FFY15-18 STIP GROUPING TRACKING
Construction: Bridge Rehab/Replace/Reconstuct.
Original Grouping Cost$322,672,163Previous Amount
STIP ADJ $0 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $322,672,163 Current Grouping Cost
$322,672,163
Current Grouping Cost Sliding Scale
Calculation
$332,672,163Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
STIP ADJ $0
STIP ADJ $0
12/22/2014 17689 RW BUILD INTERCHANGE-RT
28/WELLINGTON
RD&ELIMINATE
@GRADE XING
FROM 0.252 MILE WEST ROUTE
674 (WELLINGTON ROAD) TO
0.251 MILE EAST ROUTE 674
(WELLINGTON ROAD)
28 Northern
Virginia :
Manassas
Northern
Virginia
Urban Manassas $17,703,533 $173,455 $138,764 MOD
12/22/2014 77322 DB RTE 29 - BRIDGE
REPLACEMENT OVER
LITTLE ROCKY RUN
FROM 0.2 mi East of Pickwick
Road (Mile Marker 229.2) TO
Union Mill Road (Mile Marker
229.6)
29 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$1,560,252 $1,560,252 ACC
12/29/2014 82135 DB Bridge Decks
Replacement and
Widening of Route 7
over DATR
FROM 0.564 Mile West of Tyco
Road TO 0.162 Mile West of
Tyco Road
7 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$0 $11,984,744 ACC
1/28/2015 82131 CN MAJOR BRIDGE
REHABILITATION ON
WASHINGTON BLVD/RT
27 @RT 110
FROM 0.50 mi north of
Columbia Pike TO 0.60 mi to the
interesectionewith Rte 12-
Memorial Dr
27 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$29,064,078 $0 $3,341,495 ACC
3/4/2015 90519 CN ADEN RD (RTE. 646)
BRIDGE REPLACEMENT
OVER NSRR
FROM 0.129 MILES SOUTH OF
NORFOLK SOUTHERN RAILROAD
TO 0.061 MILES SOUTH OF
NORFOLK SOUTHERN RAILROAD
646 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$5,955,411 $4,028,805 $2,823,149 NEW
3/4/2015 90519 PE ADEN RD (RTE. 646)
BRIDGE REPLACEMENT
OVER NSRR
FROM 0.129 MILES SOUTH OF
NORFOLK SOUTHERN RAILROAD
TO 0.061 MILES SOUTH OF
NORFOLK SOUTHERN RAILROAD
646 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$1,222,480 $499,869 $399,895 MOD
3/24/2015 18860 CN BRIDGE REPLACEMENT
@ GLEBE RD/RT 120 &
RT 50 IN ARLINGTON CO
FROM 0.07 MILES SOUTH
ROUTE 50 TO 0.06 MILES
NORTH ROUTE 50
120 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$6,438,435 $260,657 $240,856 MOD
3/24/2015 89891 CN Chain Bridge Road (Rte.
123) Bridge replacement
FROM Meadow Bridge Lane TO
Kenmore Drive
123 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $4,843,450 $868,858 $710,053 MOD
Page 1 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Bridge Rehab/Replace/Reconstuct.
Original Grouping Cost$322,672,163Previous Amount
STIP ADJ $0 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $322,672,163 Current Grouping Cost
$322,672,163
Current Grouping Cost Sliding Scale
Calculation
$332,672,163Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
STIP ADJ $0
STIP ADJ $0
3/25/2015 104103 PE,RW,CN WALNEY RD - RTE 657 -
BRIDGE REPLACEMENT
AND WIDENING - D/B
FROM .083 MI. South of Flatlick
Branch TO 0.033 MI. North of
Dallas St
657 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$13,589,140 $0 $170,820 ACC
4/2/2015 87728 CN TWIN LAKES DR BRIDGE
REHABILITATION OVER
JOHNNY MOORE CREEK
FROM 0.53 MILES EAST OF
ROUTE 659 TO 0.50 MILES WEST
OF RTE 645
3546 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$999,262 $0 $135,330 ACC
4/30/2015 85428 PE Reconstr. & widen
existing bridge and
approaches (Str.#6041)
FROM 0.12 miles south of
Sycolin Creek TO 0.10 miles
north of Sycolin Creek
650 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$1,016,522 $36,850 $29,480 MOD
4/30/2015 85428 CN Reconstr. & widen
existing bridge and
approaches (Str.#6041)
FROM 0.12 miles south of
Sycolin Creek TO 0.10 miles
north of Sycolin Creek
650 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$1,924,495 $0 $295,981 MOD
5/28/2015 82214 PE WALNEY RD - RT 657 -
BRIDGE REHAB OVER
FLATLICK BRANCH
FROM 0.42mi S INT Rte 6215
TO 0.03mi N INT Rte 6755
657 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$833,740 $2,480 $1,984 MOD
6/24/2015 82135 cn Bridge Decks
Replacement and
Widening of Route 7
over DATR
FROM 0.564 Mile West of Tyco
Road TO 0.162 Mile West of
Tyco Road
7 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$44,532,013 $2,601,385 $2,601,385 ACC
8/17/2015 87728 CN TWIN LAKES DR BRIDGE
REHABILITATION OVER
JOHNNY MOORE CREEK
FROM 0.53 MILES EAST OF
ROUTE 659 TO 0.50 MILES WEST
OF RTE 645
3546 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$999,262 $0 $128,802 ACC
8/18/2015 82135 PE Bridge Decks
Replacement and
Widening of Route 7
over DATR
FROM 0.564 Mile West of Tyco
Road TO 0.162 Mile West of
Tyco Road
7 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$2,342,218 $0 $2,250,633 ACC
Page 2 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Bridge Rehab/Replace/Reconstuct.
Original Grouping Cost$322,672,163Previous Amount
STIP ADJ $0 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $322,672,163 Current Grouping Cost
$322,672,163
Current Grouping Cost Sliding Scale
Calculation
$332,672,163Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
STIP ADJ $0
STIP ADJ $0
9/2/2015 85428 CN Reconstr. & widen
existing bridge and
approaches (Str.#6041)
FROM 0.12 miles south of
Sycolin Creek TO 0.10 miles
north of Sycolin Creek
650 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$1,924,495 $399,933 $319,947 ACC
11/12/2015 99678 RW Bridge Replace. Forest
Mills Road Over Trib. of
Crooked Run
FROM 0.07 Mi. West of Rte. 841
Int. TO 0.02 Mi. West of Rte.
841 Int.
727 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$130,020 $50,203 $0 NEW
12/1/2015 90519 CN ADEN RD (RTE. 646)
BRIDGE REPLACEMENT
OVER NSRR
FROM 0.129 MILES SOUTH OF
NORFOLK SOUTHERN RAILROAD
TO 0.061 MILES SOUTH OF
NORFOLK SOUTHERN RAILROAD
646 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$5,955,411 $1,963,591 $1,583,284 AWD
12/14/2015 90519 RW ADEN RD (RTE. 646)
BRIDGE REPLACEMENT
OVER NSRR
FROM 0.129 MILES SOUTH OF
NORFOLK SOUTHERN RAILROAD
TO 0.061 MILES SOUTH OF
NORFOLK SOUTHERN RAILROAD
646 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$396,920 $1,673 $1,338 MOD
1/13/2016 97219 CN GUINEA ROAD - ROUTE
651 - REPLACE CULVERT
OVER LONG BRANCH
FROM 0.066 mi. S. of Long
Branch TO 0.047 mi. N. of Long
Branch
651 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$4,235,677 $1,078,296 $235,804 MOD
2/2/2016 84385 PE BEACH MILL ROAD - RTE
603 - BR. OVER NICHOLS
RUN
FROM 0.55 MI W. OF RTE 674
(SPRINGVALE RD) TO 0.45 MI W.
OF RTE 674 (SPRINGVALE RD)
603 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$383,579 $108,579 $87,146 MOD
3/24/2016 82131 CN MAJOR BRIDGE
REHABILITATION ON
WASHINGTON BLVD/RT
27 @RT 110
FROM 0.50 mi north of
Columbia Pike TO 0.60 mi to the
interesectionewith Rte 12-
Memorial Dr
27 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$29,064,078 $2,466,132 $1,190,412 MOD
4/26/2016 104406 PE Major Bridge Rehab at
Rte 7/King St over I-395
FROM 0.3 mi W from I-395 TO
0.3 mi E from I-395
395 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $1,750,000 $400,000 $363,496 MOD
Page 3 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Bridge Rehab/Replace/Reconstuct.
Original Grouping Cost$322,672,163Previous Amount
STIP ADJ $0 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $322,672,163 Current Grouping Cost
$322,672,163
Current Grouping Cost Sliding Scale
Calculation
$332,672,163Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
STIP ADJ $0
STIP ADJ $0
5/6/2016 87728 RW TWIN LAKES DR BRIDGE
REHABILITATION OVER
JOHNNY MOORE CREEK
FROM 0.53 MILES EAST OF
ROUTE 659 TO 0.50 MILES WEST
OF RTE 645
3546 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$18,369 $216 $173 MOD
6/1/2016 105774 PE Bridge Replacement on
Cochran Mill Rd over
Tuscarora Creek
FROM 0.107 Miles North of
Tuscarora Creek TO 0.070 Miles
South of Tuscarora Creek
653 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$0 $59,482 ACC
7/28/2016 82135 DB Bridge Decks
Replacement and
Widening of Route 7
over DATR
FROM 0.564 Mile West of Tyco
Road TO 0.162 Mile West of
Tyco Road
7 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$6,999,709 $4,452,412 MOD
8/31/2016 105898 PE #SGR Bridge Rehab at
Featherbed Lane over
Catoctin Creek
FROM 0.1 Mi East Catoctin
Creek TO 0.1 Mi West Catoctin
Creek
673 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$800,000 $0 NEW
10/19/2016 110032 PE #SGR MAJOR BRIDGE
REHABILITATION AT RTE
236 OVER I-395
FROM I-395 TO I-395 236 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$1,298,695 $1,298,695 $0 NEW
11/3/2016 109953 PE OAK STREET OVER
TRIPPS RUN BRIDGE
REHABILITATION
FROM Oak Street TO Timber
Lane/Lee Street
9999 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $265,000 $265,000 $212,000 NEW
11/4/2016 105898 PE #SGR Bridge Rehab at
Featherbed Lane over
Catoctin Creek
FROM 0.1 Mi East Catoctin
Creek TO 0.1 Mi West Catoctin
Creek
673 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
($640,000) $0 MOD
12/6/2016 99678 CN Bridge Replace. Forest
Mills Road Over Trib. of
Crooked Run
FROM 0.07 Mi. West of Rte. 841
Int. TO 0.02 Mi. West of Rte.
841 Int.
727 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$2,070,908 $244,750 $37,774 Re-Ad
Page 4 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Bridge Rehab/Replace/Reconstuct.
Original Grouping Cost$322,672,163Previous Amount
STIP ADJ $0 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $322,672,163 Current Grouping Cost
$322,672,163
Current Grouping Cost Sliding Scale
Calculation
$332,672,163Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
STIP ADJ $0
STIP ADJ $0
12/13/2016 82131 RW MAJOR BRIDGE
REHABILITATION ON
WASHINGTON BLVD/RT
27 @RT 110
FROM 0.50 mi north of
Columbia Pike TO 0.60 mi to the
interesectionewith Rte 12-
Memorial Dr
27 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$26,469 $0 ($54,904) MOD
12/21/2016 95636 PE Bridge Rehabilitation
Carlin Springs Road at
Geo Mason Dr.
FROM Carlin Springs Road TO
George Mason Dr
Northern
Virginia :
Arlington
County
Northern
Virginia
Seconda
ry
Arlington
County
$688,158 $471,158 $376,926 MOD
2/7/2017 99678 PE Bridge Replace. Forest
Mills Road Over Trib. of
Crooked Run
FROM 0.07 Mi. West of Rte. 841
Int. TO 0.02 Mi. West of Rte.
841 Int.
727 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$716,480 $50,000 $50,000 MOD
2/7/2017 99678 RW Bridge Replace. Forest
Mills Road Over Trib. of
Crooked Run
FROM 0.07 Mi. West of Rte. 841
Int. TO 0.02 Mi. West of Rte.
841 Int.
727 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$130,020 $49,797 $100,000 MOD
3/3/2017 95636 CN Bridge Rehabilitation
Carlin Springs Road at
Geo Mason Dr.
FROM Carlin Springs Road TO
George Mason Dr
Northern
Virginia :
Arlington
County
Northern
Virginia
Seconda
ry
Arlington
County
$4,674,000 $5,086,183 $0 NEW
5/8/2017 99678 CN Bridge Replace. Forest
Mills Road Over Trib. of
Crooked Run
FROM 0.07 Mi. West of Rte. 841
Int. TO 0.02 Mi. West of Rte.
841 Int.
727 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$2,070,908 $383,454 $372,572 AWD
5/17/2017 17071 PE RTE 95 - SECURING OF
CONSULTANT
FROM MANAGEMENT,
COORDINATION, SCHEDULING,
ADMINISTRATION TO AND
COMMUNITY RELATIONS AT
WOODROW WILSON BRIDGE
95 Northern
Virginia :
Alexandria
Northern
Virginia
Intersta
te
Alexandria ############ ($14,769,904) $9,384,035 ACC
5/22/2017 17601 PE,RW,CN LOVETTSVILLE SHARED
USE PATH
FROM 0.64 Miles South of
Hammond Drive TO Hammond
Drive
Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Lovettsville $673,258 $538,607 MOD
Page 5 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Bridge Rehab/Replace/Reconstuct.
Original Grouping Cost$322,672,163Previous Amount
STIP ADJ $0 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $322,672,163 Current Grouping Cost
$322,672,163
Current Grouping Cost Sliding Scale
Calculation
$332,672,163Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
STIP ADJ $0
STIP ADJ $0
9/8/2017 99678 CN Bridge Replace. Forest
Mills Road Over Trib. of
Crooked Run
FROM 0.07 Mi. West of Rte. 841
Int. TO 0.02 Mi. West of Rte.
841 Int.
727 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$2,070,908 $1,361,365 $1,235,577 NEW
Total $18,774,699 $47,359,704
$313,897,464Current Grouping Balance
(sliding scale inclusive)
Page 6 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Federal Lands Hwy
Original Grouping Cost$10,540,718Previous Amount
STIP ADJ $1,500,000 Amend/Adjust Original Grouping Cost11/24/2015
STIP ADJ $8,790,718
New Total $20,831,436 Current Grouping Cost
3/21/2017
$20,831,436
Current Grouping Cost Sliding Scale
Calculation
$13,175,898Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
16-04
17-11
STIP ADJ $0
STIP ADJ $0
7/15/2015 106493 CN Repave/Repair
Featherbed Lane (FLAP
Project)
FROM Rte 29 TO Deep Cut
Parking Lot
622 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$140,886 $200,000 $177,949 NEW
9/2/2015 106496 PE Army Navy Drive:
Complete street
bike/ped improvements
FROM S. Joyce Street TO 12th
Street South
6605 Northern
Virginia :
Arlington
County
Northern
Virginia
Miscella
neous
Arlington
County
$1,796,000 $700,000 $700,000 NEW
1/7/2016 106494 CN Rehabilitation of Old
Dominion Drive
FROM Entrance to Great Falls
Park TO Georgetown Pike
738 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$400,000 $715,240 $320,000 NEW
Total $1,615,240 $1,197,949
$11,560,658Current Grouping Balance
(sliding scale inclusive)
Page 7 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: RAIL
Original Grouping Cost$220,000Previous Amount
STIP ADJ $807,697 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $1,027,697 Current Grouping Cost
$1,027,697
Current Grouping Cost Sliding Scale
Calculation
$2,055,394Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
1/27/2015 105537 CN Rt.15- Upgrade Flashing
Lights & Gates to
LEDw/CWT Predictor
FROM .14 Mi S of Kapp Valley Rd
TO At NSRR Crossing #71`4367U
15 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$235,736 $297,567 $297,310 NEW
4/29/2015 105542 CN Rt.55-Install Flashing
Lights and Gates w/CWT
Predictors
FROM 305 ft E of Beverly Ln TO
at NSRR Crossing #714370C
55 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$161,623 $243,609 $219,248 NEW
4/29/2015 105546 CN Rt. 625 - Install CWT
Predictors and Power
Out Indicators
FROM 315 ft S of Fayette St TO
at NSRR Crossing #714365F
625 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$155,731 $241,671 $217,504 NEW
12/8/2016 105542 CN Rt.55-Install Flashing
Lights and Gates w/CWT
Predictors
FROM 305 ft E of Beverly Ln TO
at NSRR Crossing #714370C
55 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$161,623 ($81,985) ($73,787) MOD for
FV
3/26/2017 105537 CN Rt.15- Upgrade Flashing
Lights & Gates to
LEDw/CWT Predictor
FROM .14 Mi S of Kapp Valley Rd
TO At NSRR Crossing #71`4367U
15 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$235,736 ($61,831) ($61,831) MOD for
FV
Total $639,031 $598,444
$1,416,363Current Grouping Balance
(sliding scale inclusive)
Page 8 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
10/12/2013 98375 RW SR 641
@SPRINGWOODS_UPGR
ADE SIGNAL;EXTD LEFT
LN TO SMOKETOWN
FROM 0.05 W. of SR 2410
Springwoods Road TO 0.107 E.
of SR 2410 Springwoods Road
641 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$129,551 $54,551 $49,096 MOD
10/22/2014 106504 CN NRO NOVA Signal Safety
Improvements
FROM Districtwide TO
Districtwide
9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$899,683 $750,000 $0 NEW
10/22/2014 106523 PE NRO DMS LIFE-CYCLE
REPLACEMENT - ON
PRIMARY ROUTES
FROM Various TO Various 66 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$20,747 $20,000 $18,000 NEW
11/10/2014 102848 RW Fairfax County - SRTS -
Terra Centre ES -
Crossing Imp.
FROM Marshall Pond Road TO
Marshall Pond Road
0 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$8,500 $800 $800 NEW
11/20/2014 85378 CN Install Video Traffic
Monitoring Cameras
FROM City-wide TO City-wide 0 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $127,009 $126,614 $101,291 MOD
12/3/2014 106584 PE I-95 EXPRESS LANES
TRAFFIC SAFETY
ENFORCEMENT
FROM Edsall Road Exit TO
Garrisonville Road Exit
95 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$428,330 $500,000 $0 NEW
12/8/2014 105584 PE ROUTE 7/GEORGE
WASHINGTON BLVD
OVERPASS
FROM 0. 25 MI. S. OF RESEARCH
PLACE TO CENTER LINE OF
RESEARCH PLACE
7 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Loudoun
County
$1,367,000 $1,367,000 $1,093,600 NEW
Page 9 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
12/10/2014 106408 PE ROUTE 1 AT
SOUTHGATE DRIVE
INTERSECTION
IMPROVEMENTS
FROM Richmond Highway TO
Southgate Drive
1 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$130,000 $130,000 $104,000 NEW
12/17/2014 104906 CN Site Stabilization at N.
Kings Hwy & Kathryn St
FROM 0.1 Mi S Rte 611
Telegraph Rd TO 0.16 Mi S Rte
611 Telegraph Rd
241 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$194,294 $34,742 $0 AWD
12/19/2014 70632 CN SOAPSTONE DRIVE TRAIL FROM South Lakes Drive TO
Glade Drive
4720 Northern
Virginia :
Fairfax
County
Northern
Virginia
Miscella
neous
Fairfax
County
$1,378,227 $1,135,473 $859,456 NEW
12/19/2014 85374 CN Wilkes Street Bicycle
Safety Improvements at
Intersections
FROM S. West St. TO S. Royal St. 0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $135,099 $72,248 $57,798 NEW
1/5/2015 101689 CN TSM Fiber Optic Plant
Upgrades - PH3
Construction
FROM County Wide TO County
Wide
Northern
Virginia :
Arlington
County
Northern
Virginia
Miscella
neous
Arlington
County
$8,687,766 $50,105 $45,094 AWD
1/7/2015 106484 PE RTE 7 TURN LANE AT
WILLIAMS GAP ROAD
FROM 0.01mi west of Rte 711
Williams Gap Road TO 0.12 mi.
east Rte 711 Williams Gap Road
7 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Loudoun
County
$385,000 $250,000 $200,000 NEW
1/8/2015 52725 CN CLEAN AIR PARTNERS FROM (FORMERLY ENDZONE
REGIONAL PUBLIC EDUCATION
CAMPAIGN) TO
Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$3,649,000 $0 $120,000 ACC
1/9/2015 71465 CN ADD LTL ON RTE. 621,
RTL ON RTE. 622, AND A
TS.
FROM 0.17 Miles west of Rte.
622 TO 0.12 Miles east of Rte.
622
621 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$3,109,052 $0 $266,950 ACC
Page 10 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
1/15/2015 84358 PE Route 621- Intersection
Improvements at Route
772
FROM 0.17 Mi S. of Ryan Road
(Route 772) TO 0.21 Mi N. of
Ryan Road (Route 772)
621 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$1,066,363 $60,000 $54,000 MOD
1/22/2015 106524 PE VIENNA TRAFFIC SIGNAL
OPTIMIZATION
FROM TOWNWIDE TO
TOWNWIDE
9999 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $114,985 $95,000 $76,000 NEW
1/26/2015 79812 PE W & OD TRAIL
CROSSING
IMPROVEMENTS
FROM Various Intersections TO
Various Intersections
Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $133,967 $65,194 $52,155 MOD
1/26/2015 79812 CN W & OD TRAIL
CROSSING
IMPROVEMENTS
FROM Various Intersections TO
Various Intersections
Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $199,696 $8,991 $7,193 AWD
1/26/2015 82842 PE Holmes Run Trail
Chambliss Crossing
FROM Holmes Run Trail TO
Crossing Chambliss Street
Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $111,374 $9,369 $7,495 MOD
1/28/2015 84554 CN Traffic Signal
Management System
FROM Various Locations TO
Various Locations
0 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $410,868 $0 $13,739 ACC
1/29/2015 90202 CN Install Roadway Lighting
on Columbia Pike
FROM Glebe Road TO S Wayne St 244 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$384,628 $0 $5,190 ACC
2/10/2015 16632 RW Intersec & Drainage
Impro At Fairfax Blvd
(Rte 29/50 &123)
FROM 0.266 mi.West of U.S.
