FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and...

18
STS-119/15A FD 12 Execute Package MSG Page(s) Title 126A 1 - 14 FD12 Flight Plan Revision (pdf) 127 15 - 16 FD12 Mission Summary (pdf) 128 17 EFGF Target Paint (pdf) Approved by FAO: M. Blanton Last Updated: Mar 26 2009 7:53AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003

Transcript of FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and...

Page 1: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

STS-119/15A FD 12 Execute Package

MSG Page(s) Title 126A 1 - 14 FD12 Flight Plan Revision (pdf) 127 15 - 16 FD12 Mission Summary (pdf) 128 17 EFGF Target Paint (pdf)

Approved by FAO: M. Blanton Last Updated: Mar 26 2009 7:53AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003  

Page 2: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

MSG 126A - FD12 FLIGHT PLAN REVISION

MSG INDEX 1 2

MSG NO. TITLE 3 4 5 6 7 8

10

11 12 13

14 15

16 17 18 19 20 21

23 24 25 26

28 29 30 31 32 33 34 35 36 37 38 39 40

42 43 44 45 46 47 48 49 50 51

MSG126 FD12 Flight Plan Revision MSG127 FD12 Mission Summary MSG128 EFGF Target Paint 1. Cryo Config 9

For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later in the day. R1 O2,H2 MANF VLV TK2 (two) - OP (tb-OP) A11 CRYO TK4 HTRS O2 A – OFF H2 A,B (two) - OFF A15 CRYO TK5 HTRS O2 A – AUTO H2 A,B (two) - AUTO

2. FD11 MMT Summary 22

The FD11 MMT met for 7 minutes and passes on its appreciation for your tremendous work during the joint mission.

3. Pre-Landing Comm Checks 27

Pre-landing comm checks at White Sands (WSSH) and Dryden (DFR) will occur today (one day early) due to timeline constraints. During the WSSH comm check, MCC will call you on UHF only and your response will be triple simo. During the DFR comm checks, CAPCOM will make individual calls on A/G1 then A/G2 then UHF and lastly triple simo; your responses to all these calls should be triple simo. The MILA comm check will happen on FD13 at the nominal L-1 time frame. MCC will route a payload bay camera to satisfy the video component of the DFR check. Video is not required at WSSH.

4. REPLACE PAGES 2-40, 2-42, 2-43 AND 3-126 THROUGH 3-135 41

END OF PAGE 1 OF 14, MSG 126A 1

Page 3: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

FD11 AN

TONELLI

ACABA

SWANSON

ARNOLD

PHILLIPS

MAGNUS

ARCHAMBAULT

REPL

ANNE

D

2-40

S T S - 1 1 9

03/26

0102

0304

0506

0708

0910

11GMT 03/25/09 (084)

010/00

0102

0304

0506

0708

0910

1112

MET

Day 010

CDR

PRE SLEEP

EXER

CISE

SLEEP

PMC

A/G

POST SLEEP

PLT

PRE SLEEP

SLEEP

POST SLEEP

L O G

MS1

PRE SLEEP

SLEEP

POST SLEEP

MS2

PRE SLEEP

SLEEP

POST SLEEP

MS3

PRE SLEEP

C R E W @

SLEEP

POST SLEEP

MS4

PRE SLEEP

SLEEP

POST SLEEP

L O G

FE-2 DN

PRE SLEEP

SLEEP

POST SLEEP

DAY/NIGHT

ORBIT

159

160

161

162

163

164

165

166

TDRS

W E Z-ZLV -XVV

ORB ATT

GND

WSS

WSS

WSS

WSS

DFR

DFR

DFR

DFR

DFR

DFR

MLA

MLA

@CHOICE D/L

NOTES

2-40

FD11 AN

TONELLI

ACABA

SWANSON

ARNOLD

PHILLIPS

MAGNUS

ARCHAMBAULT

REPL

ANNE

D

S T S - 1 1 9

03/26

0102

0304

0506

0708

0910

11GMT 03/25/09 (084)

010/00

0102

0304

0506

0708

0910

1112

MET

Day 010

CDR

PRE SLEEP

EXER

CISE

SLEEP

PMC

A/G

POST SLEEP

PLT

PRE SLEEP

SLEEP

POST SLEEP

L O G

MS1

PRE SLEEP

SLEEP

POST SLEEP

MS2

PRE SLEEP

SLEEP

POST SLEEP

MS3

PRE SLEEP

C R E W @

SLEEP

POST SLEEP

MS4

PRE SLEEP

SLEEP

POST SLEEP

L O G

FE-2 DN

PRE SLEEP

SLEEP

POST SLEEP

DAY/NIGHT

ORBIT

159

160

161

162

163

164

165

166

TDRS

W E ZORB ATT

-ZLV -XVV

GND

NOTES

@CHOICE D/L

2

Page 4: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

FD12 AN

TONELLI

ACABA

SWANSON

ARNOLD

PHILLIPS

MAGNUS

ARCHAMBAULT

18S LAUNCH

REPL

ANNE

D

2-42

S T S - 1 1 9

12

1314

1516

1718

1920

2122

23GMT 03/26/09 (085)

