FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James...

39
ID % Complete Task Mode WBS Task Name Duration Start Finish 1 99% 1 Capstone Project: CMS 65 days Mon 1/6/20 Fri 4/3/20 2 100% 1.1 Hardware Configuration 2 days Thu 1/9/20 Fri 1/10/20 3 100% 1.1.1 Hardware Collection 2 days Thu 1/9/20 Fri 1/10/20 4 100% 1.1.1.1 Compile Hardware List 8 hrs Thu 1/9/20 Thu 1/9/20 5 100% 1.1.1.2 Submit Hardware List 8 hrs Thu 1/9/20 Thu 1/9/20 6 100% 1.1.1.3 Collect Hardware 16 hrs Thu 1/9/20 Fri 1/10/20 7 100% 1.1.1.4 M: Hardware Collected 0 days Thu 1/9/20 Thu 1/9/20 8 100% 1.1.2 Corporate Side Hardware Set-Up 0.75 days Thu 1/9/20 Thu 1/9/20 9 100% 1.1.2.1 Connect Peripheral Devices (Monitor, Keyboard, Mouse) 1 hr Thu 1/9/20 Thu 1/9/20 10 100% 1.1.2.2 Run diagnostic tests to determine device functionality, perform device cleanup 2 hrs Thu 1/9/20 Thu 1/9/20 11 100% 1.1.2.3 Install WS 2016 Datacenter OS image 1 hr Thu 1/9/20 Thu 1/9/20 12 100% 1.1.2.4 Perform housekeeping configurations (hostname, static IPs, etc.) 1 hr Thu 1/9/20 Thu 1/9/20 13 100% 1.1.2.5 Test hardware configuration 1 hr Thu 1/9/20 Thu 1/9/20 18 23 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Progress Manual Progress Page 1 Project: FINAL Capstone Projec Date: Fri 4/3/20

Transcript of FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James...

Page 1: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

1 99% 1 Capstone Project: CMS 65 days Mon 1/6/20 Fri 4/3/20

2 100% 1.1 Hardware Configuration 2 days Thu 1/9/20 Fri 1/10/20

3 100% 1.1.1 Hardware Collection 2 days Thu 1/9/20 Fri 1/10/20

4 100% 1.1.1.1 Compile Hardware List 8 hrs Thu 1/9/20 Thu 1/9/20

5 100% 1.1.1.2 Submit Hardware List 8 hrs Thu 1/9/20 Thu 1/9/20

6 100% 1.1.1.3 Collect Hardware 16 hrs Thu 1/9/20 Fri 1/10/20

7 100% 1.1.1.4 M: Hardware Collected 0 days Thu 1/9/20 Thu 1/9/20

8 100% 1.1.2 Corporate Side Hardware Set-Up 0.75 days Thu 1/9/20 Thu 1/9/20

9 100% 1.1.2.1 Connect Peripheral Devices (Monitor, Keyboard, Mouse)

1 hr Thu 1/9/20 Thu 1/9/20

10 100% 1.1.2.2 Run diagnostic tests to determine device functionality, perform device cleanup

2 hrs Thu 1/9/20 Thu 1/9/20

11 100% 1.1.2.3 Install WS 2016 Datacenter OS image 1 hr Thu 1/9/20 Thu 1/9/20

12 100% 1.1.2.4 Perform housekeeping configurations (hostname, static IPs, etc.)

1 hr Thu 1/9/20 Thu 1/9/20

13 100% 1.1.2.5 Test hardware configuration 1 hr Thu 1/9/20 Thu 1/9/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 1

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 2: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

14 100% 1.1.2.6 M: Hardware successfully configured 0 days Thu 1/9/20 Thu 1/9/20

15 100% 1.1.3 Client Side Hardware Set-Up 0.75 days Fri 1/10/20 Fri 1/10/20

16 100% 1.1.3.1 Connect Peripheral Devices (Monitor, Keyboard, Mouse)

1 hr Fri 1/10/20 Fri 1/10/20

17 100% 1.1.3.2 Run diagnostic tests to determine device functionality, perform device cleanup

2 hrs Fri 1/10/20 Fri 1/10/20

18 100% 1.1.3.3 Install WS 2016 Datacenter OS image 1 hr Fri 1/10/20 Fri 1/10/20

19 100% 1.1.3.4 Perform housekeeping configurations (hostname, static IPs, etc.)

