![Page 1: Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.](https://reader035.fdocuments.net/reader035/viewer/2022072012/56649e435503460f94b36db3/html5/thumbnails/1.jpg)
Federal AviationAdministrationData Communications
Integration Team (DCIT)
DCL Trials test activities
Presented to: DCIT # 15
By: Peter MuracaFAA
Date: May 30 – 31, 2012
![Page 2: Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.](https://reader035.fdocuments.net/reader035/viewer/2022072012/56649e435503460f94b36db3/html5/thumbnails/2.jpg)
Federal AviationAdministration
DCIT # 15
May 30 – 31, 2012
Status
• Documents– Test Plan complete
– E-E System Test Cases Document 85% complete
– VRTM 90% complete
– Working on SAT plan/procedures
• Coordination– ARINC and SITA service / connections
– FAA FNTB – nesg gateway
– T.C Project Aircraft
– HADDS Lab for failover and revision change testing
– Boeing Air Lab
– DCIT Aircraft (FedEx, United, Delta)
– A. Fry AIR LAB
2
![Page 3: Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.](https://reader035.fdocuments.net/reader035/viewer/2022072012/56649e435503460f94b36db3/html5/thumbnails/3.jpg)
Federal AviationAdministration
DCIT # 15
May 30 – 31, 2012
Status - Test Activities
3
start stop
pDTAP delivery to Tech Center 5/10/2012 8/15/2012
pDTAP / HADDS in-box Interface Testing 5/14/2012 5/28/2012
pDTAP / HADDS via FNTB Interface Testing 5/28/2012 6/4/2012
pDTAP / HADDS / CSP Interface Testing via FNTB 6/4/2012 6/13/2012
pDTAP / HADDS / CSP / LAB Avionics Connectivity Testing via FNTB 6/13/2012 6/20/2012
pDTAP (applicable) Requirements Testing via Lab infrastructure 6/20/2012 7/18/2012
pDTAP (applicable) Requirements Testing via Lab infrastructure to Boeing Air Lab 7/18/2012 8/1/2012
pDTAP PTR fixes / Regression Testing in LAB env. 8/6/2012 8/15/2012
Test Plan Update 5/10/2012 7/20/2012
Test Cases Final 5/10/2012 7/20/2012
pDTAP Quick Look Report 7/11/2012 8/15/2012
![Page 4: Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.](https://reader035.fdocuments.net/reader035/viewer/2022072012/56649e435503460f94b36db3/html5/thumbnails/4.jpg)
Federal AviationAdministration
DCIT # 15
May 30 – 31, 2012
Status - Test Activities (cont.)
4
DTAP End to End System Test 8/15/2012 10/12/2012
DTAP Requirements Testing using Lab Infrastructure (follow VRTM & Test Cases) 8/15/2012 9/14/2012
DTAP Requirements Testing using Lab Infrastructure with Test Aircraft (follow VRTM & Test Cases) 9/14/2012 9/21/2012
DTAP Requirements Testing using Lab Infrastructure with Boeing Air Lab (follow VRTM & Test Cases) 9/21/2012 9/28/2012
DTAP Requirements Testing using Lab Infrastructure with FedEx / Delta / United aircraft (follow VRTM & Test Cases) 9/28/2012 10/5/2012
DTAP Error Conditions / Abnormal Cases 8/5/2012 10/12/2012
DTAP PTR Fixes / Regression Testing 8/5/2012 10/12/2012
End to End Test Report 9/14/2012 10/12/2012
![Page 5: Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.](https://reader035.fdocuments.net/reader035/viewer/2022072012/56649e435503460f94b36db3/html5/thumbnails/5.jpg)
Federal AviationAdministration
DCIT # 15
May 30 – 31, 2012
Status - Test Activities (cont.)
5
DTAP Site Acceptance Testing 10/15/2012 10/26/2012
Final SAT Sub_set Test Cases document 9/14/2012 10/12/2012
End to End Connectivity & Functional testing in field 10/15/2012 10/18/2012
Failover Conditions Testing 10/18/2012 10/20/2012
End to End Operational testing based on Sub_set Test Cases 10/15/2012 10/26/2012
SAT Final Test Report 10/15/2012 10/29/2012
![Page 6: Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.](https://reader035.fdocuments.net/reader035/viewer/2022072012/56649e435503460f94b36db3/html5/thumbnails/6.jpg)
HADDS
HID
HOST
ERAM
HADDS
HID
HOST
ERAM
NESG
ED-8
ACY
AirlineHOST
DEMARC
DEM
ARC
TEST
ED-8
ACY
FAA Technical CenterFNTB
DEM
ARC
FTI
OPSIP
HADDS
HID
HOST
ERAM
DTAP
DTAP
DTAP
DTAP
MO
USE
KYBRDM
ON
ITOR
OS
FDP
DCL
AFN
HM
I
FANS
1/A+ STACK
1
2
3
2,3
2,3
2,3
2,3
ARINC
SITA
IP
IP
TEST
TEST
TOWER
TOWER
TOWER
TDLS
DCL Trials Architecture
AirlineHOST
ARTCC
ARTCC
2
3
2,3
HAD
DS
CSP &API
DATA RECORD
DEMARC
TDLS