FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #33 – Notes PAA Project #: 17‐22 Meeting Date: March 28, 2019 | 9:30 AM | Meeting Location: FCPS Central Office Building Current Design Phase: Construction Documents Attendees: Name Company Present Planning Team Mary Malone Rock Creek School, Principal X Meghan Mackay Little Rock Creek School, Assistant Principal Patrick McTighe Rock Creek School, Lead Custodian Sara Scovitch Frederick County Developmental Center, OT/PT X Frank Vetter Walkersville Middle School, Principal Steve Raff FCPS, Elementary Instructional Director Michelle Concepcion FCPS, Special Education Programs X Paul Lebo FCPS, Chief Operating Officer Adnan Mamoon FCPS, Construction Management X Brian Staiger FCPS, Construction Management X Tom Mulligan FCPS, Construction Management Beth Pasierb FCPS, Facilities Planning Supervisor Scott Blundell FCPS, Security and Emergency Management Keith Robeson FCPS, Security and Emergency Management Heidi Schmidt Frederick County Developmental Center, OT X Patrick Little FCPS, Maintenance and Operations Jason Wilson FCPS, Maintenance and Operations Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna Rosano Proffitt & Associates Architects X Kori Purdum Matheis Proffitt & Associates Architects X

Transcript of FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X...

Page 1: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

 

FCPS Rock Creek School  Replacement and Final Site Selection  

Design Meeting #33 – Notes  PAA Project #: 17‐22  Meeting Date: March 28, 2019 | 9:30 AM | Meeting Location: FCPS Central Office Building  Current Design Phase: Construction Documents  Attendees: 

Name  Company  Present 

Planning Team     

Mary Malone   Rock Creek School, Principal  X 

Meghan Mackay Little  Rock Creek School, Assistant Principal   

Patrick McTighe   Rock Creek School, Lead Custodian   

Sara Scovitch   Frederick County Developmental Center, OT/PT  X 

Frank Vetter    Walkersville Middle School, Principal   

Steve Raff  FCPS, Elementary Instructional Director   

Michelle Concepcion  FCPS, Special Education Programs  X 

Paul Lebo  FCPS, Chief Operating Officer   

Adnan Mamoon  FCPS, Construction Management  X 

Brian Staiger    FCPS, Construction Management  X 

Tom Mulligan   FCPS, Construction Management   

Beth Pasierb  FCPS, Facilities Planning Supervisor   

Scott Blundell  FCPS, Security and Emergency Management   

Keith Robeson  FCPS, Security and Emergency Management   

Heidi Schmidt  Frederick County Developmental Center, OT  X 

Patrick Little  FCPS, Maintenance and Operations   

Jason Wilson  FCPS, Maintenance and Operations   

Matt Evans   Dustin Construction  X 

Lloyd Hill  Dustin Construction  X 

     

Design Team     

Sandra Carpenter  Becker Morgan Group   

Donna Rosano   Proffitt & Associates Architects  X 

Kori Purdum Matheis   Proffitt & Associates Architects  X 

     

Page 2: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

Design Meeting #33 – Notes Rock Creek School Replacement PAA Project #17‐22 Meeting Date – March 28, 2019 Page 2 of 5  Agenda Items:  33.0 Project Status Updates 

 A. Area Summary Update (Note: No changes since last meeting) – 

1. Original Base Bid Ed Spec Area = 81,103 GSF 2. All co‐located spaces have been removed from the scope of work. 3. Original Add Alternate Ed Spec Area = 23,454 GSF 4. Total Base Bid + Add Alternate Ed Spec Area = 104,557 per original Ed Specs 

Current Total Base Bid Floor Plan Area = 79,474 GSF Current Total Base Bid + Add Alternate Floor Plan Area = 101,173 GSF 

5. There  are  now  four  program  space  add  alternates  –  Greenhouse,  Parks  &  Rec  Gym, Alternative Specialized Program, and Middle School Wing included in the design. The future capacity  wing  is  still  being  designed,  but  only  for  future  master‐planned  use.  It  will  be developed as a separate set of drawings and will not be permitted or bid at this time.  

B. Budget Update –  1. Total Project Budget (including soft costs) = $46,959,762 2. Total Site, Testing, & Construction Budget = $37,070,262 3. Beth  shared  her  latest  budget  sheet  update,  which  shows  $38,323,011  for  building, 

$48,154,392 total. This is being submitted for request but still needs final approval. 4. Latest  cost  estimate  puts  the  base  bid  at  $37,178,302.  Eight  Add Alternates were  priced, 

totaling  an  additional  approximately  $6,600,000.  Dustin  has  proposed  some  Value Engineering ideas, which are being evaluated. 

5. VE Items have been evaluated and the accepted items will be incorporated into the CD set.    

C. Schedule Update – 1. Overview of proposed schedule updates. Town of Walkersville Planning Commission Hearing 

appearance has been postponed to April 23rd however CD BoE presentation and submission to the State will continue as planned. A workshop has been scheduled with the Walkersville Planning Commission  for Tuesday, April 9. The overall  schedule will need to be updated after the workshop and hearing depending upon the approval timeline. i. CD Approval was received from FCPS BoE on March 27, 2019.  Design Team is planning 

to make the CD submission to the State on April 2, 2019. ii. A Community Meeting at Walkersville MS for April 2, 2019.   We will review building 

plans and elevations.  We will not present the proposed site plan since this is still under review by the Town and the County. 

 D. LEED Update – Design team is working on documenting assigned credits. 

 E. Summary of Activities for the past Two Weeks –  

1. Continued to work on site plan updates and coordination with review agencies. 2. Continued work on drawing updates and consultant coordination. 

   

 

Page 3: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

Design Meeting #33 – Notes Rock Creek School Replacement PAA Project #17‐22 Meeting Date – March 28, 2019 Page 3 of 5  33.1 General/Admin.    

A. The Public Meeting  tentatively  scheduled  for  Feb 5  at Walkersville Middle  has  been postponed pending further review of the site plan by the Town. The public meeting has been rescheduled for Tuesday, April 2nd.  

33.2 Site Design  

A. Adtek has submitted a  revised Site Plan  to  the Town of Walkersville.    The  revised plan  includes closing off Maryland Avenue, a concrete swale to convey off site stormwater from Maryland Ave to the northwest corner of site by the railroad tracks, and elimination of the proposed new Middle School parking/drop‐off entrance at the east end of W Frederick St.  Access to the existing parking area behind the Middle School and both schools’ loading areas will all be routed through the existing bus loop entrance at W Frederick St, which will become the only access point for the new Middle School drop‐off loop and associated parking. 1. Design team received comments from the Town engineer on 03/22.  Due to the extent of the 

comments  and  the  absence  of  the  Planning  Commission  Chairperson  and  the  Town  of Walkersville Planner at the 03/26 Planning Commission hearing it was decided to move our hearing to the 04/23 hearing.  The design team has also requested a workshop on 04/09 to work through open items and resolve prior to the 04/23 hearing. 

 33.3 Building Design   

A. Lighting Control Zones Review – Reflected Ceiling Plans with the proposed control zones  labeled were provided for review. 1. Typical Classroom – revise for three control zones; 1) Back half of classroom behind the main 

room  divider  curtain,  2)  Teaching  Wall  (first  three  lights)  and  3)  remainder  of  lights  for Classroom Control. 