1 hr Fri 1/10/20 Fri 1/10/20

20 100% 1.1.3.5 Test hardware configuration 1 hr Fri 1/10/20 Fri 1/10/20

21 100% 1.1.3.6 M: Hardware successfully configured 0 days Fri 1/10/20 Fri 1/10/20

22 100% 1.1.4 M: Hardware set up completed 0 days Fri 1/10/20 Fri 1/10/20

23 100% 1.2 Network Configuration 10.25 days Fri 1/10/20 Fri 1/24/20

24 100% 1.2.1 Construct Network Topology 3.5 days Fri 1/10/20 Thu 1/16/20

25 100% 1.2.1.1 Draft network diagram 1 day Fri 1/10/20 Mon 1/13/20

26 100% 1.2.1.2 Decide subnets 2 hrs Mon 1/13/20Mon 1/13/20

27 100% 1.2.1.3 Determine IP addresses 2 hrs Tue 1/14/20 Tue 1/14/20

28 100% 1.2.1.4 Implement Network Configuration 2 days Tue 1/14/20 Thu 1/16/20

29 100% 1.2.1.5 M: Network Topology created 0 days Thu 1/16/20 Thu 1/16/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 2

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 3: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

30 100% 1.2.2 Configure Network Hardware 6.75 days Thu 1/16/20 Fri 1/24/20

31 100% 1.2.2.1 Set up Switch & Router 6.75 days Thu 1/16/20 Fri 1/24/20

32 100% 1.2.2.1.1 Configure network connection 2 hrs Thu 1/16/20 Thu 1/16/20

33 100% 1.2.2.1.2 Implement network security 4 hrs Thu 1/16/20 Thu 1/16/20

34 100% 1.2.2.1.3 Configure additional Router and Switch Settings

48 hrs Fri 1/17/20 Fri 1/24/20

35 100% 1.2.2.1.4 Verify network configurations 0 hrs Fri 1/24/20 Fri 1/24/20

36 100% 1.2.2.1.5 Test network connectivity 0 hrs Fri 1/24/20 Fri 1/24/20

37 100% 1.2.2.1.6 Test network security 0 days Fri 1/24/20 Fri 1/24/20

38 100% 1.2.2.1.7 M: Network Hardware configuration completed0 days Fri 1/24/20 Fri 1/24/20

39 100% 1.2.3 Create VLAN 7 days Thu 1/16/20 Fri 1/24/20

40 100% 1.2.3.1 Design subnets 2 hrs Thu 1/16/20 Thu 1/16/20

41 100% 1.2.3.2 Generate VLANs 16 hrs Thu 1/16/20 Fri 1/17/20

42 100% 1.2.3.3 Manage trunking configuration 56 hrs Thu 1/16/20 Fri 1/24/20

43 100% 1.2.3.4 Implement VLAN configuration to Router &Switch

7 days Thu 1/16/20 Fri 1/24/20

44 100% 1.2.3.5 Test network connectivity 6 days Fri 1/17/20 Fri 1/24/20

45 100% 1.2.3.6 M: Successfully created VLANs 0 days Fri 1/24/20 Fri 1/24/20

46 100% 1.2.4 M: Network configuration successfully completed

0 days Mon 1/20/20

Mon 1/20/20

47 100% 1.3 Client Side Server Services 11.88 days Thu 1/16/20 Fri 1/31/20

48 100% 1.3.1 Hyper-V Set Up 2 days Thu 1/16/20 Fri 1/17/20

49 100% 1.3.1.1 Install Hyper-V Role on Windows Server 2016

2 hrs Thu 1/16/20 Thu 1/16/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 3

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 4: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

50 100% 1.3.1.2 Configure Hyper-V services 2 days Thu 1/16/20 Fri 1/17/20

51 100% 1.3.1.3 Test Hyper-V configuration 0 hrs Fri 1/17/20 Fri 1/17/20

52 100% 1.3.1.4 M: Hyper-V successfully configured 0 days Fri 1/17/20 Fri 1/17/20

