FGAFPT_CSR_20110203.pdf

10
CUSTOMER-SPECIFIC REQUIREMENTS FOR ISO/TS 16949 Date: 03/02/2011 Revision 02 Page 1 of 10 FIAT GROUP AUTOMOBILES and FIAT POWERTRAIN TECHNOLOGIES CUSTOMER-SPECIFIC REQUIREMENTS for use with ISO/TS 16949:2009 Revision 02 – February 3 rd , 2011

Transcript of FGAFPT_CSR_20110203.pdf

  • CUSTOMER-SPECIFIC REQUIREMENTS FOR

    ISO/TS 16949

    Date: 03/02/2011 Revision 02 Page 1 of 10

    FIAT GROUP AUTOMOBILES and

    FIAT POWERTRAIN TECHNOLOGIES

    CUSTOMER-SPECIFIC REQUIREMENTS

    for use with

    ISO/TS 16949:2009

    Revision 02 February 3rd, 2011

  • CUSTOMER-SPECIFIC REQUIREMENTS FOR

    ISO/TS 16949

    Date: 03/02/2011 Revision 02 Page 2 of 10

    Table of Contents Scope of the Document........................................................................................................................3 Section A General Procedures..........................................................................................................3 Section B Connection between FGA/FPT Customer-Specifics and ISO/TS16949.............................4 Section C FGA/FPT Customer-Specific Requirements added to ISO/TS16949.................................5

    1. Customer Representative (Ref. ISO/TS 16949 5.5.2.1) ................................................5 2. Report characteristics related documentation (Ref. ISO/TS 16949 7.2.1.1) ..................5 3. IMDS (Ref. ISO/TS 16949 7.2.1 Point C and Procurement Specific 9.01107)...............5

    3.1. FGA.................................................................................................................................5 3.2. FPT .................................................................................................................................6

    4. Special Characteristics (Ref. ISO/TS 16949 7.3.2.3) ....................................................6 4.1. FGA.................................................................................................................................6 4.2. FPT .................................................................................................................................6

    5. Periodic layout inspection and functional testing (Ref. ISO/ITS 16949 8.2.4.1).............7 6. Prototype Programme (Ref. ISO/TS 16949, 7.3.6.2).....................................................7 7. Field Management (Ref. ISO/TS 16949 8.5.2.4)...........................................................7 8. Organizations Performance Analysis (Ref. ISO/TS 16949 5.6) and Review Output

    (Ref. ISO/TS 16949 6.2.2.3) .........................................................................................7 9. Product approval process (Ref. ISO/TS 16949 7.3.6.3) ................................................8

    9.1. FGA.................................................................................................................................8 9.2. FPT .................................................................................................................................8

    10. On Job Training (Ref. ISO/TS 16949 6.2.2.3) ...............................................................8 11. Personnel Safety (Ref. ISO/TS 16949 6.4.1) ................................................................8 12. Incoming Material Quality (Ref. ISO/TS 16949 7.4.3.1) ................................................8 13. Customer Owned Production Tooling (Ref. ISO/TS 16949 7.5.4.1) ..............................8 14. Supplier Status Special Notifications (ISO/TS 16949, item 8.2.1.1) .................................8 15. Customer specifics clarification .......................................................................................9 16. Annexes ..........................................................................................................................9

    16.1. Annex 1: Program Review; ..............................................................................................9 16.2. Annex 2: PCPA; ..............................................................................................................9 16.3. Annex 3: 1DP One Day Production. .............................................................................9

    17. Revision History ..............................................................................................................9

  • CUSTOMER-SPECIFIC REQUIREMENTS FOR

    ISO/TS 16949

    Date: 03/02/2011 Revision 02 Page 3 of 10

    Scope of the Document

    This document defines Customer Specifics of both Fiat Group Automobiles (FGA) and Fiat Powertrain Technologies (FPT) in order to complete the ISO/TS 16949:2009 Quality System Requirements, and relates them with the technical documentation already used in the relation between FGA or FPT and the Organizations (Drawings, Norms, Procurement Specification, Request For Quotation and other documentation). In this document, the terms Organization and Supplier are interchangeable, both representing the company (or site) being registered to ISO/TS 16949. Every Nation where FGA and FPT have productive plants can add local supplements to these Customer-Specifics (see Local Addenda)

    Section A General Procedures

    The Customer-Specifics complement the already used general procedures that rule the supply relation between FGA, FPT and the Organizations.

    The fundamental procedures are the following: SPECIFICATION NR.