Rte 29/50 and Rte123
Intersection TO 0.379 mi. East of
U.S.RTe 29/50 and Rte 123
29 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $12,595,860 $2,294,138 $1,769,895 MOD
2/24/2015 106808 PE RIDESHARING
ENHANCEMENTS AND
TDM IN ALEXANDRIA
FY'11 - '14
FROM CITYWIDE TO CITYWIDE 9999 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $1,401,659 $1,401,659 $1,121,327 NEW
Page 11 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/18/2015 106914 PE MATOC Annual Support
FY16-FY18
FROM A REGIONAL
TRANSPORTATION
COORDINATION AND TO
COMMUNICATION PROGRAM -
METROPOLITAN WASHINGTON,
DC
9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$1,294,820 $400,000 $64,156 NEW
3/19/2015 86333 CN VA 28 SB to I-66 EB -
EXTEND LEFT TURN
LANES
FROM 0.04 MI. South of I-66
East Ramp TO 0.27 MI. NORTH
of I-66 East Ramp
28 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$3,382,159 ($70,091) $981,190 ACC
3/20/2015 90829 CN Columbia Pike Trail -
Holmes Run to Powell
Lane
FROM Holmes Run Stream
Valley Park TO Powell Lane
244 Northern
Virginia :
Fairfax
County
Northern
Virginia
Miscella
neous
Fairfax
County
$719,476 $0 $202 ACC
3/20/2015 105363 PE I-395 CORR
CONGESTION IMPROV
UPGRADE RAMP
METERING
FROM Edsall Road TO Boundary
Channel Drive
395 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$269,296 $0 $100,000 ACC
3/20/2015 95657 CN Duke Street Signal
Upgrades with Ped
Accommodations
FROM S. Walker St. TO N
PAxton St.
0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $844,415 $0 $26,826 ACC
3/20/2015 90254 PE Install Roadway Lighting
on Richmond Highway
FROM Janna Lee Rt 1202 TO
Ladson Lane Rt 921
1 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$145,325 $0 $3,138 ACC
3/23/2015 96529 CN LOCAL TRAIL
MANAGEMENT PILOT
FROM Int. Rt. 626 (Halfway
Rd)/Rt. 807 (Sullivans Mill Rd)
TO Middleburg Elementary
School
9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$85,000 $16,760 $0 AWD
Page 12 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/24/2015 68825 PE RTE 50 - TRAFFIC
CALMING - VILLAGE OF
ALDIE
FROM 0.290 MILE WEST ROUTE
734 (SNICKERSVILLE TURNPIKE)
TO 0.111 MILE EAST ROUTE 631
(NEW MOUNTAIN ROAD)
50 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Loudoun
County
$2,163,924 $43,924 $43,924 MOD
3/24/2015 71614 PE City of Fairfax, Kamp
Washington Intersection
Improvements
FROM AT INTERSECTION OF
ROUTES 29/50 & 236 TO
29 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $1,020,000 $20,000 $16,000 MOD
3/24/2015 79791 PE ALEXANDRIA BUS
SHELTERS
FROM VARIOUS LOCATIONS
THRU OUT ALEXANDRIA TO
0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $194,334 $36,000 $28,800 MOD
3/24/2015 86333 PE VA 28 SB to I-66 EB -
EXTEND LEFT TURN
LANES
FROM 0.04 MI. South of I-66
East Ramp TO 0.27 MI. NORTH
of I-66 East Ramp
28 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$623,109 $3,221 $3,221 MOD
3/25/2015 92999 PE Rt.1-Fuller Heights Road-
Fuller Road relocation
proje.
FROM Intersection
Improvements at Rt. 1 /Rt. 619
TO Intersection Improvements
at Rt. 1/Rt. 619
1 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$1,147,899 $222,899 $178,319 MOD
3/25/2015 100632 PE Ryan Road Shared Use
Path
FROM 0.308 Mi East of Belmont
Ridge Road TO 0.142 Mi West of
Old Ryan Road
772 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$662,212 $251,641 $226,477 MOD
3/25/2015 104002 PE SR 286 Install High
Tension Cable
"Guardrail" in Median
FROM SR 7412 Walnut Branch
Rd (Mile Post 21.28) TO SR 828
Wiehle Av (Mile Post 22.60)
286 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$19,999 $7,335 $6,602 MOD
3/26/2015 93000 PE Modify Right Turn Lane
on Williamson Blvd. to
Business 234
FROM NB Route 234 Business
(Sudley Rd) TO 0.06 miles East of
Route 234 Business (Sudley Rd.)
234 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$304,919 $4,919 $4,427 MOD
Page 13 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/26/2015 97736 PE Town of Occoquan
Pedestrian Safety
Enhancement, VA
FROM 0.03 mi North of Edgehill
Drive (Mile Marker 1.7) TO West
Locust Street (Mile Marker 1.8)
906 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$123,248 $8,783 $8,783 MOD
3/26/2015 98368 PE Add Lighting @ SR 784
& SR 2457 Cherrydale
FROM 0.14 Miles W of SR 2457
Cherrydale Dr on SR 784 TO 0.13
Miles E of SR 2457 Cherrydale
Dr/Barksdale St on SR 784
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$224,304 $10,787 $14,389 MOD
3/26/2015 100640 PE Redesign intersection of
Arlington Blvd and
Manchester
FROM Arlington Blvd TO
Manchester
50 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$170,000 $19,600 $19,600 MOD
3/26/2015 100649 PE Construct
Channelization, Ped
Facilities on US 1
FROM Prince William Pkwy/
Longview Drive TO Prince
William Pkwy/ Longview Drive
1 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$207,864 $52,850 $47,565 MOD
3/26/2015 103038 PE Optimization of Traffic
Signals in the City of
Fairfax
FROM Citywide TO Citywide 0 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $232,936 $17,350 $13,880 MOD
3/30/2015 71614 CN City of Fairfax, Kamp
Washington Intersection
Improvements
FROM AT INTERSECTION OF
ROUTES 29/50 & 236 TO
29 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $6,508,100 $0 $2,948,756 ACC
3/30/2015 84358 CN Route 621- Intersection
Improvements at Route
772
FROM 0.17 Mi S. of Ryan Road
(Route 772) TO 0.21 Mi N. of
Ryan Road (Route 772)
621 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$2,826,243 $553,770 $1,961,914 AWD
Page 14 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/30/2015 93000 RW Modify Right Turn Lane
on Williamson Blvd. to
Business 234
FROM NB Route 234 Business
(Sudley Rd) TO 0.06 miles East of
Route 234 Business (Sudley Rd.)
234 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$149,699 $52,969 $47,672 MOD
3/30/2015 96750 PE Install Curb & Gutter,
Sidewalks and Upgrade
Signal on US 50
FROM Park Drive TO 500'away
from Intersection
50 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$237,098 $83,200 $83,200 MOD
3/30/2015 96751 PE Install Curb & Gutter,
Sidewalk and Upgrade
Signal on US 50
FROM Irving Street TO 500'
away from intersection
50 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$308,580 $91,000 $91,000 MOD
3/30/2015 98283 CN Upgrade Existing Traffic
Signal_Wiehle Av &
Center Harbor Rd
FROM Center Harbor (Route
7410) TO Center Harbor (Route
7410)
828 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$289,237 ($16,843) $15,159 MOD
3/30/2015 96752 PE Construct Shared Use
Path on Eastside of
Signal View Drive
FROM Roseberry Farm Drive TO
Manassas Drive
2590 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$321,338 $172,375 $155,482 MOD
3/30/2015 100634 PE Custis Trail and W&OD
Trail Safety
Improvements
FROM N.Oak Street TO N. Scott
Street
29 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$467,000 $254,000 $228,600 MOD
3/30/2015 100689 PE ROOSEVELT ST ADD PED
CROSSING AT
SIGNALIZED
INTERSECTION
FROM ROOSEVELT ST TO
ROOSEVELT BLVD
0 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $242,000 $100,000 $90,000 MOD
Page 15 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/30/2015 103591 PE I-395 Gate ITS Systems
Upgrade
FROM Edsall Road TO Boundary
Channel Drive
395 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$452,432 $2,432 $1,946 MOD
3/30/2015 103591 CN I-395 Gate ITS Systems
Upgrade
FROM Edsall Road TO Boundary
Channel Drive
395 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$9,897,580 $399,950 $265,630 MOD
3/31/2015 94863 CN Upgrade Existing Signal
at Old Keene Mil Rd &
Carrleigh Pkwy
FROM Old Keene Mill Road TO
Carrleigh Pkwy
644 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$257,961 $37,057 $33,351 MOD
3/31/2015 104023 CN Automatic Vehicle
Location (AVL) System
for DASH Buses
FROM Citywide TO Citywide 0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $648,115 $3,153 $2,522 MOD
4/1/2015 8645 RW RTE 7 - INTERSECTION
IMPROVEMENTS AT
BEAUREGARD, PHASE I
FROM 0.050 Mi N. of N.
Beauregard St TO 0.190 Mi. S. of
N. Beauregard St
7 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $6,219,912 $1,263,683 $1,010,946 MOD
4/3/2015 98376 PE Upgrade Signal at SR
784 Dale & SR 2025
Delaney Rd
FROM 0.02 Miles West of SR
2025 Delaney Road TO 0.02
Miles East of SR 2025 Delaney
Road
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$206,773 $20,934 $18,841 MOD
4/3/2015 98376 CN Upgrade Signal at SR
784 Dale & SR 2025
Delaney Rd
FROM 0.02 Miles West of SR
2025 Delaney Road TO 0.02
Miles East of SR 2025 Delaney
Road
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$374,145 $2,878 $2,590 MOD
4/6/2015 98438 CN Upgrd Sgnl_Ped Xing @
SR 1779 Potomac Mill &
SR 2068 Gideon
FROM SR 2068 Gideon Drive TO
SR 2068 Gideon Drive
1779 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$309,671 $67,248 $7,209 MOD
Page 16 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
4/7/2015 68823 RW, CN RTE 50 - CONSTRUCT 4
ROUNDABOUTS AT
GILBERTS CORNER
FROM AT ROUTE 15 TO 50 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Loudoun
County
$0 $74,435 ACC
4/7/2015 84358 PE Route 621- Intersection
Improvements at Route
772
FROM 0.17 Mi S. of Ryan Road
(Route 772) TO 0.21 Mi N. of
Ryan Road (Route 772)
621 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$1,066,363 $116,363 $94,776 MOD
4/8/2015 102851 PE City of Manassas Park -
SRTS - Manassas Park
MS - Trail
FROM Industry Drive TO Blooms
Quarry Road
0 Northern
Virginia :
Manassas
Park
Northern
Virginia
Miscella
neous
Manassas
Park
$145,352 $101,000 $101,000 MOD
4/8/2015 102852 PE Town of Vienna - SRTS -
Cunningham Pk ES -
Sidewalks
FROM Harmony Drive TO Lullaby
Lane
0 Northern
Virginia :
Vienna
Northern
Virginia
Miscella
neous
Vienna $55,174 $24,261 $24,261 MOD
4/9/2015 99403 PE Improve Vertical Curve
Alignment on Logmill Rd
FROM 1232 ft West of Parnell
Court TO 86 ft East of Meader
Creek Lane
701 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$1,003,392 $125,000 $125,000 MOD
4/10/2015 70506 PE BUS SHELTERS/SAFETY
ENHANCEMENTS
FROM TO Northern
Virginia :
Arlington
County
Northern
Virginia
Miscella
neous
Arlington
County
$208,547 $1,244 $995 MOD
4/15/2015 68760 PE VILLAGE OF LUCKETTS -
SAFETY
IMPROVEMENTS IN
LOUDOUN COUNTY
FROM 0.39 MILE SOUTH
LUCKETTS RD/STUMPTOWN RD
(RTE 662) TO 0.24 MILE NORTH
LUCKETTS RD/STUMPTOWN RD
(RTE 662)
15 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Loudoun
County
$1,817,517 $551,454 $551,454 MOD
4/20/2015 81077 CN CITYWIDE SIDEWALK
CONNECTIONS
FROM Oasis Dr. (Western City
Limits) TO S. Walker St.
236 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $950,358 $727,129 $581,703 NEW
Page 17 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
4/20/2015 100632 CN Ryan Road Shared Use
Path
FROM 0.308 Mi East of Belmont
Ridge Road TO 0.142 Mi West of
Old Ryan Road
772 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$327,695 $481,140 $102,112 NEW
4/24/2015 79791 CN ALEXANDRIA BUS
SHELTERS
FROM VARIOUS LOCATIONS
THRU OUT ALEXANDRIA TO
0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $1,142,326 $0 ($23,967) MOD
4/24/2015 81077 PE CITYWIDE SIDEWALK
CONNECTIONS
FROM Oasis Dr. (Western City
Limits) TO S. Walker St.
236 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $236,748 $18,000 $14,400 MOD
4/30/2015 106523 CN NRO DMS LIFE-CYCLE
REPLACEMENT - ON
PRIMARY ROUTES
FROM Various TO Various 66 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$770,416 $337,989 $304,106 NEW
5/1/2015 100689 RW ROOSEVELT ST ADD PED
CROSSING AT
SIGNALIZED
INTERSECTION
FROM ROOSEVELT ST TO
ROOSEVELT BLVD
0 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $15,000 $41,906 $37,715 NEW
5/6/2015 97736 CN Town of Occoquan
Pedestrian Safety
Enhancement, VA
FROM 0.03 mi North of Edgehill
Drive (Mile Marker 1.7) TO West
Locust Street (Mile Marker 1.8)
906 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$207,173 $213,833 $70,393 NEW
5/12/2015 107242 PE AIDD GRANT MINI
ROUNDABOUT IN
VIENNA
FROM AT LOCUST STREET SE TO
AT LOCUST STREET SE
9999 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $75,000 $50,000 $40,000 NEW
5/19/2015 99403 CN Improve Vertical Curve
Alignment on Logmill Rd
FROM 1232 ft West of Parnell
Court TO 86 ft East of Meader
Creek Lane
701 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$3,603,053 $3,675,595 $2,947,347 NEW
Page 18 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
5/19/2015 102851 RW City of Manassas Park -
SRTS - Manassas Park
MS - Trail
FROM Industry Drive TO Blooms
Quarry Road
0 Northern
Virginia :
Manassas
Park
Northern
Virginia
Miscella
neous
Manassas
Park
$21,937 $28,897 $28,897 NEW
5/20/2015 52725 CN CLEAN AIR PARTNERS FROM (FORMERLY ENDZONE
REGIONAL PUBLIC EDUCATION
CAMPAIGN) TO
Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$3,649,000 $0 $150,000 ACC
5/26/2015 98372 CN Intersection
Improvements Dale Blvd
(Rte 784) at Hillendale
FROM 0.09 Miles West of
Hillendale Drive TO 0.01 Miles
East of Hillendale Drive
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$1,651,187 $1,340,958 $812,227 NEW
5/27/2015 77170 PE Purcellville - North 21st
St Sidewalk Improv
FROM 100' Southeast of
Branbury Glen Court TO 100'
Northwest of N 23rd Street
7 Northern
Virginia :
Purcellville
Northern
Virginia
Primary Purcellville $210,118 $10,118 $9,106 MOD
5/28/2015 90517 PE RTE 641 - CONSTRUCT
SIDEWALK ON NORTH
SIDE OF ROAD
FROM Cricket Lane (Rte
2217)/Dillingham Square TO
Mohican Road
641 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$325,142 $14,298 $12,868 MOD
5/28/2015 98438 PE Upgrd Sgnl_Ped Xing @
SR 1779 Potomac Mill &
SR 2068 Gideon
FROM SR 2068 Gideon Drive TO
SR 2068 Gideon Drive
1779 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$60,131 $5,131 $4,618 MOD
5/28/2015 102850 PE City of Falls Church -
SRTS - Henderson MS -
Ped safety imp.
FROM 7130 Leesburg Pike TO
7130 Leesburg Pike
0 Northern
Virginia :
Falls Church
Northern
Virginia
Miscella
neous
Falls Church $20,480 $480 $480 MOD
5/29/2015 CN ($48,423) ($48,515) MOD
Page 19 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
6/2/2015 107056 CN I-395 Ramp Metering
ITS Systems Upgrade
Improvement
FROM Edsall Road TO Boundary
Channel
395 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$33,213
6/3/2015 103590 PE I-395 Ramp Metering
ITS Systems Upgrade
FROM Edsall Road TO Boundary
Channel Drive
395 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$162,867 $12,867 $11,580 MOD
6/3/2015 106473 PE NORTHERN VIRGINIA
TERMS - FY16-18
FROM Funding For
Transportation Emission
Reduction Measures For TO
Norther Virginia Region
Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$10,023,373 $10,023,373 $1,281,786 NEW
6/12/2015 8645 RW RTE 7 - INTERSECTION
IMPROVEMENTS AT
BEAUREGARD, PHASE I
FROM 0.050 Mi N. of N.
Beauregard St TO 0.190 Mi. S. of
N. Beauregard St
7 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $6,219,912 $124,131 $99,305 MOD
6/12/2015 60644 CN RTE 620 - REMOVE
ISLAND EASTBOUND
ROUTE 620 (BRADDOCK
RD)
FROM 0.02 MILE WEST ROUTE
617 TO ROUTE 617 (BACKLICK
ROAD)
620 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$237,410 $205,368 $164,294 MOD
6/12/2015 71723 CN RTE 641 - PROVIDE
HANDICAP ACCESS
FROM East of Titania Way TO
Cricket Lane
641 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$861,770 $15,489 $12,391 MOD
6/12/2015 98425 PE Upgrd Sgnl+Ped Xing @
SR602 Reston Pk &
SR5320 SunriseValley
FROM SR 5320 Sunrise Valley
Drive TO SR 5320 Sunrise Valley
Drive
602 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$77,624 $17,624 $15,862 MOD
6/12/2015 98427 CN Upgrade Signal and Ped
Facilities on US 1 at Rt
630
FROM SR 630 Quander
Road/Fairhaven Avenue TO SR
630 Quander Road/Fairhaven
Avenue
1 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$221,245 $5,853 $5,268 MOD
Page 20 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
7/2/2015 98753 CN ROUTE 1 INSTALL
CROSSWALKS - PH2 @
VARIOUS SITES
FROM Route 268 (Fairfax County
Parkway) TO Route 1332
(Huntington Avenue)
1 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$1,030,382 $838,338 $670,671 NEW
7/9/2015 102668 PE OPNS IMPROVEMENTS
& BRIDGE REPAIR AT I-
395/SEMINARY RD
FROM 0.04 Mi S Rte 420 TO 0.34
Mi N Rte 420
395 Northern
Virginia :
Alexandria
Northern
Virginia
Intersta
te
Alexandria $2,200,000 $2,200,000 $2,200,000 NEW
7/9/2015 107831 PE OPNS IMPROVEMENTS
& BR REPAIR AT I-
395/SHIRLINGTON RD
FROM Shirlington Rd
Interchange TO Glebe Rd
Interchange
395 Northern
Virginia :
Alexandria
Northern
Virginia
Intersta
te
Alexandria $1,600,000 $1,600,000 $1,600,000 NEW
7/10/2015 96105 CN ARRA - I66 Pavement FROM Rte 50 TO I495 66 Northern
Virginia :
Fairfax
County
Northern
Virginia
Intersta
te
Fairfax
County
$20,489,287 $422,875 $422,875 MOD
7/13/2015 104597 CN (NFO) 2014 FAIRFAX
COUNTY PRIMARY
PAVING (PM-9G-14)
FROM VARIOUS TO VARIOUS 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$4,939,348 $0 $108,717 ACC
7/13/2015 105501 PE FAIRFAX COUNTY
PARKWAY RTE 286 AT
TERMINAL ROAD 3726
FROM 150 ft north of Backlick
Road TO 182 ft north of
Terminal Road (Rte 3726)
286 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$562,768 $500,000 $500,000 NEW
7/14/2015 PE $45,229 $4,070 MOD
7/16/2015 71470 CN RTE 707 - INSTALL
SIGNAL
FROM 0.005 MILE EAST ROUTE
55 TO 0.005 MILE SOUTH ROUTE
55
707 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$154,376 $57,771 $51,994 MOD for
FV
Page 21 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
7/16/2015 71721 CN RTE 234 BUS - PROVIDE
SIGNALIZED
CROSSWALKS
FROM AT ALL MAJOR
INTERSECTIONS TO
234 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$269,073 $44,871 $35,897 MOD for
FV
7/16/2015 81293 PE RTE 617 - CONSTRUCT
PEDESTRIAN SIDEWALK
FROM ROUTE 1467 Cabin John
Rd TO 0.09 Miles North of
ROUTE 1467
617 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$64,368 $14,702 $13,232 MOD
7/16/2015 98475 CN Alt Fueled Vehicles -
Dump Truck
FROM TO 0 Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $166,529 $4,759 $3,807 MOD for
FV
7/20/2015 92999 RW Rt.1-Fuller Heights Road-
Fuller Road relocation
proje.