53 100% 1.3.2 Client A: Active Directory Set Up 3 days Fri 1/17/20 Tue 1/21/20

54 100% 1.3.2.1 Create virtual machine for Active Directory 2 hrs Fri 1/17/20 Fri 1/17/20

55 100% 1.3.2.2 Install Active Directory Domain Services Role on Windows Server 2016

1 hr Fri 1/17/20 Mon 1/20/20

56 100% 1.3.2.3 Configure domain/forest for client A 2 hrs Fri 1/17/20 Tue 1/21/20

57 100% 1.3.2.4 Configure AD structure: Users, OUs, Groups, etc.

1 hr Fri 1/17/20 Tue 1/21/20

58 100% 1.3.2.5 Test Active Directory configurations 1 hr Fri 1/17/20 Tue 1/21/20

59 100% 1.3.2.6 M: Active Directory and Client A domain successfully configured

0 days Tue 1/21/20 Tue 1/21/20

60 100% 1.3.3 Client A: Remote Desktop Services Set Up 2 days Thu 1/23/20 Fri 1/24/20

61 100% 1.3.3.1 Create virtual machines for RDS 2 hrs Thu 1/23/20 Thu 1/23/20

62 100% 1.3.3.2 Install RDS Roles on Windows Server 2016 16 hrs Thu 1/23/20 Fri 1/24/20

63 100% 1.3.3.3 Configure RDS infrastructure 3 hrs Fri 1/24/20 Fri 1/24/20

64 100% 1.3.3.4 Test RDS Configurations 1 hr Fri 1/24/20 Fri 1/24/20

65 100% 1.3.3.5 M: Remote Desktop Services successfully configured

0 days Fri 1/24/20 Fri 1/24/20

66 100% 1.3.4 Client B: Active Directory Set Up 0.25 days Fri 1/24/20 Fri 1/24/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 4

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 5: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

67 100% 1.3.4.1 Create virtual machine for Active Directory 2 hrs Fri 1/24/20 Fri 1/24/20

68 100% 1.3.4.2 Install Active Directory Domain Services Role on Windows Server 2016

1 hr Fri 1/24/20 Fri 1/24/20

69 100% 1.3.4.3 Configure domain/forest for client B 1 hr Fri 1/24/20 Fri 1/24/20

70 100% 1.3.4.4 Configure AD structure: Users, OUs, Groups, etc.

2 hrs Fri 1/24/20 Fri 1/24/20

71 100% 1.3.4.5 Test Active Directory configurations 1 hr Fri 1/24/20 Fri 1/24/20

72 100% 1.3.4.6 M: Active Directory and Client B domain successfully configured

0 days Fri 1/24/20 Fri 1/24/20

73 100% 1.3.5 Client B: Remote Desktop Services Set Up 4.13 days Fri 1/24/20 Thu 1/30/20

74 100% 1.3.5.1 Create virtual machines for RDS 3 hrs Fri 1/24/20 Fri 1/24/20

75 100% 1.3.5.2 Install RDS Roles on Windows Server 2016 5 hrs Fri 1/24/20 Fri 1/24/20

76 100% 1.3.5.3 Configure RDS infrastructure 1 day Fri 1/24/20 Mon 1/27/20

77 100% 1.3.5.4 Test RDS Configurations 1 hr Thu 1/30/20 Thu 1/30/20

78 100% 1.3.5.5 M: Remote Desktop Services successfully configured

0 days Thu 1/30/20 Thu 1/30/20

79 100% 1.3.6 Client C: Active Directory Set Up 0.88 days Thu 1/30/20 Thu 1/30/20

80 100% 1.3.6.1 Create virtual machine for Active Directory 2 hrs Thu 1/30/20 Thu 1/30/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 5

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 6: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

81 100% 1.3.6.2 Install Active Directory Domain Services Role on Windows Server 2016

1 hr Thu 1/30/20 Thu 1/30/20

82 100% 1.3.6.3 Configure domain/forest for client C 1 hr Thu 1/30/20 Thu 1/30/20

83 100% 1.3.6.4 Configure AD structure: Users, OUs, Groups, etc.