    # PROCEDURE DESCRIPTION FGA FPT

    1 Fiat Auto S.p.A. - General Purchasing Conditions 9.01100 2 Quality Of Supplies 9.01102 FPT.9.01102 3 Supply Material Certification Quality Document CQC

    - Product Quality And Conformity Certificate 9.01103 FPT.9.01103

    4 Use Provisions For The I.M.D.S. (International Material Data System) System 9.01107

    5 Qualification Of Production Parts New Components (Buy) 07740 FPT.IFP059

    6 Program Review Procedure FGP-Procedure 13 7 PCPA (Process Control Plan Audit) and PSA

    (Potential Supplier Assessment) FGP-Procedure 14 8 1DP One Day Production Procedure FGP-Procedure 15 9 Management of Variances (Buy Components) 08090 FPT.IFP059 10 Reinforced Control Plan 07171 FPT.MAP048 11 Quality Monitoring Of Direct Materials Supplies At

    Manufacturing Factories And Spare Parts Storehouses 08018

    12 CSL New Business Hold FGP-Procedure 16

    Remarks: FGP: Fiat Group Purchasing; FPT: Fiat Powertrain Technologies. These documents can be reviewed, after Customer authorization, in the website https://norme.orange.fiat.it

  • CUSTOMER-SPECIFIC REQUIREMENTS FOR

    ISO/TS 16949

    Date: 03/02/2011 Revision 02 Page 4 of 10

    Section B Connection between FGA/FPT Customer-Specifics and ISO/TS16949

    CUSTOMER-SPECIFICS ISO/TS 16949:2009 DESCRIPTION FGA FPT

    4.2.4.1 Records Retention 9.01102 FPT.9.01102 7.1 Planning of Product Realization FGP-Procedure 13

    7.1.1 Planning of Product Realization Supplemental Timing Chart

    7.1.2 Acceptance Criteria 9.01102 9.01102/10

    FPT.9.01102 FPT.IFP053

    7.1.3 Confidentiality

    9.01102 9.01100 FGP-Procedure 23

    Attachment 03 (Confidentiality Agreement)

    FPT.9.01102 9.01100 FGP-Procedure 23

    Attachment 03 (Confidentiality Agreement)

    7.1.4 Change Control 08090 07740 FPT.IFP059

    7.2.1 Determination of Requirements related to the Product

    9.01102 FGP-Procedure 01

    Attachment 06 Request For Quotation (RFQ) and Statement Of Requirements (SOR)

    FPT.9.01102 FGP-Procedure 01

    Attachment 06 Request For Quotation (RFQ) and Statement Of Requirements (SOR)

    7.3.2.3 Special Characteristics 9.01102 9.01102/10 9.01120

    FPT.9.01102 FPT.IFP053

    7.3.6.2 Prototype Programme 9.01103 FPT.9.01103 7.3.6.3 Product Approval Process 07740 FPT.IFP059

    7.4.1.3 Customer Approved Sources

    9.01100 FGP-Procedure 01 Attachment 06 Request

    For Quotation (RFQ) and Statement Of Requirements (SOR)

    7.5.1.1 Control Plan 9.01102 07171

    FPT.9.01102 FPT.IFP059 FPT.MAP048

    7.5.1.7 Feedback of Information from Service 08018

    Supply Quality Performance (SQP)

    7.5.3 Identification and Traceability 07170 9.01105 9.01106

    FPT.IFP057 9.01105 9.01106

    7.6.3.2 External Laboratory 07740 FPT.IFP059

  • CUSTOMER-SPECIFIC REQUIREMENTS FOR

    ISO/TS 16949

    Date: 03/02/2011 Revision 02 Page 5 of 10

    CUSTOMER-SPECIFICS ISO/TS 16949:2009 DESCRIPTION FGA FPT

    8.2.1.1 Customer Satisfaction Supplemental

    08018 Supply Quality Performance (SQP)

    FGP-Procedure 16

    8.2.2.2 Manufacturing Process Audit FGP-Procedure 14 FGP-Procedure 15

    8.2.4.1 Layout Inspection and Functional Testing 07740 FPT.IFP059

    8.3.4 Customer Waiver 08090 FPT.IFP059 8.5.2.1 Problem Solving 08018

    8.5.2.4 Rejected Product Test/Analyses 08018

    Supply Quality Performance (SQP) 9.01100

    Section C FGA/FPT Customer-Specific Requirements added to ISO/TS16949

    1. Customer Representative (Ref. ISO/TS 16949 5.5.2.1) The Organizations Top Management shall individualize in its structure at least one Customer Representative in the Quality Department and/or in the Technical Area. The Representative shall have responsibility and authority to ensure that these Customer requirements are addressed and implemented.

