Field Modification of DCU Support Skirt-to-Vessel
Attachment Weld Geometry
By: Pedro E. Amador – VP Business Development & TechnologyDarren Barborak PhD. – Director of Materials & WeldingPatrick Lester BSWE CWI – Senior Welding Engineer
![Page 2: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/2.jpg)
Typical DCU Vessel Failure Modes
• Coker Vessels are known to be susceptible to low cycle fatigue damage
• Delayed Coking requires cyclic operation and the cyclic changes in temperature cause significant stress intensities
• Over time, as operating cycles accumulate, vessels start to experience a variety of failure modes
?
2
![Page 3: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/3.jpg)
Typical DCU Vessel Failure Modes
Bulging
Skirt Attachment Cracking
Pressure Boundary Cracking
3
![Page 4: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/4.jpg)
4
Established Practice For Shell Bulging/Cracking
Engineered Structural Overlays
• Map vessel to collect deformation data
• Evaluate stress/strain intensities with analytical tools
• Characterize highly affected areas
• Design “Structural Overlays” to address critical regions
4
![Page 5: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/5.jpg)
5
Inco 625
Engineered Structural Overlays
Established Practice For Shell Bulging/Cracking
• Install structural overlay(s) in accordance with design criteria
• Utilize automated welding processes to provide homogeneous mechanical properties and minimize volumetric and surface imperfections
5
![Page 6: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/6.jpg)
Typical Skirt Attachment Geometries1
Issues at the Skirt to Vessel Interface
1 - “Analyses of Alternate Skirt Attachments to Coke Drums” PVP Vol. 315, Leslie Antalffy et. al., ASME 1995
Cracking At Top of Skirt Attachment Weld
6
![Page 7: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/7.jpg)
Field Attachment Weld Geometry Modification
Unique Implementation Case Study
![Page 8: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/8.jpg)
Skirt Attachment Weld Stress Model
Fill Quench
8
![Page 9: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/9.jpg)
Customer Issues at the Skirt to Vessel Interface
Original Geometry1
1 - “American Petroleum Institute, Technical Report 934G” API, Washington D.C. 2014
Improved Geometry1
9
![Page 10: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/10.jpg)
• Remove portions of the existing skirt using track mounted torch cutting system
• Remove remaining skirt to vessel connection weld metal and grind flush
• Repair performed in segments around the vessel to avoid need for crane support
Step 1 – Original Skirt Removal
10
![Page 11: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/11.jpg)
Magnetic Particle Inspection of Coker Vessel Base Material
(Showing Vertically Aligned Crack)
Step 2 – Base Metal Inspection
11
![Page 12: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/12.jpg)
Removal of Flaws Detected with Magnetic Particle and LPAUT
Step 3 – Removal of Damaged Areas
12
![Page 13: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/13.jpg)
13
Step 4 – Base Material Repair Welding
• The 2-1/4 Cr Cone Base material repaired/restored to nominal using NBIC Alternative Welding Method 2 repair (Temper Bead)
• 2-1/4 Cr filler materialER80S-B3L
• After welding, the surface of the cone was ground flush
13
![Page 14: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/14.jpg)
Repair Welding of Cone Base Material
(2 Layers Required to Achieve Tempering)
Step 4 – Base Material Repair Welding
14
![Page 15: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/15.jpg)
15
Step 5 – Initial Knuckle Build-Up
• A build-up/structural overlay was deposited on the restored and unrestored surface of the cone using NBIC Alternative Welding Method 2
• Machine GMAW process and a 1-1/4 Cr filler material ER70S-B2L was used
• Two layers were applied to ensure proper bead placement and overlap
15
![Page 16: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/16.jpg)
Appearance of ER70S-B2L Deposit
(Two Layers)
Step 5 – Initial Knuckle Build-Up
16
![Page 17: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/17.jpg)
17
• A Casting Insert was installed to create the desired knuckle radius