2 hrs Thu 1/30/20 Thu 1/30/20

84 100% 1.3.6.5 Test Active Directory configurations 1 hr Thu 1/30/20 Thu 1/30/20

85 100% 1.3.6.6 M: Active Directory and Client C domain successfully configured

0 days Thu 1/30/20 Thu 1/30/20

86 100% 1.3.7 Client C: Remote Desktop Services Set Up 0.88 days Fri 1/31/20 Fri 1/31/20

87 100% 1.3.7.1 Create virtual machines for RDS 2 hrs Fri 1/31/20 Fri 1/31/20

88 100% 1.3.7.2 Install RDS Roles on Windows Server 2016 2 hrs Fri 1/31/20 Fri 1/31/20

89 100% 1.3.7.3 Configure RDS infrastructure 2 hrs Fri 1/31/20 Fri 1/31/20

90 100% 1.3.7.4 Test RDS Configurations 1 hr Fri 1/31/20 Fri 1/31/20

91 100% 1.3.7.5 M: Remote Desktop Services successfully configured

0 days Fri 1/31/20 Fri 1/31/20

92 100% 1.3.8 M: Client(s) Server Services set up completed 0 days Fri 1/31/20 Fri 1/31/20

93 100% 1.4 Corporate Side Server Services 5 days Fri 1/31/20 Fri 2/7/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 6

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 7: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

94 100% 1.4.1 Hyper-V Set Up 0.38 days Fri 1/31/20 Fri 1/31/20

95 100% 1.4.1.1 Install Hyper-V Role on Windows Server 2016

2 hrs Fri 1/31/20 Fri 1/31/20

96 100% 1.4.1.2 Configure Hyper-V services 1 hr Fri 1/31/20 Fri 1/31/20

97 100% 1.4.1.3 Test Hyper-V configuration 1 hr Fri 1/31/20 Fri 1/31/20

98 100% 1.4.1.4 M: Hyper-V successfully configured 0 days Fri 1/31/20 Fri 1/31/20

99 100% 1.4.2 Corporate: Active Directory Set Up 0.38 days Thu 2/6/20 Thu 2/6/20

100 100% 1.4.2.1 Create virtual machine for Active Directory 2 hrs Thu 2/6/20 Thu 2/6/20

101 100% 1.4.2.2 Install Active Directory Domain Services Role on Windows Server 2016

1 hr Thu 2/6/20 Thu 2/6/20

102 100% 1.4.2.3 Configure domain/forest for organization 1 hr Thu 2/6/20 Thu 2/6/20

103 100% 1.4.2.4 Configure AD structure: Users, OUs, Groups, etc.

1 hr Thu 2/6/20 Thu 2/6/20

104 100% 1.4.2.5 Test Active Directory configurations 1 hr Thu 2/6/20 Thu 2/6/20

105 100% 1.4.2.6 M: Active Directory and organization domain successfully configured

0 days Thu 2/6/20 Thu 2/6/20

106 100% 1.4.3 Corporate: Apache Web Server Set Up 0.88 days Thu 2/6/20 Thu 2/6/20

107 100% 1.4.3.1 Create virtual machine for web server 2 hrs Thu 2/6/20 Thu 2/6/20

108 100% 1.4.3.2 Install WAMPServer on Windows Server 2016

1 hr Thu 2/6/20 Thu 2/6/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 7

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 8: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

109 100% 1.4.3.3 Configure WAMPServer Apache settings: virtual hosts, access, SSL set up, etc.

3 hrs Thu 2/6/20 Thu 2/6/20

110 100% 1.4.3.4 Test WAMPServer configurations 1 hr Thu 2/6/20 Thu 2/6/20

111 100% 1.4.3.5 M: Apache Web Server successfully configured

0 days Thu 2/6/20 Thu 2/6/20

112 100% 1.4.4 Corporate: mySQL Database Set Up 1 day Thu 2/6/20 Thu 2/6/20

113 100% 1.4.4.1 Create virtual machine for web server 2 hrs Thu 2/6/20 Thu 2/6/20

114 100% 1.4.4.2 Install WAMPServer on Windows Server 2016

1 hr Thu 2/6/20 Thu 2/6/20

115 100% 1.4.4.3 Configure WAMPServer mySQL settings: access, SSL set up, etc.