12

1314

1516

1718

1920

2122

23011/00

MET

Day 010

CDR

M N V R

S T B DPORT WING SURVEY

NOSE CAP

SURVEY

M N V R

N O S E

M N V R

P O R T

- Z L V

- X V VMEAL

EXERCISE

+ Z L V

- X V V

F E S - I

F E S - T

♣PMC

A/G

PRE SLEEP

P O D *POST SLEEP

F E S - I

POST

SLEEP

F E S - T

I M U

PLT

STBD WING SURVEY

PORT WING SURVEY

OBSS BERTH

R M S

P W R D N

OBSS UNBERTH

MEAL

PRE SLEEP

M C I U @

EXERCISE

POST SLEEP

MS1

STBD WING SURVEY

NOSE CAP

SURVEY

OBSS BERTH

R M S

P W R D N

L-1

COMM

CHK

OBSS UNBERTH

POST SLEEP

MEAL

PRE SLEEP

EXERCISE

L-1

COMM

CHK

M U S

PRE

SLEEP

C R E W #

MS2

EMU

INSTL

EVA

UNPACK

& STOW

PST ISS EVA

ENT PREP

PORT WING SURVEY

C O M M 1

POST SLEEP

MEAL

PRE SLEEP

EXERCISE

MS3

EMU

INSTL

EVA

UNPACK

& STOW

PST ISS EVA

ENT PREP

LDRI D/L

O C A %POST SLEEP

MEAL

PRE SLEEP

EXERCISE

MS4

STBD WING SURVEY

NOSE CAP

SURVEY

MEAL

PRE SLEEP

EXERCISE

M D D K *

M D D K *M U SPOST SLEEP

FE-2 DN

POST SLEEP

MEAL

PRE SLEEP

EXERCISE

EXERCISE

DAY/NIGHT

ORBIT

166

167

168

169

170

171

172

173

174

TDRS

W E Z-ZLV -XVV

BIAS +YSI

BIAS +XSI

BIAS -YSI

+ZLV

-ZLV -XVV

ORB ATT

GND

WSS

WSS

DFR

DFR

MLA

♣PRE SLEEP

*A POD HTR RECONFIG

@FILTER CK

#CHOICE D/L

%RATE RECONFIG

*STATUS CK

*STATUS CK

NOTES

2-42

FD12 AN

TONELLI

ACABA

SWANSON

ARNOLD

PHILLIPS

MAGNUS

ARCHAMBAULT

18S LAUNCH

REPL

ANNE

D

S T S - 1 1 9

12

1314

1516

1718

1920

2122

23GMT 03/26/09 (085)

