UCI Engineering Design in IndustryWater Pump Project - Fall 2011
Final Presentation
Students Advisor OC Great Park
Kevin AnglimAndrea MarianiBrandon NillesPhong PhanGagan Singh
John Garman Glenn ChalkleyTom GrimmTom LarsonJordan Perkins
![Page 2: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/2.jpg)
The Goal
The goal of this project was the design anddevelopment of a water pump apparatus thatwould be used as an educational exhibit in the OCGreat Park’s Farm & Food Lab.
As a secondary objective, this pump wouldadvertise a utilitarian pumping system that will bedeveloped for nations with water-pumping needs,alleviating some of the hardships people mustendure in order to get the water they need.
![Page 3: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/3.jpg)
Water Awareness - California
• 200 million acre- feet of water fall in CA/ year▫ Over half soaks into ground/ evaporates/ used by
vegetation
▫ Leaves 86 million acre-feet of water for use
48%- environmental uses
41%- agriculture
9%- cities & industries
75% of CA’s available water occurs N. of Sacramento, while 80% of the demand occurs in the southern 2/3 of the state
*1 acre foot is 326,000 gallons- enough water for 2 families for a year
![Page 4: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/4.jpg)
Water Awareness – CA Water Delivery
• Surface Water Projects
▫ Provide major portion of water
▫ 1000+ federal, state, local reservoirs & hundreds of miles of canals and pipelines
▫ 2 major:
Central Valley Project (CVP, federal)
State Water Project (SWP, state)
![Page 5: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/5.jpg)
Water Awareness - Key Water Projects
Water Projects Amount of Water
Central Valley Project 7 MAF- per year
State Water Project 2.3 MAF- per year
All- American Canal 3 MAF- per year
Colorado River Aqueduct 1.2 MAF-per year
Los Angeles Acqueduct 200,000 AF- per year
Mokelumne Aqueduct 364,000 AF- per year
San Francisco Hetch Hetchy Project 330,000 AF- per year
![Page 6: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/6.jpg)
Water Awareness - CVP
• Begins in Cascade Mtn’s near Redding, and goes down to near Bakersfield
• 20 damns and reservoirs, 11 power plants, 500 miles of major canals
• Manages 9 million acre-feet of water
• 600,000 acre-feet for municipal and industrial use ~1 million households for a year
• 800,000 acre-feet/ year to fish and wildlife; 410,000 acre- feet to State and Federal wildlife refuges and wetlands
![Page 7: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/7.jpg)
Water Awareness - CVP
Courtesy: U.S. Dept. of the Interior
![Page 8: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/8.jpg)
Water Awareness - SWP
• Nation’s largest state built system
• Water for 23 million & 755,000 acres of farmland
• Includes the 444 mile CA aqueduct
▫ Delivers to San Joaquin Valley, SF Bay, S. CA
![Page 9: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/9.jpg)
Water Awareness - SWP
Courtesy: Legislative Analysts Office
![Page 10: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/10.jpg)
Water Awareness - Irvine
• We get our water from 3 sources:
▫ State water project
▫ Colorado River
▫ Groundwater
![Page 11: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/11.jpg)
Design Issue
• Main Issues▫ Durability
Frequency of maintenance?
How long it would last?
▫ Accessibility
Age and size?
Handicap?
▫ Availability
Off the shelf products?
▫ Ease of Manufacture
Difficulty of assembly and fabrication
▫ Safety
Does it satisfy safety regulations?
