FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

19
FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update

Transcript of FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

Page 1: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

FGDC Steering Committee Meeting June 5, 2008

Geospatial LoB Update

Page 2: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

2

Overview

• Update on LoB Activities – FY 2010 Funding Strategy– Reporting on OMB Memo 06-22

• Status Report on LoB Workgroups– Recent Activities– Upcoming Milestones

• Lifecycle Management Workgroup Report– Challenges and Solutions for OMB Circular A-16

• Next Steps

Page 3: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

3

2010 Funding Strategy

• OMB requested that all E-gov Line of Business initiatives submit funding strategies for the FY 2010 budget cycle by June 6, 2008.  

• Discussed this topic with agency representatives during the FGDC Coordination Group meeting May 28 

• Recommendation is to continue the current funding algorithm at a slightly lower funding level for FY 2010. The proposed funding strategy (algorithm and funding levels) is unchanged from what is documented in the FY 2009 GeoLOB Joint Business Case, which was agreed to by all partner agencies last year.

• We are asking that SAOGIs concur with this measure to secure funding in the budget for FY 2010.    

Page 4: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

4

OMB Memo 06-22

• With OMB Memo 06-22 of August, 2006, OMB requested that all E-gov Lines of Business establish base-line spending plans and report actual costs against those baselines. This is not a new data call.

• Reporting was to take place at the individual Department level, and some Departments have been reporting over the last two years.  

• Recently, OMB asked agencies that do not have baseline spending plans to complete them by June 6, 2008, and report actual spending against those plans through Q2 FY 2008. The Managing Partner Agency of the Geo LOB provided a method and data to help make this easier for other partner agencies last week.

• Agencies can use information provided, or use their own data to satisfy this request as long as they meet the June 6 deadline.   

Page 5: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

5

Common Services Work Group Report

Workgroup Lead: Matt Leopard (EPA)

Activities Accomplished to Date: • Analyzed past ELA data call information• Conducted workshops to plan SmartBUY expansion approach• Gained GSA support for selected list of Tier 1 and 2 vendors• Sought licensing requirements from the 34 agency participants• In full-day Work Group off-site, planned the launch of the SmartBUY multi-

vendor BPA for geospatial software and services. Working closely with GSA on this.

• Unveiled a working prototype for the Geospatial Software Repository

Activities Planned:• Quantify agency SmartBUY requirements, constraints, and interests • Hold SmartBUY Workshop to validate requirements with Federal Agencies• Complete SmartBUY Negotiation Strategy• Work with GSA to set up vendor days in June/July timeframe and award

contracts tentatively slotted for September

Page 6: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

6

Common Services Work Group Report

Key Milestones:• Completion of common services scope requirements and Acquisition Plan (January 31,

2008)• Selection of approaches to pursue (April 30, 2008)• Completion of SmartBUY Negotiation Strategy (June 30, 2008)• Seek award of at least two ELAs (or SmartBUY with at least two vendors) by the end of the

Calendar Year (striving for the end of the Fiscal Year) • Deploy V 1.0 of Software Solutions Repository by October 31, 2008

Page 7: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

7

Performance Management Work Group

Work Group Lead: John Mahoney (DOI-USGS)

Recent Activities:• Transition of FGDC Task Force to Coordination Group (January 15, 2008)• Completed Geo LoB Strategic Plan per OMB Passback (March 14, 2008)• Completed Final LoB Performance Management Plan (March 31, 2008)

Key Milestones:• Review and revise FGDC operations groups and procedures (September 30,

2008)• Review & recommend revisions to the existing FGDC

Coordination Group and FGDC Steering Committee Charters (Summer 2008)• With Lifecycle Management Workgroup, coordinate with agency theme leads on

draft LoB definitions of theme lead responsibilities and A-16 revisions. (Summer 2008)

• With Lifecycle Management Workgroup (and OMB concurrence) implement proposed changes to A-16 Appendix on data themes (March 31, 2009)

Page 8: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

888

Grants & Contracts Work Group

Workgroup Lead: Lew Sanford (DOJ)

Recent Activities:• Revised the draft Geospatial Grants & Contracts Guidance Language document

(pre-final draft May 29, 2008)• Plan to present draft Geospatial Grants & Contracts Guidance Language

document to OMB/OIRA by mid to late-June

Key Milestones:• Development of model geospatial grants guidance language (September 31,

2008)• Development of voluntary agency-specific contract language models

(September 31, 2008) • Approved timeline for changes to FAR/DFAR or addition to contracts (December

31, 2008)

Page 9: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

9

Technical Architecture Work Group

Workgroup Lead: Doug Nebert (FGDC)