    2. Report characteristics related documentation (Ref. ISO/TS 16949 7.2.1.1) Supplier shall draw up a specific documentation related to qualification and/or homologation and to production processes from which it must be evident, moreover, how, by whom and with which results the involved characteristics have been put on trial and approved. This documentation shall be stored by the Supplier for at least 15 years. Supplier shall ensure that checks and inspections can be performed by competent authorities.

    Remarks: FPT Report Characteristics are identified by PQC-S FGA Report Characteristics are identified by

    3. IMDS (Ref. ISO/TS 16949 7.2.1 Point C and Procurement Specific 9.01107) 3.1. FGA The Organization shall upload to the International Material Data System (IMDS), http://www.mdsystem.com, the data related to the chemical composition of its products. The

  • CUSTOMER-SPECIFIC REQUIREMENTS FOR

    ISO/TS 16949

    Date: 03/02/2011 Revision 02 Page 6 of 10

    Organization is even responsible for the data uploaded in IMDS related to the products of its own Suppliers. In case of product under development, the data uploading shall be done before the Process Verification (VP).

    3.2. FPT The Organization, if requested, shall upload to the International Material Data System (IMDS), http://www.mdsystem.com, the data related to the chemical composition of its products. The Organization is even responsible for the data uploaded to IMDS related to the products of its own Suppliers. In case of product under development, the data uploading shall be done before the Pilot Phase.

    4. Special Characteristics (Ref. ISO/TS 16949 7.3.2.3) 4.1. FGA A product characteristic is a potential "Key" characteristic when its variation out of the technical specifications (Non-Conformity) can compromise important aspects of the product itself, such as passenger safety (Report), Law/Legal approval Conformity, external Customer satisfaction, internal Customer satisfaction. The Key characteristics related to the last two type of product aspects shall be pointed out on technical documentation with the symbol .

    4.2. FPT A product characteristic is a potential "Key" characteristic when its variation out of the technical specifications (Non-Conformity) can compromise important aspects of the product itself, such as passenger safety (Report), Law/Legal approval Conformity, external Customer satisfaction, internal Customer satisfaction. The Key characteristics related to the last two type of product aspects shall be pointed out on technical documentation with the symbol PQC. Supplier can use its proper symbology for the identification of Key characteristics. However, a correlation table must be established between Supplier and Customer documentary systems and must be quoted on the drawing. Standard FPT.IFP053 must always be considered.

  • CUSTOMER-SPECIFIC REQUIREMENTS FOR

    ISO/TS 16949

    Date: 03/02/2011 Revision 02 Page 7 of 10

    5. Periodic layout inspection and functional testing (Ref. ISO/ITS 16949 8.2.4.1). Organization shall plan dimensional inspections and functional tests even if not expressly required by the Customer; this plan shall fulfill as minimum with the following:

    - Complete Self-Qualification every 2 (two) years (unless otherwise agreed by SQE). - Complete dimensional and material controls once per year.

    Records shall be available for Customer review and results must be submitted to Customer for revision.

    6. Prototype Programme (Ref. ISO/TS 16949, 7.3.6.2) Supplier will provide all delivered prototype parts with Certification of Quality and Conformance of Prototypes.

    7. Field Management (Ref. ISO/TS 16949 8.5.2.4) On demand, Organization shall actively participate in the Tutorship and Field Management programs, in order to improve the Quality level of the products and to reduce the related warranty costs.

    8. Organizations Performance Analysis (Ref. ISO/TS 16949 5.6) and Review Output (Ref. ISO/TS 16949 6.2.2.3) The Organizations Board shall analyze the Customer satisfaction factors monthly; The analysis shall at least include the following:

    i. Performance indicators available in SQP system (e.g. PPM, IP/E, CSL) ii. Customer validated Action Plan monitoring, due to negative outcome (2) of PCPA,

    1DP, Program Review. iii. FIAT Customer specific Implementation Plans monitoring. iv. Poor quality cost monitoring (e.g. scraps, reworks, sorts, CSL2 and CSL3 due to

    internal failures, warranty, penalties, recall campaigns for external failures).

    Output of management reviews shall include detailed decisions and actions related to problems pointed out by Customer (CSL1, CSL2, PPM, etc.).

