FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, …...
Transcript of FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, …...
![Page 1: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/1.jpg)
1
FDA “Critical Path” Initiative: Closing Productivity Gap in Medical Product Development
October 4, 2004
![Page 2: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/2.jpg)
2
Trends in Biomedical Research Spending
0
50
100
150
200
250
300
350
400
1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003
Year
Inde
xed
Gro
wth
(199
3 =
100) PhRMA R&D Spending
Total NIH Budget
CDER NME Median Approval Times by Calendar Year
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003
Med
ian
App
rova
l Tim
e (M
onth
s)
Standard (1992 - 2003)Type C (1981 -1991)
Priority (1992 - 2003)Type A or B (1981 -1991)
NMEs Filed by Fiscal Year
0
10
20
30
40
50
1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003
Num
ber F
iled
Priority Standard
What is the problem ?
R&D Spending Has Accelerated Since 1990
And FDA Review Efficiency Has Increased…
But New Product Submissions Are Flat or Even Down
![Page 3: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/3.jpg)
3
Problem: Productivity Gap in Development of New Medical Technologies
Development Process Itself Now a BottleneckMany basic research breakthroughs BUT product development still uses decades-old tools/technology.
Development is High Risk, High CostOnly 22 percent of new compounds entering Phase I get market approval.
Patent life is limited, subsequent generic competition fierce (in the U.S.).
Not all approved drugs become blockbusters.
![Page 4: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/4.jpg)
4
Problem: Productivity Gap in Development of New Medical Technologies
DiMasi, et al. (2003) estimated that the capitalized cost for self-originated NMEs* developed by multinational pharma & approved in 2001 would be about $1.1 B per NME.
Annual growth in capitalized costs was 7.4 % relative to earlier study, after inflation. Real capitalized clinical costs grew at 11.8 %.
Growth in trial sizes was 7.5 %
Medical inflation beat general inflation by 3.7 %
*New Molecular Entity
![Page 5: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/5.jpg)
5
That Has a Negative Impact on Public Health
Companies focus on revenue 'blockbusters' Clinically important therapies that don't promise largest revenues —not being developedExamples: antibiotics, vaccines, medical countermeasures, blood products, products that target smaller populations (e.g., Parkinsons')
We need more innovation where public healthneed is urgent
More affordable medicine: Higher development cost limits innovation and price competition
![Page 6: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/6.jpg)
6
Why is FDA Concerned?
FDA Statutory Mission -- Not only to protect but also to advance public health, by access and availability of safe and effective new medical products.
![Page 7: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/7.jpg)
7
What is on "Critical Path" toMedical Product Development?
Applies basic science to address 3 key dimensions:
Assessment of Safety – how to predict if a potential product will be harmful?
Proof of Efficacy -- how to determine if a potential product will have medical benefit?
Industrialization – how to manufacture a product at commercial scale with consistently high quality?
![Page 8: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/8.jpg)
8
Applied Science Needed to Better Evaluate and Predict on 3 Key Dimensions on 'Critical Path' of Development
FDA oversees this process and plays a unique role
![Page 9: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/9.jpg)
9
What is at Stake? What Patients are Telling Us
“FasterCures is strongly supportive of and encouraged by the FDA’s new Critical Path Initiative. This effort has the potential to contribute to the goal of saving lives by saving time in making new therapies available for use sooner.”FasterCures
“…We heartily endorse the FDA for its leadership in launching the Critical Pathway Initiative.” Prostate Cancer Foundation
“We particularly welcome the Critical Path Initiative’s attention to improving models and technology for enhancing the clinical relevance and predictive value of preclinical assays, especially those related to pharmacology and toxicology.” -- AIDS Treatment Activist Coalition
“We commend you for the serious effort you are making to resolve the dilemma we face, and offer you our support and help as we address these challenging questions.” -- National Osteoporosis Foundation
“We wish to congratulate the Food and Drug Administration (FDA) for its excellent report…” – National Organization for Rare Disorders
![Page 10: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/10.jpg)
10
Need Better Tools:Public Health Challenges
Patients – Need new treatments for serious diseasesE.g., autism, addictive disorders, Alzheimer’s disease, bipolar disorders, cancer, cystic fibrosis, heart diseases, diabetes, morbid obesity, multiple sclerosis, muscular dystrophy, rheumatoid arthritis, osteoarthritis, systemic lupus, schizophrenia, stroke, …
Physicians – Need tools to better diagnose disease,Target therapies at the patients most likely to benefitMeasure individual patients’ responses [at molecular level]
Payers -- Need tools to better identify and pay for most effective treatments; best buy for health-care buck
![Page 11: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/11.jpg)
11
Examples: A Little FDA Science Could Go A Long Way
Smaller, Smarter Clinical Trials Research to validate cutting edge statistics and innovative trial designs.Reduce paperwork burden -- consensus development to facilitate standard electronic submissions.