2. Dining – Light zones as shown on Alban drawings are acceptable.  Mary requested shades be provided  on  the  low windows  along  the  East wall  to  facilitate  room  darkening.    PAA will confirm with Dave Yates whether a Daylight Zone will be required on the Courtyard side of this space. 

3. Gymnasium and Platform light zones are all acceptable. 4. Specialty Classroom zones are acceptable (Music, Maker, Tech Lab). 5. Media Center – revise for three separate zones at 1) Teaching Area, 2) Stacks and 3) Computer 

area. 6. Shared Learning – revise for a separate zone at the first row of lights in front of the teaching 

wall. 7. PAA will send revisions to Dave Yates at Alban for incorporation into the drawings. 

 B. Room  Signage  Graphics  and  Design  Theme  Updates  –  Kori  provided  a  graphic  showing  the 

proposed room signage design from BMG for review. See attached.  1. Each  sign has  three  segments  –  the  top will  have  a  consistent material/color  that  can be 

selected for use throughout the building. The center segment can have the Rock Creek School logo. On the bottom segment, each wing will have a different color and area symbol: Specials and Commons to be blue = water drop, Green wing = leaf, Purple wing = paw print, and Yellow 

Page 4: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

Design Meeting #33 – Notes Rock Creek School Replacement PAA Project #17‐22 Meeting Date – March 28, 2019 Page 4 of 5  

wing  =  sun. Mary will  review  and  provide  a  final  determination  regarding  symbol  for  the Orange wing = monarch butterfly or oriole. 

2. A Directory Sign is currently only planned for the Commons area, however some directional signage at other areas of the school – major intersections ‐ calling out directions back to the Main Office and to other public spaces was requested. The design team will provide some suggestions.  

C. Kori noticed during a recent visit to Sugarloaf Elementary that an illuminated exterior FCPS logo sign was  provided  outside  of  the  gymnasium area.  Brian will  provide  direction  as  to whether something  like this should be  included at Rock Creek. He will also advise whether any signage needs to be provided on exterior doors around the building directing visitors to check in at the main office.  

D. Flaghouse is currently working on plan updates for the Sensory Room equipment. Updated plans will be shared once received. 

 E. Mary stated that a separate small lockable narcotics storage cabinet like the one presented by 

BMG  is not  required at  the Health Suite.  Lockable base and wall  cabinets will  be adequate.  If possible, some tall lockable storage can be provided. The school will also bring over their existing mobile medical supply cart for additional storage. 

 F. The Health Suite has an undercounter ice machine.   Matt warned that other jurisdictions have 

required  the  ice maker be  connected  to an open  floor drain,  sometimes  slightly  raised above finished floor, which makes it difficult to fit the drain and ice machine in the available space.  PAA to confirm requirements with Alban and AHJ as needed. 

 G. Some samples of  the proposed poured‐in‐place Pulastic gym flooring were shared. The school 

asked whether it is able to be repaired if it is damaged and whether tape can be used to mark off lines on the floor. Dustin reported that the flooring is easily repairable and that a special Game Line tape can be used to provide markings as needed. 

 33.4 Two Week Projection  

 

A. Workshop  site  plan  comments  with  Town  of  Walkersville  and  revise  for  Planning  Commission Hearing.  

B. Finalize documents to be submitted to the State.  

The next meeting is to be held on Thursday, April 11th at 9:30 AM at the Rock Creek School. The meeting topics are to be determined. As we move toward completion of construction documents, we may trade the large bi‐weekly committee meetings for smaller group focused meetings as needed.  This summarizes the topics discussed at the meeting. Please review and address any comments and corrections to the Architect within 5 days of receipt of these minutes.  

Kori Purdum Matheis, AIA, LEED AP BD+C  

Page 5: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

Design Meeting #33 – Notes Rock Creek School Replacement PAA Project #17‐22 Meeting Date – March 28, 2019 Page 5 of 5  Distribution via email – all attendees and Design Committee Members  Attachments:    Project Schedule Milestones List, dated March 28, 2019  Lighting Zone Diagram updates, dated March 28, 2019  Signage Concept diagram 

 

Page 6: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

FCPS Rock Creek School  Replacement and Final Site Selection  PAA Project #: 17‐22  

MAJOR MILESTONES OVERVIEW 28 March 2019   March 7, 2019    Re‐submit Site Plan to Town of Walkersville & Frederick County  TBD    Submit Improvements Plans to Town of Walkersville & Frederick County  March 13, 2019    Submit CD Package to BoE  March 27, 2019    CD Presentation to BoE  March 27, 2019    Consultants send CD Submission Documents to PAA  April 2, 2019    CD Submission to State of MD, Building Permit Submission  April 2, 2019  Community Meeting  April 9, 2019  Town of Walkersville Planning Commission Workshop  April 23, 2019    Town of Walkersville Planning Commission Meeting  June 11,2019   Consultants send Bidding Documents to PAA  June 17,2019    Issue Documents for Bidding  September 2019 – March 2021 ‐ Construction 

Page 7: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

1. SEE FINISH SCHEDULE FOR ACT TYPES.2. SEE MECHANICAL DRAWINGS FOR G.R.D. TYPES, LOCATIONS, AND ADDITIONAL WORK.3. SEE ELECTRICAL DRAWINGS FOR LIGHT FIXTURE TYPES AND LOCATIONS.4. CEILING HEIGHTS INDICATED ARE FROM FINISH FLOOR. CEILINGS AT LANDINGS, RAMPS ETC., REFER TO NEAREST FLOOR LEVEL. COORDINATE WITH EXG. WINDOW MULLION LOCATIONS.5. ALL EXPOSED LINTELS SHALL BE PAINTED.6. ALIGN BULKHEADS TO FACE OF WALL / OPENING, U.O.N.

CEILING LEGEND

2x2 ACT CEILINGSCRUBBABLE ACT-3

INTERIOR - GWB CEILINGS /BULKHEADS

X EXPOSED

2x4 ACT CEILINGACT-1

LINEAR ACOUSTICAL PANEL (LAP-#)

METAL SOFFIT (EXTERIOR)

CEILING NOTES

2x4 ACT SCRUBBABLE CEILING ACT- 2

SUPPLY/RETURN/EXHAUST DIFFUSER OR REGISTER -SEE MECH.

LIGHT - SEE ELEC.

VRF UNIT - SEE MECH.

RADIANT HEAT PANEL -SEE MECH.

CLASSROOMCLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM CLASSROOM

STORAGESTORAGE

TOILET TOILET

TOILET

STORAGE STORAGE

TOILET

BOYSLOCKERROOM

GIRLSLOCKERROOM

STUDENTTOILET

STAFFTOILET

WOMEN MEN

CLASSROOM

STORAGESTORAGE

TOILET TOILET

TYPICALCLASSROOM

STORAGE

TOILET

TOILET

STORAGE

CLASSROOMCLASSROOM

STORAGE

ACCESSSTAIR

LIBRARY

OUTDOORLEARNING

SLPOFFICESENSORY

ROOM

ADAPTIVEPE

OFFICE

MUSICMOVEMENTROOM STORAGE

TOILET

OT/PTOFFICE

OT/PTSTORAGE

OFFICE /WORKROOM MAKER

LAB

STORAGE& KILN

TOILET

TEACHERLOUNGE

STAFFTOILET

STAFFTOILET

STAFFSUPPORT

MAINT.OFFICE

OPERATIONSOFFICE

CORR.