  • CUSTOMER-SPECIFIC REQUIREMENTS FOR

    ISO/TS 16949

    Date: 03/02/2011 Revision 02 Page 8 of 10

    9. Product approval process (Ref. ISO/TS 16949 7.3.6.3) 9.1. FGA The Organization shall use FGA-like methodologies (07740) for product approval process of its own Suppliers. In case the Organization cannot afford this requirement, the product approval process adopted shall be validated by FGAs SQE.

    9.2. FPT The Organization shall use FPT-like methodologies (FPT.IFP059) for product approval process of its own Suppliers. In case the Organization cannot afford this requirement, the product approval process adopted shall be validated by FPTs SQE. Sub-Suppliers with quality system in development that do not fulfill minimum requirements for PPAP completion, must in accordance with the Supplier work out an Action Plan for PPAP implementation.

    10. On Job Training (Ref. ISO/TS 16949 6.2.2.3) Procedures shall be used in order to avoid that either contractors or agency personnel are assigned to quality critical jobs.

    11. Personnel Safety (Ref. ISO/TS 16949 6.4.1) The Organization, on its own liability, must provide evidence when applicable of suitable fire permission, issued by the competent authority.

    12. Incoming Material Quality (Ref. ISO/TS 16949 7.4.3.1) Incoming material inspection and testing if not in free pass are mandatory for all materials and components.

    13. Customer Owned Production Tooling (Ref. ISO/TS 16949 7.5.4.1) All the Customer owned tools, specially the ones for the low volume productions, must be subjected to preventive maintenance (see PCPA check list). Special attention must be paid to those tools used for either low volumes or sporadic productions.

    14. Supplier Status Special Notifications (ISO/TS 16949, item 8.2.1.1) Supplier will have to inform its own Certification Body within 5 working days in case of notification of Customer special quality issues:

  • CUSTOMER-SPECIFIC REQUIREMENTS FOR

    ISO/TS 16949

    Date: 03/02/2011 Revision 02 Page 9 of 10

    - Supplier in NBH (New Business Hold); - Supplier with Controlled Shipment Level 2 and Level 3 (opened).

    15. Customer-Specifics clarification Frequently Asked Questions with official FIAT replies will be periodically made public. These FAQs will be part of the FIAT Customer-Specifics.

    16. Annexes The following documents shall be considered integral part of FIAT Customer-Specifics. 16.1. Annex 1: Program Review; 16.2. Annex 2: PCPA; 16.3. Annex 3: 1DP One Day Production.

    17. Revision History DATE SECTION MODIFICATION

    October, 2007 All New Document All Added Fiat Powertrain Technologies (FPT) Section A Added FGP-Procedure 13 (Program Review)

    Added FGP-Procedure 14 (PCPA/PSA) Added FGP-Procedure 15 (1DP) Canceled Procedure 07741 Canceled Procedure 07172 Added FGP-Procedure 16 (CSL/NBH)

    Section B Added FGP-Procedure 23 (Supplier Selection) Added Procedure 08090 for Change Control Canceled Procedure 07741 Added FGP-Procedure 01 (RFQ and SOR) Added FGP-Procedure 16 (CSL/NBH) Added FGP-Procedure 14 (PCPA) Changed 07740 with 07741 for 8.2.4.1 Added 9.01100 for 8.5.2.4

    Section C Par. 2

    New

    26th October, 2010

    Section C Par. 3

    Revised number Added IMDS website Differentiated between FGA and FPT Requirements

  • CUSTOMER-SPECIFIC REQUIREMENTS FOR

    ISO/TS 16949

    Date: 03/02/2011 Revision 02 Page 10 of 10

    DATE SECTION MODIFICATION Section C Par. 4

    Revised number Differentiated between FGA and FPT Requirements

    Section C Par. 5

    Revised number

    Section C Par. 6

    New

    Section C Par. 7

    Revised number

    Section C Par. 8

    Revised number Added requirements about analysis output

    Section C Par. 9

    Revised number Canceled Procedure 07741 Differentiated between FGA and FPT Requirements

    Section C Par. 10

    New

    Section C Par. 11

    New

    Section C Par. 12

    New

    Section C Par. 13

    New

    Section C Par. 14

    New

    Section C Par. 15

    Revised number

    26th October, 2010 (continued)

    Section C Par. 16

    New

    All Modified logos 3rd February, 2011 Section B Added point 7.1 of ISO/TS 16949:2009, connected

    with FGP-Procedure 13 (Program Review) Added FGP-Procedure 15 (1DP) for 8.2.2.2

    Checked and Signed by Marco Dalla Vedova FGP Supplier Quality VP