FROM Intersection
Improvements at Rt. 1 /Rt. 619
TO Intersection Improvements
at Rt. 1/Rt. 619
1 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$2,767,465 $1,687,484 $1,000,000 MOD
7/20/2015 94213 PE Arlington Shared-Use
Path Connections
FROM 0.19 Mi. N of Army Navy
Drive TO Army Navy Drive
Northern
Virginia :
Arlington
County
Northern
Virginia
Miscella
neous
Arlington
County
$830,263 $580,263 $496,000 MOD
7/24/2015 8645 CN RTE 7 - INTERSECTION
IMPROVEMENTS AT
BEAUREGARD, PHASE I
FROM 0.050 Mi N. of N.
Beauregard St TO 0.190 Mi. S. of
N. Beauregard St
7 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $2,154,584 $1,625,654 $752,802 NEW
7/31/2015 107540 PE I95 CORR TECH ADV-US
1 CCTV PHASE 1
FROM VARIOUS TO VARIOUS 1 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$3,945 $5,000 $0 NEW
Page 22 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
8/3/2015 107542 PE I66 & I95 CORR TECH
ADV-28, 234, 286, 294
CCTV PHASE 1
FROM I-95 TO I-66 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$1,892 $5,000 $0 NEW
8/3/2015 107544 PE I66 CORR TECH ADV-29,
50, 7, 236 CCTV PHASE 1
FROM US 15 TO DC Line Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$1,950 $5,000 $0 NEW
8/12/2015 107011 PE Districtwide Buckle-Up
Signing Safety
Improvement - NOVA
FROM Various TO Various 0 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$6,784 $5,000 $5,000 NEW
8/17/2015 106343 CN ADA Compliance FROM various TO various Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$2,863,880 $2,000,000 $2,000,000 MOD
8/17/2015 106345 CN ADA COMPLIANCE FROM various TO various Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$2,863,880 $2,000,000 $2,000,000 MOD
8/20/2015 106934 RW GALLOWS RD AND
BOONE BLVD PED
INTERSECTION
IMPROVEMENTS
FROM .009 Mi S of Boone Blvd
TO .008 Mi N of Boone Blvd
650 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$25,000 $25,000 $20,000 NEW
8/25/2015 71614 CN City of Fairfax, Kamp
Washington Intersection
Improvements
FROM AT INTERSECTION OF
ROUTES 29/50 & 236 TO
29 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $6,508,100 $1,718,469 $0 AWD
Page 23 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
9/2/2015 93000 CN Modify Right Turn Lane
on Williamson Blvd. to
Business 234
FROM NB Route 234 Business
(Sudley Rd) TO 0.06 miles East of
Route 234 Business (Sudley Rd.)
234 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$325,551 $10,994 $9,895 Re-
Establish
9/2/2015 93568 CN Roadway improvements
including align, lane,
shldr, guardrail
FROM O.06 Miles North of Cedar
Ridge Blvd (Rte 2738) TO 0.02
Miles North of Sweetwater Lane
659 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$3,248,575 $2,699,075 $0 NEW
9/2/2015 105596 PE I-66 WB at RTE 28
SHOULDER
iMPROVEMENT
FROM West of Exit Ramp 53B TO
Exit Ramp 53B
66 Northern
Virginia :
Fairfax
County
Northern
Virginia
Intersta
te
Fairfax
County
$54,251 $120,000 $0 NEW
9/3/2015 85374 CN Wilkes Street Bicycle
Safety Improvements at
Intersections
FROM S. West St. TO S. Royal St. 0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $135,099 $68,536 $50,281 AWD
9/4/2015 99403 CN Improve Vertical Curve
Alignment on Logmill Rd
FROM 1232 ft West of Parnell
Court TO 86 ft East of Meader
Creek Lane
701 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$3,603,053 ($72,542) $0 AWD
9/9/2015 93570 PE Mod. Signal and Add
LTLs on Braddock Road
FROM Intersection at TO
Ravensworth Road
620 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$426,118 $65,118 $58,606 MOD
9/9/2015 96998 PE Intersection
improvements @ Rte.
620/7783/659
FROM SR 620 New Braddock Rd
TO Union Mill Road Rte 659
620 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$262,197 $14,749 $13,274 MOD
9/9/2015 100646 CN Modify Traffic Signal at
Rte 846 and Rte 636
FROM Sterling Blvd (Rt 846) TO
Shaw Rd (Rt 636)
846 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$45,457 $4,296 $3,866 MOD
Page 24 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
9/9/2015 107011 CN Districtwide Buckle-Up
Signing Safety
Improvement - NOVA
FROM Various TO Various 0 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$3,546 $132,269 $0 NEW
9/14/2015 17837 RW RTE 621 - IMPROVE
SIGHT DISTANCE &
CONSTRUCT TURN
LANES
FROM 0.065 MILE EAST ROUTE
660 TO 0.011 MILE WEST ROUTE
660
621 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$83,873 $8,600 $7,740 MOD
9/14/2015 87493 PE Transportation System
Management &
Communications Plant
Upgr
FROM Countywide TO Northern
Virginia :
Arlington
County
Northern
Virginia
Miscella
neous
Arlington
County
$1,012,102 $2,103 $1,682 MOD
9/15/2015 52981 RW RTE 609 - STRAIGHTEN
CURVE (HES PROGRAM
PROJECT)
FROM AT 0.2 MILE NORTH
ROUTE 620 TO
609 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$293,800 $4,690 $4,221 MOD
9/17/2015 70632 CN SOAPSTONE DRIVE TRAIL FROM South Lakes Drive TO
Glade Drive
4720 Northern
Virginia :
Fairfax
County
Northern
Virginia
Miscella
neous
Fairfax
County
$1,378,227 $242,754 $0 AWD
9/21/2015 97736 CN Town of Occoquan
Pedestrian Safety
Enhancement, VA
FROM 0.03 mi North of Edgehill
Drive (Mile Marker 1.7) TO West
Locust Street (Mile Marker 1.8)
906 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$207,173 $45,904 $51,036 AWD
9/22/2015 107242 CN AIDD GRANT MINI
ROUNDABOUT IN
VIENNA
FROM AT LOCUST STREET SE TO
AT LOCUST STREET SE
9999 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $321,885 $214,000 $171,200 NEW
Page 25 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
9/24/2015 107405 PE INSTALL SIGNAL @
BLACKBURN RD -
RIPPON BLVD
INTERSECTION
FROM 0.1 Mi N of Rippon
Boulevard TO 0.1 Mi S of Rippon
Boulevard
638 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$270,000 $130,000 $0 NEW
9/27/2015 85380 CN Edsall Road & South
Pickett Street
Intersection
Improvements
FROM Intersection with TO
Edsall Road
0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $323,487 $341,108 $0 NEW
10/29/2015 98372 CN Intersection
Improvements Dale Blvd
(Rte 784) at Hillendale
FROM 0.09 Miles West of
Hillendale Drive TO 0.01 Miles
East of Hillendale Drive
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$1,651,187 $98,245 $561,916 Re-Ad
10/29/2015 105597 PE RTE 234 - DUMFRIES
ROAD - PEDESTRIAN
IMPROVEMENTS
FROM Four Seasons Drive TO
0.11 Miles North of Four
Seasons Drive
234 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$350,000 $220,000 $220,000 NEW
10/29/2015 106942 PE CONSTRUCT MINI
ROUNDABOUT - RTE
742 AND EDGEWATER
ST
FROM AT INTERSECTION OF
POLAND RD AND EDGEWATER
TO 300' FROM INTERSECTION
OF POLAND RD AND
EDGEWATER
742 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$400,000 $210,000 $0 NEW
11/10/2015 106609 PE NRO DMS LIFE-CYCLE
REPLACEMENT -
EXISTING SUPPORT
POLES
FROM REGIONWIDE TO
REGIONWIDE
Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$22,959 $105,000 $94,500 NEW
11/10/2015 107436 CN WIEHLE AVE/DULLES
TOLL ROAD RAMPS
(NORTH SIDE) SIDEWALK
FROM Dulles Toll Road Ramp TO
Dulles Toll Road Ramp
828 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$77,194 $60,398 $0 NEW
Page 26 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
11/18/2015 100632 CN Ryan Road Shared Use
Path
FROM 0.308 Mi East of Belmont
Ridge Road TO 0.142 Mi West of
Old Ryan Road
772 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$327,695 ($42,371) $292,780 AWD
11/18/2015 81077 CN CITYWIDE SIDEWALK
CONNECTIONS
FROM Oasis Dr. (Western City
Limits) TO S. Walker St.
236 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $950,358 $223,229 $150,297 AWD
11/24/2015 100462 RW Installation of Traffic
Signal- Route 50 at
Draper Drive
FROM Intersection of TO Draper
Drive
50 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $40,452 $74,900 $59,920 NEW
11/25/2015 86514 PE Shift the Median to the
Right for left turn
Realignment
FROM Loisdale Road TO Loisdale
Court
789 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$216,828 $16,827 $15,145 MOD
12/4/2015 97613 PE Arlington Bus Shelter
Contract Various Sites -
Ph2
FROM 10 Bus Shelter Sites TO Northern
Virginia :
Arlington
County
Northern
Virginia
Miscella
neous
Arlington
County
$38,552 $1,552 $1,242 MOD
12/4/2015 100641 CN Install Signal and
Redesign Intersection at
Cascades Pkwy
FROM Cascades Parkway TO
Costco Plaza
1794 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$273,733 $53,733 $48,360 MOD
12/4/2015 100644 PE Improve sight distance
at Old Keene Mill Rd &
Rte 638
FROM Old Keene Mill Rd (Rt
644) TO Rolling Rd (Rt 638)
644 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$119,594 $19,594 $17,635 MOD
12/14/2015 85374 PE Wilkes Street Bicycle
Safety Improvements at
Intersections
FROM S. West St. TO S. Royal St. 0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $44,901 $14,901 $11,921 MOD
Page 27 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
12/14/2015 98753 CN ROUTE 1 INSTALL
CROSSWALKS - PH2 @
VARIOUS SITES
FROM Route 268 (Fairfax County
Parkway) TO Route 1332
(Huntington Avenue)
1 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$192,044 $153,635 AWD
12/21/2015 93568 CN Roadway improvements
including align, lane,
shldr, guardrail
FROM O.06 Miles North of Cedar
Ridge Blvd (Rte 2738) TO 0.02
Miles North of Sweetwater Lane
659 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$3,248,575 $368,000 $2,491,432 AWD
1/7/2016 106504 CN NRO NOVA Signal Safety
Improvements
FROM Districtwide TO
Districtwide
9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$899,683 $150,000 $0 MOD
1/8/2016 108112 CN NOVA DISTRICT-WIDE
ADA CURB RAMP
IMPROVEMENTS
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$500,000 $0 NEW
1/13/2016 100649 CN Construct
Channelization, Ped
Facilities on US 1
FROM Prince William Pkwy/
Longview Drive TO Prince
William Pkwy/ Longview Drive
1 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$231,073 $4,711 $4,240 MOD
1/21/2016 105596 CN I-66 WB at RTE 28
SHOULDER
iMPROVEMENT
FROM West of Exit Ramp 53B TO
Exit Ramp 53B
66 Northern
Virginia :
Fairfax
County
Northern
Virginia
Intersta
te
Fairfax
County
$423,995 $0 NEW
1/26/2016 105596 PE I-66 WB at RTE 28
SHOULDER
iMPROVEMENT
FROM West of Exit Ramp 53B TO
Exit Ramp 53B
66 Northern
Virginia :
Fairfax
County
Northern
Virginia
Intersta
te
Fairfax
County
$54,251 ($65,000) $55,000 ACC
Page 28 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
2/3/2016 85380 CN Edsall Road & South
Pickett Street
Intersection
Improvements
FROM Intersection with TO
Edsall Road
0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $323,487 ($1,515) $271,674 AWD
2/16/2016 105363 CN I-395 CORR
CONGESTION IMPROV
UPGRADE RAMP
METERING
FROM Edsall Road TO Boundary
Channel Drive
395 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$1,068,312 $1,086,312 $0 NEW
2/26/2016 70599 PE RTE 236 - CONGESTION
RELIEF PROJECT
FROM Dove Street TO Walker
Street
236 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $77,505 $10,004 $8,004 MOD
2/29/2016 57416 RW RTE 692 - DRAINAGE
IMPROVEMENTS
FROM 0.10 MILE N. HIDDEN
SPRING DRIVE, ROUTE 2559 TO
0.16 MILE SOUTH HIDDEN
SPRING DRIVE, ROUTE 2559
692 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$236,489 $56,216 $44,973 MOD
3/1/2016 106573 PE RTE 7 INTERCHANGE AT
BATTLEFIELD PKWY
FROM Int. Cardinal Park Drive
TO Int. River Creek Pkwy /
Crosstrail Blvd
7 Northern
Virginia :
Leesburg
Northern
Virginia
Primary Leesburg $4,000,000 $4,000,000 $0 NEW
3/2/2016 106473 PE NORTHERN VIRGINIA
TERMS - FY16-18
FROM Funding For
Transportation Emission
Reduction Measures For TO
Norther Virginia Region
Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$10,023,373 $0 $2,151,227 ACC
3/4/2016 107405 PE INSTALL SIGNAL @
BLACKBURN RD -
RIPPON BLVD
INTERSECTION
FROM 0.1 Mi N of Rippon
Boulevard TO 0.1 Mi S of Rippon
Boulevard
638 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$270,000 $0 $104,000 ACC
Page 29 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/4/2016 108079 CN ADA COMPLIANCE FOR
LOUDOUN & PRINCE
WILLIAM
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$631,751 $995,513 $0 NEW
3/10/2016 107438 RW SUNRISE VALLEY
SIDEWALK - S. SIDE,
GLADE TO RESTON
PKWY
FROM Glade Drive TO Reston
Parkway
5320 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$880,500 $880,500 $704,400 NEW
3/14/2016 92999 RW Rt.1-Fuller Heights Road-
Fuller Road relocation
proje.
FROM Intersection
Improvements at Rt. 1 /Rt. 619
TO Intersection Improvements
at Rt. 1/Rt. 619
1 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$2,767,465 $0 $779,127 ACC
3/16/2016 98372 CN Intersection
Improvements Dale Blvd
(Rte 784) at Hillendale
FROM 0.09 Miles West of
Hillendale Drive TO 0.01 Miles
East of Hillendale Drive
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$1,651,187 $214,609 $193,148 MOD
3/18/2016 106609 CN NRO DMS LIFE-CYCLE
REPLACEMENT -
EXISTING SUPPORT
POLES
FROM REGIONWIDE TO
REGIONWIDE
Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$749,497 $765,862 $588,035 NEW
3/24/2016 98372 PE Intersection
Improvements Dale Blvd
(Rte 784) at Hillendale
FROM 0.09 Miles West of
Hillendale Drive TO 0.01 Miles
East of Hillendale Drive
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$582,040 $191,400 $172,260 MOD
Page 30 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/28/2016 99403 PE Improve Vertical Curve
Alignment on Logmill Rd
FROM 1232 ft West of Parnell
Court TO 86 ft East of Meader
Creek Lane
701 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$1,003,392 $555,000 $545,438 MOD
3/28/2016 103932 CN ITS Integration Phase II FROM Citywide TO Citywide 0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $2,788,783 $1,087,309 $869,847 AWD
3/29/2016 99403 CN Improve Vertical Curve
Alignment on Logmill Rd
FROM 1232 ft West of Parnell
Court TO 86 ft East of Meader
Creek Lane
701 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$3,603,053 $0 $307,367 ACC
3/31/2016 81410 PE DISTRICTWIDE
ROADWAY SAFETY
ASSESSMENT - NOVA
DISTRICT
FROM FY07 HSIP PROJECT TO 0 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$1,582,588 $616,050 $616,050 MOD
3/31/2016 99403 RW Improve Vertical Curve
Alignment on Logmill Rd
FROM 1232 ft West of Parnell
Court TO 86 ft East of Meader
Creek Lane
701 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$414,436 $857,980 $686,384 MOD
4/5/2016 105372 CN I-95 & I-66 CORR
CONGEST IMPROV DMS
UPGRADE TRAVELER
INFO
FROM Various TO Various Northern
Virginia :
Multi-
jurisdictional
: Northern
Virginia MPO
Northern
Virginia
Intersta
te
Multi-
jurisdictional:
Northern
Virginia MPO
$960,910 $1,432,004 $0 NEW
4/7/2016 89889 PE HERNDON PARKWAY
INTERSECTION AT VAN
BUREN STREET
FROM HDN PKWY10+92.28;
VanBuren St 16+78.41 TO HDN
PKWY 19+63.19; VanBuren St.
22+53.30
606 Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $512,000 $412,000 $329,600 MOD
Page 31 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
4/7/2016 102848 CN Fairfax County - SRTS -
Terra Centre ES -
Crossing Imp.
FROM Marshall Pond Road TO
Marshall Pond Road
0 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$203,713 $151,715 $0 NEW
4/15/2016 100423 RW ROBERTS ROAD
SIDEWALK
IMPROVEMENTS
FROM Main Street TO Sager
Avenue
0 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $246,270 $260,000 $125,955 NEW
4/19/2016 16632 CN Intersec & Drainage
Impro At Fairfax Blvd
(Rte 29/50 &123)
FROM 0.266 mi.West of U.S.
Rte 29/50 and Rte123
Intersection TO 0.379 mi. East of
U.S.RTe 29/50 and Rte 123
29 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $28,955,520 $21,066,459 $0 NEW
4/20/2016 76683 CN INTERSECTION
IMPROVEMENTS TO
MANASSAS DRIVE AT
EUCLID AVENUE
FROM At Euclid Avenue TO Northern
Virginia :
Manassas
Park
Northern
Virginia
Urban Manassas
Park
$2,166,350 $1,746,130 $0 NEW
4/25/2016 105283 CN TOWN OF VIENNA -
SRTS - VIENNA ES -
SIDEWALKS, XWALKS,
ADA
FROM LOCUST ST TO MOORE ST 0 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $360,337 $429,151 $0 NEW
4/26/2016 96751 CN Install Curb & Gutter,
Sidewalk and Upgrade
Signal on US 50
FROM Irving Street TO 500'
away from intersection
50 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$727,050 $696,009 $0 NEW
4/27/2016 100689 PE ROOSEVELT ST ADD PED
CROSSING AT
SIGNALIZED
INTERSECTION
FROM ROOSEVELT ST TO
ROOSEVELT BLVD
0 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $242,000 $110,000 $99,000 MOD
5/2/2016 8645 CN RTE 7 - INTERSECTION
IMPROVEMENTS AT
BEAUREGARD, PHASE I
FROM 0.050 Mi N. of N.
Beauregard St TO 0.190 Mi. S. of
N. Beauregard St
7 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $2,154,584 $528,930 $0 AWD
Page 32 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
5/4/2016 99179 PE Traffic Signal
Optimization - Phase 6
FROM Arlington County Wide
TO Arlington County Wide
Northern
Virginia :
Arlington
County
Northern
Virginia
Miscella
neous
Arlington
County
$2,255,267 $786,267 $130,067 MOD
5/4/2016 107436 CN WIEHLE AVE/DULLES
TOLL ROAD RAMPS
(NORTH SIDE) SIDEWALK
FROM Dulles Toll Road Ramp TO
Dulles Toll Road Ramp
828 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$77,194 $16,796 $61,755 AWD
5/11/2016 97736 CN Town of Occoquan
Pedestrian Safety
Enhancement, VA
FROM 0.03 mi North of Edgehill
Drive (Mile Marker 1.7) TO West
Locust Street (Mile Marker 1.8)
906 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$207,173 $45,904 $64,139 AWD
5/12/2016 106362 PE VA-289E BRIDGE OVER
ACCOTINK CREEK, ADD
BARRIER, FOA TO GR
FROM 0.58 East of Fairfax
County Pkwy JNC TO 0.64 East
of Fairfax County Pkwy JNC
289 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$150,000 $90,000 $81,000 NEW
5/18/2016 79791 CN ALEXANDRIA BUS
SHELTERS
FROM VARIOUS LOCATIONS
THRU OUT ALEXANDRIA TO
0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $1,142,326 $180,893 $0 AWD
5/23/2016 108447 PE ROADWAY DEPARTURE
CRASH MITIGATION -
NOVA
FROM Various TO Various 0 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$125,000 $125,000 $112,500 NEW
5/26/2016 99054 RW Rte 1 - Install
Crosswalks - RW Phase 1
FROM 0.025 Miles North of
Belford Drive TO 0.134 Miles
West of Lukens Lane
1 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$1,873,514 $1,917 $1,534 MOD
Page 33 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
5/26/2016 107540 CN I95 CORR TECH ADV-US
1 CCTV PHASE 1
FROM VARIOUS TO VARIOUS 1 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$225,000 $213,181 $0 NEW
5/26/2016 108491 PE TRANSFORM 66
CONGESTION
MITIGATION TRANS
MGMT PLAN
FROM TRANSIT OPS, TDM,
COMMUNICATIONS, INCIDENT
MGMT, MOT TO & LNO/ITS
ALONG I-66 FROM RTE
29/ROSSLYN TUNNEL TO RTE 15
66 Northern
Virginia :
Fairfax
County
Northern
Virginia
Intersta
te
Fairfax
County
$30,000,000 $30,000,000 $24,000,000 NEW
5/27/2016 107542 CN I66 & I95 CORR TECH
ADV-28, 234, 286, 294
CCTV PHASE 1
FROM I-95 TO I-66 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$198,000 $188,946 $0 NEW
5/27/2016 107544 CN I66 CORR TECH ADV-29,
50, 7, 236 CCTV PHASE 1
FROM US 15 TO DC Line Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$228,000 $213,693 $0 NEW
6/6/2016 8645 CN RTE 7 - INTERSECTION
IMPROVEMENTS AT
BEAUREGARD, PHASE I
FROM 0.050 Mi N. of N.
