2010 Sarasota County Consolidated Major Revenue and Debt Report
February 10, 2010 Sarasota Memorial Health Care System Management Council February 10, 2010.
-
Upload
isaak-fenley -
Category
Documents
-
view
216 -
download
0
Transcript of February 10, 2010 Sarasota Memorial Health Care System Management Council February 10, 2010.
February 10, 2010
Sarasota Memorial HealthCare System
Management Council
February 10, 2010
February 10, 2010
Construction Milestone Schedule
February 10, 2010
• Preparation for Structural Steel
• Close Arlington Street
Capture Site
Set up Crane for Structural Steel
• Open Arlington Street
Project Milestones – Surgery Vertical Expansion:Target Start – 2/22/10
Target Start – 4/12/10
Target Start - 12/31/10
February 10, 2010
Site Phasing Diagram – Surgery Vertical Expansion
Construction Zone for Crane, Material Deliveries, etc.
Ambulance Access to be Maintained at All Times
February 10, 2010
• Wound Care Renovations• CEP Equipment Removal• Construct Temporary Waldemere Garage Entrance• After Garage Entrance is complete construct Interim
Main Entrance• Old Central Energy Plant Structure Demolition• Construct Temporary ECC Canopy & Drop off• Open Temporary Canopy & Drop Off / Close
Hawthorne in Front of ECC / Construct New ECC Drop Off
• Install New & Relocate Site Utilities / Construct New Loop Road
• Open New Loop Road / New Drop Offs / Close Hawthorne / Capture Site for Bed Tower Demolition / Construct Stair & Elevator Tower & Bridge Connector
• New Bed Tower Construction
Project Milestones – New Bed Tower:Target Completion - 7/1/10
Target Start - 3/8/10
Target Start - 3/29/10
Target Start - 5/17/10
Target Start - 3/29/10
Target Start - 5/3/10
Target - 6/7/10
Target Start - 5/3/10
Target Start - 9/20/10
Target Start - 12/28/10
February 10, 2010
Site Phasing Diagram - 1
Demolish Old CEP
Interim Moves for Surgery Support & Pathology
Remove Equipment from CEP
Create Temporary Garage Entry/Exit onto Waldemere St
February 10, 2010
Site Phasing Diagram - 2
Create Temporary ECC Entry Drop-Off
Temporary ECC Entry Canopy
February 10, 2010
Site Phasing Diagram - 3
Open Temporary ECC Entry Canopy & Drop-off
Build Temp Main Entrance Canopy, Drop-off & Vestibule
Close Hawthorne Street
Construct New Loop Road and Associated Utilities
Temporary Route to ECC
Construct New ECC Vestibule, Canopy & Drop-off
Open New Entry/Exit at Waldemere Garage
February 10, 2010
Site Phasing Diagram - 4
Open Temporary Main Entry Canopy & Drop-off
Demolish Existing Main Entry Canopy
Open ECC Vestibule, Canopy & Drop-off
Open New Loop Road
Demolish Northeast Tower
Demolish Portion of Critical Care Tower for New Bridge
February 10, 2010
Site Phasing Diagram - 5
Construct New Bed Tower and Bridge