WOMENSLOCKERROOM

MENSLOCKERROOM

OPERATIONSSTORAGE

IDF

FAM TLT

PEOFFICE

GYMOUTDOORSTORAGE

PROFESSIONALLEARNING/PLANNING

CONFERENCE

HEALTHSPECIALIST

RECORDSTORAGE

PRINCIPAL

ASST.PRINCIPAL

WORK/MAILROOM

STAFFTOILET

PLATFORM

MAINT.STORAGE

MECHANICAL

ELECTRICAL

OPERATIONSOUTDOORSTORAGEDRY

STORAGE

TOILETLCKRS

SOAPSTOR.

HEALTHSUITE

WAITING/ REST

NURSEOFFICE

STOR.

TOILET

OFFICETABLE

STORAGEDISHWASH

M/EIDF

CLUSTERSTORAGE

CUST. MDFSLP

OFFICE

GENERALRECEPTION

WOMEN

AQUATICSTORAGE

CHANGING

CHANGING

KITCHEN

TECHNOLOGYLAB

TV LAB

LAUNDRY

SCHOOLSTORE

PUMPROOM

CORR.

VESTIBULE

CUST.STAFFTLT

SOCIALWORKER/GUIDANCE

OFFICE

MULTI-PURPOSEMEETING

DINING

AQUATICSOFFICE

CHEMSTOR.

COMMONS

STORAGELAB

STORAGE

CLUSTERSTORAGE

FIREPUMP

MEN

SECRETARY

HALL

CORR.

CORR.

CORR.

CORR.

SUPPLYSTORAGE

COMMONS

TOILETFURNITURESTORAGE

STORAGE

SECLUSION

AQUATIC

CHANGING

ST

OR

.

RESOURCEROOM

CUSTACCESSSTAIR

CORR.

TOILET

INSTRUCTIONALKITCHEN

DAILYLIVINGSTOR.

DAILYLIVINGSUITE

SLPOFFICE

CLUSTERSTORAGE

ITINERANTSTAFFOFFICE

CLASSROOM

IDF

ADAPTIVEPE

STORAGE

CORR.

CORR.

GYM

TOILET

STORAGE

LAUNDRY

VEST.

CORR.

CORR

CORR

BOYSSHWR.

GIRLSSHWR.

SERVING

CORR.

CORR. ELEC.

ELEC

MATCHLINE - SEE 1 / A104A

MA

TC

HLI

NE

-S

EE

1 /

A10

4A

MATCHLINE - SEE 1 / A104B

MA

TC

HLI

NE

-S

EE

1 /

A10

4B

MATCHLINE - SEE 1 / A104C

MATCHLINE - SEE 1 / A104D

MA

TC

HLI

NE

-S

EE

1 /

A10

4D

MA

TC

HLI

NE

-S

EE

1 /

A10

4C

READINGSPECIALISTS

MATHSPECIALISTS

TESTINGROOM

STOR.

HEARING&

VISION

VEST

3' -

9 1

/2"

1' -

4"

LIGHT, SEE ELEC

CUST

INDOORPE

STORAGE

OUTDOORLEARNING

MAINT/STORAGE

STORAGE

CLASSROOM

TOILET

STORAGE

SLPOFFICE

VEST

CORR

© C

OP

YR

IGH

T

PR

OF

FIT

T &

AS

SO

CIA

TE

S A

RC

HIT

EC

TS

ISSUE

PROJECT NO.:

49 SOUTH CARROLL STREETFREDERICK, MARYLAND 21701

PHONE (301) 662-8532FAX (301) 662-4192

[email protected]

EXPI

RAT

ION

DAT

E

DESCRIPTIONDATEREV

DATE:

SEAL

I CER

TIFY

TH

AT T

HES

ED

OC

UM

ENTS

WER

E PR

EPAR

ED

OR

APP

RO

VED

BY

ME,

AN

D

THAT

I AM

A D

ULY

LIC

ENSE

D

ARC

HIT

ECT

UN

DER

TH

E LA

WS

OF

THE

STAT

E O

F M

ARYL

AND

.

312 W MAIN ST., SUITE 300SALISBURY, MARYLAND 21801

PHONE (410) 546-9100FAX (410) 546-5824

[email protected]

LIC

ENSE

No.

NE

W F

AC

ILIT

Y F

OR

:

00-0

0-00

00

0000

0

2019

RO

CK

CR

EE

K S

CH

OO

L

55 W

ES

T F

RE

DE

RIC

K S

TR

EE

TW

ALK

ER

SV

ILLE

, MA

RY

LAN

D 2

1793

A104

OVERALL FIRSTFLOOR REFLECTED

CEILING PLAN

2017171.0001-30-2019

FR

ED

ER

ICK

CO

UN

TY

PU

BLI

C S

CH

OO

LS

65%

CD

PR

ICIN

G S

ET

SCALE: 1/16" = 1'-0"1OVERALL FIRST FLOORREFLECTED CEILING PLAN

0'0'16' 8' 16'

SCALE : 1/16" = 1'-0"

N

KEY PLAN

A B

CDLIGHTING ZONE DIAGRAMS MARCH 28, 2019

Page 8: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

1

A302

1

A301

1

A303

2

A302

4

A301

1

A304

2

A304

LIBRARY714

OUTDOORLEARNING

EXT

MUSIC716

MOVEMENTROOM

718

STORAGE716A

OT/PTOFFICE

720OFFICE /

WORKROOM714A

MAKER LAB709

STORAGE &KILN709A

CONFERENCE107

HEALTHSPECIALIST

802

RECORDSTORAGE

108

PRINCIPAL105

ASST.PRINCIPAL

103

WORK/MAILROOM

102

STAFFTOILET

106

HEALTHSUITE

WAITING /REST

200

NURSEOFFICE

202

STOR.203

TOILET201

M/E310IDF

304

GENERALRECEPTION

100

SCHOOLSTORE

300

VESTIBULE001

CUST.302STAFF TLT

301

SOCIALWORKER/GUIDANCE

OFFICE804

COMMONS002

SECRETARY101

HALL109

CORR.024

SUPPLYSTORAGE

104

RESOURCEROOM

803

ACCESSSTAIR

307

TOILETB101B

STORAGEB101A

CORR.011

TOILETB107B

STORAGEB107A

CLASSROOMB107

INSTRUCTIONALKITCHEN

305

DAILY LIVINGSTOR.