2 hrs Thu 2/6/20 Thu 2/6/20

116 100% 1.4.4.4 Create database structure 2 hrs Thu 2/6/20 Thu 2/6/20

117 100% 1.4.4.5 Test WAMPServer configurations 1 hr Thu 2/6/20 Thu 2/6/20

118 100% 1.4.4.6 M: mySQL Database successfully configured

0 days Thu 2/6/20 Thu 2/6/20

119 100% 1.4.5 M: Corporate Server Services set up completed

0 days Fri 2/7/20 Fri 2/7/20

120 100% 1.5 Web Application Set Up 29.13 days Mon 2/3/20 Fri 3/13/20

121 100% 1.5.1 PowerShell Scripting 20.13 days Mon 2/3/20 Mon 3/2/20

122 100% 1.5.1.1 Develop PowerShell script to batch create user accounts for each client

3 days Mon 2/3/20 Wed 2/5/20

123 100% 1.5.1.2 Test account creation PowerShell script 1 hr Thu 2/6/20 Thu 2/6/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 8

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 9: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

124 100% 1.5.1.3 Develop PowerShell script to retrieve user account info from client's Active Directory for password notification

2 days Fri 2/14/20 Mon 2/17/20

125 100% 1.5.1.4 Test account info retrieval PowerShell script

1 hr Fri 2/14/20 Fri 2/14/20

126 100% 1.5.1.5 Develop PowerShell script to configure Auto Login to Remote Desktop Services forclients

2 days Thu 2/27/20 Fri 2/28/20

127 100% 1.5.1.6 Test Auto Login PowerShell script 1 hr Mon 3/2/20 Mon 3/2/20

128 100% 1.5.1.7 M: PowerShell scripts completed 0 days Mon 3/2/20 Mon 3/2/20

129 100% 1.5.2 mySQL Database Set Up 8.25 days Fri 2/7/20 Wed 2/19/20

130 100% 1.5.2.1 Design database structure 2 hrs Fri 2/7/20 Fri 2/7/20

131 100% 1.5.2.2 Configure database structure 3 days Fri 2/7/20 Wed 2/12/20

132 100% 1.5.2.3 Test and verify database structure 1 hr Fri 2/14/20 Fri 2/14/20

133 100% 1.5.2.4 Integrate database with PowerShell scripts 3 days Fri 2/14/20 Wed 2/19/20

134 100% 1.5.2.5 Test PowerShell integration 1 hr Wed 2/19/20Wed 2/19/20

135 100% 1.5.2.6 M: mySQL Database successfully configured

0 days Wed 2/19/20

Wed 2/19/20

136 100% 1.5.3 Web Application Pages 19.13 days Mon 2/17/20Fri 3/13/20

137 100% 1.5.3.1 Application Login Page 6.13 days Mon 2/17/20Tue 2/25/20

138 100% 1.5.3.1.1 Design web page structure 2 days Mon 2/17/20Tue 2/18/20

139 100% 1.5.3.1.2 Develop and code HTML structure for web page

2 days Wed 2/19/20

Thu 2/20/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 9

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 10: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

140 100% 1.5.3.1.3 Develop and code PHP elements for webpage

2 days Fri 2/21/20 Mon 2/24/20

141 100% 1.5.3.1.4 Test login page functionality 1 hr Tue 2/25/20 Tue 2/25/20

142 100% 1.5.3.1.5 M: Login Page completed 0 days Tue 2/25/20 Tue 2/25/20

143 100% 1.5.3.2 Request Credentials Page 6.13 days Fri 2/21/20 Mon 3/2/20

144 100% 1.5.3.2.1 Design web page structure 2 days Fri 2/21/20 Mon 2/24/20

145 100% 1.5.3.2.2 Develop and code HTML structure for web page

2 days Tue 2/25/20 Wed 2/26/20

146 100% 1.5.3.2.3 Develop and code PHP elements for webpage

2 days Thu 2/27/20 Fri 2/28/20

147 100% 1.5.3.2.4 Test request page functionality 1 hr Mon 3/2/20 Mon 3/2/20

148 100% 1.5.3.2.5 M: Request Page completed 0 days Mon 3/2/20 Mon 3/2/20

149 100% 1.5.3.3 Account and Password Status Page 6.13 days Mon 3/2/20 Tue 3/10/20