12

1314

1516

1718

1920

2122

23011/00

MET

Day 010

CDR

M N V R

S T B DPORT WING SURVEY

NOSE CAP

SURVEY

M N V R

N O S E

M N V R

P O R T

- Z L V

- X V VMEAL

EXERCISE

+ Z L V

- X V V

F E S - I

F E S - T

♣PMC

A/G

PRE SLEEP

P O D *POST SLEEP

F E S - I

POST

SLEEP

F E S - T

I M U

PLT

STBD WING SURVEY

PORT WING SURVEY

OBSS BERTH

R M S

P W R D N

OBSS UNBERTH

MEAL

PRE SLEEP

M C I U @

EXERCISE

POST SLEEP

MS1

STBD WING SURVEY

NOSE CAP

SURVEY

OBSS BERTH

R M S

P W R D N

L-1

COMM

CHK

OBSS UNBERTH

POST SLEEP

MEAL

PRE SLEEP

EXERCISE

L-1

COMM

CHK

M U S

PRE

SLEEP

C R E W #

MS2

EMU

INSTL

EVA

UNPACK

& STOW

PST ISS EVA

ENT PREP

PORT WING SURVEY

C O M M 1

POST SLEEP

MEAL

PRE SLEEP

EXERCISE

MS3

EMU

INSTL

EVA

UNPACK

& STOW

PST ISS EVA

ENT PREP

LDRI D/L

O C A %POST SLEEP

MEAL

PRE SLEEP

EXERCISE

MS4

STBD WING SURVEY

NOSE CAP

SURVEY

MEAL

PRE SLEEP

EXERCISE

M D D K *

M D D K *M U SPOST SLEEP

FE-2 DN

POST SLEEP

MEAL

PRE SLEEP

EXERCISE

EXERCISE

DAY/NIGHT

ORBIT

166

167

168

169

170

171

172

173

174

TDRS

W E ZORB ATT

-ZLV -XVV

BIAS +YSI

BIAS +XSI

BIAS -YSI

+ZLV

-ZLV -XVV

GND

NOTES

♣PRE SLEEP

*A POD HTR RECONFIG

@FILTER CK

#CHOICE D/L

%RATE RECONFIG

*STATUS CK

*STATUS CK

3

Page 5: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

FD12 AN

TONELLI

ACABA

SWANSON

ARNOLD

PHILLIPS

MAGNUS

ARCHAMBAULT

REPL

ANNE

D

2-43

S T S - 1 1 9

03/27

0102

0304

0506

0708

0910

11GMT 03/26/09 (085)

011/00

0102

0304

0506

0708

0910

1112

MET

Day 011

CDR

POST SLEEP

SLEEP

PRE SLEEP

PLT

POST SLEEP

L O GPRE SLEEP

SLEEP

MS1

POST SLEEP

EXER

CISE

SLEEP

PRE SLEEP

MS2

P O S T

S L E E P

S L V AD R Y S L V

D R Y S L V

POST SLEEP

PRE SLEEP

SLEEP

MS3

P O S T

S L E E P

S L V AD R Y S L V

D R Y S L V

POST SLEEP

PRE SLEEP

SLEEP

MS4

P O S T

S L E E P

L O GS L V AD R Y S L V

D R Y S L V

POST SLEEP

PRE SLEEP

SLEEP

FE-2 DN

P O S T

S L E E P

D R Y S L VS L V A

D R Y S L V

POST SLEEP

PRE SLEEP

SLEEP

DAY/NIGHT

ORBIT

174

175

176

177

178

179

180

181

182

TDRS

W E Z-ZLV -XVV

ORB ATT

GND

WSS

WSS

DFR

DFR

DFR

DFR

DFR

MLA

MLA

MLA

NOTES

2-43

FD12 AN

TONELLI

ACABA

SWANSON

ARNOLD

PHILLIPS

MAGNUS

ARCHAMBAULT

REPL

ANNE

D

S T S - 1 1 9

03/27

0102

0304

0506

0708

0910

11GMT 03/26/09 (085)

011/00

0102

0304

0506

0708

0910

1112

MET

Day 011

CDR

POST SLEEP

SLEEP

PRE SLEEP

PLT

POST SLEEP

L O GPRE SLEEP

SLEEP

MS1

POST SLEEP

EXER

CISE

SLEEP

PRE SLEEP

MS2

P O S T

S L E E P

S L V AD R Y S L V

D R Y S L V

POST SLEEP

PRE SLEEP

SLEEP

MS3

P O S T

S L E E P

S L V AD R Y S L V

D R Y S L V

POST SLEEP

PRE SLEEP

SLEEP

MS4

P O S T

S L E E P

L O GS L V AD R Y S L V

D R Y S L V

POST SLEEP

PRE SLEEP

SLEEP

FE-2 DN

P O S T

S L E E P

D R Y S L VS L V A

D R Y S L V

POST SLEEP

PRE SLEEP

SLEEP

DAY/NIGHT

ORBIT

174

175

176

177

178

179

180

181

182

TDRS

W E ZORB ATT

-ZLV -XVV

GND

NOTES

4

Page 6: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

12

ARCH

AMBA

ULT

ANTO

NELL

IAC

ABA

FD12 EZ ACTIVITIES:

√OCAC FILTER

TEPC (STATUS CHECK)

(ORB OPS, CREW SYS )

HARD REBOOT ALL PGSCs EXCEPT:

STS-6(WLES)

RE

PLAN

NED

3-126

STS-

119

FD (

)

08:00

09:00

10:00

11:00

GMT

Date

03/26

(085)

08:00

09:00

10:00

11:00

12:00

MET

Day 010

WE

Z

T D R S

~

~

~

D / N

D O R B 1 4 1 5 1 6

O R B 1 6 4 1 6 5 1 6 6

~ ~- Z L V - X V VS T S A T T

CDR

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-126

12

ARCH

AMBA

ULT

ANTO

NELL

IAC

ABA

FD12 EZ ACTIVITIES:

√OCAC FILTER

TEPC (STATUS CHECK)

(ORB OPS, CREW SYS )

HARD REBOOT ALL PGSCs EXCEPT:

STS-6(WLES)

RE

PLAN

NED

STS-

119

FD (

)

08:00

09:00

10:00

11:00

GMT

Date

03/26

(085)

