Field trip in Ho Chi Minh City
1. Tide-controlling sluice gate
(Nhieu loc – Thi nghe)
3. Wastewater treatment
plant (Binh Hung)
2. Wastewater Pumping station(Nhieu loc – Thi nghe)
1. Location of Canal Nhiêu lộc – Thị nghè
Objective of this project
Prevent flood for the central of HCM city, 3.393 ha, including 7 dist. (Dist. 1, 3, 10, Bình Thạnh, Gò Vấp, Phú Nhuận, Tân Bình).
Improve the environmental landscape in the canal Nhiêu Lộc – Thị Nghè.
Location of the gate
TRẠM CỐNG KST
To control the water level at the canal NL-TL, increased by tide and flood of the Saigon river
Improve drainage efficacy of the rainy water
Keep the water level low
Function of the sluice gate
Illustration of the sluice gate
MÁY BƠM 1
Cửa phẳng
MÁY BƠM 2
MÁY BƠM 3
MÁY BƠM 4
HẦM BƠM
CỐNG NGĂN TRIỀU 1(Cửa sập)
MÁY BƠM 5
Cửa phẳng
MÁY BƠM 6
MÁY BƠM 7
MÁY BƠM 8
HẦM BƠM
CỐNG NGĂN TRIỀU 2(Cửa sập)
Hợp lưu Kênh NLTN, Rạch Văn Thánh
MẶT BẰNG TRẠM KST NL-TN
Khu vực nhà điều hành: - Cấp II 2 tầng- Kích thước nhà điều hành:7,2 x 14,4 m Cầu trên cống;- Tổng chiều dài : 112 m
Trạm biến áp 22 kV – 0,4 kV- Công suất : 2 x 1500 kVA Máy phát điện dự phòng. - Công suất : 200 kVA
- Chiều rộng : 8 m - Tải trọng: 300 KG/m2
Sewer system
wastewaterRain water
Pumping station64.000 m3/h
WWTP
Phase 1
Phase 2
Other sewer system
2. Pumping station NLTN
Pumping station NLTN
Nhà điều hành
Nhà lược rác Trạm khử mùi
Trạm cấp điện 1
12 bơm chính
Trạm cấp điện 2
Bảo vệ
Pumping station Nhiêu Lộc – Thị Nghè
Location: Xã Bình Hưng, huyện Bình Chánh, TP.HCMArea: 47ha (phase 1: 14ha)Capacity (phase 1): 141.000 m3 / ngàyAdvance activated slugde technologyLoans from Japan ODA, phase 1: 100 triệu USDCompleted on 12/2008
3. WWTP-Binh Hung
12
Wastewater treatment processWastewater treatment process
Sludge treatment
Coarse screen
Primary sedimentation tank Aerobic tank Secondary
sedimentation tankDisinfection
CentrifugationConcentrating
Sludge tank
Mixed sludge tank Centrifuge dewatering
Bánh bùn
Xe chở bùn
NaClO
Bùn tươi
Sludge recycle (25%)
Bùn dư Canal Tắc Bến Rô
influent
Effluent
Storage as fertiliser
1305/02/23
Year Area Population Capacity (m3/day)
Quality of treated water
Phase I 2008 824,8 ha 425.830 141.000 BOD ≤ 50 mg/LSS ≤ 100 mg/L
Phase II 2015 2.791,6 ha 1.421.778 469.000 BOD ≤ 50 mg/L SS ≤ 100 mg/L
Phase III 2020 2.791,6 ha 1.390.282 512.000 BOD ≤ 20 mg/L SS ≤ 50 mg/L
Design parametersDesign parameters
14
Quality of treated water
15
Safety rules in WWTP• Personal protective equipment
(helmet, cover shoe)• Notice the sign• No smoking• All go together, and follow the
guide• Donot use recycle water from
outside faucet. Only use water in the main office
16
Keep calm
Assemble at safety point
Follow the guide/leader
Do not return the dangerous area
Emergency situation