306A

DAILY LIVINGSUITE

306

TOILETB102B

STORAGEB102A

SLP OFFICEB100

CLUSTERSTORAGE

308

ITINERANTSTAFFOFFICE

309

CLASSROOMB102

TYPICALCLASSROOM

B106

CLASSROOMB108

STORAGEB108A

TOILETB108B

TOILETB106B

STORAGEB106A

CLASSROOMB101

8' - 8" 8' - 8"

8' - 8"

8' - 8" 8' - 8"

8' - 8"

9' - 4" 9' - 4"

9' - 4"

9' - 4"

8' - 0"8' - 0"

8' - 0"

8' - 0"

8' - 0"CORR.003

CORR.009

CORR.010

9' - 4"

9' - 4"

8' - 8"

9' - 4"

9' - 4"

10' - 0"

8' - 0"

9' - 4"

9' - 4" 8' - 8" 8' - 0"8' - 8"

15' - 0"

9' - 0"

9' - 4"

10' - 8"

8' - 8"8' - 8"

X

X X

ELEC303

X

X

8' - 8" 9' - 4"

9' - 4"

9' - 4"

X

9' - 4"

9' - 4"

8' - 8"

9' - 4"

9' - 4"

8' - 8"

9' - 4"

9' - 4"

9' - 4"

9' - 4" 9' - 4"

CUBICLE CURTAIN, TYP.

MATCHLINE - SEE 1 / A104D MATCHLINE - SEE 1 / A104B

MA

TC

HLI

NE

-S

EE

1 /

A10

4B

MATCHLINE - SEE 1 / A104C

MATCHLINE - SEE 1 / A104B

9' - 4"

MA

TC

HLI

NE

-S

EE

1 /

A10

4B

CLASSROOMB105

TOILETB105B

8' - 8"

8' - 8"

8' -

8"8'

-8"

8' -

8"8'

-8"

9' -

4"

9' -

4"8'

-0"

8' -

0"9'

-4"

9' -

4"

9' -

4"

10' - 0"

9' - 0"12' -

3"

12' -

0"

9' - 0"

8' - 8"

4

A307

9' - 4"

LIFT, TRACK

LIFT, TRACK

LIFT, TRACK

LIFT, TRACK

9' - 4"

DIVIDER CURTAIN, TYP

9' - 4" 8' - 0"

9' -

4"

8' - 0" 12' - 0"12' - 0"

9' - 4"

9' - 4"10' - 8"

12' - 0"

STORAGEB105A

8' - 0"

SECLUSIONB104

10' - 0"

STORAGEA101

2' -

0"

2' -

0"

3' -

0"

3' -

0"

9' -

1"

5' -

5 1

/2"

1' - 4"

2' - 4"

5' -

5 1

/2"

4' -

0"

4' -

8"

4' - 8" 4' - 8"

4' - 8" 4' - 8"

TYP.

3' - 4"

OUTDOORLEARNING

MAINT/STORAGE008

1

A305

9' - 4"

9' -

4"

1' -

4"

1' - 4"

1' - 8"

05

A403

3

xxx

15' - 4"

10' - 0" 12' - 4"

16' - 8"11' - 0" 18' - 8"

13' - 4"

15' - 4"

11' - 0"

11' - 8"16' - 0"

1' -

6"

1' -

6"

1. SEE FINISH SCHEDULE FOR ACT TYPES.2. SEE MECHANICAL DRAWINGS FOR G.R.D. TYPES, LOCATIONS, AND ADDITIONAL WORK.3. SEE ELECTRICAL DRAWINGS FOR LIGHT FIXTURE TYPES AND LOCATIONS.4. CEILING HEIGHTS INDICATED ARE FROM FINISH FLOOR. CEILINGS AT LANDINGS, RAMPS ETC., REFER TO NEAREST FLOOR LEVEL. COORDINATE WITH EXG. WINDOW MULLION LOCATIONS.5. ALL EXPOSED LINTELS SHALL BE PAINTED.6. ALIGN BULKHEADS TO FACE OF WALL / OPENING, U.O.N.

CEILING LEGEND

2x2 ACT CEILINGSCRUBBABLE ACT-3

INTERIOR - GWB CEILINGS /BULKHEADS

X EXPOSED

2x4 ACT CEILINGACT-1

LINEAR ACOUSTICAL PANEL (LAP-#)

METAL SOFFIT (EXTERIOR)

CEILING NOTES

2x4 ACT SCRUBBABLE CEILING ACT- 2

SUPPLY/RETURN/EXHAUST DIFFUSER OR REGISTER -SEE MECH.

LIGHT - SEE ELEC.

VRF UNIT - SEE MECH.

RADIANT HEAT PANEL -SEE MECH.

VERTICAL TRANSITION MOLDING

5/8" GWB

ACOUSTICAL CEILING AS SCHED., TYP.

GWB SUSPENSION SYSTEM

ACOUSTICAL CEILING WALL ANGLE, SET IN CONT. ACOUSTICAL SEALANT

SE

E C

EIL

ING

PLA

N6"

MIN

.

GWB SUSPENSION SYSTEM BRACING AS REQ'D

© C

OP

YR

IGH

T

PR

OF

FIT

T &

AS

SO

CIA

TE

S A

RC

HIT

EC

TS

ISSUE

PROJECT NO.:

49 SOUTH CARROLL STREETFREDERICK, MARYLAND 21701

PHONE (301) 662-8532FAX (301) 662-4192

[email protected]

EXPI

RAT

ION

DAT

E

DESCRIPTIONDATEREV

DATE:

SEAL

I CER

TIFY

TH

AT T

HES

ED

OC

UM

ENTS

WER

E PR

EPAR

ED

OR

APP

RO

VED

BY

ME,

AN

D

THAT

I AM

A D

ULY

LIC

ENSE

D

ARC

HIT

ECT

UN

DER

TH

E LA

WS

OF

THE

STAT

E O

F M

ARYL

AND

.

312 W MAIN ST., SUITE 300SALISBURY, MARYLAND 21801

PHONE (410) 546-9100FAX (410) 546-5824

[email protected]

LIC

ENSE

No.

NE

W F

AC

ILIT

Y F

OR

:

00-0

0-00

00

0000

0

2019

RO

CK

CR

EE

K S

CH

OO

L

55 W

ES

T F

RE

DE

RIC

K S

TR

EE

TW

ALK

ER

SV

ILLE

, MA

RY

LAN

D 2

1793

A104A

FIRST FLOORREFLECTED CEILING

PLAN - AREA A

2017171.0001-30-2019

FR

ED

ER

ICK

CO

UN

TY

PU

BLI

C S

CH

OO

LS

65%

CD

PR

ICIN

G S

ET

SCALE: 1/8" = 1'-0"1FIRST FLOOR REFLECTEDCEILING PLAN - AREA A

0'0'16' 8' 16'

SCALE : 1/16" = 1'-0"

N

KEY PLAN

A B

CD

SCALE: 1 1/2" = 1'-0"2TYPICAL CEILING TRANSITIONDETAIL

Daylighting Zone

Rest Area Zone

Classroom Control Zone

Teaching Wall Zone

Note: Daylighting zone is not required if the basis-of-design light fixtures are utilized, but could be required if alternative lights are provided, depending upon the fixture wattage.