08:00

09:00

10:00

11:00

12:00

MET

Day 010

WE

Z

T D R SD / N

D O R B 1 4 1 5 1 6

O R B 1 6 4 1 6 5 1 6 6

S T S A T T ~ ~- Z L V - X V V

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

5

Page 7: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

12

SWAN

SON

ARNO

LDPH

ILLI

PSMA

GNUS

RE

PLAN

NED

3-127

STS-

119

FD (

)

08:00

09:00

10:00

11:00

GMT

Date

03/26

(085)

08:00

09:00

10:00

11:00

12:00

MET

Day 010

WE

Z

T D R S

~

~

~

D / N

D O R B 1 4 1 5 1 6

O R B 1 6 4 1 6 5 1 6 6

~ ~- Z L V - X V VS T S A T T

MS2

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS3

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

FE-2 (DN)

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-127

12

SWAN

SON

ARNO

LDPH

ILLI

PSMA

GNUS

RE

PLAN

NED

STS-

119

FD (

)

08:00

09:00

10:00

11:00

GMT

Date

03/26

(085)

08:00

09:00

10:00

11:00

12:00

MET

Day 010

WE

Z

T D R SD / N

D O R B 1 4 1 5 1 6

O R B 1 6 4 1 6 5 1 6 6

S T S A T T ~ ~- Z L V - X V V

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

FE-2 (DN)

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

6

Page 8: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

12

ARCH

AMBA

ULT

ANTO

NELL

IAC

ABA

RE

PLAN

NED

MNVR (TRK) BIAS +YSI (Stbd Survey)

TG=4 BV=5 P=0 Y=40 OM=280

A14/AUTO/VERN, OBSS UNBERTH Complete,

Init TRK

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS)

Step 1, using FES Pri A

SUPPLY H2O DUMP USING FES

(ORB OPS, ECLS)

Step 2, FES Pri A required

3-128

STS-

119

FD (

)

12:00

13:00

14:00

15:00

GMT

Date

03/26

(085)

12:00

13:00

14:00

15:00

16:00

MET

Day 010

WE

Z

T D R S

~

~

~

D / N

D O R B 1 6 1 2 3

O R B 1 6 6 1 6 7 1 6 8 1 6 9

~ - Z L V - X V V ~B I A S + Y S IS T S A T T

CDR

EXERCISE

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

~

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

Ref. MSG 128

L17 Check MCIU filter screen

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS1

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

~

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

Ref. MSG 128

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-128

12

ARCH

AMBA

ULT

ANTO

NELL

IAC

ABA

RE

PLAN

NED

MNVR (TRK) BIAS +YSI (Stbd Survey)

TG=4 BV=5 P=0 Y=40 OM=280

A14/AUTO/VERN, OBSS UNBERTH Complete,

Init TRK

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS)

Step 1, using FES Pri A

SUPPLY H2O DUMP USING FES

(ORB OPS, ECLS)

Step 2, FES Pri A required

STS-

119

FD (

)

12:00

13:00

14:00

15:00

GMT

Date

03/26

(085)

12:00

13:00

14:00

15:00

16:00

MET

Day 010

WE

Z

T D R SD / N

D O R B 1 6 1 2 3

O R B 1 6 6 1 6 7 1 6 8 1 6 9

S T S A T T ~ - Z L V - X V V ~B I A S + Y S I

CDR

EXERCISE

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

Ref. MSG 128

L17 Check MCIU filter screen

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS1

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

Ref. MSG 128

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

7

Page 9: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

12

SWAN

SON

ARNO

LDPH

ILLI

PSMA

GNUS

RE

PLAN

NED

3-129

STS-

119

FD (

)

12:00

13:00

14:00

15:00

GMT

Date

03/26

(085)

12:00

13:00

14:00

15:00

16:00

MET

Day 010

WE

Z

T D R S

~

~

~

D / N

D O R B 1 6 1 2 3

O R B 1 6 6 1 6 7 1 6 8 1 6 9

~ - Z L V - X V V ~B I A S + Y S IS T S A T T

MS2

EMU INSTALLATION

(EVA, AIRLOCK CONFIG)

POST EVA EMU RECONFIGURATION

AND TRANSFER

(EVA, AIRLOCK CONFIG)

Perform EVA UNPACK AND STOW

POST ISS EVA ENT PREP

(EVA, POST EVA ENT PREP)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

~

MS3

EMU INSTALLATION

(EVA, AIRLOCK CONFIG)

POST EVA EMU RECONFIGURATION

AND TRANSFER

(EVA, AIRLOCK CONFIG)

Perform EVA UNPACK AND STOW

POST ISS EVA ENT PREP

(EVA, POST EVA ENT PREP)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

~

MDDK ST CK

(ASSY OPS, PAYLOADS)

