FINAL DESIGN FOR
YORKTOWN HIGH SCHOOLINTERNAL MODIFICATIONSSchool Board Information ItemFebruary 15, 2018
Q U I N N E V A N S A R C H I T E C T S
2QUINN EVANS ARCHITECTS|Washington, DC
PROJECT INTRODUCTION
ADD A MINIMUM OF 300 SEATS
COMPLETE BY SEPTEMBER 2018
$4 MILLION FUNDING AVAILABLE
3QUINN EVANS ARCHITECTS|Washington, DC
PROJECT OVERVIEW
BRIDGET LOFT, PRINCIPAL
REBECCA BONZANO
TYRONE BYRD
DEBBIE DEFRANCO
DOT GREEN
KELLY KING
MICHAEL KRULFELD
CAROL MCCOSKRIE
ALYSON MCKOWEN
AARON SCHULTZ
JEFFREY STAHL
SUN WILKOFF
4QUINN EVANS ARCHITECTS|Washington, DC
PROJECT TEAM
SCHOOL BASED COMMITTEE
CARL ELEFANTE, FAIA, PRINCIPAL
ABBY TOURTELLOTTE, AIA, PROJECT MANAGER
JACK CHIN
DEVON HOGAN
QUINN EVANS ARCHITECTS
APS DESIGN & CONSTRUCTION
ROBIN COOK
BENJAMIN BURGIN
JEFFREY CHAMBERS
MICHAEL SEWELL, PE
LUCAS HOFFMANN, PE
MITCH BALESI
2RW CONSULTING
DONNA SHEBAT, PE
REBECCA BISKADUROS
MCMULLAN & ASSOCIATES
5QUINN EVANS ARCHITECTS|Washington, DC
PROJECT SCHEDULE
6QUINN EVANS ARCHITECTS|Washington, DC
FINAL DESIGNSTRATEGIES TO INCREASE CAPACITY
INCREASE CLASSROOM UTILIZATION TO 6/7
PERIODS PER DAY.
PROVIDE FLEXIBLE TEACHER WORK SPACES
OUTSIDE OF CLASSROOMS.
CAPTURE UNDERUTILIZED SPACES AND CONVERT
TO CLASSROOMS AND WORKROOMS.
INCREASE FUNCTIONALITY OF AREAS OUTSIDE
CLASSROOMS.
7QUINN EVANS ARCHITECTS|Washington, DC
FINAL DESIGNDESIGN SUMMARY
INCREASES BUILDING CAPACITY BY 310 STUDENTS,
FROM 1,879 TO 2,189.
ADD SPECIAL ED. SUITE ON FIRST FLOOR TO
CONSOLIDATE SERVICES.
CREATE SMALL WORKROOMS AND CONFERENCE
ROOMS THROUGHOUT BUILDING FOR FLEXIBLE WORK
MODES.
CONVERT UNDERUTILIZED SPACES TO CLASSROOMS.
PROVIDE COUNTERS WITH CHARGING STATIONS AND
FURNISHINGS IN INFORMAL GATHERING SPACES.
ADD GYM DIVIDER CURTAINS FOR INCREASED
FUNCTIONALITY.