Biomarker Validation set scientific standards for validation, so industry can do the necessary validation work
![Page 12: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/12.jpg)
12
What is Next Step on Critical Path?
Fall 2004: Announce National Critical Path Challenges List -- Identify and prioritize opportunities for build better tools to speed product development
![Page 13: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/13.jpg)
13
Interactions Between Drug Development and Regulatory Procedures
![Page 14: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/14.jpg)
14
FDA Has Unique Role Vis à Vis the Critical Path
FDA scientists are involved in review during product development -- they see the successes, failures, and missed opportunities
FDA sets the standards that innovators must meet.New knowledge and applied science tools needed not only by innovators – must also be incorporated into agency review.
FDA guidance documents are known to foster innovation and improve chances of success.
![Page 15: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/15.jpg)
15
FDA Has Frequent Interactions With Innovators During Product DevelopmentExample: Drug and Biologics Development
![Page 16: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/16.jpg)
16
Better Standards to Evaluate & Predict Safety & Effectiveness
Would improve product quality and lower cost of developmentThis would keep more promising therapies in the pipeline
E.g., If time in Phase III could be reduced by 50%, total capitalized costs would decline by $90 m per NME approved.
11.2%7.5%2.7%4.7%50%
9.0%6.1%2.2%3.8%40%
6.9%4.6%1.7%2.9%30%
4.6%3.1%1.1%2.0%20%
2.3%1.6%0.6%1.0%10%
Phase III
Phase II
Phase IPre-clinical
Reduction in Capitalized Cost per Approved New Drug*Reduce
Phase Length
Source: Tufts Center for Study of Drug Development.
* Based on Estimate of $802M on average to develop & get approval for NME in the US
![Page 17: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/17.jpg)
17
Improving Predictability & Productivity of Development Process
Improving predictability of process reduces risk of developing new products-- encourages continued development of more new innovative therapies
Shifting 5% of clinical failures from Phase 3 to Phase 1 reduces out-of-pocket cost $15.5-20.0M and capitalized clinical cost by $23.8-29.4MShifting 25% of failures from Phase 2 to Phase 1 reduces out-of-pocket cost $12.4-21.4M and capitalized cost by $21.9-37.8M 8.1%7.6%25%
6.5%6.1%20%
4.9%4.6%15%
3.2%3.0%10%
1.6%1.5%5%
Capitalized Cost
Out-of-Pocket Cost
Reduction in Clinical Cost per approved NCE
% of Investi-gational drugs shifted to earlier failure: Phase II to Phase I
Source: Tufts Center for Study of Drug Development.
* Based on Estimate of $802M on average to develop & get approval for NME in the US
![Page 18: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/18.jpg)
18
Increasing Share of New Drugs Get to US Patients First
5 % 8 % 1 8 %3 7 % 4 7 %
1980-84 1985-89 1990-94 1995-99 2000-03
Year of NAS Cohort
0
50
100
150
200
250
300
Tota
l NA
Ss
Non-USA USA
Data source: Scrip World Pharmaceutica l News & Scrip Magazine
USA Share of NASs First on World Market( USA % in Bars )
U.S. leads world with investments in pharmaceutical R&D -- US: $27.3B; Europe: $19.1B; Japan: $7.9B, NAS=new active substance.
![Page 19: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/19.jpg)
19
What is on "Critical Path" to Product Development?
Applying basic science to address 3 key dimensions of product performance:
Assessment of Safety – how to predict if a potential product will be harmful?
Proof of Efficacy -- how to determine if a potential product will have medical benefit?
Industrialization – how to manufacture a product at commercial scale with consistently high quality?
![Page 20: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/20.jpg)
20
International benefits
Faster development of better drugs is global public good, can reduce disease burden everywhere.Objective science-based standards relating to approval will help harmonization of drug approval world-wide.
![Page 21: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/21.jpg)
21
![Page 22: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/22.jpg)
22
Comments on LDCs
Chile and Mexico have as many manufacturers per product as Canada and France. Use of generics is higher in Chile than Canada (62 vs 26) and higher in Mexico than France (26 vs 14)Per capita consumption by age of drug
Chile is less than U.S. especially for new drugs.Mexico is less than U.S. even more so for new drugs.
Danzon and Furukawa, Health Affairs, 2003.
![Page 23: FDA “Critical Path” Initiative: Closing Productivity Gap ...schizophrenia, stroke, … Physicians – Need tools to better diagnose disease, Target therapies at the patients most](https://reader030.fdocuments.net/reader030/viewer/2022040912/5e87065987af6047895a517c/html5/thumbnails/23.jpg)
23
Comments on LDCs
Prices in Chile and Mexico (relative to U.S. prices) are much higher than in Canada and France. Taking into account income differences, prices relative to the U.S. are much greater in Chile and Mexico than in Canada and France.