Beauregard St TO 0.190 Mi. S. of
N. Beauregard St
7 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $2,154,584 $531,862 $425,490 MOD
6/10/2016 71465 PE ADD LTL ON RTE. 621,
RTL ON RTE. 622, AND A
TS.
FROM 0.17 Miles west of Rte.
622 TO 0.12 Miles east of Rte.
622
621 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$927,087 $113,495 $76,129 MOD
6/10/2016 102851 CN City of Manassas Park -
SRTS - Manassas Park
MS - Trail
FROM Industry Drive TO Blooms
Quarry Road
0 Northern
Virginia :
Manassas
Park
Northern
Virginia
Miscella
neous
Manassas
Park
$1,136,343 $1,024,649 $317,603 NEW
Page 34 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
6/23/2016 70586 PE CITY OF ALEXANDRIA -
TRAFFIC SIGNAL
SYNCHRONIZATION
FROM (MPO PROJECT)PE ONLY
TO
Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $191,377 $190,273 $152,218 Re-
Establish
7/5/2016 105284 RW TOWN OF HERNDON -
SRTS - HERNDON ES -
SIDEWALKS
FROM VAN BUREN ST TO
Dransville Road
0 Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $14,000 $14,000 $14,000 NEW
7/6/2016 106992 PE SIGNAL REBUILD AND
REALIGN RTE 7 / KING
STREET AND DAWES
FROM INTERSECTION RTE
7/KING STREET AND DAWES
100' EAST TO INTERSECTION RTE
7/ KING STREET AND
CHESTERFIELD 500' WEST
7 Northern
Virginia :
Alexandria
Northern
Virginia
Primary Alexandria $200,000 $200,000 $200,000 NEW
7/11/2016 109591 PE CONSTRUCT TURN
LANE/SIGNAL AT
WILLIAMSON BLVD
STONEHOUSE DR
FROM Intersection of
Williamson Blvd and Stonehouse
Dr TO Intersection of Williamson
Blvd and Stonehouse Dr
1596 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$190,000 $190,000 $190,000 NEW
7/19/2016 108414 CN NRO High Visibility
SIgnal Backplate Safety
Improvements
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$1,224,279 $1,000,000 $0 NEW
7/25/2016 106473 PE NORTHERN VIRGINIA
TERMS - FY16-18
FROM Funding For
Transportation Emission
Reduction Measures For TO
Norther Virginia Region
Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$10,023,373 $0 $2,342,895 ACC
7/26/2016 104597 CN (NFO) 2014 FAIRFAX
COUNTY PRIMARY
PAVING (PM-9G-14)
FROM VARIOUS TO VARIOUS 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$4,939,348 $0 $3,020,948 ACC
Page 35 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
7/27/2016 50100 PE #SMART18 WIDEN E
ELDEN ST FROM VAN
BUREN ST TO FXCO
PKWY
FROM VAN BUREN STREET TO
ECL OF HERNDON
Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $3,985,510 $3,914,201 $1,223,463 MOD
7/27/2016 107011 CN Districtwide Buckle-Up
Signing Safety
Improvement - NOVA
FROM Various TO Various 0 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$3,546 $0 $132,269 ACC
7/27/2016 91247 cn Construction of
pedestrian walkways &
enhancements to a park
FROM 0.05 mi. south int.
Marshal Street, int. Madison
Street TO 0.02 mi. north int.
Marshal Street, int. Liberty Street
626 Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Middleburg $450,056 $69,200 $69,200 MOD
7/27/2016 109309 PE #HB2.FY17 UNIVERSITY
DRIVE EXTENSION
FROM FAIRFAX BLVD TO EATON
PL
9999 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $300,000 $300,000 $0 NEW
7/28/2016 107541 PE I95 CORR TECH ADV-US
1 CCTV PHASE 2
FROM VARIOUS TO VARIOUS 1 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$51,000 $70,000 $0 NEW
7/28/2016 107543 PE I66 & I95 CORR TECH
ADV-28, 234, 286, 294
CCTV PHASE 2
FROM i-95 TO i-66 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$65,000 $50,000 $0 NEW
7/28/2016 107545 PE I66 CORR TECH ADV-29,
50, 7, 236 CCTV PHASE 2
FROM US 15 TO DC Line Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$115,000 $100,000 $0 NEW
Page 36 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
8/4/2016 100634 CN Custis Trail and W&OD
Trail Safety
Improvements
FROM N.Oak Street TO N. Scott
Street
29 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$1,458,000 $1,396,044 $1,117,018 NEW
8/4/2016 104598 CN 2014 NOVA INTERSTATE
PAVING (PM-9I-14)
FROM VARIOUS TO VARIOUS 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$8,420,695 $0 $2,594,000 ACC
8/8/2016 109486 PE TRANSFORM 66 CM
TMP - RTE 15 AND I66
HAYMARKET P&R LOT
FROM Ramp B @ I66 and Rte 15
TO Rte 15 and Heathcote Blvd
15 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$600,309 $1,000,000 $800,000 NEW
8/9/2016 107548 PE I95 CORR TECH ADV-US
1 SIGNAL OPERATIONS
ENHANCEMENT
FROM VARIOUS TO VARIOUS 1 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$333,777 $333,777 $0 NEW
8/9/2016 107549 PE I66 & I95 CORR TECH
ADV-28, 234, 286, 294
SIGNAL OP ENHANCE
FROM I-95 TO I-66 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$334,262 $334,262 $0 NEW
8/9/2016 107550 PE I66 CORR TECH ADV-29,
50, 7, 236 SIGNAL OPS.
ENHANCEMENT
FROM US 15 TO DC Line Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$851,143 $687,143 $0 NEW
8/11/2016 52284 CN RTE 120 - NORTH GLEBE
ROAD PEDESTRIAN
CROSSINGS
FROM FAIRFAX DRIVE TO
NORTH CARLIN SPRINGS ROAD
120 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$2,852,794 $370,982 $296,786 MOD
Page 37 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
8/12/2016 106549 PE Committed Safety
Projects-Northern VA
FROM various TO various 0 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$3,816,874 $3,816,874 $46,408 NEW
8/17/2016 70586 PE CITY OF ALEXANDRIA -
TRAFFIC SIGNAL
SYNCHRONIZATION
FROM (MPO PROJECT)PE ONLY
TO
Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $191,377 $190,273 $152,218 MOD
8/17/2016 105285 CN PRINCE WILLIAM
COUNTY - SRTS -
ANTIETAM - SIDEWALK
FROM OLD BRIDGE ROAD TO
WOODFERN COURT
2185 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$836,000 $835,824 $266,000 NEW
8/19/2016 101689 CN TSM Fiber Optic Plant
Upgrades - PH3
Construction
FROM County Wide TO County
Wide
Northern
Virginia :
Arlington
County
Northern
Virginia
Miscella
neous
Arlington
County
$8,687,766 $0 $1,038,813 MOD
8/25/2016 109620 PE OLD CENTREVILLE RD &
OLD MILL RD TRAFFIC
SIGNAL & TURN LANE
FROM Old Mill Rd TO Old Mill Rd 858 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$60,000 $80,000 $80,000 NEW
8/30/2016 102578 CN Telegraph Road P&R
access improvements
FROM 0.20 Mi South of Caton
Hill Road TO 0.37 Mi North of
Caton Hill Road
95 Northern
Virginia :
Prince
William
County
Northern
Virginia
Intersta
te
Prince
William
County
$5,760,658 $0 $687,112 MOD
8/31/2016 109549 PE #HB2.FY17
WARRENTON PARK AND
RIDE LOT EXPANSION
AT 29/605
FROM AT THE INTERSECTION OF
29 /605 TO AT THE
INTERSECTION OF 29 /605
29 Northern
Virginia :
Fauquier
Culpeper Primary Fauquier
County
$211,000 $211,000 $0 NEW
Page 38 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
9/1/2016 105283 CN TOWN OF VIENNA -
SRTS - VIENNA ES -
SIDEWALKS, XWALKS,
ADA
FROM LOCUST ST TO MOORE ST 0 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $360,337 ($68,814) $0 AWD
9/1/2016 105283 CN TOWN OF VIENNA -
SRTS - VIENNA ES -
SIDEWALKS, XWALKS,
ADA
FROM LOCUST ST TO MOORE ST 0 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $360,337 $360,337 $288,269 AWD
9/2/2016 109289 PE #HB2.FY17 ARLINGTON
TDM STRATEGIES
SERVING I-66 CORRIDOR
FROM VARIOUS TO VARIOUS 66 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$5,000 $5,000 $0 NEW
9/6/2016 109589 PE DISTRICTWIDE
ROADWAY SAFETY
ASSESSMENT - NOVA
FY17-FY22
FROM FY17 HSIP PROJECT TO 0 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$300,000 $300,000 $241,618 NEW
9/7/2016 109293 PE #HB2.FY17 SUDLEY
ROAD NB WIDENING
FROM DORSEY CIRCLE TO
GODWIN DRIVE
234 Northern
Virginia :
Manassas
Northern
Virginia
Urban Manassas $400,000 $400,000 $0 NEW
9/7/2016 109296 PE #HB2.FY17 BROADBAND
LINK FOR EISENHOWER
AVENUE
FROM ADJACENT TO I-495 TO
ADJACENT TO SOUTH VAN
DORN STREET
9999 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $50,000 $50,000 $0 NEW
9/7/2016 109297 PE #HB2.FY17 MAPLE AVE
AND PARK ST SIGNAL
RECONSTRUCTION
FROM INTERSECTION OF MAPLE
AVENUE E TO AND PARK STREET
123 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $25,000 $25,000 $25,000 NEW
9/7/2016 109299 PE #HB2.FY17
GOVERNMENT CENTER
PARKWAY EXTENSION
FROM STEVENSON STREET TO
JERMANTOWN ROAD
9999 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $300,000 $300,000 $0 NEW
9/7/2016 109307 PE #HB2.FY17 TRAFFIC
ADAPTIVE SIGNAL
CONTROL
FROM CITYWIDE TO CITYWIDE 9999 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $1,000,000 $1,000,000 $0 NEW
Page 39 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
9/13/2016 109594 PE TOWN OF LEESBURG -
BATTLEFIELD PKWY
SHARED USE PATH @
RTE 15
FROM 0.12 mi. west, Int. Route
15 TO 0.18 mi. east, Int. Route 15
267 Northern
Virginia :
Leesburg
Northern
Virginia
Urban Leesburg $121,000 $121,000 $121,000 NEW
9/16/2016 109642 PE MANASSAS SIGNAL
SOFTWARE AND
EQUIPMENT
FROM Citywide TO Citywide 9999 Northern
Virginia :
Manassas
Northern
Virginia
Urban Manassas $20,000 $20,000 $18,000 NEW
9/19/2016 100702 CN #HB2.FY17 MODIFY I-95
SB OFF RAMP AT SR 784
ADD SIGNAL
FROM 0.012 Miles West of
Ashdale Dale Plaza TO 0.130
Miles East of Ashdale Dale Plaza
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$1,188,747 $1,136,685 $861,707 NEW
9/20/2016 100702 CN #HB2.FY17 MODIFY I-95
SB OFF RAMP AT SR 784
ADD SIGNAL
FROM 0.012 Miles West of
Ashdale Dale Plaza TO 0.130
Miles East of Ashdale Dale Plaza
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$1,188,747 $100,000 $100,000 MOD
9/20/2016 109473 PE BELMONT RIDGE ROAD
INTERIM WIDENING AT
DULLES GREENWAY
FROM 0.2 mi. south, Rte 267 TO
0.2 mi. north, Rte 267
659 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$800,000 $800,000 $0 NEW
9/22/2016 109571 PE CITY OF FALLS CHURCH -
TRAFFIC SIGNAL TIMING
FROM Various TO Various 9999 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $330,922 $295,000 $0 NEW
10/11/2016 98438 CN Upgrd Sgnl_Ped Xing @
SR 1779 Potomac Mill &
SR 2068 Gideon
FROM SR 2068 Gideon Drive TO
SR 2068 Gideon Drive
1779 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$309,671 $0 $61,305 ACC
10/12/2016 17671 CN RTE 236 -TURN LNS
SIGNL & SPOT SAFETY
IMPRVMNTS-PE & RW
ONLY
FROM 0.06 MILE EAST OF
PICKETT ROAD (ROUTE 237) TO
0.12 MILE EAST OF LAKE DRIVE
236 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$9,218,475 $5,732 $39,322 MOD
Page 40 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
10/17/2016 106562 PE ITS INTEGRATION -
PHASE IV
FROM CITYWIDE TO CITYWIDE 9999 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $506,326 $506,326 $377,162 NEW
10/18/2016 108584 CN NOVA-ITS & TRAF.
SIGNAL INSTALLATION,
REBUILD/MODIFICATIIO
N
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$4,000,843 $4,089,585 $0 NEW
10/20/2016 89658 CN Retrofit US 1 (Caroline-
Fairfax) w/ Centerline
Rumble Strip
FROM Caroline County Line TO
Fairfax County Line
1 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$176,593 $6,665 $5,912 MOD
10/24/2016 100462 CN Installation of Traffic
Signal- Route 50 at
Draper Drive
FROM Intersection of TO Draper
Drive
50 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $653,793 $439,494 $0 NEW
11/9/2016 108078 CN ADA COMPLIANCE FOR
FAIRFAX & ARLINGTON
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$917,093 ($668,513) $0 AWD
11/9/2016 106484 RW RTE 7 TURN LANE AT
WILLIAMS GAP ROAD
FROM 0.01mi west of Rte 711
Williams Gap Road TO 0.12 mi.
east Rte 711 Williams Gap Road
7 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Loudoun
County
$262,834 $262,834 $210,267 NEW
11/9/2016 107242 CN AIDD GRANT MINI
ROUNDABOUT IN
VIENNA
FROM AT LOCUST STREET SE TO
AT LOCUST STREET SE
9999 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $321,885 $107,885 $86,308 AWD
11/10/2016 108079 CN ADA COMPLIANCE FOR
LOUDOUN & PRINCE
WILLIAM
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$631,751 ($363,762) $0 AWD
Page 41 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
11/21/2016 16632 CN Intersec & Drainage
Impro At Fairfax Blvd
(Rte 29/50 &123)
FROM 0.266 mi.West of U.S.
Rte 29/50 and Rte123
Intersection TO 0.379 mi. East of
U.S.RTe 29/50 and Rte 123
29 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $28,955,520 $7,889,061 $91,528 AWD
11/22/2016 102841 CN City of Alexandria -
SRTS - crossing
improvements
FROM Multiple TO Multiple 0 Northern
Virginia :
Alexandria
Northern
Virginia
Miscella
neous
Alexandria $290,557 $320,941 $0 NEW
11/30/2016 102851 CN City of Manassas Park -
SRTS - Manassas Park
MS - Trail
FROM Industry Drive TO Blooms
Quarry Road
0 Northern
Virginia :
Manassas
Park
Northern
Virginia
Miscella
neous
Manassas
Park
$1,136,343 $107,694 $0 AWD
11/30/2016 105501 CN FAIRFAX COUNTY
PARKWAY RTE 286 AT
TERMINAL ROAD 3726
FROM 150 ft north of Backlick
Road TO 182 ft north of
Terminal Road (Rte 3726)
286 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$1,709,004 $1,624,014 $0 NEW
12/8/2016 79812 CN W & OD TRAIL
CROSSING
IMPROVEMENTS
FROM Various Intersections TO
Various Intersections
Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $199,696 ($1,554) ($1,244) MOD for
FV
12/8/2016 98438 CN Upgrd Sgnl_Ped Xing @
SR 1779 Potomac Mill &
SR 2068 Gideon
FROM SR 2068 Gideon Drive TO
SR 2068 Gideon Drive
1779 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$309,671 $0 $3 MOD
12/9/2016 79812 CN W & OD TRAIL
CROSSING
IMPROVEMENTS
FROM Various Intersections TO
Various Intersections
Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $199,696 ($1,554) ($1,244) MOD for
FV
12/13/2016 106562 PE ITS INTEGRATION -
PHASE IV
FROM CITYWIDE TO CITYWIDE 9999 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $506,326 ($506,326) ($377,162) MOD
12/15/2016 110208 CN SSP Communications
Upgrade
FROM statewide TO statewide 9999 Multiple
MPOs :
Statewide
Statewide Intersta
te
Statewide $225,000 $225,000 $0 NEW
Page 42 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
12/28/2016 102851 PE City of Manassas Park -
SRTS - Manassas Park
MS - Trail
FROM Industry Drive TO Blooms
Quarry Road
0 Northern
Virginia :
Manassas
Park
Northern
Virginia
Miscella
neous
Manassas
Park
$145,352 $30,535 $0 MOD
12/30/2016 76683 PE INTERSECTION
IMPROVEMENTS TO
MANASSAS DRIVE AT
EUCLID AVENUE
FROM At Euclid Avenue TO Northern
Virginia :
Manassas
Park
Northern
Virginia
Urban Manassas
Park
$619,000 $19,000 $15,200 MOD
12/30/2016 76683 CN INTERSECTION
IMPROVEMENTS TO
MANASSAS DRIVE AT
EUCLID AVENUE
FROM At Euclid Avenue TO Northern
Virginia :
Manassas
Park
Northern
Virginia
Urban Manassas
Park
$2,166,350 $0 $317,256 AWD
12/30/2016 76683 CN INTERSECTION
IMPROVEMENTS TO
MANASSAS DRIVE AT
EUCLID AVENUE
FROM At Euclid Avenue TO Northern
Virginia :
Manassas
Park
Northern
Virginia
Urban Manassas
Park
$2,166,350 $420,220 $0 AWD
1/10/2017 103465 PE Route 29 & Buckland
Area Transportation
Improvement Study
FROM MP 212.25 Route
29/Route 215 intersection Bev
Mill Rd. TO MP 218.87
I66/Rte.29 interchange
29 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$300,000 ($200,000) $240,000 MOD
1/10/2017 63362 PE CITY OF ALEXANDRIA -
TRAFFIC STUDY
FROM OLD TOWN TRAFFIC
STUDY OF CONGESTION
REDUCTION MEASURES TO
Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $158,193 $157,817 $126,253 Re-
Establish
1/17/2017 108295 PE FALLS CHURCH CITY
BRIDGE INSPECTIONS
FROM Various TO Various 9999 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $75,000 $75,000 $60,000 NEW
1/18/2017 60104 CN RTE 7199 - RESTON
TOWN CENTER TRANSIT
CENTER; CO ADMIN
CMAQ
FROM AT EXPLORER ST TO 7199 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$1,461,575 $292,315 $233,852 Re-
Establish
Page 43 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
1/18/2017 77262 PE EADS STREET EXIT
RAMP IMPROVEMENT
FROM BEGINNING OF EXIT GORE
TO EADS STREET
395 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$505,827 $0 $4,662 MOD
1/18/2017 96510 PE Offset left turn lanes on
Old Bridge Rd (Rte 641)
at Harbor
FROM 0.101 Mile West of
Harbor Drive (Rte 2101) TO
0.093 Mile East of Harbor Drive
(Rte 2101)
641 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$365,249 $65,249 $58,724 MOD
1/18/2017 98371 PE Cnstr Offset Lft
Lns,Upgrd Sgnl @ SR784
& SR 2053 Lindendale
FROM 0.108 Miles West of
Lindendale Road/Quate Lane TO
0.142 Miles East of Lindendale
Road/Quate Lane
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$354,908 $54,908 $34,481 MOD
1/19/2017 70586 PE CITY OF ALEXANDRIA -
TRAFFIC SIGNAL
SYNCHRONIZATION
FROM (MPO PROJECT)PE ONLY
TO
Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $191,377 $0 $178 MOD
1/25/2017 100634 PE Custis Trail and W&OD
Trail Safety
Improvements
FROM N.Oak Street TO N. Scott
Street
29 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$467,000 $203,000 $182,700 MOD
1/27/2017 77384 PE #HB2.FY17 CONST
INTER RTE 15/17/29 AT
RTE 15/17/29 BUS
FROM ROUTE 744 Lovers Ln TO
0.8 MILE NORTH OF ROUTE
15/17/29 & ROUTE 15/17/29
BUSINESS
29 Northern
Virginia :
Fauquier
Culpeper Primary Fauquier
County
$2,500,000 $23,514,039 $837,919 NEW
1/31/2017 107962 PE RTE 7 - INTERSECTION
IMPROVEMENTS AT
BEAUREGARD, PHASE II
FROM 0.050 Mi. N. of N.
Beauregard St TO 0.190 Mi. S. of
N. Beauregard St
7 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $93,000 $93,000 $74,400 NEW
2/1/2017 100640 PE Redesign intersection of
Arlington Blvd and
Manchester
FROM Arlington Blvd TO
Manchester
50 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$170,000 $52,400 $52,400 MOD
Page 44 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
2/3/2017 102848 PE Fairfax County - SRTS -
Terra Centre ES -
Crossing Imp.
FROM Marshall Pond Road TO
Marshall Pond Road
0 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$79,000 $31,500 $31,500 MOD
2/3/2017 102848 RW Fairfax County - SRTS -
Terra Centre ES -
Crossing Imp.