Perform Step 1 only

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

FE-2 (DN)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

NOTES

3-129

12

SWAN

SON

ARNO

LDPH

ILLI

PSMA

GNUS

RE

PLAN

NED

STS-

119

FD (

)

12:00

13:00

14:00

15:00

GMT

Date

03/26

(085)

12:00

13:00

14:00

15:00

16:00

MET

Day 010

WE

Z

T D R SD / N

D O R B 1 6 1 2 3

O R B 1 6 6 1 6 7 1 6 8 1 6 9

S T S A T T ~ - Z L V - X V V ~B I A S + Y S I

MS2

EMU INSTALLATION

(EVA, AIRLOCK CONFIG)

POST EVA EMU RECONFIGURATION

AND TRANSFER

(EVA, AIRLOCK CONFIG)

Perform EVA UNPACK AND STOW

POST ISS EVA ENT PREP

(EVA, POST EVA ENT PREP)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

MS3

EMU INSTALLATION

(EVA, AIRLOCK CONFIG)

POST EVA EMU RECONFIGURATION

AND TRANSFER

(EVA, AIRLOCK CONFIG)

Perform EVA UNPACK AND STOW

POST ISS EVA ENT PREP

(EVA, POST EVA ENT PREP)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

MDDK ST CK

(ASSY OPS, PAYLOADS)

Perform Step 1 only

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

FE-2 (DN)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

NOTES

8

Page 10: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

12

ARCH

AMBA

ULT

ANTO

NELL

IAC

ABA

MNVR (TRK) BIAS -YSI (Port Survey)

TG=4 BV=5 P=0 Y=323 OM=335

A14/AUTO/VERN, RCC SURVEY-PORT Step 3,

Init TRK

RE

PLAN

NED

3-130

STS-

119

FD (

)

16:00

17:00

18:00

19:00

GMT

Date

03/26

(085)

16:00

17:00

18:00

19:00

20:00

MET

Day 010

WE

Z

T D R S

~ ~~

~

D / N

D O R B 3 4 5 6

O R B 1 6 9 1 7 0 1 7 1

~ B I A S + X S I ~B I A S - Y S IS T S A T T

CDR

OBSS LDRI/IDC RCC SURVEY-PORT

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

OBSS LDRI-IDC RCC SURVEY-NOSE CAP

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

MNVR (TRK) BIAS +XSI (Nose Cap Survey)

TG=4 BV=5 P=330 Y=0 OM=300

A14/AUTO/VERN, SURVEY STBD Cmplt, Init TRK

MEAL

PLT

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

~

OBSS LDRI/IDC RCC SURVEY-PORT

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

MEAL

MS1

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

~

OBSS LDRI-IDC RCC SURVEY-NOSE CAP

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

MEAL

EXERCISE

NOTES

3-130

12

ARCH

AMBA

ULT

ANTO

NELL

IAC

ABA

MNVR (TRK) BIAS -YSI (Port Survey)

TG=4 BV=5 P=0 Y=323 OM=335

A14/AUTO/VERN, RCC SURVEY-PORT Step 3,

Init TRK

RE

PLAN

NED

STS-

119

FD (

)

16:00

17:00

18:00

19:00

GMT

Date

03/26

(085)

16:00

17:00

18:00

19:00

20:00

MET

Day 010

WE

Z

T D R SD / N

D O R B 3 4 5 6

O R B 1 6 9 1 7 0 1 7 1

S T S A T T ~ B I A S + X S I ~B I A S - Y S I

CDR

OBSS LDRI/IDC RCC SURVEY-PORT

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

OBSS LDRI-IDC RCC SURVEY-NOSE CAP

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

MNVR (TRK) BIAS +XSI (Nose Cap Survey)

TG=4 BV=5 P=330 Y=0 OM=300

A14/AUTO/VERN, SURVEY STBD Cmplt, Init TRK

MEAL

PLT

~OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

OBSS LDRI/IDC RCC SURVEY-PORT

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

MEAL

MS1

~OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

OBSS LDRI-IDC RCC SURVEY-NOSE CAP

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

MEAL

EXERCISE

NOTES

9

Page 11: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

12

SWAN

SON

ARNO

LDPH

ILLI

PSMA

GNUS

RE

PLAN

NED

3-131

STS-

119

FD (

)

16:00

17:00

18:00

19:00

GMT

Date

03/26

(085)

16:00

17:00

18:00

19:00

20:00

MET

Day 010

WE

Z

T D R S

~ ~~

~

D / N

D O R B 3 4 5 6

O R B 1 6 9 1 7 0 1 7 1

~ B I A S + X S I ~B I A S - Y S IS T S A T T

MS2

OBSS LDRI/IDC RCC SURVEY-PORT

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

MEAL

EXERCISE

~

MS3

MEAL

EXERCISE

MS4

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

~

OBSS LDRI-IDC RCC SURVEY-NOSE CAP

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

MEAL

FE-2 (DN)