• A temporary welding shelf was installed to support the Casting Insert and provide a bottom surface for weld tie-in
Step 6 – Installation of Proprietary Insert
17
![Page 18: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/18.jpg)
Step 6 – Installation of Proprietary Insert
Casting Insert (White) and Welding Shelf
18
![Page 19: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/19.jpg)
Casting Insert (White) and Welding Shelf
Step 6 – Installation of Proprietary Insert
19
![Page 20: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/20.jpg)
20
• With the Casting Insert the weld build-up was completed with ER70S-B2L
• NBIC Alternative Method 2 was used for this portion of the weld
• The final deposited weld metal was considered a 1-1/4Cr, P4, base metal for the remainder of the repair
Step 7 – Weld Build Up of Knuckle
20
![Page 21: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/21.jpg)
Machine Applied Knuckle Weld Deposit
Completely Covering Casting Insert
Step 7 – Weld Build Up of Knuckle
21
![Page 22: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/22.jpg)
Surface Shaping of Deposited Knuckle Weld
Step 7 – Weld Build Up of Knuckle
22
![Page 23: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/23.jpg)
23
• After sufficient build-up was deposited:▪ The Welding Shelf Was Removed
▪ The Casting Insert was removed
▪ The bottom radius was polished by grinding
▪ The front of the build-up was blended to the cone and a bevel prep was cut for the skirt attachment weld
Step 7 – Weld Build Up of Knuckle
23
![Page 24: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/24.jpg)
Machine Torch Cutting of the Weld Bevel
Step 7 – Weld Build Up of Knuckle
24
![Page 25: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/25.jpg)
Knuckle Radius Bottom of Weld Deposit
Step 7 – Weld Build Up of Knuckle
25
![Page 26: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/26.jpg)
Front Surface of Knuckle Weld Deposit
(After Blending and Surface Profiling)
Step 7 – Weld Build Up of Knuckle
26
![Page 27: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/27.jpg)
27
• Replacement skirt windows were installed and fit to achieve proper weld geometry
• The joint to be welded 1-1/4 Cr, P4 to P4
Step 8 – Fit-Up of Replacement Skirt Windows
27
![Page 28: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/28.jpg)
Section Alignment Fixturing
Step 8 – Fit-Up of Replacement Skirt Windows
28
![Page 29: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/29.jpg)
Proper Root Opening for Welding
Step 8 – Fit-Up of Replacement Skirt Windows
29
![Page 30: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/30.jpg)
Final Fit-Up after Tacking
Step 8 – Fit-Up of Replacement Skirt Windows
30
![Page 31: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/31.jpg)
31
• Weld out completed using “Controlled Deposition” which is similar to temper bead but per API-510, not NBIC
• A proprietary GTAW HotPulse process was used for this weld
Step 9 – Final Window Tie-In Weld
31
![Page 32: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/32.jpg)
32
• After completing the weld out of the build-up to skirt weld:
• The backside of the joint will be cleaned up and blended with a pencil grinder
• Contour grinding will be performed on the cap to blend with taper of build-up.
Step 9 – Final Window Tie-In Weld
32
![Page 33: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/33.jpg)
GTAW Hot Pulse Welding System Installed
Step 9 – Final Window Tie-In Weld
33
![Page 34: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/34.jpg)
Better Photo of GTAW Hot Pulse on Mockup
Step 9 – Final Window Tie-In Weld
34
![Page 35: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/35.jpg)
35
Step 9 – GTAW HotPulse Welding In Process
35
![Page 36: Field Modification of DCU Support Skirt-to-Vessel ... · Typical Skirt Attachment Geometries1 Issues at the Skirt to Vessel Interface 1 - “Analyses of Alternate Skirt Attachments](https://reader036.fdocuments.net/reader036/viewer/2022062507/5fc73dadcaea270188682c81/html5/thumbnails/36.jpg)
Final Appearance after Installation
(Inspection: Liquid Penetrant Inspection and Linear Phased Array)
Step 10 – Final Assembly after Inspection
36