FROM Marshall Pond Road TO
Marshall Pond Road
0 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$8,500 $7,700 $7,700 MOD
2/6/2017 107548 CN I95 CORR TECH ADV-US
1 SIGNAL OPERATIONS
ENHANCEMENT
FROM VARIOUS TO VARIOUS 1 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$50,000 $50,000 $0 MOD
2/6/2017 107549 CN I66 & I95 CORR TECH
ADV-28, 234, 286, 294
SIGNAL OP ENHANCE
FROM I-95 TO I-66 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$359,999 $360,000 $0 MOD
2/6/2017 107550 CN I66 CORR TECH ADV-29,
50, 7, 236 SIGNAL OPS.
ENHANCEMENT
FROM US 15 TO DC Line Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$196,000 $196,000 $0 MOD
2/8/2017 96750 PE Install Curb & Gutter,
Sidewalks and Upgrade
Signal on US 50
FROM Park Drive TO 500'away
from Intersection
50 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$237,098 $33,400 $33,400 MOD
2/9/2017 96751 PE Install Curb & Gutter,
Sidewalk and Upgrade
Signal on US 50
FROM Irving Street TO 500'
away from intersection
50 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$308,580 $137,580 $137,580 MOD
Page 45 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
2/9/2017 107802 PE Incident Management
Emergency Evacuation
and Detour Plans
FROM Various TO Various 9999 Multiple
MPOs :
Statewide
Statewide Intersta
te
Statewide $725,000 $225,000 $225,000 MOD
2/10/2017 102848 CN Fairfax County - SRTS -
Terra Centre ES -
Crossing Imp.
FROM Marshall Pond Road TO
Marshall Pond Road
0 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$203,713 $39,914 $77,500 AWD
2/16/2017 86517 CN Route 234 - Partial
Intersection
Reconstruction and
Upgrade
FROM 0.03 Miles West of Rte. 1
TO 0.04 Miles South of Rte. 234
234 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$504,910 $26,733 $26,061 MOD
2/22/2017 107242 PE AIDD GRANT MINI
ROUNDABOUT IN
VIENNA
FROM AT LOCUST STREET SE TO
AT LOCUST STREET SE
9999 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $75,000 $18,382 $14,705 MOD
2/23/2017 110526 CN Enhancements to the
Statewide 511 System
FROM Various TO Various 9999 Multiple
MPOs :
Statewide
Statewide Intersta
te
Statewide $376,939 $376,939 $0 NEW
2/23/2017 110545 CN Development of a Cloud
Based Portal
FROM Various TO Various 9999 Multiple
MPOs :
Statewide
Statewide Intersta
te
Statewide $630,000 $630,000 $0 NEW
2/23/2017 110551 CN Traffic Video
Expansion - Statewide
FROM Various TO Various 9999 Multiple
MPOs :
Statewide
Statewide Intersta
te
Statewide $212,000 $212,000 $0 NEW
2/28/2017 99712 PE #SMART18 KING STREET
STATION PEDESTRIAN
TUNNEL VRE
FROM Duke Street TO King
Street
7 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $2,700,000 $1,274,827 $1,147,344 MOD
3/2/2017 100640 CN Redesign intersection of
Arlington Blvd and
Manchester
FROM Arlington Blvd TO
Manchester
50 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$542,400 $605,745 $0 NEW
Page 46 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/3/2017 96750 CN Install Curb & Gutter,
Sidewalks and Upgrade
Signal on US 50
FROM Park Drive TO 500'away
from Intersection
50 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$820,502 $889,073 $0 NEW
3/7/2017 50430 CN RTE 95 - GEOTECHNICAL
STUDIES
FROM WOODROW WILSON
MEMORIAL BRIDGE TO (N504-
WICK DRAIN TEST
EMBANKMENT)
95 Northern
Virginia :
Alexandria
Northern
Virginia
Intersta
te
Alexandria $267,742 $0 $34,766 MOD
3/13/2017 71465 PE ADD LTL ON RTE. 621,
RTL ON RTE. 622, AND A
TS.
FROM 0.17 Miles west of Rte.
622 TO 0.12 Miles east of Rte.
622
621 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$927,087 $9,884 $22,574 MOD
3/13/2017 101017 CN SR 289 (Old 7900)
Upgrade & Install
median Guardrail
FROM MP 2.00: I-95_HOV/SR
617 Backlick Rd TO MP 0.00: SR
286 Fairfax County Pkwy/SR 638
Rolling Rd
289 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$417,943 $6,157 $5,542 MOD
3/13/2017 110561 PE I-95 Ramp Metering
Expansion - PE Only
FROM Various locations from
MM 170 TO Various locations
from MM 133
95 Multiple
MPOs :
Statewide
Statewide Intersta
te
Statewide $200,000 $200,000 $200,000 NEW
3/14/2017 105284 CN TOWN OF HERNDON -
SRTS - HERNDON ES -
SIDEWALKS
FROM VAN BUREN ST TO
Dransville Road
0 Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $391,000 $483,046 $0 NEW
3/20/2017 110265 CN RICHMOND HWY AND
RUSSELL ROAD TRAFFIC
SIGNAL REBUILD
FROM Richmond Hwy and
Russell Road TO Richmond Hwy
and Russell Road
9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$450,000 $279,970 $0 NEW
3/21/2017 100632 CN Ryan Road Shared Use
Path
FROM 0.308 Mi East of Belmont
Ridge Road TO 0.142 Mi West of
Old Ryan Road
772 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$327,695 ($102,112) $21,166 MOD
Page 47 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/24/2017 77170 CN Purcellville - North 21st
St Sidewalk Improv
FROM 100' Southeast of
Branbury Glen Court TO 100'
Northwest of N 23rd Street
7 Northern
Virginia :
Purcellville
Northern
Virginia
Primary Purcellville $917,813 ($14,995) $116,716 MOD
3/24/2017 89889 RW HERNDON PARKWAY
INTERSECTION AT VAN
BUREN STREET
FROM HDN PKWY10+92.28;
VanBuren St 16+78.41 TO HDN
PKWY 19+63.19; VanBuren St.
22+53.30
606 Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $725,413 $1,181,170 $944,936 NEW
3/28/2017 110629 PE I-66 EB INSIDE
BELTWAY - TMP - WFC
METRO ACCESS
FROM 0.25 MI WEST OF I66 EB
EXIT RAMP 66 B TO I66 EB ON
RAMP AT EXIT 66B
66 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$300,000 $3,300,000 $0 NEW
4/5/2017 80798 CN TOWN OF CLIFTON-
MAIN STREET PARKING
& SIDEWALK
IMPROVEMENTS
FROM Within limits of Town of
Clifton TO
Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Clifton $29,682 $2,248 $1,798 MOD
4/11/2017 100702 PE #HB2.FY17 MODIFY I-95
SB OFF RAMP AT SR 784
ADD SIGNAL
FROM 0.012 Miles West of
Ashdale Dale Plaza TO 0.130
Miles East of Ashdale Dale Plaza
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$716,233 $74,857 $14,113 MOD
4/11/2017 100702 CN #HB2.FY17 MODIFY I-95
SB OFF RAMP AT SR 784
ADD SIGNAL
FROM 0.012 Miles West of
Ashdale Dale Plaza TO 0.130
Miles East of Ashdale Dale Plaza
784 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$1,188,747 $5,006 $0 AWD
4/12/2017 102578 CN Telegraph Road P&R
access improvements
FROM 0.20 Mi South of Caton
Hill Road TO 0.37 Mi North of
Caton Hill Road
95 Northern
Virginia :
Prince
William
County
Northern
Virginia
Intersta
te
Prince
William
County
$5,760,658 ($1,122,783) $220,326 MOD
Page 48 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
4/13/2017 105285 CN PRINCE WILLIAM
COUNTY - SRTS -
ANTIETAM - SIDEWALK
FROM OLD BRIDGE ROAD TO
WOODFERN COURT
2185 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$836,000 $52,504 $0 AWD
4/24/2017 100689 CN ROOSEVELT ST ADD PED
CROSSING AT
SIGNALIZED
INTERSECTION
FROM ROOSEVELT ST TO
ROOSEVELT BLVD
0 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $606,520 $614,520 $0 NEW
4/24/2017 106942 RW CONSTRUCT MINI
ROUNDABOUT - RTE
742 AND EDGEWATER
ST
FROM AT INTERSECTION OF
POLAND RD AND EDGEWATER
TO 300' FROM INTERSECTION
OF POLAND RD AND
EDGEWATER
742 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$186,055 $186,055 $186,055 NEW
4/28/2017 108447 CN ROADWAY DEPARTURE
CRASH MITIGATION -
NOVA
FROM Various TO Various 0 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$500,000 $487,482 $439,963 NEW
5/2/2017 109620 CN OLD CENTREVILLE RD &
OLD MILL RD TRAFFIC
SIGNAL & TURN LANE
FROM Old Mill Rd TO Old Mill Rd 858 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$301,542 $0 $301,542 MOD
5/3/2017 71723 RW RTE 641 - PROVIDE
HANDICAP ACCESS
FROM East of Titania Way TO
Cricket Lane
641 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$381,947 $0 $12,521 MOD
5/4/2017 18863 CN ARLINGTON COUNTY -
SIDEWALKS/OTHER
PEDESTRIAN
IMPROVEMENTS
FROM Lee Highway TO Fairfax
County Line
309 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$1,250,000 $73,934 $59,147 Re-
Establish
Page 49 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
5/9/2017 108584 CN NOVA-ITS & TRAF.
SIGNAL INSTALLATION,
REBUILD/MODIFICATIIO
N
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$4,000,843 ($322,250) $0 AWD
5/9/2017 102841 CN City of Alexandria -
SRTS - crossing
improvements
FROM Multiple TO Multiple 0 Northern
Virginia :
Alexandria
Northern
Virginia
Miscella
neous
Alexandria $290,557 $224,591 $271,057 AWD
5/10/2017 105501 CN FAIRFAX COUNTY
PARKWAY RTE 286 AT
TERMINAL ROAD 3726
FROM 150 ft north of Backlick
Road TO 182 ft north of
Terminal Road (Rte 3726)
286 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$1,709,004 $84,990 $1,709,004 AWD
5/16/2017 79793 CN HOLMES RUN BIKE TRAIL FROM RIPLEY STREET TO
HOLMES RUN PARKWAY
Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $3,798,503 ($463,042) $2,560 AWD
5/25/2017 107437 CN TOWN CENTER
PARKWAY AT SUNSET
HILLS SIDEWALK
FROM Sunset Hills Rd TO .062 mi
North of Sunset Hills Road
9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$238,856 $238,856 $0 NEW
6/1/2017 100634 CN Custis Trail and W&OD
Trail Safety
Improvements
FROM N.Oak Street TO N. Scott
Street
29 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$1,458,000 $683,072 $313,937 AWD
6/1/2017 105284 CN TOWN OF HERNDON -
SRTS - HERNDON ES -
SIDEWALKS
FROM VAN BUREN ST TO
Dransville Road
0 Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $391,000 $490,450 $389,500 AWD
6/6/2017 109486 CN TRANSFORM 66 CM
TMP - RTE 15 AND I66
HAYMARKET P&R LOT
FROM Ramp B @ I66 and Rte 15
TO Rte 15 and Heathcote Blvd
15 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Prince
William
County
$4,745,031 $5,218,609 $4,174,887 NEW
Page 50 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
6/7/2017 94105 cn 7.05 MI
Grade,Drain,Asp. Pave,
Signs,Lighting & Incid.
FROM 0.55 M. S. of Dumfries
Road TO 0.24 M. N. od Peince
William County Pkwy
95 Northern
Virginia :
Prince
William
County
Northern
Virginia
Intersta
te
Prince
William
County
$38,446,735 ($17,239,956) ($15,515,960) MOD
6/7/2017 94105 CN 7.05 MI
Grade,Drain,Asp. Pave,
Signs,Lighting & Incid.
FROM 0.55 M. S. of Dumfries
Road TO 0.24 M. N. od Peince
William County Pkwy
95 Northern
Virginia :
Prince
William
County
Northern
Virginia
Intersta
te
Prince
William
County
$38,446,735 $17,239,956 $17,239,956
6/8/2017 104906 CN Site Stabilization at N.
Kings Hwy & Kathryn St
FROM 0.1 Mi S Rte 611
Telegraph Rd TO 0.16 Mi S Rte
611 Telegraph Rd
241 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$194,294 ($39,567) $99,820 MOD
6/8/2017 70603 CN RTE 773 - EDWARDS
FERRY ROAD -
CONGESTION
MITIGATION PROJECT
FROM INTERSECTION OF ROUTE
773 WITH ROUTE 15 TO 0.02
MILE WEST OF INTERSECTION
ON ROUTE 773
773 Northern
Virginia :
Leesburg
Northern
Virginia
Urban Leesburg $853,300 ($465,299) $205,145 MOD
6/12/2017 107541 CN I95 CORR TECH ADV-US
1 CCTV PHASE 2
FROM VARIOUS TO VARIOUS 1 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$334,000 $285,843 $0 MOD
6/12/2017 107543 CN I66 & I95 CORR TECH
ADV-28, 234, 286, 294
CCTV PHASE 2
FROM i-95 TO i-66 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$225,000 $194,451 $0 MOD
6/12/2017 107545 CN I66 CORR TECH ADV-29,
50, 7, 236 CCTV PHASE 2
FROM US 15 TO DC Line Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$438,829 $392,562 $0 MOD
Page 51 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
6/16/2017 105284 PE TOWN OF HERNDON -
SRTS - HERNDON ES -
SIDEWALKS
FROM VAN BUREN ST TO
Dransville Road
0 Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $95,000 $25,344 $25,344 MOD
6/16/2017 106362 CN VA-289E BRIDGE OVER
ACCOTINK CREEK, ADD
BARRIER, FOA TO GR
FROM 0.58 East of Fairfax
County Pkwy JNC TO 0.64 East
of Fairfax County Pkwy JNC
289 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$564,722 $564,722 $508,250 NEW
6/16/2017 110912 CN Statewide Truck Parking
Management System -
Phase 1
FROM Various TO Various 9999 Multiple
MPOs :
Statewide
Statewide Intersta
te
Statewide $425,000 $320,000 $0 NEW
6/19/2017 110912 PE Statewide Truck Parking
Management System -
Phase 1
FROM Various TO Various 9999 Multiple
MPOs :
Statewide
Statewide Intersta
te
Statewide $500,000 $375,000 $0 NEW
6/19/2017 111613 PE Statewide Truck Parking
Management System -
Phase 2
FROM Various TO Various 9999 Multiple
MPOs :
Statewide
Statewide Intersta
te
Statewide $307,000 $51,170 $0 NEW
6/21/2017 84358 PE Route 621- Intersection
Improvements at Route
772
FROM 0.17 Mi S. of Ryan Road
(Route 772) TO 0.21 Mi N. of
Ryan Road (Route 772)
621 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$1,066,363 $0 $93 MOD
6/26/2017 100462 PE Installation of Traffic
Signal- Route 50 at
Draper Drive
FROM Intersection of TO Draper
Drive
50 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $65,366 $15,366 $12,293 MOD
6/27/2017 70762 PE ROSSLYN CIRCLE
IMPROVEMENTS,WB
LEE HWY - US 29 (MPO
PROJECT)
FROM N. Oak Street. TO 0.02 M
I E. of N.LYNN Street
29 Northern
Virginia :
Arlington
County
Northern
Virginia
Seconda
ry
Arlington
County
$2,604,425 $0 $20,508 MOD
6/27/2017 111470 PE #SMART18 ONE
LOUDOUN AND
WESTERN LOUDOUN
PARK & RIDE LOTS
FROM ONE LOUDOUN TO
WESTERN LOUDOUN
9999 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$895,000 $895,000 $716,000 NEW
Page 52 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Safety/ITS/Operational Improvement
Original Grouping Cost$798,107,234Previous Amount
STIP ADJ $34,013,148 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $832,120,382 Current Grouping Cost
$832,120,382
Current Grouping Cost Sliding Scale
Calculation
$842,120,382Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
6/27/2017 111471 PE #SMART18 ROUTE 123
AND ROUTE 243 SIGNAL
UPGRADES
FROM MAPLE AVENUE
CORRIDOR TO NUTLEY STREET
CORRIDOR
123 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $306,000 $306,000 $244,800 NEW
6/28/2017 85380 PE Edsall Road & South
Pickett Street
Intersection
Improvements
FROM Intersection with TO
Edsall Road
0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $15,392 $5,392 $4,314 MOD
6/28/2017 100462 CN Installation of Traffic
Signal- Route 50 at
Draper Drive
FROM Intersection of TO Draper
Drive
50 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $653,793 $164,408 $146,664 AWD
6/28/2017 107405 PE INSTALL SIGNAL @
BLACKBURN RD -
RIPPON BLVD
INTERSECTION
FROM 0.1 Mi N of Rippon
Boulevard TO 0.1 Mi S of Rippon
Boulevard
638 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$270,000 $140,000 $112,000 MOD
6/29/2017 109272 RW EVERGREEN MILLS RD
INT. IMPROVEMENTS
AT RELOCATED RTE 771
FROM 0.15 mi. south relocated
Rte 771 TO 0.19 mi. north
relocated Rte 771
621 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$449,500 $449,500 $359,600 NEW
7/5/2017 81517 PE RTE 1 - IMPROVEMENTS
TO MAIN STREET
FROM 0.112 Mi. S. Int. Route
1/Route 1085 TO 0.129 Mi. N.
Int. Route 1/Route 1085
1 Northern
Virginia :
Dumfries
Northern
Virginia
Urban Dumfries $550,000 $250,000 $139,182 MOD
7/5/2017 106942 PE CONSTRUCT MINI
ROUNDABOUT - RTE
742 AND EDGEWATER
ST
FROM AT INTERSECTION OF
POLAND RD AND EDGEWATER
TO 300' FROM INTERSECTION
OF POLAND RD AND
EDGEWATER
742 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$400,000 $190,000 $400,000 MOD
Total $204,633,784 $107,352,921
$637,486,598Current Grouping Balance
(sliding scale inclusive)
Page 53 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
10/6/2014 105478 PE MULTIMODAL
TRANSPORTATION PLAN
FROM CITYWIDE TO CITYWIDE 0 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $281,878 $300,000 $0 NEW
10/15/2014 105478 PE MULTIMODAL
TRANSPORTATION PLAN
FROM CITYWIDE TO CITYWIDE 0 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $281,878 $0 $240,000 ACC
10/30/2014 106432 CN Reforestation of
Disposal Areas at Route
50/Route 27
FROM Route 27 TO Route 27 50 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$303,390 $279,713 $223,770 NEW
11/6/2014 106532 PE POTOMAC AVENUE
STREETSCAPE
IMPROVEMENTS
FROM Broadway Street TO River
Road
1401 NonMPO :
NonMPO
Northern
Virginia
Enhance
ment
Quantico $35,000 $10,000 $8,000 NEW
11/19/2014 103632 RW Roosevelt Street
Sidewalk Improvements
FROM E. Broad St. TO Roosevelt
Blvd
6792 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $80,601 $80,601 $64,481 NEW
1/9/2015 63578 CN CITY OF FAIRFAX -
CROSS COUNTY TRAIL
FROM CONSTRUCTION OF THE
CROSS COUNTY TRAIL FROM
LAKE ACCONTINK TO DAM TO
HUNTER VILLAGE DRIVE
Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$2,219,754 $1,275 $1,020 MOD
1/12/2015 56458 CN TOWN OF OCCOQUAN -
CONSTRUCT A
RIVERFRONT
BOARDWALK
FROM TO Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Occoquan $281,518 $17,210 $13,768 MOD
1/13/2015 63582 PE LOUDOUN COUNTY -
MOUNT ZION CHURCH
SCENIC VIEWSHED
FROM ACQUISITION OF LAND
AND CONSTRUCTION OF A
VISITORS CENTER, TO EXHIBIT
HALL AND PARKING
Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Loudoun
County
$2,172 $576 $461 MOD
Page 54 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
1/13/2015 63582 RW LOUDOUN COUNTY -
MOUNT ZION CHURCH
SCENIC VIEWSHED
FROM ACQUISITION OF LAND
AND CONSTRUCTION OF A
VISITORS CENTER, TO EXHIBIT
HALL AND PARKING
Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Loudoun
County
$436,578 $138,174 $110,539 MOD
1/13/2015 78236 CN TOWN OF NEW
MARKET -
STREETSCAPING
IMPROVEMENTS
FROM 0.02 Mi. S. Stuart Street
TO 0.03 Mi. N. Breckenridge Lane
NonMPO :
NonMPO
Staunton Primary New Market $1,137,958 $218,861 $134,000 MOD
1/21/2015 64766 PE, CN Route 55 - Washington
Street- Streetscape
FROM MADISON STREET TO
0.093 MILES EAST OF ST. PAUL
DRIVE
55 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Haymarket $283,243 $627,154 MOD
1/27/2015 106432 CN Reforestation of
Disposal Areas at Route
50/Route 27
FROM Route 27 TO Route 27 50 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$303,390 $23,677 $16,230 NEW
1/28/2015 17601 PE, CN LOVETTSVILLE SHARED
USE PATH
FROM 0.64 Miles South of
Hammond Drive TO Hammond
Drive
Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Lovettsville $0 $0 MOD
1/29/2015 106049 PE OLD COURTHOUSE
ROAD SRTS SIDEWALK -
VIENNA
FROM OLD COURTHOUSE RD TO
WESTBRIAR ELEMENTARY
SCHOOL
Northern
Virginia :
Vienna
Northern
Virginia
Enhance
ment
Vienna $28,146 $28,146 $22,517 NEW
1/30/2015 105472 CN Town of Purcellville
Streetscape - Phase II
C502
FROM Int. Business Rte 7 TO 0.3
mi. north, int. Business Rte 7
12 Northern
Virginia :
Purcellville
Northern
Virginia
Enhance
ment
Purcellville $1,443,055 $547,244 $102,508 AWD
2/2/2015 CN $148,876 $119,101 AWD
2/5/2015 106050 PE MIDDLEBURG
DOWNTOWN
PEDESTRIAN
IMPROVEMENTS
FROM Int. Rte 626 The Plains
Road TO Int. Rte 1201 Jay Street
50 Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Middleburg $33,646 $43,646 $34,917 NEW
Page 55 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/6/2015 106134 PE BLACKBURN ROAD
SIDEWALK
FROM Rippon Boulevard TO Cow
Branch Bridge
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$300,000 $399,000 $319,200 NEW
3/6/2015 105976 PE SMOKETOWN ROAD
SIDEWALKS
FROM Nazarene Way TO Various 642 Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$188,660 $150,928 NEW
3/20/2015 103734 CN Purchase DASH Buses FROM Purchase DASH Buses TO
Purchase DASH Buses
0 Northern
Virginia :
Alexandria
Northern
Virginia
Public
Transpo
rtation
Alexandria $8,550,245 $0 $2,615 ACC
3/23/2015 91247 CN Construction of
pedestrian walkways &
enhancements to a park
FROM 0.05 mi. south int.