OVERALL GAIN: 5 SP. ED. WORKSTATIONS 5 ADMIN WORKSTATIONS 3 MEETING / LOUNGE AREAS 1 SPEC. ED RESOURCE ROOM
2 WORKROOMS 4 DROP-INS 1 GEN. SCIENCE CLASSROOM 3 GENERAL CLASSROOMS
QUINN EVANS ARCHITECTS|Washington, DC
FINAL DESIGNPRECEDENTS
A. MODULAR LOUNGE SEATINGB. DROP-IN WORKSPACESC. LOCKABLE TEACHER STORAGED. GYM DIVIDER CURTAINE. COUNTER SEATING & CHARGING
8
A
B C
D E
QUINN EVANS ARCHITECTS|Washington, DC
FINAL DESIGN1ST FLOOR – OVERALL PLAN
9
10. CONVERT COPY ROOM & WORKROOM INTO SPECIAL EDUCATION SUITE
11. CONVERT COMPUTER ALCOVE TO GENERAL CLASSROOM
12. PROVIDING ACCESSIBLE TOILET IN LIFE SKILLS CLASSROOM
13. CONVERT STORAGE INTO BIKE STORAGE
14. ADD CHARGING STATIONS AND WALK-UP COUNTERS IN CAFETERIA
15. ADD CHARGING STATIONS AND WALK-UP COUNTERS IN ATRIUM
16. ADD FOLD-UP DIVIDER CURTAINS IN MAIN GYM
17. ADD FOLD-UP DIVIDER CURTAIN IN AUX. GYM
18. REPLACE EXISTING GYM LOCKERS
QUINN EVANS ARCHITECTS|Washington, DC
FINAL DESIGN2nd FLOOR – OVERALL PLAN
10
20. PROVIDE TEACHER WORKROOM AND DROP-IN AT NEIGHBORHOOD COMMONS
21. CONVERT SPECIAL EDUCATION OFFICES & CONFERENCE INTO SPECIAL EDUCATION RESOURCE ROOM
22. ADD CHARGING STATIONS & WALK-UP COUNTERS IN NORTH CORRIDOR
23. RE-PURPOSE OFFICES & CREATE ADDITIONAL OFFICE
24. ADD CHARGING STATIONS AND WALK-UP COUNTER IN EAST CORRIDOR
25. CONVERT SPECIAL EDUCATION WORKROOM & CLASSROOM INTO LARGE SCIENCE CLASSROOM
26. PROVIDE LOUNGE SEATING IN SCIENCE COMMONS
QUINN EVANS ARCHITECTS|Washington, DC
FINAL DESIGN3rd FLOOR – OVERALL PLAN
11
30. CONVERT TEACHER WORKROOM INTO GENERAL CLASSROOM
31. CONVERT SPECIAL EDUCATION WORKROOM INTO GENERAL CLASSROOM
32. CREATE MEETING ROOM & DROP-IN AT COMMONS
33. CONVERT EXISTING COMPUTER LAB & CLASSROOM INTO GENERAL CLASSROOMS
34. ADD CHARGING STATIONS & WALK-UP COUNTER IN EAST CORRIDOR
35. PROVIDE LOUNGE SEATING IN SCIENCE COMMONS
36. ADD OFFICE & LARGE MEETING ROOM IN TEACHER LOUNGE
37. CONVERT WORKROOM & OFFICE INTO PROFESSIONAL LEARNING COMMUNITY & DROP-IN
QUINN EVANS ARCHITECTS|Washington, DC
PROJECT ESTIMATE & FUNDING
12
PROJECT ESTIMATE CONSTRUCTION COSTS $2,175,000 OWNER (SOFT) COSTS $1,500,000 CONTINGENCY $ 325,000 TOTAL PROJECT COST $4,000,000
PROJECT FUNDING CAPITAL RESERVE* $4,000,000
*Funds allocated from Capital Reserve at FY 2016 Closeout
QUINN EVANS ARCHITECTS|Washington, DC
RECOMMENDATIONS
13
APPROVE GENERAL LOCATION AND EXTENT OF INTERNAL MODIFICATIONS
APPROVE NEW BUILDING CAPACITY OF 2,189 SEATS
REAFFIRM $4 MILLION IN TOTAL FUNDING AVAILABLE FROM THE CAPITAL RESERVE
DIRECT STAFF TO SOLICIT BIDS FOR THE CONSTRUCTION WORK
THANK YOU
QUINN EVANS ARCHITECTS
QUINN EVANS ARCHITECTS|Washington, DC
WASHINGTON, DC
BALTIMORE, MD
ANN ARBOR, MI
DETROIT, MI
MADISON, WI
We s ee a be t t e r wo r l d .
Where o the rs s ee l im i t s , we s ee pos s ib i l i t i es .