LIGHTING ZONE DIAGRAMS MARCH 28, 2019

Page 9: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

3

A301

1

A303

2

A303

2

A302

3

A303

1

A304

2

A304

M/E310

AQUATICSTORAGE

405

BOYSLOCKERROOM

403

CHANGING400A

CHANGING400B

STAFFTOILET

316

TECHNOLOGYLAB315

TV LAB315A

LAUNDRY404

GIRLSLOCKERROOM

402

PUMP ROOM407

DINING500

AQUATICSOFFICE

406

CHEM STOR.408

STORAGEC101

LABSTORAGE

315C

STUDENTTOILET

315B

AQUATIC400

CHANGING400C

CUST312

WOMEN313

MEN314

CLUSTERSTORAGE

308

ITINERANTSTAFFOFFICE

309

CLASSROOMB102

TYPICALCLASSROOM

B106

CLASSROOMB108

IDF311

CORR.009

VEST.401

9' - 4"8' - 0"8' - 0"

9' - 4"8' - 8"

8' - 8"

9' - 4" 8' - 8"

8' - 8"

8' - 8"8' - 8"

9' - 4"

9' - 4"

8' - 8"8' - 0" 8' - 8"

8' - 0"

XX X

X

X X

2X2 ACT CLOUDS W/AXIOM TRIM, TYP.

X

CORR012

CORR013

BOYSSHWR.

403A

GIRLSSHWR.

402A

10' - 0"

10' - 8"

9' - 4"

9' - 4"

8' -

8"

MA

TC

HLI

NE

-S

EE

1 /

A10

4A

MATCHLINE - SEE 1 / A104CMATCHLINE - SEE 1 / A104C

MA

TC

HLI

NE

-S

EE

1 /

A10

4A

2" EXP. JT.

2" EXP. JT.

8' -

8"

21' - 0" 21' - 0" 21' - 0" 21' - 0"

21' - 0"21' - 0"21' - 0"21' - 0"

21' - 0" 21' - 0" 21' - 0" 21' - 0"

9' - 4" 8' -

8"

8' -

0"

5

A311

PTD. DUCT, TYP

LIGHT, SEE ELEC

4' -

0"

TY

P.

8' -

0"

TYP

4' - 0"

TYP

12' - 0"

3' - 8"4' -

5 1

/2"

2' - 9 49/64"

12' -

0"

12' - 8"

10' - 0"

3

A310

CEILING HUNG ACOUSTIC PANELS

DUCT, SEE MECH

LIFT, TRACK

LIFT, TRACK

LIFT, TRACK

LIFT, TRACK

5

A308

LIGHT, SEE ELEC

9' - 4"

10' - 8"

10' - 0" 10' - 0"10' - 0"

12' -

0"

10' - 8"

12' - 0"

1' - 4"

1' - 4"

SLP OFFICEC100

1' - 10"

2' -

4"

2' -

4"

4

A310

3' - 2"

9' - 4"

9' - 4"

9' - 4"9' - 4"

PRIVACY CURTAINTRACK, TYP

PRIVACY CURTAIN TRACK, TYP

1. SEE FINISH SCHEDULE FOR ACT TYPES.2. SEE MECHANICAL DRAWINGS FOR G.R.D. TYPES, LOCATIONS, AND ADDITIONAL WORK.3. SEE ELECTRICAL DRAWINGS FOR LIGHT FIXTURE TYPES AND LOCATIONS.4. CEILING HEIGHTS INDICATED ARE FROM FINISH FLOOR. CEILINGS AT LANDINGS, RAMPS ETC., REFER TO NEAREST FLOOR LEVEL. COORDINATE WITH EXG. WINDOW MULLION LOCATIONS.5. ALL EXPOSED LINTELS SHALL BE PAINTED.6. ALIGN BULKHEADS TO FACE OF WALL / OPENING, U.O.N.

CEILING LEGEND

2x2 ACT CEILINGSCRUBBABLE ACT-3

INTERIOR - GWB CEILINGS /BULKHEADS

X EXPOSED

2x4 ACT CEILINGACT-1

LINEAR ACOUSTICAL PANEL (LAP-#)

METAL SOFFIT (EXTERIOR)

CEILING NOTES

2x4 ACT SCRUBBABLE CEILING ACT- 2

SUPPLY/RETURN/EXHAUST DIFFUSER OR REGISTER -SEE MECH.

LIGHT - SEE ELEC.

VRF UNIT - SEE MECH.

RADIANT HEAT PANEL -SEE MECH.

© C

OP

YR

IGH

T

PR

OF

FIT

T &

AS

SO

CIA

TE

S A

RC

HIT

EC

TS

ISSUE

PROJECT NO.:

49 SOUTH CARROLL STREETFREDERICK, MARYLAND 21701

PHONE (301) 662-8532FAX (301) 662-4192

[email protected]

EXPI

RAT

ION

DAT

E

DESCRIPTIONDATEREV

DATE:

SEAL

I CER

TIFY

TH

AT T

HES

ED

OC

UM

ENTS

WER

E PR

EPAR

ED

OR

APP

RO

VED

BY

ME,

AN

D

THAT

I AM

A D

ULY

LIC

ENSE

D

ARC

HIT

ECT

UN

DER

TH

E LA

WS

OF

THE

STAT

E O

F M

ARYL

AND

.

312 W MAIN ST., SUITE 300SALISBURY, MARYLAND 21801

PHONE (410) 546-9100FAX (410) 546-5824

[email protected]

LIC

ENSE

No.

NE

W F

AC

ILIT

Y F

OR

:

00-0

0-00

00

0000

0

2019

RO

CK

CR

EE

K S

CH

OO

L

55 W

ES

T F

RE

DE

RIC

K S

TR

EE

TW

ALK

ER

SV

ILLE

, MA

RY

LAN

D 2

1793

A104B

FIRST FLOORREFLECTED CEILING

PLAN - AREA B

2017171.0001-30-2019

FR

ED

ER

ICK

CO

UN

TY

PU

BLI

C S

CH

OO

LS

65%

CD

PR

ICIN

G S

ET

SCALE: 1/8" = 1'-0"1FIRST FLOOR REFLECTEDCEILING PLAN - AREA B

0'0'16' 8' 16'

SCALE : 1/16" = 1'-0"

N

KEY PLAN

A B

CD

Daylighting Zone

Room Control Zone

LIGHTING ZONE DIAGRAMS MARCH 28, 2019

Page 10: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

FD

FD

1

A302

1

A303

2

A303

2

A302

3

A303

9' - 4"

8' - 8"8' - 8"

8' - 8"

8' - 8"8' - 8"

8' - 8" 8' - 8"

9' - 4"

9' - 4" 9' - 4"

8' - 0"

8' - 0" 8' - 0"

8' - 0" 8' - 0"

9' - 4"

8' - 8" 8' - 8"

8' - 0"

8' - 0"8' - 8" 8' - 0"

9' - 4"

9' - 4" 9' - 4"

8' - 8"

9' - 4"

CLASSROOME107

STORAGEE107A

TOILETE107B

CLASSROOME104

CLASSROOME101

STORAGEE101A

ACCESSSTAIR

712

LIBRARY714

OUTDOORLEARNING

EXT

TOILETE101B

CLASSROOME108

CLASSROOME103

CLASSROOME102

STORAGEE108A

TOILETE108B

STORAGEE102A

TOILETE102B

SLP OFFICEE100

SENSORYROOM

717

ADAPTIVE PEOFFICE

715

MUSIC716

STORAGE716A

TOILET716B

OFFICE /WORKROOM

714A

MAKER LAB709

STORAGE &KILN709A

TOILET709B

TEACHERLOUNGE

707

STAFFTOILET

705

STAFFTOILET

703

STAFFSUPPORT

701

MAINT.OFFICE

606

OPERATIONSOFFICE

604CORR.