Marshal Street, int. Madison
Street TO 0.02 mi. north int.
Marshal Street, int. Liberty Street
626 Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Middleburg $450,056 $0 $0 AWD
3/25/2015 105910 CN Beverley Mill Site
Improvements - C503
Pathways and Signage
FROM Beverley Mill Historic Site
TO Beverley Mill Historic Site
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$270,002 $444,400 $267,488 NEW
3/30/2015 103282 PE Gosnell Road Old
Courthouse Road
Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$100,883 $107,839 $86,271 MOD
3/30/2015 103632 PE Roosevelt Street
Sidewalk Improvements
FROM E. Broad St. TO Roosevelt
Blvd
6792 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $374,000 $163,443 $130,754 MOD
Page 56 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/30/2015 93578 CN Install sidewalk and Ped
Crossing on Prince
William Pkwy
FROM 0.0371 MI.E OF Caton Hill
Road Intersection-RTE 639 TO
0.0174 MI.E OF Horner Corner
Commuter Parking Lot
3000 Northern
Virginia :
Prince
William
County
Northern
Virginia
Miscella
neous
Prince
William
County
$190,726 $3,190 $2,025 MOD
3/31/2015 105266 PE RESTON BIKESHARE
INFRASTRUCTURE
SUPPORT
FROM Multiple Locations in
Reston TO Multiple Locations in
Reston
Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$50,000 $50,000 $40,000 NEW
3/31/2015 102931 CN Gideon Drive Sidewalk FROM Dale Boulevard TO 0.1
Mile S. of Opitz Boulevard
2068 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$2,941,837 $1,266,345 $1,016,244 AWD
4/15/2015 103596 RW Gilbert's Corner - Aldie
Battlefield Land
Acquistion
FROM TO Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$647,236 $0 $10,789 MOD
4/15/2015 106062 PE LOUDOUN COUNTY PS
SRTS IMPROVEMENTS
FROM TO Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$174,850 $75,275 $60,220 NEW
4/16/2015 105990 PE OLD COURTHOUSE
ROAD SRTS SIDEWALK -
FAIRFAX
FROM OLD COURTHOUSE ROAD
TO WESTBRIAR ELEMENTARY
SCHOOL
Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$500,000 $255,000 $204,000 NEW
4/21/2015 103305 CN Mason Neck Trail - C503
Phase 2B
FROM Pohick Bay Drive, Rte 721
(Ent. Pohick Bay Reg Park) TO
Ent. to Pohick Bay Reg Park Golf
Course
Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$1,270,465 $881,148 $704,918 NEW
4/22/2015 106315 RW HISTORIC HERNDON
STREETSCAPE - PHASE II
FROM Center Street TO Monroe
Street
Northern
Virginia :
Herndon
Northern
Virginia
Enhance
ment
Herndon $79,777 $278,355 $222,684 NEW
Page 57 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
4/27/2015 103887 RW RTE 50 TRAFFIC
CALMING - TOWN OF
MIDDLEBURG
FROM 0.0190 Mi. West of The
Plains Road TO 0.0109 Mi. East
of Jay Street
50 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Middleburg $42,056 $149,400 $149,400 NEW
4/29/2015 103887 PE RTE 50 TRAFFIC
CALMING - TOWN OF
MIDDLEBURG
FROM 0.0190 Mi. West of The
Plains Road TO 0.0109 Mi. East
of Jay Street
50 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Middleburg $696,470 $198,778 $490,778 MOD
5/5/2015 62146 PE RTE 120 -XWALKS,PED
SIGNLS,REFUGE
AREAS,RECONST CURB
CORNERS
FROM 26TH STREET & GLEBE
ROAD (Route120) TO
120 Northern
Virginia :
Arlington
County
Northern
Virginia
Primary Arlington
County
$44,538 $0 $1,800 ACC
5/21/2015 106050 CN MIDDLEBURG
DOWNTOWN
PEDESTRIAN
IMPROVEMENTS
FROM Int. Rte 626 The Plains
Road TO Int. Rte 1201 Jay Street
50 Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Middleburg $707,200 $337,140 $269,712 NEW
5/21/2015 106143 PE CINDER BED ROAD
BIKEWAY
FROM Fairfax County Parkway
Trail TO Franconia-Springfield
Metrorail Station
Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$500,000 $500,000 $400,000 NEW
5/21/2015 103887 CN RTE 50 TRAFFIC
CALMING - TOWN OF
MIDDLEBURG
FROM 0.0190 Mi. West of The
Plains Road TO 0.0109 Mi. East
of Jay Street
50 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Middleburg $3,424,837 $2,696,800 $366 NEW
5/28/2015 104907 PE WALK TO
DOWNTOWN - BEULAH
ROAD
FROM CHURCH STREET TO 0.04
MI. SE OF CHURCH STREET
0 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $5,068 $2,438 $1,950 MOD
6/16/2015 100410 PE UNIVERSITY DRIVE
SIDEWALK
CONSTRUCTION
FROM Armstrong Street TO
Breckinridge Lane
0 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $65,000 $80,000 $64,000 Re-
Establish
Page 58 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
6/17/2015 106144 PE ARLINGTON SRTS
IMPROVEMENTS -
ASHLAWN ELEM &
WILLIAMSBURG MS
FROM TO Northern
Virginia :
Arlington
County
Northern
Virginia
Enhance
ment
Arlington
County
$100,000 $100,000 $80,000 NEW
7/1/2015 106932 RW OLD GALLOWS RD AND
GALLOWS BRANCH PED
INTERSECTION IMPROVE
FROM Gallows Road TO Gallows
Branch Road
650 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$33,000 $33,000 $26,400 NEW
7/17/2015 107817 PE BIKESHARE STATIONS
CITYWIDE
FROM CITYWIDE TO CITYWIDE 9999 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $8,000 $8,000 $6,400 NEW
7/23/2015 17600 CN QUANTICO POTOMAC
TRANSPORTATION
FACILITY
FROM A BICYCLE/PEDESTRIAN
TRAIL STARTING AT
AMTRAK/VRE STATION; A TO
PAVED PARKING LOT, PAVED &
GRAVELED WALKS, TIMBER
DECK TRAIL
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Quantico $955,085 $0 $0 MOD
7/23/2015 17603 CN BUS PASSENGER
WAITING SHELTERS
FROM CONSTRUCTION OF 30
BUS SHELTERS AT HIGHLY
UTILIZED BUS TO STOPS IN
FAIRFAX COUNTY.
Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$270,000 $25,560 $20,448 MOD
7/24/2015 16087 PE MOUNT ZION CHURCH
STABILIZATION
FROM PLAN, DESIGN &
STABILIZE HISTORIC STRUCTURE,
A LANDMARK TO FOR BOTH
FEDERAL & CONFEDERATE
TROOPS DURING CIVIL WAR
Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$288,323 $22,500 $18,000 MOD
7/24/2015 103282 CN Gosnell Road Old
Courthouse Road
Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$214,949 $111,648 $89,318 NEW
Page 59 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
7/27/2015 103265 CN International Drive
Greensboro Drive
Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$377,533 $195,965 $156,772 NEW
8/14/2015 65680 RW WATERFORD'S
HISTORIC DISTRICT
FROM ACQUISTION OF PHILIP'S
FARM PROPERTY AND
CONSTRUCTION OF TO AN
INTERPRETIVE PULL-OFF
Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$1,298,368 $0 $55,557 MOD
8/18/2015 103276 RW Tysons Blvd Galleria
Drive Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$162,000 $305,000 $0 NEW
8/18/2015 107437 RW TOWN CENTER
PARKWAY AT SUNSET
HILLS SIDEWALK
FROM Sunset Hills Rd TO .062 mi
North of Sunset Hills Road
9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$50,000 $50,000 $40,000 NEW
8/19/2015 106929 RW ALINE AVENUE
WALKWAY
FROM .047 Mi East of Gallows
Road TO .057 Mi Northeast of
Gallows Road
3402 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$280,000 $400,000 $320,000 NEW
8/19/2015 106928 RW GALLOWS ROAD
WALKWAY
FROM .034 Mi NW of Old
Courthouse Rd TO .057 Mi N of
Gallows Road
650 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$386,715 $350,000 $277,116 NEW
8/20/2015 106937 RW MADRILLON ROAD
WALKWAY
FROM .023 Mi North of Boss
Street TO .094 Mi North of Boss
Street
839 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$75,000 $50,000 $40,000 NEW
8/20/2015 106933 RW OLD COURTHOUSE RD
AND WOODFORD RD
PEDESTRIAN
IMPROVEMENTS
FROM .003 Mi East of Woodford
Rd TO .019 Mi East of Woodford
Rd
677 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$150,000 $75,000 $60,000 NEW
Page 60 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
9/2/2015 107661 PE Louise Archer
Elementary SRTS
Improvements
FROM Nutley Street TO West
Street NW
Northern
Virginia :
Vienna
Northern
Virginia
Enhance
ment
Vienna $153,000 $152,979 $0 NEW
9/4/2015 78240 CN LOUDOUN COUNTY - E.
E. LAKES GENERAL
STORE VISITOR CENTER
FROM REHABILITATIONOF THE
E. E. LAKES GENERAL STORE FOR
USE AS TO A VISITOR CENTER
Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$440,000 $449,305 $0 NEW
9/8/2015 107817 CN BIKESHARE STATIONS
CITYWIDE
FROM CITYWIDE TO CITYWIDE 9999 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $726,319 $726,319 $0 NEW
9/8/2015 78238 CN FAIRFAX COUNTY -
COLUMBIA PIKE/RTE 7
STREETSCAPING
FROM STREETSCAPE
IMPROVEMENTS FROM
COLUMBIA PIKE AND SEMINARY
TO ROAD ALONG THE
COLUMBIA PIKE/RTE 7 RAMP
Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$228,000 $13,512 $0 AWD
9/15/2015 106935 RW INTERNATIONAL DR
AND TYSONS BLVD PED
INTERSECTION
IMPROVMNTS
FROM International Drive TO
Tysons Blvd
684 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$25,000 $17,000 $0 NEW
9/17/2015 103594 CN McLean Gateway on Old
Dominion Drive
FROM Old Dominion Drive TO
500 ft. east of Longfellow St (Rte
1809)
309 Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$73,971 $20,656 $0 AWD
9/17/2015 65680 CN WATERFORD'S
HISTORIC DISTRICT
FROM ACQUISTION OF PHILIP'S
FARM PROPERTY AND
CONSTRUCTION OF TO AN
INTERPRETIVE PULL-OFF
Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$189,665 $69,446 $55,557 MOD
9/17/2015 106945 RW McLean Streetscape -
Chainbridge Road C503
FROM Intersection of Chain
Bridge Road TO and Old
Dominion Drive
Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$229,333 $229,333 $0 NEW
Page 61 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
9/21/2015 81772 CN PRINCE WILLIAM -
BUCKLAND HISTORIC
TRANSPORTATION
LANDSCAPE
FROM ARCHAEOLOGY OF THE
ROADS AND ROADHOUSES OF
BUCKLAND, TO INSTALLATION
OF INTERPRETIVE MARKERS,
LANDSCAPING & TRAILS
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$17,779 $99,088 $0 NEW
9/21/2015 91228 PE,CN 1/2 mi. paved
bicycle/pedestrian trail
at Woods of Warrenton
FROM TO Northern
Virginia :
Fauquier
Culpeper Enhance
ment
Fauquier
County
$314,573 $0 MOD
9/22/2015 107817 CN BIKESHARE STATIONS
CITYWIDE
FROM CITYWIDE TO CITYWIDE 9999 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $726,319 $0 $581,055 AWD
9/24/2015 91248 PE, RW, CN CONSTRUCTION OF
SIDEWALKS AND
CROSSWALKS
FROM Int. Business Rte 7 TO
0.24 mi. north, Business Rte 7
719 Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Round Hill $0 $0 MOD
11/18/2015 97839 CN Access Improvements to
the Southern Railway
Caboose
FROM TO Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Haymarket $27,189 $3,312 $0 AWD
12/2/2015 106050 CN MIDDLEBURG
DOWNTOWN
PEDESTRIAN
IMPROVEMENTS
FROM Int. Rte 626 The Plains
Road TO Int. Rte 1201 Jay Street
50 Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Middleburg $707,200 $408,972 $237,091 AWD
12/7/2015 97837 CN Pohick Stream Valley
Trail - Phase I
FROM Burke Lake Road (Rte
645) TO Burke Rd (Rte 652) trail
to Rolling Rd. VRE Station
Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$1,190,149 $1,190,149 $0 NEW
12/8/2015 106573 PE RTE 7 INTERCHANGE AT
BATTLEFIELD PKWY
FROM Int. Cardinal Park Drive
TO Int. River Creek Pkwy /
Crosstrail Blvd
7 Northern
Virginia :
Leesburg
Northern
Virginia
Primary Leesburg $4,000,000 $4,000,000 $0 NEW
Page 62 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
12/14/2015 50110 PE LANDSCAPING AND
PLANNING
FROM CHAIN BRIDGE ROAD TO Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$646,938 $496,700 $397,360 MOD
12/29/2015 94683 CN Mason Neck Trail - C502
Phase II construction of
the trail
FROM Entrance to Pohick Bay
Drive (Rte. 721) TO 300 ft. west
of entrance to Gunston Hall
Plantation
242 Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$201,148 $9,224 $7,379 MOD
12/29/2015 103305 RW Mason Neck Trail - C503
Phase 2B
FROM Pohick Bay Drive, Rte 721
(Ent. Pohick Bay Reg Park) TO
Ent. to Pohick Bay Reg Park Golf
Course
Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$106,572 $51,284 $41,027 MOD
12/31/2015 103593 PE Vienna Train Station -
Pedestrian Safety
Improvements
FROM Historic Vienna Trail
Station TO Mill St. N.E.
Northern
Virginia :
Vienna
Northern
Virginia
Enhance
ment
Vienna $63,132 $38,132 $30,506 MOD
1/6/2016 103887 CN RTE 50 TRAFFIC
CALMING - TOWN OF
MIDDLEBURG
FROM 0.0190 Mi. West of The
Plains Road TO 0.0109 Mi. East
of Jay Street
50 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Middleburg $3,424,837 $574,187 $35,860 AWD
1/12/2016 103265 CN International Drive
Greensboro Drive
Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$377,533 $181,570 $145,256 AWD
1/12/2016 103282 CN Gosnell Road Old
Courthouse Road
Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$214,949 $103,301 $82,641 AWD
1/21/2016 103305 CN Mason Neck Trail - C503
Phase 2B
FROM Pohick Bay Drive, Rte 721
(Ent. Pohick Bay Reg Park) TO
Ent. to Pohick Bay Reg Park Golf
Course
Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$1,270,465 $389,317 $311,454 AWD
Page 63 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
1/28/2016 107204 CN STERLING BLVD
BEAUTIFICATION PH.
III - E HOLLY AVE
SIDEWALK
FROM Intersection, Route 846
Sterling Blvd TO Intersection,
North Emory Dr
1401 Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$161,929 $220,512 $0 NEW
2/23/2016 107662 PE McKinley Road / N Ohio
Street SRTS
Improvements
FROM Wilson Boulevard TO 11th
Street
Northern
Virginia :
Arlington
County
Northern
Virginia
Enhance
ment
Arlington
County
$270,000 $270,000 $216,000 NEW
2/23/2016 107530 PE Old Bridge Road
Sidewalk
FROM Mohican Road TO
Antietam Road
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$157,500 $304,000 $243,200 NEW
3/2/2016 107528 PE Smoketown Road /
Opitz Blvd. Pedestrian
Improvements
FROM Intersection at Gideon
Drive TO Intersection at
Potomac Mills Road
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$200,000 $200,000 $160,000 NEW
3/9/2016 105910 CN Beverley Mill Site
Improvements - C503
Pathways and Signage
FROM Beverley Mill Historic Site
TO Beverley Mill Historic Site
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$270,002 ($444,400) $0 WD
3/11/2016 105976 PE SMOKETOWN ROAD
SIDEWALKS
FROM Nazarene Way TO Various 642 Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
($188,660) $0 WD
3/14/2016 97735 RW Town of Haymarket
Pedestrian Connections,
VA
FROM 0.01 Mi NE of Route 55
TO 0.01 Mi SW of Cheyenne Way
55 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Haymarket $117,638 $117,638 $117,638 NEW
Page 64 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
4/6/2016 103265 PE International Drive
Greensboro Drive
Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$105,239 $95,842 $76,674 MOD
4/7/2016 103280 PE LEESBURG PIKE (RTE 7)
UNDER CHAIN BRIDGE
RD (RTE123) NORTH
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$655,000 $425,000 $340,000 MOD
4/7/2016 103632 PE Roosevelt Street
Sidewalk Improvements
FROM E. Broad St. TO Roosevelt
Blvd
6792 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $374,000 $200,557 $160,446 MOD
4/8/2016 103262 RW Tyson East Sidewalk
South Side of Route
123 - CMAQ
FROM 0.144 mi S. Int. Route 267
TO 0.296 mi N. Int. Route 267
9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$35,000 $11,000 $8,800 NEW
4/12/2016 106050 PE MIDDLEBURG
DOWNTOWN
PEDESTRIAN
IMPROVEMENTS
FROM Int. Rte 626 The Plains
Road TO Int. Rte 1201 Jay Street
50 Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Middleburg $33,646 ($7,182) ($5,745) MOD
4/25/2016 106936 RW VESPER STREET TRAIL FROM Route 7 TO Vesper 3838 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$10,000 $15,000 $12,000 NEW
5/5/2016 107658 PE Van Buren Street Multi-
Modal Improvements
FROM Alabama Drive TO
Herndon Parkway
Northern
Virginia :
Herndon
Northern
Virginia
Enhance
ment
Herndon $350,000 $350,000 $280,000 NEW
5/5/2016 107659 PE Hamilton Pedestrian
Improvements
FROM South Hughes Street TO
Harmony Church Road
Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$67,420 $67,420 $53,936 NEW
Page 65 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
5/6/2016 103281 PE LEESBURG PIKE (RTE 7)
UNDER CHAIN BRIDGE
RD (RTE 123) SOUTH
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$464,000 $234,000 $187,200 MOD
5/10/2016 103560 PE BICYCLE PARKING FROM West End Transitway TO
West End Transitway
0 Northern
Virginia :
Alexandria
Northern
Virginia
Urban Alexandria $45,000 $25,000 $20,000 NEW
5/10/2016 103262 PE Tyson East Sidewalk
South Side of Route
123 - CMAQ
FROM 0.144 mi S. Int. Route 267
TO 0.296 mi N. Int. Route 267
9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$735,000 $220,000 $176,000 MOD
5/24/2016 103284 RW Sunrise Valley Drive
South - Soapstone -
South Lakes - CMAQ
FROM Soapstone Drive TO South
Lakes Drive
9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$300,000 $260,000 $208,000 NEW
6/6/2016 103282 CN Gosnell Road Old
Courthouse Road
Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$214,949 $85,051 $68,041 MOD
6/7/2016 108492 CN I-66 SPOT 2
LANDSCAPING
FROM .2 MILES West of Rte 703
(Haycock Rd.) TO N.
Westmoreland Street
66 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$670,000 $624,886 $624,886 NEW
6/8/2016 107204 CN STERLING BLVD
BEAUTIFICATION PH.