MEAL

EXERCISE

~

NOTES

3-131

12

SWAN

SON

ARNO

LDPH

ILLI

PSMA

GNUS

RE

PLAN

NED

STS-

119

FD (

)

16:00

17:00

18:00

19:00

GMT

Date

03/26

(085)

16:00

17:00

18:00

19:00

20:00

MET

Day 010

WE

Z

T D R SD / N

D O R B 3 4 5 6

O R B 1 6 9 1 7 0 1 7 1

S T S A T T ~ B I A S + X S I ~B I A S - Y S I

MS2

OBSS LDRI/IDC RCC SURVEY-PORT

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

MEAL~

EXERCISE

MS3

MEAL

EXERCISE

MS4

~OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

OBSS LDRI-IDC RCC SURVEY-NOSE CAP

(PDRS, OBSS OPERATIONS)

Ref. MSG 122

MEAL

FE-2 (DN)

MEAL ~

EXERCISE

NOTES

10

Page 12: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

12

ARCH

AMBA

ULT

ANTO

NELL

IAC

ABA

SUPPLY WATER DUMP USING FES

(ORB OPS, ECLS) Step 1, using FES Pri A

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS)

Step 2, FES Pri A req'd

RE

PLAN

NED

A A14 RCS/OMS HTR L POD - B OFF

- A AUTO

R POD - B OFF

- A AUTO

3-132

STS-

119

FD (

)

20:00

21:00

22:00

23:00

GMT

Date

03/26

(085)

20:00

21:00

22:00

23:00

00:00

MET

Day 010

WE

Z

T D R S

~~

~

D / N

D O R B 6 7 8

O R B 1 7 2 1 7 3 1 7 4

~ B I A S - Y S I + Z L V ~- Z L V - X V VS T S A T T

CDR

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A1/AUTO/VERN, Init TRK

MNVR (TRK) +ZLV -XVV (WSS L-1)

TG=2 BV=5 P=270 Y=0 OM=180

A1/AUTO/VERN, (21:10), Init TRK

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

RCS/OMS POD HTR RECONFIG A

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

PLT

OBSS BERTH

(PDRS, OBSS OPERATIONS)

RMS PWRDN

(PDRS, RMS PWRDN)

PORT RMS HTR A -OFF, B -AUTO

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

MS1

OBSS BERTH

(PDRS, OBSS OPERATIONS)

RMS PWRDN

(PDRS, RMS PWRDN)

PORT RMS HTR A -OFF, B -AUTO

LANDING-1 COMM C/O

(ORB OPS, COMM/INST)

WSSH AOS 21:31 - LOS 21:39

WSSH UHF C/O -Steps 1 & 3 only

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

LANDING-1 COMM C/O

(ORB OPS, COMM/INST)

DFRS AOS 23:05 - LOS 23:13

Steps 1 & 3 only

MUS

(ASSY OPS, PAYLOADS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLAYBACK OPERATIONS (CREW CHOICE)

(P/TV, CC) KU TDRE (21:37-21:56)

NOTES

3-132

12

ARCH

AMBA

ULT

ANTO

NELL

IAC

ABA

SUPPLY WATER DUMP USING FES

(ORB OPS, ECLS) Step 1, using FES Pri A

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS)

Step 2, FES Pri A req'd

RE

PLAN

NED

A A14 RCS/OMS HTR L POD - B OFF

- A AUTO

R POD - B OFF

- A AUTO

STS-

119

FD (

)

20:00

21:00

22:00

23:00

GMT

Date

03/26

(085)

20:00

21:00

22:00

23:00

00:00

MET

Day 010

WE

Z

T D R SD / N

D O R B 6 7 8

O R B 1 7 2 1 7 3 1 7 4

S T S A T T ~ B I A S - Y S I + Z L V ~- Z L V - X V V

CDR

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A1/AUTO/VERN, Init TRK

MNVR (TRK) +ZLV -XVV (WSS L-1)

TG=2 BV=5 P=270 Y=0 OM=180

A1/AUTO/VERN, (21:10), Init TRK

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

RCS/OMS POD HTR RECONFIG A

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

PLT

OBSS BERTH

(PDRS, OBSS OPERATIONS)

RMS PWRDN

(PDRS, RMS PWRDN)

PORT RMS HTR A -OFF, B -AUTO

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)EXERCISE

MS1

OBSS BERTH

(PDRS, OBSS OPERATIONS)

RMS PWRDN

(PDRS, RMS PWRDN)