600

WOMENSLOCKERROOM

602

MENSLOCKERROOM

601

OPERATIONSSTORAGE

605

MAINT.STORAGE

607

MECHANICAL608

ELECTRICAL609

OPERATIONSOUTDOORSTORAGE

018

DRYSTORAGE

507

TOILET505A LCKRS

505

SOAPSTOR.

506

OFFICE508

TABLESTORAGE

501

DISHWASH504

CLUSTERSTORAGE

711 CUST.702

MDF700

SLP OFFICED100

KITCHEN503

CORR.021

DINING500

CLUSTERSTORAGE

610

FIRE PUMP611

CORR.015

CORR.017

COMMONS016

SECLUSION509

STOR.603

TOILETE103B

STORAGEE103A

SERVING502

12' - 0"

10' - 8"

10' - 0"

HEARING &VISION

704

TESTINGROOM

706MATHSPECIALISTS

708

READINGSPECIALISTS

710

8' - 8"

8' - 8"

8' - 8"8' - 8"

9' - 4"

8' - 8"

9' - 4"

10' - 0"

9' - 4"

9' - 4"

9' - 0"

10' - 0"

10' - 0"8' - 8"8' - 8"

8' - 8"

X

X

X

XXSTOR.

708A8' - 8"

X

X

9' - 4"

8' - 8"

AIR CURTAIN -SEE MECH AND KITCHEN

HOOD -SEE KITCH.

LINTEL @ 8'-0"

8' - 8"

12' - 0"12' - 0" 12' - 0"

8' - 0"

MA

TC

HLI

NE

-S

EE

1 /

A10

4D

MATCHLINE - SEE 1 / A104BMATCHLINE - SEE 1 / A104B

MA

TC

HLI

NE

-S

EE

1 /

A10

4D

9' - 4"

8' - 8"

TOILETE104B

STORAGEE104A

8' - 8"

8' - 8"8' - 8"

8' - 8"

8' - 8"

8' - 0" 8' - 8"8' - 8"

21' - 0"

10' - 0"

21' - 0" 21' - 0" 21' - 0"

21' - 0"21' - 0"21' - 0"21' - 0"

8' -

8"

8' -

8"9'

-4"

8' -

0"

8' - 0"8' - 0"

9' -

4"8'

-8"

8' -

8"

9' -

4"9'

-4" 9' -

4"

8' -

8"

TRACK CURTAINS, TYP

12' -

0"

9' - 0"

2

A311

10' - 0"10' - 0"

10' - 0"

10' - 0"

9' - 4"9' - 4"

ACT TRIM-1, TYP.

LIFT, TRACK

LIFT, TRACK

LIFT, TRACK

LIFT, TRACK

LIFT, TRACK

LIFT, TRACK

2" EXP. JT.

2" EXP. JT.

5

A308

VEST017A

1' - 4"

4' - 8" 4' - 8"

3' -

0"

3' - 4" 3' - 4"

1' -

4"

1' -

4"

1' -

4"

1' - 0"

1' -

0"

1' - 0"

1' -

0"

8' - 8"

10' - 0"

10' - 0"

2' - 0"

2' -

0"

2' - 0"

2' -

0"

9' - 4"

9' - 4"

9' - 4"

1' - 7 5/8"

1' -

4"

1' -

4"

TY

P.

1' - 4" TYP.

1' -

4"

2' -

0"

1' - 4"

1' -

4"

1' -

4"

2' -

8"

2' -

0"

2' -

0"

4' - 8"4' - 8"

9' - 4"

8' -

0"

4

A310

1

A305

7

A403

2

xxx

1' - 5"

1. SEE FINISH SCHEDULE FOR ACT TYPES.2. SEE MECHANICAL DRAWINGS FOR G.R.D. TYPES, LOCATIONS, AND ADDITIONAL WORK.3. SEE ELECTRICAL DRAWINGS FOR LIGHT FIXTURE TYPES AND LOCATIONS.4. CEILING HEIGHTS INDICATED ARE FROM FINISH FLOOR. CEILINGS AT LANDINGS, RAMPS ETC., REFER TO NEAREST FLOOR LEVEL. COORDINATE WITH EXG. WINDOW MULLION LOCATIONS.5. ALL EXPOSED LINTELS SHALL BE PAINTED.6. ALIGN BULKHEADS TO FACE OF WALL / OPENING, U.O.N.

CEILING LEGEND

2x2 ACT CEILINGSCRUBBABLE ACT-3

INTERIOR - GWB CEILINGS /BULKHEADS

X EXPOSED

2x4 ACT CEILINGACT-1

LINEAR ACOUSTICAL PANEL (LAP-#)

METAL SOFFIT (EXTERIOR)

CEILING NOTES

2x4 ACT SCRUBBABLE CEILING ACT- 2

SUPPLY/RETURN/EXHAUST DIFFUSER OR REGISTER -SEE MECH.

LIGHT - SEE ELEC.

VRF UNIT - SEE MECH.

RADIANT HEAT PANEL -SEE MECH.

© C

OP

YR

IGH

T

PR

OF

FIT

T &

AS

SO

CIA

TE

S A

RC

HIT

EC

TS

ISSUE

PROJECT NO.:

49 SOUTH CARROLL STREETFREDERICK, MARYLAND 21701

PHONE (301) 662-8532FAX (301) 662-4192

[email protected]

EXPI

RAT

ION

DAT

E

DESCRIPTIONDATEREV

DATE:

SEAL

I CER

TIFY

TH

AT T

HES

ED

OC

UM

ENTS

WER

E PR

EPAR

ED

OR

APP

RO

VED

BY

ME,

AN

D

THAT

I AM

A D

ULY

LIC

ENSE

D

ARC

HIT

ECT

UN

DER

TH

E LA

WS

OF

THE

STAT

E O

F M

ARYL

AND

.

312 W MAIN ST., SUITE 300SALISBURY, MARYLAND 21801

PHONE (410) 546-9100FAX (410) 546-5824

[email protected]

LIC

ENSE

No.

NE

W F

AC

ILIT

Y F

OR

:

00-0

0-00

00

0000

0

2019

RO

CK

CR

EE

K S

CH

OO

L

55 W

ES

T F

RE

DE

RIC

K S

TR

EE

TW

ALK

ER

SV

ILLE

, MA

RY

LAN

D 2

1793

A104C

FIRST FLOORREFLECTED CEILING

PLAN - AREA C

2017171.0001-30-2019

FR

ED

ER

ICK

CO

UN

TY

PU

BLI

C S

CH

OO

LS

65%

CD

PR

ICIN

G S

ET

SCALE: 1/8" = 1'-0"1FIRST FLOOR REFLECTEDCEILING PLAN - AREA C

0'0'16' 8' 16'

SCALE : 1/16" = 1'-0"

N

KEY PLAN

A B

CD

Daylight Zone

Control Zone '1'

Control Zone '2'Control Zone '3'

Daylight Zone

Teaching Wall Zone

Classroom Control Zone

Note: Daylighting zone is not required if the basis-of-design light fixtures are utilized, but could be required if alternative lights are provided, depending upon the fixture wattage.