III - E HOLLY AVE
SIDEWALK
FROM Intersection, Route 846
Sterling Blvd TO Intersection,
North Emory Dr
1401 Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$161,929 ($17,672) $145,005 AWD
6/8/2016 103276 PE Tysons Blvd Galleria
Drive Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$215,000 $59,748 $47,798 MOD
Page 66 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
6/13/2016 103282 RW Gosnell Road Old
Courthouse Road
Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$177,300 $46,663 $37,661 MOD
6/21/2016 103276 RW Tysons Blvd Galleria
Drive Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$162,000 ($3,000) ($2,400) MOD
6/24/2016 103285 RW Sunrise Valley Drive
Sidewalk North -
Association to Preston
FROM Association Dr TO Preston
White Dr
9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$650,000 $425,000 $340,000 NEW
6/30/2016 105520 CN WALK TO
DOWNTOWN - BEULAH
ROAD PH II
FROM 298 LF West of Beulah
Road NE TO Beulah Road NE
9999 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $305,186 $395,093 $29,933 NEW
6/30/2016 103283 CN GOSNELL ROAD
SIDEWALK EAST SIDE
FROM Brenthill Court TO Chain
Bridge Rd
9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$92,050 $124,695 $103,830 NEW
7/5/2016 100410 CN UNIVERSITY DRIVE
SIDEWALK
CONSTRUCTION
FROM Armstrong Street TO
Breckinridge Lane
0 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $209,704 $94,811 $79,849 NEW
7/7/2016 105299 CN PICKETT ROAD TRAIL
UNDERPASS
FROM Under Pickett Road
Bridge TO Under Pickett Road
Bridge
Northern
Virginia :
Fairfax
Northern
Virginia
Enhance
ment
Fairfax $401,802 $138,118 $84,214 NEW
7/13/2016 106062 CN LOUDOUN COUNTY PS
SRTS IMPROVEMENTS
FROM TO Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$165,695 $172,011 $137,609 NEW
Page 67 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
7/25/2016 106134 CN BLACKBURN ROAD
SIDEWALK
FROM Rippon Boulevard TO Cow
Branch Bridge
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$400,000 $307,176 $240,800 NEW
8/3/2016 70318 CN COLUMBIA PIKE/JOHN
MARR DRIVE
STREETSCAPING
FROM Backlick Road (Rte 617)
TO John Marr Dr. (Rte 2948)
244 Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$373,827 $70,264 $56,211 MOD
8/4/2016 105292 CN MASON TO METRO
BICYCLE ROUTE
FROM George Mason University
TO Vienna/Fairfax-GMU
Metrorail Station
Northern
Virginia :
Fairfax
Northern
Virginia
Enhance
ment
Fairfax $48,254 $39,920 $31,936 NEW
8/10/2016 94286 PE Fairfax County Civil War
Bicycle Tour
FROM NA TO NA Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$127,000 $126,998 $101,598 MOD
8/12/2016 64766 CN Route 55 - Washington
Street- Streetscape
FROM MADISON STREET TO
0.093 MILES EAST OF ST. PAUL
DRIVE
55 Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Haymarket $2,078,506 $0 $74,921 MOD
8/17/2016 105243 CN Powells Creek Ped.
Footbridge and Sidewalk
FROM Route 1 at Powells Creek
Boulevard TO Route 1 just north
of Powells Creek
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$1,424,066 $1,019,664 $811,200 NEW
8/30/2016 108502 RW ROUTE 50 AND
WOODLAWN AVENUE
INTERSECTION
FROM 500 ft. West of
Woodlawn Ave. TO 470 ft. East
of Wayne Road
50 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$10,000 $35,000 $28,000 NEW
Page 68 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
8/30/2016 108501 RW ROUTE 50 SIDEWALK
FROM ANNANDALE
ROAD TO CHERRY
STREET
FROM CHERRY STREET TO
ANNANDALE ROAD
50 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$50,000 $50,000 $40,000 NEW
8/31/2016 108493 RW ROUTE 50 EASTBOUND
SIDEWALK FROM
SOUTH STREET TO
ASPEN LANE
FROM SOUTH STREET TO ASPEN
LANE
50 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$50,000 $50,000 $0 NEW
8/31/2016 108497 RW ROUTE 50 SIDEWALK
FROM WOODLAWN
AVE TO CHURCH
PARKING LOT
FROM CHURCH PARKING LOT TO
WOODLAWN AVE
50 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$75,000 $75,000 $0 NEW
9/2/2016 106945 rw McLean Streetscape -
Chainbridge Road C503
FROM Intersection of Chain
Bridge Road TO and Old
Dominion Drive
Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$229,333 $0 $183,466 ACC
9/6/2016 86354 CN McLean Streetscape -
Phase II streetscape
demonstration C502
FROM TO Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$547,496 $119,897 $95,918 MOD
9/12/2016 108496 RW ROUTE 50 SIDEWALK
PATRICK HENRY DRIVE
TO OLIN DR
(SOUTHSIDE)
FROM 200 feet west of Olin
Drive TO 250 feet east of olin
drive
50 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$280,000 $280,000 $224,000 NEW
9/13/2016 100410 CN UNIVERSITY DRIVE
SIDEWALK
CONSTRUCTION
FROM Armstrong Street TO
Breckinridge Lane
0 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $209,704 $123,358 $98,686 MOD
9/14/2016 109749 PE #HB2.FY17 BALLSTON-
MU METRORAIL
STATION WEST
ENTRANCE
FROM BALLSTON-MU
METRORAIL STATION WEST TO
BALLSTON-MU METRORAIL
STATION WEST
237 Northern
Virginia :
Arlington
County
Northern
Virginia
Public
Transpo
rtation
Arlington
County
$14,800,000 $14,800,000 $0 NEW
Page 69 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
9/20/2016 109949 PE TOWN OF CLIFTON
STREETSCAPE PROJECT -
PHASE II
FROM Ford Lane TO
Approximately 50 feet east of
Chapel Street
645 Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$144,000 $144,000 $115,200 NEW
9/26/2016 81773 CN TOWN OF LEESBURG -
REPLACEMENT OF
WOOD/METAL
STREETLIGHTS
FROM Downtown Leesburg TO Northern
Virginia :
Leesburg
Northern
Virginia
Urban Leesburg $738,925 $741,838 $0 MOD
10/25/2016 110038 PE S. WASHINGTON
STREET MULTI-MODAL
IMPROVEMENTS
FROM TWO LOCATIONS TO
TWO LOCATIONS
29 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $895,000 $895,000 $0 NEW
10/28/2016 109954 PE BIKESHARE
CONNECTIONS-ORANGE
& SILVER LINE
METRORAIL STATION
FROM Citywide TO Citywide 9999 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $250,000 $250,000 $0 NEW
11/9/2016 80434 CN NORTHERN VA
POTOMAC HERITAGE
NATIONAL SCENIC TRAIL
FROM FY07 SAFETEA-LU
EARMARK PROJECT TO
Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$230,302 $79,998 ($63,998) MOD
11/10/2016 16637 CN TOWN OF
HAYMARKET - INSTALL 5
FOOT WIDE BRICK
SIDEWALKS;
FROM STORM DRAINS;
COLONIAL STYLE STREETLIGHTS;
STREET TREES & TO PLANTER
BOXES; STREET FURNITURE;
BIKE LANES & RACKS
Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Haymarket $586,995 $0 $3,415 MOD
11/14/2016 109604 PE HORNER ROAD
SIDEWALKS
FROM Forest Glen Road TO Kirby
Elementary School
639 Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$227,140 $227,140 $181,712 NEW
Page 70 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
11/14/2016 109606 PE HISTORIC STONE
BRIDGE - MANASSAS
BATTLEFIELD
FROM Manassas Battlefield TO
Historic stone bridge over Bull
Run
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$75,000 $75,000 $60,000 NEW
11/18/2016 109607 PE VAN DORN STREET
PEDESTRIAN AND
BICYCLE ACCESS
IMPROVEMENTS
FROM Oakwood Road TO City of
Alexandria Border
Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$300,000 $300,000 $240,000 NEW
11/18/2016 109608 PE MT. VERNON TRAIL
PEDESTRIAN BRIDGE
FROM Bridge 12 Located 2.3
miles E / NE of the TO Southern
terminus of Mt. Vernon Trail
Northern
Virginia :
Alexandria
Northern
Virginia
Enhance
ment
Alexandria $275,000 $275,000 $220,000 NEW
11/21/2016 16637 PE TOWN OF
HAYMARKET - INSTALL 5
FOOT WIDE BRICK
SIDEWALKS;
FROM STORM DRAINS;
COLONIAL STYLE STREETLIGHTS;
STREET TREES & TO PLANTER
BOXES; STREET FURNITURE;
BIKE LANES & RACKS
Northern
Virginia :
Prince
William
County
Northern
Virginia
Primary Haymarket $193,059 $8,157 $5,246 MOD
11/21/2016 108492 CN I-66 SPOT 2
LANDSCAPING
FROM .2 MILES West of Rte 703
(Haycock Rd.) TO N.
Westmoreland Street
66 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$670,000 $50,075 $50,075 Re-Ad
11/22/2016 105520 CN WALK TO
DOWNTOWN - BEULAH
ROAD PH II
FROM 298 LF West of Beulah
Road NE TO Beulah Road NE
9999 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $305,186 ($89,907) $15,987 AWD
12/1/2016 106062 CN LOUDOUN COUNTY PS
SRTS IMPROVEMENTS
FROM TO Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$165,695 ($6,316) ($5,053) AWD
12/6/2016 106050 PE MIDDLEBURG
DOWNTOWN
PEDESTRIAN
IMPROVEMENTS
FROM Int. Rte 626 The Plains
Road TO Int. Rte 1201 Jay Street
50 Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Middleburg $33,646 ($2,818) ($2,254) MOD for
FV
Page 71 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
12/19/2016 103280 CN LEESBURG PIKE (RTE 7)
UNDER CHAIN BRIDGE
RD (RTE123) NORTH
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$1,600,000 $989,283 $0 NEW
12/19/2016 103281 CN LEESBURG PIKE (RTE 7)
UNDER CHAIN BRIDGE
RD (RTE 123) SOUTH
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$1,450,000 $1,031,411 $0 NEW
12/28/2016 65680 CN WATERFORD'S
HISTORIC DISTRICT
FROM ACQUISTION OF PHILIP'S
FARM PROPERTY AND
CONSTRUCTION OF TO AN
INTERPRETIVE PULL-OFF
Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$189,665 $26 $19 MOD
12/28/2016 106315 CN HISTORIC HERNDON
STREETSCAPE - PHASE II
FROM Center Street TO Monroe
Street
Northern
Virginia :
Herndon
Northern
Virginia
Enhance
ment
Herndon $2,134,999 $1,836,817 $0 NEW
1/11/2017 17600 PE QUANTICO POTOMAC
TRANSPORTATION
FACILITY
FROM A BICYCLE/PEDESTRIAN
TRAIL STARTING AT
AMTRAK/VRE STATION; A TO
PAVED PARKING LOT, PAVED &
GRAVELED WALKS, TIMBER
DECK TRAIL
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Quantico $87,287 ($34,828) $17,571 MOD
1/11/2017 52043 CN PRINCE WILLIAM
COUNTY - TURN THE
MILL AROUND
CAMPAIGN
FROM TO PRESERVE AND
RESTORE THE STONE WALLS
AND ENVIRONS OF TO BEVERLEY
MILL
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$353,638 $9,095 $7,275 MOD
1/11/2017 18413 CN ACCOTINK GATEWAY
CONNECTOR TRAIL
FROM FACILITY FOR BIKES &
PEDESTRIANS, LANDSCAPING &
HISTORIC TO PRESERVATION,
WILL LINK TRAILS LOCATED IN
CITY TO COUNTY
Northern
Virginia :
Fairfax
County
Northern
Virginia
Urban Fairfax
County
$357,408 $67,775 $57,256 MOD
Page 72 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
1/17/2017 100428 PE Sidewalks to
METRORAIL - Town of
Vienna
FROM Within One Mile TO of
Vienna Metrorail Station
243 Northern
Virginia :
Vienna
Northern
Virginia
Urban Vienna $254,949 $1,950 $1,560 MOD
1/20/2017 109603 PE OPITZ BOULEVARD
SIDEWALK
FROM Potomac Library TO
Potomac Center Boulevard
2000 Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$427,400 $427,400 $341,920 NEW
1/20/2017 109602 PE DUMFRIES ROAD
SIDEWALK
FROM Counselor Road TO
Tayloe Drive
234 Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$305,450 $305,450 $244,360 NEW
2/1/2017 103632 PE Roosevelt Street
Sidewalk Improvements
FROM E. Broad St. TO Roosevelt
Blvd
6792 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $374,000 ($30,000) $0 MOD
2/3/2017 104328 PE HERNDON METRORAIL
INTERMODAL ACCESS
IMPROVEMENTS
FROM Van Buren Street TO 1.0
Mi. East of Van Buren Street
Northern
Virginia :
Herndon
Northern
Virginia
Urban Herndon $600,000 $450,000 $360,000 MOD
2/15/2017 91245 EN Stabilization of Mill
structure & bldg access
improvements
FROM TO Northern
Virginia :
Loudoun
County
Northern
Virginia
Enhance
ment
Loudoun
County
$250,000 $200,000 MOD
2/17/2017 109812 PE INNOVATION TECH.
PARK
TRAILS/SIDEWALKS
FROM Cannon Creek Lane TO
Prince William Parkway
840 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$485,000 $485,000 $388,000 NEW
2/28/2017 81773 PE TOWN OF LEESBURG -
REPLACEMENT OF
WOOD/METAL
STREETLIGHTS
FROM Downtown Leesburg TO Northern
Virginia :
Leesburg
Northern
Virginia
Urban Leesburg $261,075 $255,102 $204,082 MOD
Page 73 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
3/1/2017 94287 PE Workhouse (Lorton)
Arts Foundation Cross
County Trail
FROM Occoquan Regional Park
TO Laurel Hill Greenway
Northern
Virginia :
Fairfax
County
Northern
Virginia
Enhance
ment
Fairfax
County
$537,749 $248,853 $199,082 MOD
3/9/2017 100475 PE Reconstruction of Route
50
FROM Rebel Run Road TO
Fairfax Circle
50 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $4,710 $252,279 $201,823 MOD
3/14/2017 93578 CN Install sidewalk and Ped
Crossing on Prince
William Pkwy
FROM 0.0371 MI.E OF Caton Hill
Road Intersection-RTE 639 TO
0.0174 MI.E OF Horner Corner
Commuter Parking Lot
3000 Northern
Virginia :
Prince
William
County
Northern
Virginia
Miscella
neous
Prince
William
County
$190,726 $0 $846 MOD
3/15/2017 103593 CN Vienna Train Station -
Pedestrian Safety
Improvements
FROM Historic Vienna Trail
Station TO Mill St. N.E.
Northern
Virginia :
Vienna
Northern
Virginia
Enhance
ment
Vienna $290,207 $73 $59 MOD
3/29/2017 106936 CN VESPER STREET TRAIL FROM Route 7 TO Vesper 3838 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$1,900,000 $1,617,517 $1,448,517 NEW
4/11/2017 105243 PE Powells Creek Ped.
Footbridge and Sidewalk
FROM Route 1 at Powells Creek
Boulevard TO Route 1 just north
of Powells Creek
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$360,000 $71,500 $57,200 MOD
4/11/2017 105243 CN Powells Creek Ped.
Footbridge and Sidewalk
FROM Route 1 at Powells Creek
Boulevard TO Route 1 just north
of Powells Creek
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$1,424,066 $0 $75,259 MOD
Page 74 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
4/12/2017 13776 PE COLUMBIA
PIKE/PENTAGON TRAIL
FROM 1.2 MILE 8-FOOT WIDE
BICYCLE & PEDESTRIAN PATHS
UTILIZING TO OFF-ROAD TRAILS,
SIDE ROADS, & BOTH SIDES OF
COLUMBIA PIKE
Northern
Virginia :
Arlington
County
Northern
Virginia
Enhance
ment
Arlington
County
$27,580 $16,526 $13,221 MOD
4/14/2017 103632 CN Roosevelt Street
Sidewalk Improvements
FROM E. Broad St. TO Roosevelt
Blvd
6792 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $1,190,602 $1,047,870 $0 NEW
4/25/2017 106532 CN POTOMAC AVENUE
STREETSCAPE
IMPROVEMENTS
FROM Broadway Street TO River
Road
1401 NonMPO :
NonMPO
Northern
Virginia
Enhance
ment
Quantico $191,261 $263,000 $0 NEW
4/26/2017 105910 CN Beverley Mill Site
Improvements - C503
Pathways and Signage
FROM Beverley Mill Historic Site
TO Beverley Mill Historic Site
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$270,002 $328,096 $216,001 NEW
5/10/2017 108492 CN I-66 SPOT 2
LANDSCAPING
FROM .2 MILES West of Rte 703
(Haycock Rd.) TO N.
Westmoreland Street
66 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$670,000 $191,134 $191,134 AWD
5/12/2017 81772 CN PRINCE WILLIAM -
BUCKLAND HISTORIC
TRANSPORTATION
LANDSCAPE
FROM ARCHAEOLOGY OF THE
ROADS AND ROADHOUSES OF
BUCKLAND, TO INSTALLATION
OF INTERPRETIVE MARKERS,
LANDSCAPING & TRAILS
Northern
Virginia :
Prince
William
County
Northern
Virginia
Enhance
ment
Prince
William
County
$17,779 ($429,026) $67,820 AWD
5/16/2017 103276 CN Tysons Blvd Galleria
Drive Sidewalk - CMAQ
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$345,000 $344,427 $0 NEW
5/31/2017 50110 PE LANDSCAPING AND
PLANNING
FROM CHAIN BRIDGE ROAD TO Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$646,938 $70,882 $56,706 MOD
Page 75 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
6/7/2017 106937 CN MADRILLON ROAD
WALKWAY
FROM .023 Mi North of Boss
Street TO .094 Mi North of Boss
Street
839 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$210,000 $209,600 $0 NEW
6/22/2017 110332 PE #HB2.FY17 BROAD
STREET PEDESTRIAN
CROSSINGS
FROM West Broad Street and
Oak Street TO East Broad Street
and Berry Street
7 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $200,000 $200,000 $200,000 NEW
6/22/2017 110335 PE #HB2.FY17
DOWNTOWN
PLANNING
OPPORTUNITY AREA
FROM W. BROAD STREET TO
PARK AVENUE
9999 Northern
Virginia :
Falls Church
Northern
Virginia
Urban Falls Church $170,000 $170,000 $0 NEW
6/26/2017 104295 PE RTE 123 - CHAIN BRIDGE
RD PED & DRAINAGE
IMPROVEMENTS
FROM North Street TO Rust Hill
Place
123 Northern
Virginia :
Fairfax
Northern
Virginia
Urban Fairfax $466,000 $266,000 $94,654 MOD
6/27/2017 102931 RW Gideon Drive Sidewalk FROM Dale Boulevard TO 0.1
Mile S. of Opitz Boulevard
2068 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$323,882 $45,021 $36,017 MOD
6/27/2017 103262 PE Tyson East Sidewalk
South Side of Route
123 - CMAQ
FROM 0.144 mi S. Int. Route 267
TO 0.296 mi N. Int. Route 267
9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$735,000 $9,156 $7,325 MOD
6/27/2017 103285 RW Sunrise Valley Drive
Sidewalk North -
Association to Preston
FROM Association Dr TO Preston
White Dr
9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$650,000 $225,000 $180,000 MOD
6/27/2017 103262 RW Tyson East Sidewalk
South Side of Route
123 - CMAQ
FROM 0.144 mi S. Int. Route 267
TO 0.296 mi N. Int. Route 267
9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$35,000 $24,000 $19,200 MOD
Page 76 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
6/27/2017 103284 RW Sunrise Valley Drive
South - Soapstone -
South Lakes - CMAQ
FROM Soapstone Drive TO South
Lakes Drive
9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$300,000 $40,000 $32,000 MOD
6/27/2017 102931 CN Gideon Drive Sidewalk FROM Dale Boulevard TO 0.1
Mile S. of Opitz Boulevard
2068 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$2,941,837 $45,000 $36,000 MOD
6/27/2017 106935 RW INTERNATIONAL DR
AND TYSONS BLVD PED
INTERSECTION
IMPROVMNTS
FROM International Drive TO
Tysons Blvd
684 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$25,000 $8,000 $20,000 MOD
6/27/2017 106937 RW MADRILLON ROAD
WALKWAY
FROM .023 Mi North of Boss
Street TO .094 Mi North of Boss
Street
839 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$75,000 $25,000 $20,000 MOD
6/28/2017 106928 RW GALLOWS ROAD
WALKWAY
FROM .034 Mi NW of Old
Courthouse Rd TO .057 Mi N of
Gallows Road
650 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$386,715 $36,715 $29,372 MOD
6/28/2017 106933 RW OLD COURTHOUSE RD
AND WOODFORD RD
PEDESTRIAN
IMPROVEMENTS
FROM .003 Mi East of Woodford
Rd TO .019 Mi East of Woodford
Rd
677 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$150,000 $75,000 $60,000 MOD
7/5/2017 103280 CN LEESBURG PIKE (RTE 7)
UNDER CHAIN BRIDGE
RD (RTE123) NORTH
FROM Tysons TO Reston 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$1,600,000 $666,317 $1,324,480 MOD
Page 77 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Construction: Transportation Enhance/Byway/Non-Traditional
Original Grouping Cost$111,992,532Previous Amount
STIP ADJ $328,291 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $112,320,823 Current Grouping Cost
$112,320,823
Current Grouping Cost Sliding Scale
Calculation
$122,320,823Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
FFY15-06
STIP ADJ $0
STIP ADJ $0
7/5/2017 111647 PE #SMART18 -
BROADVIEW AVENUE
ACCESS MANAGEMENT
IMPROVEMENTS
FROM INTERSECTION OF FROST
AVE (RTE 211) AND BROADVIEW
AVENUE TO 0.81 MI FROM INT
OF FROST AVE (RTE 211) AND
BROADVIEW AVENUE
17 Northern
Virginia :
Warrenton
Culpeper Urban Warrenton $991,877 $991,877 $585,023 NEW
7/5/2017 111648 PE #SMART18 - INT.
IMPROVEMENTS AT
FROST AVE. &
BROADVIEW AVE.
FROM 0.07 MILES S. RTE. 211
(FROST AVE.) TO 0.14 MILES N.