150 100% 1.5.3.3.1 Design web page structure 2 days Mon 3/2/20 Tue 3/3/20

151 100% 1.5.3.3.2 Develop and code HTML structure for web page

2 days Wed 3/4/20 Thu 3/5/20

152 100% 1.5.3.3.3 Develop and code PHP elements for webpage

2 days Fri 3/6/20 Mon 3/9/20

153 100% 1.5.3.3.4 Test status page functionality 1 hr Tue 3/10/20 Tue 3/10/20

154 100% 1.5.3.3.5 M: Status Page completed 0 days Tue 3/10/20 Tue 3/10/20

155 100% 1.5.3.4 User Credentials Page 5 days Thu 3/5/20 Wed 3/11/20

156 100% 1.5.3.4.1 Design web page structure 1 day Thu 3/5/20 Thu 3/5/20

157 100% 1.5.3.4.2 Develop and code HTML structure for web page

2 days Thu 3/5/20 Fri 3/6/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 10

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 11: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

158 100% 1.5.3.4.3 Develop and code PHP elements for webpage

3 days Mon 3/9/20 Wed 3/11/20

159 100% 1.5.3.4.4 Test credentials page functionality 1 hr Wed 3/11/20Wed 3/11/20

160 100% 1.5.3.4.5 M: Credentials Page completed 0 days Wed 3/11/20Wed 3/11/20

161 100% 1.5.3.5 Account Reset Page 5 days Thu 3/5/20 Wed 3/11/20

162 100% 1.5.3.5.1 Design web page structure 1 day Thu 3/5/20 Thu 3/5/20

163 100% 1.5.3.5.2 Develop and code HTML structure for web page

2 days Fri 3/6/20 Mon 3/9/20

164 100% 1.5.3.5.3 Develop and code PHP elements for webpage

3 days Tue 3/10/20 Thu 3/12/20

165 100% 1.5.3.5.4 Test credentials page functionality 1 hr Fri 3/13/20 Fri 3/13/20

166 100% 1.5.3.5.5 M: Credentials Page completed 0 days Fri 3/13/20 Fri 3/13/20

167 100% 1.5.3.6 M: Web Application Pages completed 0 days Fri 3/13/20 Fri 3/13/20

168 100% 1.5.4 M: Web Application Set Up successfully completed0 days Fri 3/13/20 Fri 3/13/20

169 100% 1.6 Client Side Security Set Up 30.25 days Fri 2/7/20 Fri 3/20/20

170 100% 1.6.1 Create virtual machine for pfSense 2 hrs Fri 2/7/20 Fri 2/7/20

171 100% 1.6.2 Install pfSense 1 hr Fri 2/7/20 Fri 2/7/20

172 100% 1.6.3 Open essential services ports 1 hr Fri 2/7/20 Thu 3/19/20

173 100% 1.6.4 Configure firewall and NAT rules 1 hr Fri 2/7/20 Thu 3/19/20

174 100% 1.6.5 Configure site-to-site VPN using IPSec 1 hr Thu 2/13/20 Thu 2/13/20

175 100% 1.6.6 Test site-to-site VPN connections 1 hr Thu 2/13/20 Thu 2/13/20

176 100% 1.6.7 Perform penetration and functionality tests 2 hrs Fri 3/20/20 Fri 3/20/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 11

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 12: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

177 100% 1.6.8 M: Security settings successfully configured 0 days Fri 3/20/20 Fri 3/20/20