PORT RMS HTR A -OFF, B -AUTO

LANDING-1 COMM C/O

(ORB OPS, COMM/INST)

WSSH AOS 21:31 - LOS 21:39

WSSH UHF C/O -Steps 1 & 3 only

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

LANDING-1 COMM C/O

(ORB OPS, COMM/INST)

DFRS AOS 23:05 - LOS 23:13

Steps 1 & 3 only

MUS

(ASSY OPS, PAYLOADS) ~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLAYBACK OPERATIONS (CREW CHOICE)

(P/TV, CC) KU TDRE (21:37-21:56)

NOTES

11

Page 13: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

12

SWAN

SON

ARNO

LDPH

ILLI

PSMA

GNUS

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

RE

PLAN

NED

After Crew Choice D/L Complete:

L10(MUX) √MUX/VTR/CC PWR-ON (LED ON)

RECONFIGURE OCA DOWNLINK RATE

(ORB OPS, PGSC)

Perform Part C, Omit Step 4

On MCC GO:

L10(MUX) √MUX/VTR/CC PWR-OFF(LED OFF)

B

3-133

STS-

119

FD (

)

20:00

21:00

22:00

23:00

GMT

Date

03/26

(085)

20:00

21:00

22:00

23:00

00:00

MET

Day 010

WE

Z

T D R S

~~

~

D / N

D O R B 6 7 8

O R B 1 7 2 1 7 3 1 7 4

~ B I A S - Y S I + Z L V ~- Z L V - X V VS T S A T T

MS2

COMM STRING 1 C/O (PART A)

(ORB OPS, COMM/INST)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS3

PLAYBACK (DIGITAL)

(PHOTO/TV, CUE CARD)

LDRI SURVEYS

KU TDRE (20:04-20:38)

KU TDRW (20:49-21:18)

OCA RATE RECONFIGB

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

~

EXERCISE

MDDK ST CK (ASSY OPS, PAYLOADS)

Perform Step 1 only

MUS

(ASSY OPS, PAYLOADS)

FE-2 (DN)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

~

NOTES

3-133

12

SWAN

SON

ARNO

LDPH

ILLI

PSMA

GNUS

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

RE

PLAN

NED

After Crew Choice D/L Complete:

L10(MUX) √MUX/VTR/CC PWR-ON (LED ON)

RECONFIGURE OCA DOWNLINK RATE

(ORB OPS, PGSC)

Perform Part C, Omit Step 4

On MCC GO:

L10(MUX) √MUX/VTR/CC PWR-OFF(LED OFF)

B

STS-

119

FD (

)

20:00

21:00

22:00

23:00

GMT

Date

03/26

(085)

20:00

21:00

22:00

23:00

00:00

MET

Day 010

WE

Z

T D R SD / N

D O R B 6 7 8

O R B 1 7 2 1 7 3 1 7 4

S T S A T T ~ B I A S - Y S I + Z L V ~- Z L V - X V V

MS2

COMM STRING 1 C/O (PART A)

(ORB OPS, COMM/INST)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

PLAYBACK (DIGITAL)

(PHOTO/TV, CUE CARD)

LDRI SURVEYS

KU TDRE (20:04-20:38)

KU TDRW (20:49-21:18)

OCA RATE RECONFIGB

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

EXERCISE

MDDK ST CK (ASSY OPS, PAYLOADS)

Perform Step 1 only

MUS

(ASSY OPS, PAYLOADS)

FE-2 (DN)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

NOTES

12

Page 14: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

12

ARCH

AMBA

ULT

ANTO

NELL

IAC

ABA

CREW

WAK

E at

11/

09:3

0

RE

PLAN

NED

3-134

STS-

119

FD (

)

00:00

01:00

02:00

03:00

GMT

Date

03/26

(085)

00:00

01:00

02:00

03:00

04:00

MET

Day 011

WE

Z

T D R S

~~

~

D / N

D O R B 8 9 1 0 1 1

O R B 1 7 4 1 7 5 1 7 6 1 7 7

~ ~- Z L V - X V VS T S A T T

CDR

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-134

12

ARCH

AMBA

ULT

ANTO

NELL

IAC

ABA

CREW

WAK

E at

11/

09:3

0

RE

PLAN

NED

STS-

119

FD (

)

00:00

01:00

02:00

03:00

GMT

Date

03/26

(085)

00:00

01:00

02:00

03:00

04:00

MET

Day 011

WE

Z

T D R SD / N

D O R B 8 9 1 0 1 1

O R B 1 7 4 1 7 5 1 7 6 1 7 7

S T S A T T ~ ~- Z L V - X V V

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

13

Page 15: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

FLT PLN/119/FLIGHT

12

SWAN

SON

ARNO

LDPH

ILLI

PSMA

GNUS

CREW

WAK

E at

11/

09:3

0

RE

PLAN

NED

3-135

STS-

119

FD (

)