LIGHTING ZONE DIAGRAMS MARCH 28, 2019

Page 11: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

1

A302

2

A301

1

A301

4

A301

CLASSROOME104

LIBRARY714

CLASSROOME108

CLASSROOME102

STORAGEE108A

TOILETE108B

STORAGEE102A

TOILETE102B

SLP OFFICEE100SENSORY

ROOM717

ADAPTIVE PEOFFICE

715

MUSIC716

MOVEMENTROOM

718STORAGE

716A

TOILET716B

OT/PTOFFICE

720

OT/PTSTORAGE

723

OFFICE /WORKROOM

714A

IDF719

FAM TLT900B PE OFFICE

904

GYMOUTDOORSTORAGE

906

PROFESSIONALLEARNING/PLANNING

800

CONFERENCE107 HEALTH

SPECIALIST802

RECORDSTORAGE

108

PRINCIPAL105

STAFFTOILET

106

PLATFORM905

WOMEN903

CORR.021

SOCIALWORKER/GUIDANCE

OFFICE804

MULTI-PURPOSEMEETING

801

MEN902

HALL109

CORR.024

CORR.020

SUPPLYSTORAGE

104

TOILET904A

FURNITURESTORAGE

901

STORAGE718A

RESOURCEROOM

803

ADAPTIVE PESTORAGE

725

GYM900

LAUNDRY721

8' - 8"

8' - 8"

9' - 4"

9' - 4" 8' - 0"

8' - 0"

8' - 8"

9' - 4"

9' - 4"

8' - 8"

8' - 8"

8' - 8"

8' - 0"

8' - 0"

8' - 0"

8' - 8"

9' - 4"

9' - 4"

9' - 4"

9' - 4"

9' - 4" 9' - 4"9' - 4"

9' - 4"9' - 4"

9' - 4"

9' - 4"

8' - 8" 8' - 8"

8' - 8"

ELEC.722

XX

X

X

X

X

X

CORR.022

VEST025

CORR.020 10' - 0"10' - 0"

9' - 4" 8' - 8"

10' - 0"

8' - 8" 8' - 8"

MATCHLINE - SEE 1 / A104A MATCHLINE - SEE 1 / A104A

MA

TC

HLI

NE

-S

EE

1 /

A10

4CM

AT

CH

LIN

E -

SE

E 1

/ A

104C

X

INDOOR PESTORAGE

907

2" EXP. JT.

2" EXP. JT.

2" EXP. JT.

2" EXP. JT.2" EXP. JT.

8' - 0"8' - 0" 8' - 8"8' - 8"

12' - 0"

10' - 8"

10' - 0"

8' - 0"8' - 0"

3

A311

18' -

8"

3

A312CUST

900C

12' - 0"12' - 0"12' - 0"

10' - 0"

9' - 4"

LIFT, TRACK

LIFT, TRACK

8' - 8"

TOILETE104B

STAGE CURTAIN W/ VALENCE

BORDER CURTAIN TYP. OF (2)

CYCLORAMA CURTAIN

8' - 0"

CORR020A

1' - 4"

1' -

4"

1' -

4"

2' -

0"

2' -

0"

5' -

4"

TYP.2' - 0"

TY

P.

2' -

0"

2' -

0"

1' -

3" 4'

- 4

"

4' -

4"

4' -

4"

9' - 4"8' - 0"

STORAGEE104A

8' - 8"

9' - 4"

LIFT, TRACK

2' -

0"

TRACK LIGHTING

1

A305

6

A403

7

A403

2

xxx

6

xxx

2' - 0" 2' - 8"

DIVIDER CURTAIN

4

A312

1. SEE FINISH SCHEDULE FOR ACT TYPES.2. SEE MECHANICAL DRAWINGS FOR G.R.D. TYPES, LOCATIONS, AND ADDITIONAL WORK.3. SEE ELECTRICAL DRAWINGS FOR LIGHT FIXTURE TYPES AND LOCATIONS.4. CEILING HEIGHTS INDICATED ARE FROM FINISH FLOOR. CEILINGS AT LANDINGS, RAMPS ETC., REFER TO NEAREST FLOOR LEVEL. COORDINATE WITH EXG. WINDOW MULLION LOCATIONS.5. ALL EXPOSED LINTELS SHALL BE PAINTED.6. ALIGN BULKHEADS TO FACE OF WALL / OPENING, U.O.N.

CEILING LEGEND

2x2 ACT CEILINGSCRUBBABLE ACT-3

INTERIOR - GWB CEILINGS /BULKHEADS

X EXPOSED

2x4 ACT CEILINGACT-1

LINEAR ACOUSTICAL PANEL (LAP-#)

METAL SOFFIT (EXTERIOR)

CEILING NOTES

2x4 ACT SCRUBBABLE CEILING ACT- 2

SUPPLY/RETURN/EXHAUST DIFFUSER OR REGISTER -SEE MECH.

LIGHT - SEE ELEC.

VRF UNIT - SEE MECH.

RADIANT HEAT PANEL -SEE MECH.

© C

OP

YR

IGH

T

PR

OF

FIT

T &

AS

SO

CIA

TE

S A

RC

HIT

EC

TS

ISSUE

PROJECT NO.:

49 SOUTH CARROLL STREETFREDERICK, MARYLAND 21701

PHONE (301) 662-8532FAX (301) 662-4192

[email protected]

EXPI

RAT

ION

DAT

E

DESCRIPTIONDATEREV

DATE:

SEAL

I CER

TIFY

TH

AT T

HES

ED

OC

UM

ENTS

WER

E PR

EPAR

ED

OR

APP

RO

VED

BY

ME,

AN

D

THAT

I AM

A D

ULY

LIC

ENSE

D

ARC

HIT

ECT

UN

DER

TH

E LA

WS

OF

THE

STAT

E O

F M

ARYL

AND

.

312 W MAIN ST., SUITE 300SALISBURY, MARYLAND 21801

PHONE (410) 546-9100FAX (410) 546-5824

[email protected]

LIC

ENSE

No.

NE

W F

AC

ILIT

Y F

OR

:

00-0

0-00

00

0000

0

2019

RO

CK

CR

EE

K S

CH

OO

L

55 W

ES

T F

RE

DE

RIC

K S

TR

EE

TW

ALK

ER

SV

ILLE

, MA

RY

LAN

D 2

1793

A104D

FIRST FLOORREFLECTED CEILING

PLAN - AREA D

2017171.0001-30-2019

FR

ED

ER

ICK

CO

UN

TY

PU

BLI

C S

CH

OO

LS

65%

CD

PR

ICIN

G S

ET

SCALE: 1/8" = 1'-0"1FIRST FLOOR REFLECTEDCEILING PLAN - AREA D

0'0'16' 8' 16'

SCALE : 1/16" = 1'-0"

N

KEY PLAN

A B

CD

Control Zone 'A' Control Zone 'B'

Dimmer '1'

Dimmer '2'

Dimmer '3'

LIGHTING ZONE DIAGRAMS MARCH 28, 2019

Page 12: FCPS Rock Creek School - Amazon Web Services · 3/28/2019  · Matt Evans Dustin Construction X Lloyd Hill Dustin Construction X Design Team Sandra Carpenter Becker Morgan Group Donna

FD

FD

FD

FD

FD

FD

TW

S3L

V

S3L

V

VS W

STW

S3

S 3

OS H

OS H

CR

VS W

3

ARAF

12

AK AL

13

5

8

AJ AM

7.9

11.1

A707

4

3

1' -

10"15' - 0"

610/1

611/11' -

2"

2B

EXT-2

EXT-2

EXT-1

A703

23CUST.

