Your working platform must provide a stable working surface for all plant used on the site. Optimised design for your specific requirements leads to economical platforms. We can complete your design with- out fuss and fast minimising project delay. Design and installation of temporary working platforms, as with any tempo- rary works, must be undertaken in ac- cordance with BS 5975. But we understand that you will want the most economical solution possible, commensurate with the required level of safety. Our expertise covers granular and reinforced mats, cement stabilized or hydraulically bound solutions, includ- ing the re-use of onsite materials (where appropriate). Our experience with working design and in developing industry best practice makes us the preferred designer of working platforms for many contractors. We can also assist in determining plant loading, and linked with our expertise in ground improvement and slope stability we can help you find efficient solutions even for the most challenging site condi- tions. CASE STUDY A redevelopment site on an old sand quarry had single size sand as the working platform which completely degraded in the wet, Fig A above. Using on-site material a cement stabilised platform was provided which performed in very wet conditions for the lifetime of the development construction Fig B. Figure A Running surface degraded Figure B Cement stabilised platform designed to perform in all weathers. Platform design & slope stability Reinforced platforms can bring savings Use of modern design methods Developed revised FPS Rig Bearing Pressure Tool CONTACT US London & Midlands 0207 206 2576 01788 211778 North & Scotland 01423 589500 [email protected] www.remedygeotechnics.com Follow Us @RemGeotechnics / LinkedIn

Transcript of Figure A - Remedy Geotechnics · cordance with BS 5975. But we understand that you will want the...

Page 1: Figure A - Remedy Geotechnics · cordance with BS 5975. But we understand that you will want the most economical solution possible, commensurate with the required level of safety.

Your working platform must provide a

stable working surface for all plant

used on the site.

Optimised design for your specific

requirements leads to economical

platforms.

We can complete your design with-

out fuss and fast minimising project

delay.

Design and installation of temporary

working platforms, as with any tempo-

rary works, must be undertaken in ac-

cordance with BS 5975.

But we understand that you will want

the most economical solution possible,

commensurate with the required level of

safety. Our expertise covers granular

and reinforced mats, cement stabilized

or hydraulically bound solutions, includ-

ing the re-use of onsite materials (where

appropriate).

Our experience with working design and

in developing industry best practice

makes us the preferred designer of

working platforms for many contractors.

We can also assist in determining plant

loading, and linked with our expertise in

ground improvement and slope stability

we can help you find efficient solutions

even for the most challenging site condi-

tions.

CASE STUDY A redevelopment site on an old sand quarry had single size

sand as the working platform which completely degraded in the wet, Fig A

above. Using on-site material a cement stabilised platform was provided

which performed in very wet conditions for the lifetime of the development

construction Fig B.

Figure A Running surface degraded

Figure B Cement stabilised platform designed to

perform in all weathers.

Platform design & slope stability

Reinforced platforms can bring savings

Use of modern design methods

Developed revised FPS Rig Bearing

Pressure Tool

CONTACT US London & Midlands

0207 206 2576 01788 211778

North & Scotland 01423 589500

[email protected] www.remedygeotechnics.com

Follow Us @RemGeotechnics / LinkedIn