00:00

01:00

02:00

03:00

GMT

Date

03/26

(085)

00:00

01:00

02:00

03:00

04:00

MET

Day 011

WE

Z

T D R S

~~

~

D / N

D O R B 8 9 1 0 1 1

O R B 1 7 4 1 7 5 1 7 6 1 7 7

~ ~- Z L V - X V VS T S A T T

MS2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

MS3

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

FE-2 (DN)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-135

12

SWAN

SON

ARNO

LDPH

ILLI

PSMA

GNUS

CREW

WAK

E at

11/

09:3

0

RE

PLAN

NED

STS-

119

FD (

)

00:00

01:00

02:00

03:00

GMT

Date

03/26

(085)

00:00

01:00

02:00

03:00

04:00

MET

Day 011

WE

Z

T D R SD / N

D O R B 8 9 1 0 1 1

O R B 1 7 4 1 7 5 1 7 6 1 7 7

S T S A T T ~ ~- Z L V - X V V

MS2

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

MS3

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

MS4

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

FE-2 (DN)

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

NOTES

14

Page 16: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

MSG 127 - FD12 MISSION SUMMARY

END OF PAGE 1 OF 2, MSG 127

Good Morning Discovery! 1 2 Great job yesterday on the flyaround! And for Sandy, welcome back to the shuttle. 3 4 YOUR CURRENT ORBIT IS: 196 X 185 NM 5 6 NOTAMS: 7 8 NOTAMS – NO CHANGES 9 10

EDW - EDW IN USE. EDT ELS DAY / VFR ONLY. 11 EDW - LAKEBED RWY 15/33 - GREEN. RWY 18L - UNUSABLE. 12 NOR - LAKEBED RUNWAYS GREEN. 13 ILM - DME DIW107 OTS 14 FMH - TACAN PVD103 DME ONLY. 15 DOV - RWY 14/32 CLOSED. 16 YQX - TACAN YQX74 OTS. 17 MRN - TACAN AOG23 OTS. 18 WAK - TACAN AWK82 OTS. 19 HAW - TACAN ASI59 DME OTS. 20 KKI - TACAN RIY92 OTS. 21 IKF - NOT USABLE. NO AGREEMENT. 22 BEN - NOT RECOMMENDED/NOT SUPPORTED. 23

24 NEXT 2 PLS OPPORTUNITIES: 25 26 KSC15 ORB 170 – 10/17:37 SCT050 BKN200 7 160/14P23 27 EDW04 ORB 188 – 11/21:10 SKC 7 060/13P20 28 29 OMS TANK FAIL CAPABILITY: 30 31 L OMS FAILS: NO 32 R OMS FAILS: NO 33 34 LEAKING OMS PRPLT BURN: 35 36 L OMS LEAK: ALWAYS BURN RETROGRADE 37 R OMS LEAK: ALWAYS BURN RETROGRADE 38 39 OMS QUANTITIES(%) 40 41 L OMS OX = 36.1 R OMS OX = 35.8 42 FU = 35.6 FU = 35.8 43 Subtract interconnect counter for current OMS quantities. 44 45 46 47 48 49 50 51

15

Page 17: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

MSG 127 - FD12 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 127

DELTA V AVAILABLE: 1 2 3 OMS 372 FPS 4 ARCS (TOTAL ABOVE QTY1) 35 FPS 5 6 TOTAL IN THE AFT 407 FPS 7 8 ARCS (TOTAL ABOVE QTY2) 69 FPS 9 FRCS (ABOVE QTY 1) 11 FPS 10 11 AFT QTY 1 75 % 12 AFT QTY 2 37 % 13 14 15 16

SYSTEM FAILURE IMPACT WORK AROUND GNC -Z Star Tracker received

a Pressure Fail BITE when powered-up prior to Undock.

None. Pressure loss does not affect star tracker performance. BITE displayed for -Z S TRK on SPEC 22

None. Nominal star tracker ops for the remainder of the mission.

17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

16

Page 18: FD12 FLIGHT PLAN REVISIONMSG128 EFGF Target Paint 9 1. Cryo Config For today's cryo config, O2 and H2 Tanks 2 and 5 will be active. O2 and H2 Tank 5 are expected to be depleted later

MSG 128 - EFGF TARGET PAINT

END OF PAGE 1 OF 1, MSG 128

During a review of mission imagery, the RMS MER noticed some paint on the EFGF target 1 of the OBSS is peeling. The affected locations are along the “wings” of the target. See 2 images below. This peeled paint should not be an issue for OBSS operations. 3 4

5 6 7 8 9 10 11 12 13 14 15 16

17