178 100% 1.7 Corporate Side Security Set Up 35.25 days Fri 2/7/20 Fri 3/27/20

179 100% 1.7.1 Create virtual machine for pfSense 2 hrs Fri 2/7/20 Fri 2/7/20

180 100% 1.7.2 Install pfSense 1 hr Fri 2/7/20 Fri 2/7/20

181 100% 1.7.3 Open essential services ports 1 hr Fri 2/7/20 Fri 2/7/20

182 100% 1.7.4 Configure firewall and NAT rules 1 hr Fri 2/7/20 Fri 2/7/20

183 100% 1.7.5 Configure site-to-site VPN using IPSec 1 hr Fri 2/7/20 Fri 2/7/20

184 100% 1.7.6 Test site-to-site VPN connections 1 hr Fri 2/7/20 Fri 2/7/20

185 100% 1.7.7 Configure client-to-site VPN using OpenVPN 4 hrs Thu 2/27/20 Thu 2/27/20

186 100% 1.7.8 Test client-to-site VPN connection 1 hr Fri 3/6/20 Fri 3/6/20

187 100% 1.7.9 Perform penetration and functionality tests 2 hrs Fri 3/27/20 Fri 3/27/20

188 100% 1.7.10 M: Security settings successfully configured 0 days Fri 3/27/20 Fri 3/27/20

189 100% 1.8 Documentation 6 days Thu 3/26/20 Thu 4/2/20

190 100% 1.8.1 Develop User Manual 6 days Thu 3/26/20 Thu 4/2/20

191 100% 1.8.2 Develop Administrator Manual 6 days Thu 3/26/20 Thu 4/2/20

192 100% 1.8.3 Develop Final Project Report 6 days Thu 3/26/20 Thu 4/2/20

193 100% 1.8.4 Develop Final Project Presentation PowerPoint

6 days Thu 3/26/20 Thu 4/2/20

194 100% 1.8.5 M: Documentation completed 0 days Tue 3/31/20 Tue 3/31/20

195 75% 1.9 Wrap-Up Meeting 6 days Fri 3/27/20 Fri 4/3/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 12

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 13: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

ID % Complete Task

Mode

WBS Task Name Duration Start Finish

196 100% 1.9.1 Plan Wrap-Up Meeting 1 hr Fri 3/27/20 Fri 3/27/20

197 0% 1.9.2 Attend Meeting 0.02 days Fri 4/3/20 Fri 4/3/20

198 0% 1.9.2.1 Agenda Adoption 1 min Fri 4/3/20 Fri 4/3/20

199 0% 1.9.2.2 Meeting Minutes Adoption 1 min Fri 4/3/20 Fri 4/3/20

200 0% 1.9.2.3 Deliver Final Product 11 mins Fri 4/3/20 Fri 4/3/20

201 0% 1.9.2.4 Project Debrief 7 mins Fri 4/3/20 Fri 4/3/20

202 0% 1.9.2.5 M: Wrap-Up Meeting Completed 0 days Fri 4/3/20 Fri 4/3/20

203 0% 1.9.3 M: Meetings completed 0 days Fri 4/3/20 Fri 4/3/20

204 0% 1.10 M: Capstone Project Completed 0 days Fri 4/3/20 Fri 4/3/20

18 23 28

November 2019

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 13

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 14: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

James Mathew Nefulda

Nino Angelo Cubero

1/9

Al George Regaspi

Al George Regaspi

Al George Regaspi

Al George Regaspi

Al George Regaspi

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 14

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 15: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

1/9

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/10

1/10

Al George Regaspi

Al George Regaspi

Al George Regaspi

Al George Regaspi

1/16

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 15

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 16: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

Al George Regaspi

Al George Regaspi

Al George Regaspi

1/24

1/24

1/24

1/24

Al George Regaspi

Al George Regaspi

Al George Regaspi

Al George Regaspi

Al George Regaspi

1/24

1/20

James Mathew Nefulda

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 16

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 17: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

1/17

1/17

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/21

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/24

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 17

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 18: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/24

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/30

James Mathew Nefulda

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 18

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 19: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/30

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/31

1/31

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 19

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 20: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/31

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

2/6

James Mathew Nefulda

James Mathew Nefulda

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 20

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 21: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

James Mathew Nefulda

2/6

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

2/6

2/7

Nino Angelo Cubero

Nino Angelo Cubero

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 21

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 22: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

