Subsea Pump Module (SPM)
3. Umbilical & Umbilical winch (UW)
4. Office & Tool Container (OTC)
5. Power and Control Container (CC)
6. Mud Return Line (MRL)
![Page 8: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/8.jpg)
8FOR INTERNAL USE ONLY
1. Suction Module (SMO)
▌ Collecting mud returns▌ Provides connection to SPM▌ Lighting & Video Camera▌ Mud level control system▌ Deployed through rigs moon
pool
![Page 9: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/9.jpg)
9FOR INTERNAL USE ONLY
2. Subsea Pump Module (SPM)
▌ Support frame for pump & motor
▌ Connected to SM by flexible hose
▌ Three electrically disc driven pumps
▌ Pump cutting upto 20” inches diameter
▌ Minimal damage to cuttings
![Page 10: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/10.jpg)
10FOR INTERNAL USE ONLY
3. Umbilical & winch (UW)
▌ Power supply ▌ Control connection between CC &
SPM
![Page 11: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/11.jpg)
11FOR INTERNAL USE ONLY
4. Power and Control Container (CC)
▌ Crew work area▌ Monitor & Control SPM & SM ▌ Monitor mud level▌ Supply data to rig system
![Page 12: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/12.jpg)
12FOR INTERNAL USE ONLY
5. Mud Return Line (MRL)
▌ Return mud to rig▌ 6’’ diameter ▌ Connected to pump via ROV
![Page 13: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/13.jpg)
13FOR INTERNAL USE ONLY
![Page 14: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/14.jpg)
14FOR INTERNAL USE ONLY
Limitations
▌ The max water-depth is 4,593ft (1400m).
▌ Pumping mud weight up to 14.35PPG (1.72sg )
This is still a developing and evolving with time as deepwater drilling technology.
![Page 15: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/15.jpg)
15FOR INTERNAL USE ONLY
Case Study – West Azeri FieldDrilled a well in 2003 by BP with semi-sub with a water depth of 120 mtrs ft.Drilled 36” OH till 423 mtrs, 30” CSG @ 413 mtrsDrilled 24” OH 801 mtrs, 18 5/8” CSG @ 794 mtrs.Cement job was good. Used less volume of cement as compared to standard volume calculation which was 200% excess.
Case Study – Shakhalin Shelf (Russia)Due to ecological restriction. RMR system was used to provide a close loop system and it worked very well.
![Page 16: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/16.jpg)
16FOR INTERNAL USE ONLY
RMR TRACK RECORD
![Page 17: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/17.jpg)
17FOR INTERNAL USE ONLY
1 well2034 ft
7 wells279-354 ft
1 well4657 ft
24 wells154-1004 ft
7 wells249-1148 ft
33 well387-1723 ft
35 wells85-430 ft
![Page 18: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/18.jpg)
18FOR INTERNAL USE ONLY
How is our role as mud engineers changes?
For riserless we had to think more about volume of PAD mud and logistic issues.
But with RMR – Engineered FluidWaste Management system
![Page 19: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/19.jpg)
19FOR INTERNAL USE ONLY
Enhancement in DFG
![Page 20: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/20.jpg)
20FOR INTERNAL USE ONLY
Pioneers In This Industry
▌ The shallow water version of RMR has been used commercially since 2003 on more than 100 wells worldwide.
AGR Subsea BP Shell PETRONAS Chevron Statoil Demo 2000
![Page 21: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/21.jpg)
21FOR INTERNAL USE ONLY
CONCLUSION
• Evolving Technology.
• More field trails.
![Page 22: Final presentation RMR](https://reader033.fdocuments.net/reader033/viewer/2022050914/58acebe21a28ab40588b624b/html5/thumbnails/22.jpg)
22FOR INTERNAL USE ONLY
References• Hector Moreno – SME (Lead Technical Instructor)• OTC 17665• SPE IADC 105212• www.enhanced-drilling.com
SPE 166839• “Feasibility Study of a Dual Gradient Mud System for
Deepwater Drilling Operations”, 1997 OTC #8465.• http://www.odplegacy.org/PDF/Admin/Long_Range/• CONCORD.pdf.http://www.enhanced-drilling.com/solutions/
rmr- riserless-mud recovery?gclid=CjwKEAjwxKSoBRCZ5oyy87DimEcSJADiWsvgq5yiTEp9Er_Vym7h5Wzmn9IwEm04DdtvcqtaeJSZlRoCK1fw_w cB
• http://www.drillingcontractor.org/new-deepwater-riserless-mud-recovery-system-opens-door-to-deepwater-dual-gradient-
drilling- 5313