Recent Activities:• Continued to review and revise the Geospatial Profile v2.0 --on track to

send to AIC and the FGDC Coordination Group June 6, 2008

Key Milestones:• Submit FEA Geospatial Profile, Version 2.0 to AIC and the FGDC

Coordination Group (June 6, 2008)

• Investigate and document operational demands and requirements of geospatial Web services and related content standards and formats as “Best Practices” for federal operators or contractors (June 1, 2009)

Page 10: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

1010

A presentation on A-16 Themes for The FGDC Steering Committee

June 5, 20008

by Wendy Blake-ColemanUS EPA

Lifecycle Management Work GroupLifecycle Management Work Group

Page 11: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

11

Briefing Purpose

• Summarize challenges/opportunities with existing OMB Circular A-16 document and processes

• Review issues being addressed by the Geospatial LOB Lifecycle Management Work Group

• Discuss Work Group products and timeline

• Request FGDC Steering Committee approval on selected Work Group products in Fall 2008

Page 12: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

12

Challenges with Current A-16 Processes

• Critical data often are not available for business processes in timeframe necessary, or not available at all

• Geographic data approach in A-16 should be better aligned with business process approaches (e.g. FEA) which have emerged since 2002

• Long timeframes to complete national data sets can lead to

duplicative efforts, decreased performance, and increased costs

• Inconsistent A-16 portfolio management and reporting limits the ability to evaluate completion schedules and cost of A-16 themes and datasets

• Need for improved communication and coordination across multiple programs, initiatives, and stakeholders

Page 13: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

1313

Lifecycle Management Work Group Structure

• Lifecycle Management Work Group has 30 members from 10 Federal Departments and Independent Agencies– Work Group Lead: Wendy Blake-Coleman, EPA– Include representatives from both geospatial data-

producing and geospatial data-using agencies

• Work Group includes three sub-groups– OMB Circular A-16 Definitions: Dennis Crow, USDA, Lead– Lifecycle: Jeff Booth, DOE, Co-lead– Theme Content: Michael Lee, USGS/DHS, and David

LaBranche, DOD, Co-Leads

Page 14: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

1414

Lifecycle Management Work Group Activities

• Evaluating “as-is” state of OMB Circular A-16 and impact on theme/dataset portfolio management – Definitions – Management and reporting responsibilities – Scope

• Drafting improvement strategy for A-16 portfolio management – Providing more precise operational definitions – Defining nationally significant themes/datasets– Creating criteria to add, delete, or consolidate

themes/datasets – Incorporating the entire lifecycle management practices

into portfolio management – Identifying opportunities for efficient data development

Page 15: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

1515

Lifecycle Management Work GroupActivities

• Developing supplemental guidance for implementation of A-16 portfolio management and reporting– More robust definitions– Clearer roles and responsibilities – More consistent reporting process– As appropriate changes to Appendix E: NSDI Data Themes,

Definitions, and Lead Agencies

• Providing FGDC Coordination Group with a suite of processes to: – Track and evaluate progress for completing the NSDI– Make recommendations to the FGDC Steering Committee on:

• Setting priorities for cross government partnerships• Amending the management or composition of themes/data

under OMB Circular A-16 • Data development efficiencies

Page 16: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

1616

Process Flow for Lifecycle Management Work Group2008 Deliverables & Activities

Page 17: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

1717

Next Steps in 2008

• June/July 2008 - Complete first round of draft products

• June /July 2008 – Provide products to FGDC Coordination Group for review

• Summer 2008- Geo LOB will convene an A-16 theme lead meeting to review draft recommendations and products

• Summer 2008- Provide products to FGDC Steering Committee for review

• Late Summer 2008 - Provide input on annual agency A-16 Theme Status Report to FGDC

• Fall 2008- Solicit Feedback from NGAC on Workgroup Products

• December 2008 – Finalize supplemental OMB Circular A-16 Guidance

Page 18: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

18

Summary of Lifecycle Management Workgroup Products in the Fall of 2008

• Common Geospatial Terms Lexicon

• Updated definitions of OMB Circular A-16 terms, roles, and responsibilities

• Criteria to assess designation of nationally significant themes/data sets

• Comprehensive definition of geospatial data lifecycle phases

• Candidate data lifecycle best management practices

• Documented process to add, delete, or modify OMB circular A-16 themes

• Best practice for aligning homeland Security Presidential Directive 7 ( HSPD-7) geospatial data requirements with OMB Circular A-16 geospatial data themes and theme leadership roles and responsibilities

Page 19: FGDC Steering Committee Meeting June 5, 2008 Geospatial LoB Update.

19

Presentation Discussion

Questions/Comments?