RTE. 211 (FROST AVE)
17 Northern
Virginia :
Warrenton
Culpeper Urban Warrenton $655,303 $655,303 $0 NEW
Total $59,788,661 $23,181,228
$62,532,162Current Grouping Balance
(sliding scale inclusive)
Page 78 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Transit: Amenities
Original Grouping Cost$9,363,750Previous Amount
STIP ADJ $0 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $9,363,750 Current Grouping Cost
$9,363,750
Current Grouping Cost Sliding Scale
Calculation
$14,045,625Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
STIP ADJ $0
STIP ADJ $0
11/5/2014 T207 PE $500,000 $400,000 NEW
7/1/2015 T99 Other $600,000 $480,000 NEW
7/17/2015 97678 CN Canopy for Dulles North
Transit Center Rider
Queuing Area
FROM At Dulles North Transit
Center TO Interchange of Dulles
Greenway and Rte 606 Old Ox
Road
267 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Loudoun
County
$1,799,237 $191,220 $152,976 MOD
10/29/2015 T207 Other $520,000 $416,000 NEW
Total $1,811,220 $1,448,976
$12,234,405Current Grouping Balance
(sliding scale inclusive)
Page 79 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Transit: Ridesharing
Original Grouping Cost$20,430,351Previous Amount
STIP ADJ $0 Amend/Adjust Original Grouping Cost
STIP ADJ $0
New Total $20,430,351 Current Grouping Cost
$20,430,351
Current Grouping Cost Sliding Scale
Calculation
$23,494,904Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District -- NoVa MPO
STIP ADJ $0
STIP ADJ $0
8/17/2015 T100 CN $4,524,405 $3,619,524 NEW
8/31/2015 T100 CN $0 $0 MOD
8/24/2016 T100 $4,751,913 $3,801,531 NEW
Total $9,276,318 $7,421,055
$14,218,586Current Grouping Balance
(sliding scale inclusive)
Page 80 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Maintenance: Preventive Maintenance for Bridges
Original Grouping Cost$2,095,209Previous Amount
STIP ADJ $2,904,791 Amend/Adjust Original Grouping Cost10/25/2016
STIP ADJ ($3,726,000)
New Total $1,918,300 Current Grouping Cost
3/21/2017
$1,918,300
Current Grouping Cost Sliding Scale
Calculation
$3,836,600Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District
17-02
17-11
STIP ADJ $644,30017-22 5/22/2017
STIP ADJ $0
10/27/2016 105297 CN Bridge Maintenance &
Repair at Glebe Rd
Interchange on I-395
FROM State Milepoint 6.6 TO
State Milepoint 6.8
120 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$4,687,281 $4,687,281 $0 AWD
11/4/2016 106949 CN #SGR Route
650(Gallows road) over
Route 50 Bridge
Rehabilita
FROM 00.59 miles from Route
29 TO 00.65 miles from Route 29
650 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$5,000,000 $4,362,876 $0 NEW
11/9/2016 108168 PE I-395 over Four Mile
Run Bridge
Rehabilitation
FROM South Approach of the
bridge TO North Approach of the
bridge
395 Northern
Virginia :
Alexandria
Northern
Virginia
Intersta
te
Alexandria $348,587 $488,587 $0 NEW
11/14/2016 110125 PE Bridge Rehabilitation
I495 Bridges
FROM RAMP E OVER I-495 TO
RAMPS G & E OVER NSRR
495 Northern
Virginia :
Fairfax
County
Northern
Virginia
Intersta
te
Fairfax
County
$800,000 $800,000 $0 NEW
12/19/2016 108168 CN I-395 over Four Mile
Run Bridge
Rehabilitation
FROM South Approach of the
bridge TO North Approach of the
bridge
395 Northern
Virginia :
Alexandria
Northern
Virginia
Intersta
te
Alexandria $6,701,413 $6,790,532 $0 NEW
1/31/2017 110498 PE BRIDGE REHAB AT
FEATHERBED LANE
OVER CATOCTIN CREEK
FROM 500 Feet beyond
abutment TO 500 Feet beyond
abutment
673 Northern
Virginia :
Loudoun
County
Northern
Virginia
Seconda
ry
Loudoun
County
$790,000 $790,000 $0 NEW
1/31/2017 110499 PE HUNTER MILL ROAD
OVER COLVIN RUN
FROM 1 South of Colvin Run TO
1 North of Colvin Run
674 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$700,000 $700,000 $0 NEW
1/31/2017 110500 PE INTERSTATE 66 -
REHABILITATION - FED
ID 174
FROM Ramp B and F from RTE
29 TO Ramp B and F to Const.
Ave.
66 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$700,000 $699,999 $0 NEW
3/16/2017 NA PE $20,000,000 $0 NEW
Page 81 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Maintenance: Preventive Maintenance for Bridges
Original Grouping Cost$2,095,209Previous Amount
STIP ADJ $2,904,791 Amend/Adjust Original Grouping Cost10/25/2016
STIP ADJ ($3,726,000)
New Total $1,918,300 Current Grouping Cost
3/21/2017
$1,918,300
Current Grouping Cost Sliding Scale
Calculation
$3,836,600Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District
17-02
17-11
STIP ADJ $644,30017-22 5/22/2017
STIP ADJ $0
4/19/2017 106949 CN Route 650(Gallows
road) over Route 50
Bridge Rehabilita
FROM 00.59 miles from Route
29 TO 00.65 miles from Route 29
650 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$5,000,000 $4,256,794 $0 AWD
5/1/2017 108168 CN I-395 over Four Mile
Run Bridge
Rehabilitation
FROM South Approach of the
bridge TO North Approach of the
bridge
395 Northern
Virginia :
Alexandria
Northern
Virginia
Intersta
te
Alexandria $6,701,413 $6,912,337 $0 AWD
5/11/2017 110125 CN Bridge Rehabilitation
I495 Bridges
FROM RAMP E OVER I-495 TO
RAMPS G & E OVER NSRR
495 Northern
Virginia :
Fairfax
County
Northern
Virginia
Intersta
te
Fairfax
County
$6,700,000 $7,142,017 $0 AWD
5/19/2017 106633 CN Preventive
Maintenance - Bridge
Washing District-wide
FROM 0 TO 0 0 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$550,000 $550,000 $123,300 MOD
5/23/2017 88959 CN BRIDGE INSPECTION
NORTHERN VIRGINIA
DISTRICT
FROM DISTRICTWIDE TO
DISTRICTWIDE
0 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$21,807,160 $21,807,160 $431,000 MOD
5/23/2017 105297 PE Bridge Maintenance &
Repair at Glebe Rd
Interchange on I-395
FROM State Milepoint 6.6 TO
State Milepoint 6.8
120 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$510,456 $530,000 $502,300 MOD
5/24/2017 95093 CN Collision Rpr & Other
Struct. Rprs on I-66
WB/EB over Rte 29
FROM 0.00 Mi Rte 29 TO 0.00
Mi Rte 29
66 Northern
Virginia :
Fairfax
County
Northern
Virginia
Intersta
te
Fairfax
County
$2,640,997 $2,640,997 $80,000 MOD
5/25/2017 105297 CN Bridge Maintenance &
Repair at Glebe Rd
Interchange on I-395
FROM State Milepoint 6.6 TO
State Milepoint 6.8
120 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$4,687,281 $4,687,281 $2,700,000 MOD
Page 82 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Maintenance: Preventive Maintenance for Bridges
Original Grouping Cost$2,095,209Previous Amount
STIP ADJ $2,904,791 Amend/Adjust Original Grouping Cost10/25/2016
STIP ADJ ($3,726,000)
New Total $1,918,300 Current Grouping Cost
3/21/2017
$1,918,300
Current Grouping Cost Sliding Scale
Calculation
$3,836,600Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District
17-02
17-11
STIP ADJ $644,30017-22 5/22/2017
STIP ADJ $0
Total $87,845,861 $3,836,600
$0Current Grouping Balance
(sliding scale inclusive)
Page 83 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Maintenance: Preventive Maintenance & System Preservation
Original Grouping Cost$16,556,122Previous Amount
STIP ADJ $812,611 Amend/Adjust Original Grouping Cost10/28/2016
STIP ADJ ($3,904,733)
New Total $39,874,612 Current Grouping Cost
3/21/2017
$39,874,612
Current Grouping Cost Sliding Scale
Calculation
$43,862,073Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District
17-02
17-11
STIP ADJ $26,410,61217-22 5/22/2017
STIP ADJ $0
10/26/2016 107667 CN Herndon Monroe Park
and Ride Bridge Joint
Closures
FROM Various TO Various 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$547,366 $339,135 $0 AWD
10/26/2016 107666 CN Monroe Street and Van
Buren Joint Closures
FROM approx. 0.61 Mi. from Rt.
665 TO approx. 0.10 Mi. to
Worldgate Drive
666 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$605,889 $383,282 $0 AWD
10/26/2016 107669 CN Reston Parkway Joint
Closure and
Substructure
Rehabilitation
FROM approx. 0.06 Mi. from Rt.
675 TO approx. 0.45 Mi. to Rt.
5320
602 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$3,883,905 $1,822,713 $0 AWD
10/27/2016 107668 CN Reston Parkway Deck
Mill and Overlay and
Barrier Repair
FROM approx. 0.06 Mi. from Rt.
675 TO approx. 0.45 Mi. to Rt.
5320
602 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$1,390,265 $1,338,775 $0 AWD
12/9/2016 109204 CN PM-9T-17 (NoVA District
Wide Primary Plant Mix)
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$6,402,327 $6,257,604 $0 NEW
12/22/2016 109145 CN #SGR PM-9L-17
PRIMARY PLANT MIX
FROM VARIOUS TO VARIOUS 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$6,765,131 $5,418,824 $0 AWD
1/5/2017 109205 CN PM-9I-17 NOVA
DISTRICTWIDE
INTERSTATE PLANT MIX
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$7,441,894 $7,633,663 $0 NEW
Page 84 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Maintenance: Preventive Maintenance & System Preservation
Original Grouping Cost$16,556,122Previous Amount
STIP ADJ $812,611 Amend/Adjust Original Grouping Cost10/28/2016
STIP ADJ ($3,904,733)
New Total $39,874,612 Current Grouping Cost
3/21/2017
$39,874,612
Current Grouping Cost Sliding Scale
Calculation
$43,862,073Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District
17-02
17-11
STIP ADJ $26,410,61217-22 5/22/2017
STIP ADJ $0
1/5/2017 109209 CN PM-9S-17 (Fairfax
Secondary Plant Mix)
FROM Various TO Various 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$8,606,362 $8,606,092 $0 NEW
1/5/2017 109208 CN PM-9F-17 (Fairfax
Primary Plant Mix)
FROM Various TO Various 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$6,557,060 $6,571,056 $0 NEW
2/13/2017 103790 CN Major Bridge Rehab at
Old Centreville Rd over
Bull R
FROM 0.2 Mi fr Somersworth Dr
TO 0.3 Mi fr Somersworth Dr
616 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$3,175,179 $3,130,004 $0 AWD
2/17/2017 105271 CN Prince William
Secondary Paving (PM-
9U-15)
FROM VARIOUS TO VARIOUS 9999 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$3,852,515 $3,852,515 ($117,381) MOD for
FV
2/23/2017 109079 CN PM-9P-17 (PRIMARY
PLANT MIX)
FROM VARIOUS TO VARIOUS 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$522,699 $505,844 $0 AWD
2/27/2017 109142 CN LM-9B-17 (DISTRICT
WIDE PRIMARY LATEX)
FROM VARIOUS TO VARIOUS 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$1,397,039 $1,286,550 $0 AWD
3/17/2017 NA CN $90,000,000 $0 NEW
3/17/2017 NA CN $90,000,000 $0 NEW
Page 85 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Maintenance: Preventive Maintenance & System Preservation
Original Grouping Cost$16,556,122Previous Amount
STIP ADJ $812,611 Amend/Adjust Original Grouping Cost10/28/2016
STIP ADJ ($3,904,733)
New Total $39,874,612 Current Grouping Cost
3/21/2017
$39,874,612
Current Grouping Cost Sliding Scale
Calculation
$43,862,073Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District
17-02
17-11
STIP ADJ $26,410,61217-22 5/22/2017
STIP ADJ $0
4/28/2017 109204 CN PM-9T-17 (NoVA District
Wide Primary Plant Mix)
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$6,402,327 $5,758,549 $0 AWD
5/1/2017 109208 CN PM-9F-17 (Fairfax
Primary Plant Mix)
FROM Various TO Various 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$6,557,060 $7,199,993 $0 AWD
5/1/2017 109205 CN PM-9I-17 NOVA
DISTRICTWIDE
INTERSTATE PLANT MIX
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$7,441,894 $8,298,967 $0 AWD
5/1/2017 109209 CN PM-9S-17 (Fairfax
Secondary Plant Mix)
FROM Various TO Various 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$8,606,362 $8,633,639 $0 AWD
5/10/2017 97617 CN Loudoun/Fairfax
Primary Paving 2011
FROM various TO various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$4,060,019 $4,060,019 $69,862 ACC
5/19/2017 103924 CN Deck Repair & Overlay
at I-66 over Rte 29
(Centreville)
FROM 0.00 Mi Rte 29 TO 0.00
Mi Rte 29
66 Northern
Virginia :
Fairfax
County
Northern
Virginia
Intersta
te
Fairfax
County
$1,746,742 $1,746,742 $1,569,500 MOD
5/19/2017 104556 PE Bridge Rehab at Rte
7WB over Sugarland Run
FROM 0.25 Mi East from
Intersection with Rte 228 TO 0.0
Intersection with Rte 228
7 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$1,224,877 $1,224,877 $362,100 MOD
Page 86 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Maintenance: Preventive Maintenance & System Preservation
Original Grouping Cost$16,556,122Previous Amount
STIP ADJ $812,611 Amend/Adjust Original Grouping Cost10/28/2016
STIP ADJ ($3,904,733)
New Total $39,874,612 Current Grouping Cost
3/21/2017
$39,874,612
Current Grouping Cost Sliding Scale
Calculation
$43,862,073Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District
17-02
17-11
STIP ADJ $26,410,61217-22 5/22/2017
STIP ADJ $0
5/19/2017 106508 CN Districtwide High
Volume Secondary Latex
(LM-9C-15)
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Seconda
ry
Northern
Virginia
District-wide
$2,774,894 $2,774,894 $1,876,500 ACC
5/22/2017 103340 CN District-wide Interstate
Paving (PM-9I-15)
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$9,215,951 $9,215,951 $4,700,000 ACC
5/22/2017 107973 CN LM-9B-16 (District Wide
Primary Latex)
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$4,465,533 $4,465,533 $3,828,300 ACC
5/22/2017 89369 CN Fairfax County
Secondary Paving
FROM various TO various 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Seconda
ry
Fairfax
County
$13,019,400 $13,019,400 $12,600 ACC
5/22/2017 107972 CN PM-9F-16 (Fairfax
Primary)
FROM Various TO Various 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$7,288,166 $7,288,166 $6,100,000 ACC
5/22/2017 107971 CN PM-9L-16 (Loudoun
County Primary Plant
Mix)
FROM Various TO Various 9999 Northern
Virginia :
Loudoun
County
Northern
Virginia
Primary Loudoun
County
$5,934,201 $5,934,201 $5,000,000 ACC
5/24/2017 107401 CN PM-9I-16 FAIRFAX
COUNTY INTERSTATE
PLANT MIX
FROM Various TO Various 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Intersta
te
Fairfax
County
$7,864,938 $7,864,883 $7,800,000 MOD
Page 87 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Maintenance: Preventive Maintenance & System Preservation
Original Grouping Cost$16,556,122Previous Amount
STIP ADJ $812,611 Amend/Adjust Original Grouping Cost10/28/2016
STIP ADJ ($3,904,733)
New Total $39,874,612 Current Grouping Cost
3/21/2017
$39,874,612
Current Grouping Cost Sliding Scale
Calculation
$43,862,073Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District
17-02
17-11
STIP ADJ $26,410,61217-22 5/22/2017
STIP ADJ $0
5/24/2017 103788 CN STRUCTURAL REPAIRS
BRIDGE AT RT 29 OVER
TRIB. ACCOTINK CREEK
FROM 0.07 Mi fr Rte 243 TO
0.08 Mi fr Rte 342
29 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$383,650 $383,650 $305,000 MOD
5/25/2017 103791 CN Major Bridge Rehab at
Brentsville Rd over
Broad Run
FROM 0.8 Mi fr Lucasville Rd TO
1.0 Mi fr Lucasville Rd
649 Northern
Virginia :
Prince
William
County
Northern
Virginia
Seconda
ry
Prince
William
County
$2,115,746 $2,115,746 $1,689,292 MOD
5/25/2017 104813 PE Bridge Rehab at Rte 50
over Goose Creek
FROM 0.1 Mi West Rte 624
Crenshaw Rd TO 0.15 Mi West
Rte 624 Crenshaw Rd
50 NonMPO :
NonMPO
Northern
Virginia
Primary Northern
Virginia
District-wide
$580,000 $580,000 $244,400 MOD
5/25/2017 103253 CN PRIMARY PAVING PM-
9A-14 FAIRFAX
FROM Various TO Various 9999 Northern
Virginia :
Fairfax
County
Northern
Virginia
Primary Fairfax
County
$4,340,417 $4,880,000 $3,471,500 MOD
5/25/2017 106210 CN Fairfax Secondary
Paving (PM-9D-15)
FROM Various TO Various 9999 NonMPO :
NonMPO
Northern
Virginia
Seconda
ry
Northern
Virginia
District-wide
$6,990,178 $7,033,457 $6,900,000 MOD
Total $329,624,724 $43,811,673
$50,400Current Grouping Balance
(sliding scale inclusive)
Page 88 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Maintenance: Traffic & Safety Operations
Original Grouping Cost$1,476,796Previous Amount
STIP ADJ $348,000 Amend/Adjust Original Grouping Cost10/25/2016
STIP ADJ $16,434,204
New Total $10,979,315 Current Grouping Cost
3/21/2017
$10,979,315
Current Grouping Cost Sliding Scale
Calculation
$13,724,144Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District
17-02
17-11
STIP ADJ ($7,279,685)17-22 5/22/2017
STIP ADJ $0
1/12/2017 109770 CN STATEWIDE ITS
MAINTENANCE - NRO
(NOVA) FY17-20
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$15,005,212 $15,005,212 $0 NEW
1/17/2017 110125 CN Bridge Rehabilitation
I495 Bridges
FROM RAMP E OVER I-495 TO
RAMPS G & E OVER NSRR
495 Northern
Virginia :
Fairfax
County
Northern
Virginia
Intersta
te
Fairfax
County
$6,700,000 $6,201,821 $0 NEW
1/18/2017 110029 CN #SGR PM-9L-17
PRIMARY SYSTEM
GUARDRAIL UPGRADE
FROM VARIOUS TO VARIOUS 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$775,000 $768,595 $0 NEW
2/10/2017 109783 CN STATEWIDE OPS
PROGRAM MGMT
SUPPORT - NRO (NOVA)
FY17-20
FROM NoVA District TOC TO
NoVA District TOC
9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$2,716,748 $2,716,748 $0 MOD
3/6/2017 110413 CN DISTRICTWIDE ON-CALL
ADA COMPLIANCE
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$825,257 $851,245 $0 NEW
3/16/2017 109760 CN STATEWIDE TOC / SSP -
NRO (NOVA) FY17-22
FROM NoVA TOC TO NoVA TOC 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$48,362,377 $48,362,377 $0 NEW
Page 89 of 907/21/2017
FFY15-18 STIP GROUPING TRACKING
Maintenance: Traffic & Safety Operations
Original Grouping Cost$1,476,796Previous Amount
STIP ADJ $348,000 Amend/Adjust Original Grouping Cost10/25/2016
STIP ADJ $16,434,204
New Total $10,979,315 Current Grouping Cost
3/21/2017
$10,979,315
Current Grouping Cost Sliding Scale
Calculation
$13,724,144Cannot exceed 10% of
Current Grouping Cost =
Date UPCPhase
Authorized Project Name Project Description Route MPO DistrictRoad
System JurisdictionPhase
Estimate
Net Increase
/Decrease of
TEC of Phase Obligated Actions
Northern Virginia District
17-02
17-11
STIP ADJ ($7,279,685)17-22 5/22/2017
STIP ADJ $0
5/15/2017 110029 CN #SGR PM-9L-17
PRIMARY SYSTEM
GUARDRAIL UPGRADE
FROM VARIOUS TO VARIOUS 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$775,000 $833,115 $0 AWD
5/18/2017 84224 PE PSTOC Operations Floor
for NOVA and SSP Labor
Staffing Svc
FROM DISTRICTWIDE TO Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Intersta
te
Northern
Virginia
District-wide
$41,989,627 $2,206,000 MOD
5/19/2017 105135 CN I-395 Service Panel &
Lighting Upgrade Phase
2
FROM Washington Blvd TO
Shirlington Road
395 Northern
Virginia :
Arlington
County
Northern
Virginia
Intersta
te
Arlington
County
$2,085,060 $2,085,060 $1,772,000 MOD
5/26/2017 106009 CN STATEWIDE TOC, SSP &
ITS DEVICES - NOVA
DISTRICT
FROM TOC at Alliance Drive TO
TOC at Alliance Drive
9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Primary Northern
Virginia
District-wide
$55,357,623 $55,357,623 $0 MOD
6/1/2017 110413 CN DISTRICTWIDE ON-CALL
ADA COMPLIANCE
FROM Various TO Various 9999 Northern
Virginia :
Northern
Virginia
District-wide
Northern
Virginia
Miscella
neous
Northern
Virginia
District-wide
$825,257 $708,182 $708,182 AWD
Total $174,879,605 $4,686,182
$9,037,962Current Grouping Balance
(sliding scale inclusive)
Page 90 of 907/21/2017