3/2

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

2/19

Nino Angelo Cubero

Nino Angelo Cubero

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 22

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 23: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

Nino Angelo Cubero

Nino Angelo Cubero

2/25

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

3/2

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

3/10

Nino Angelo Cubero

Nino Angelo Cubero

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 23

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 24: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

Nino Angelo Cubero

Nino Angelo Cubero

3/11

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

3/13

3/13

3/13

James Mathew Nefulda

James Mathew Nefulda

Al George Regaspi

Al George Regaspi

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 24

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 25: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

3/20

James Mathew Nefulda

James Mathew Nefulda

Al George Regaspi

Al George Regaspi

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

3/27

Nino Angelo Cubero

James Mathew Nefulda

James Mathew Nefulda

Al George Regaspi

3/31

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 25

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 26: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

Al George Regaspi,James Mathew Nefulda,Nino Angelo Cubero

Al George Regaspi,James Mathew Nefulda,Nino Angelo Cubero

Al George Regaspi,James Mathew Nefulda,Nino Angelo Cubero

Al George Regaspi,James Mathew Nefulda,Nino Angelo Cubero

Al George Regaspi,James Mathew Nefulda,Nino Angelo Cubero

4/3

4/3

4/3

28 3 8 13 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2

November 2019 December 2019 January 2020 February 2020 March 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 26

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 27: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

James Mathew Nefulda

Nino Angelo Cubero

1/9

Al George Regaspi

Al George Regaspi

Al George Regaspi

Al George Regaspi

Al George Regaspi

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 27

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 28: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

1/9

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/10

1/10

Al George Regaspi

Al George Regaspi

Al George Regaspi

Al George Regaspi

1/16

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 28

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 29: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

Al George Regaspi

Al George Regaspi

Al George Regaspi

1/24

1/24

1/24

1/24

Al George Regaspi

Al George Regaspi

Al George Regaspi

Al George Regaspi

Al George Regaspi

1/24

1/20

James Mathew Nefulda

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 29

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 30: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

1/17

1/17

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/21

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/24

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 30

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 31: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/24

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/30

James Mathew Nefulda

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 31

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 32: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/30

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/31

1/31

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 32

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 33: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

1/31

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

2/6

James Mathew Nefulda

James Mathew Nefulda

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 33

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 34: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

James Mathew Nefulda

James Mathew Nefulda

2/6

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

2/6

2/7

Nino Angelo Cubero

Nino Angelo Cubero

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 34

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 35: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

3/2

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

2/19

Nino Angelo Cubero

Nino Angelo Cubero

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 35

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 36: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

Nino Angelo Cubero

Nino Angelo Cubero

2/25

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

3/2

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

Nino Angelo Cubero

3/10

Nino Angelo Cubero

Nino Angelo Cubero

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 36

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 37: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

Nino Angelo Cubero

Nino Angelo Cubero

3/11

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

3/13

3/13

3/13

James Mathew Nefulda

James Mathew Nefulda

Al George Regaspi

Al George Regaspi

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 37

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 38: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

3/20

James Mathew Nefulda

James Mathew Nefulda

Al George Regaspi

Al George Regaspi

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

James Mathew Nefulda

3/27

Nino Angelo Cubero

James Mathew Nefulda

James Mathew Nefulda

Al George Regaspi

3/31

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 38

Project: FINAL Capstone Projec

Date: Fri 4/3/20

Page 39: FINAL Capstone Project Gantt - proj354.com · Title: FINAL Capstone Project Gantt Author: James Mathew Nefulda Created Date: 4/3/2020 7:21:03 AM

Al George Regaspi,James Mathew Nefulda,Nino Angelo Cubero

Al George Regaspi,James Mathew Nefulda,Nino Angelo Cubero

Al George Regaspi,James Mathew Nefulda,Nino Angelo Cubero

Al George Regaspi,James Mathew Nefulda,Nino Angelo Cubero

Al George Regaspi,James Mathew Nefulda,Nino Angelo Cubero

4/3

4/3

4/3

2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5

March 2020 April 2020 May 2020 June 2020

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 39

Project: FINAL Capstone Projec

Date: Fri 4/3/20