![Page 12: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/12.jpg)
Initial Requirements
Requirement Units Nominal Optimal Weight
User: - - - -
Age Years 6 to 16 4 to 21 3
Quantity People / Day 100 1000 4
Engineering: - - - -
ADA Accessibility Need Yes Yes 4
Flow Rate Gallons/Minute 5 10 5
Optimized Volume Pumped Need Yes Yes 4
Budget Dollars ($) $500-$1000 <$500 4
Design: - - - -
Longevity Years 5 10 5
Maintenance Minutes/month 5 0 5
Production Quality 1 - 5 (5=best) 5 5 5
Aesthetic 1 - 5 (5=best) 4 5 4
Safety 1 - 5 (5=safest) 4 5 5
![Page 13: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/13.jpg)
Initial Ideas
• Handcart
• Treadmill
• Wheel
• Pendulum pump
• Archimedes screw
• Pulley
• Bicycle powered pump
![Page 14: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/14.jpg)
Updated RequirementsRequirement Units Nominal Optimal Weight
User: - - - -
Age Years 6 to 11 4 to 21 3
Quantity People / Day 100 1000 4
Engineering: - - - -
ADA Accessibility Need Yes Yes 1
Optimized Volume Pumped Need Yes Yes 4
Design: - - - -
Longevity Years 5 10 5
Maintenance Minutes/month 5 0 5
Production Quality 1 - 5 (5=best) 5 5 5
Aesthetic 1 - 5 (5=best) 4 5 4
Safety 1 - 5 (5=safest) 4 5 5
Representative of Exportable 1 - 5 3 5 5
Budget Dollars ($) $500-$1000 <$500 4
Cycle Specific Requirements: - - - -
Cadence Range RPM 60 to 90 Any 3
Crank-to-Seat Length Inches 16 16-24 3
Pump Specific Requirements:
Flow Rate Gallons/Minute 6 to 10 15 to 20 3
Cadence Range Rotations/Minute 90 to 120 150 to 200 4
![Page 15: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/15.jpg)
Bicycle System
• Two main design concerns:
▫ Drive Train
Chain
Belt
Shaft
▫ Seat Configuration
Upright
recumbent
![Page 16: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/16.jpg)
Shaft Drive
• Pros
Safe
Gears are enclosed
No exposable moving parts
Lower maintenance frequency
Bevel gears protected from impacts/debris
Durable
• Cons
Heavier
Inability to repair
shaft must be replaced
More expensive
![Page 17: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/17.jpg)
Seat Selection
RecumbentPros:
• More comfortable• Safer due to lower
center of gravityCons:
• Unable to shift weight to balance
UprightPros:
• Commonly found• Light-weight• Can have multiple riding
positionsCons:
• Uncomfortable over long periods of time
![Page 18: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/18.jpg)
Down-Selection of Drive Train
Selection Criteria Chain Drive Rubber Belt Drive Kevlar Belt Drive Drive Shaft
Durability 2-3 Months* 1 Year* 1+ Year 1+ Year
Safety(1-5)
3 3 3 5
Maintenance(1-5)
4 3 3 5
Maintenance Frequency
2 Weeks* 1 Week* 2 Weeks* 1 Month*
Outdoor Use (1-5)
3 3 5 5
Replaceability(1-5)
5 4 3 2
Cost $100* $200* $300* $100*
Ease of Manufacture(1-5)
5 5 5 5
Rank 3 4 2 1
Continue? No No No Yes
* = estimation
![Page 19: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/19.jpg)
Status at Midterm
• Had selected our final design
• Completed two proof of concept tests
Need to:
• Construct a final working prototype
![Page 20: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/20.jpg)
Final Steps
![Page 21: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/21.jpg)
Final Production Steps
• Detail components and materials for actual parts sourced
• Fabricate prototype to verify design
• Analyze prototype performance
• Recommend design revisions
![Page 22: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/22.jpg)
Final Product
![Page 23: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/23.jpg)
Recommendations
• The use of components other than those used in our prototype is acceptable and occasionally preferable (i.e. pump selection). Details of the final design would be changed to account for this, but the fabricator judgment can account for these variations. Details of our prototype design have been included.
• Optimizing some features (e.g. seat geometry, pump selection) can only be done with further iteration of the whole system, which we hadn’t the resources for. A design that will last for years would call for this.
• The above holds true for exportable versions of this concept as well as they would demand durability perhaps beyond even that required in a park full of children.
![Page 24: Final Presentation MAE188 Fall Quarter 2011](https://reader030.fdocuments.net/reader030/viewer/2022020123/55a76b1f1a28ab195c8b4952/html5/thumbnails/24.jpg)
Special Thanks!
• AbioBikes.com▫ Provided the drive shaft
• BambooDNA.com▫ Provided fabrication shop
• OC Great Park▫ Provided the opportunity to work on a great project