702

CORR.017

019/2

D102A/1 D101A/1

D108A/1 D107A/1

D102B/1 D101B/1

D107B/1D108B/1

D107/1

D101/1D102/1

CLASSROOMD108

CLASSROOMD107

CLASSROOMD104 SHARED

LEARNINGD103

STORAGED107A

TOILETD107B

STORAGED108A

STORAGED102ACLASSROOM

D102

CLASSROOMD101

TOILETD102B

TOILETD101B

STORAGED101A

TOILETD108B

CORR.019

PERSONALCARE

D105

D108/1

D100/1

019/1MDF700

SLP OFFICED100

CLUSTERSTORAGE

610

FIRE PUMP611

7

A804

4

A804

8

A804

2

A805

3

A805

9' -

4"

6' -

0"

4' -

0"

6' -

0"

48' -

0"

6' -

0"

4' -

0"

6' -

0"

4' -

0"

SF-1

SF-1A

SF-1A

SF-1

43' - 8" 8' - 8" 43' - 8"

9' -

4"

6' -

0"

4' -

0"

6' -

0"

23' -

4"

12' -

0"

12' -

8"

6' -

0"

4' -

0"

6' -

0"

14' -

4"

4' -

4"

2' -

8"

SF-1A

SF-1

SF-1A

SF-1

32' -

8"

12' -

4"

10' -

4"

31' -

6"

9"31

' - 1

1"

33' -

2"

32' -

9"

32' -

7"

8"10

' - 1

0"

40' - 6" 15' - 0" 40' - 6"

8' -

6"

1' -

4"

TY

P.

24' -

5"

3' -

1"

5' -

0"

7"13

' - 2

"

1' -

4"7'

- 7

"1'

- 0

"9'

- 1

0"

1' -

4"

16' -

8"

11' -

6"

3' -

6"

1' -

2"

1' - 8" 25' - 2" 13' - 8" 15' - 0" 2' - 8" 5' - 4" 32' - 6"

EXT-1

EXT-1

93' -

4"

1' -

0"

EXT-2

BATHROOM CUBBIES, TYP. - SEE B/A401

CUBBIES, TYP. 1E

2P

2L

2J3C

3N

2B

2B

3N

1E

3C1E

2B

2B

2J

1E

2Q

3C

2B

2B

1E

1E2L 2L

2B

2B

1E

1E

2L

EXT-1

EXT-1

EXT-1 2L

1E

3C

1E

2M

F.E.C.

1E

3N

2B

2B

EXT-1

1E

EXT-2 SF-3

1' -

8"

33' -

4"

32' -

8"

32' -

8"

1E 1E

1E 1E

TYP.

3' - 4" 8' - 4"

TYP.

3' - 4"

9' -

8"

11' -

1"

12' -

7"

9' -

0"

12' -

7"

9' -

2"

8' -

10"

12' -

7"

3N

13' - 0" 13' - 2"

13' - 0"

2"

A805

4

SEE 1/A401 FOR TYPICAL LAYOUTS AT TOILET D101B, D102B, D104B, D107B & D108A

STORAGED104A

TOILETD104B

SECLUSIOND106

D104A/1

D104B/1 D106/1

D105/1

D103/1

D104/1

REVISE BASE BID CLASSROOM B105 & CLASSROOM E103, STORAGE B105A & STORAGE E103A, TOILET B105B & TOILET E103B AND CORRIDOR 011 & CORRIDOR 021 TO MATCH THIS LAYOUT

A8056

8

SF-1A

96' - 0"

1' - 8" 34' - 0" 3' - 8" 17' - 4" 3' - 8" 34' - 0" 1' - 8"

11' -

1"

9' -

8"

13' - 2"

SF-4

EXT-1

2Q

1E

1E4B4B

4B4A

1E

1E2K

3C

2' - 0" BENCH

1E A805

7 5

2J1E

G G

G

2J

G

G

2B

3N

1E

8' - 8" 8' - 0"CUST.

702

CORR.017 10' - 0"

XX

X

2

A805

3

A805

CLASSROOMD108

CLASSROOMD107

CLASSROOMD104

STORAGED107A

TOILETD107B

STORAGED108A

STORAGED102A

CLASSROOMD102

CLASSROOMD101

TOILETD102B

TOILETD101B

STORAGED101A

TOILETD108B

SECLUSIOND106CORR.

019

8' - 8" 8' - 8"

8' - 8" 8' - 8"

9' - 4"

9' - 4"9' - 4"

9' - 4"

8' - 0" 8' - 0"

8' - 0"8' - 0"

MDF700

SLP OFFICED100

CLUSTERSTORAGE

610

FIRE PUMP611

CURTAIN TRACK,TYP

SHAREDLEARNING

D103

PERSONALCARE

D105

TOILETD104B

STORAGED104A 9' - 4"

8' -

4"

9' -

4"8'

-0"

8' - 0"9' - 4"

8' -

8"

8' -

8"

8' -

8" 8' -

8"

3' - 4" 8' - 4" 3' - 4"

8' - 8"

9' -

4"

10' - 0"

9' -

4"

9' -

4"

9' - 4"

1' - 4" 1' - 4"

3' -

0"

1' -

4"

X

X

1' - 4" 1' - 4"

8' -

0"

8' - 8"

LIFT, TRACK

LIFT, TRACK

LIFT, TRACK

3

ARAF

11

4

AJ AM

6

11.7

10

MECH SCREEN, TYP.

1/4" / 12"1/4" / 12"PENTHOUSE

1/4" / 12"

C.H./S.B.

C.H./S.B.

C.H.

C.H.O.S.

O.S.

C.H.

O.S.

C.H.O.S.

C.H.O.S.

C.H.O.S.

C.H.

C.H.

O.S.

O.S.

O.S.

O.S.

MAINT. WALKWAY -SEE FLOOR AND RAIL TYPES

STOREFRONT, TYP.CAST STONE SILL, TYP.FACE BRICK (BK-3) REVEAL, TYP.

MANUFACTURED STONE MASONRY, TYP.

METAL WALL PANEL (MWP-1)

COPING, TYP.

SCREEN WALL, TYP.

FACE BRICK (BK-1), TYP.

C.J. C.J. C.J.C.J.C.J.C.J.

DOOR AND FRAME AS SCHED.

ALTERNATE BASE BID

OVERFLOW SCUPPER, TYP.

FACE BRICK (BK-2) ACCENT

CONDUCTOR HEAD AND DOWNSPOUT, TYP.

DOOR AND FRAME AS SCHED.

FACE BRICK (BK-3) REVEAL, TYP.

MANUFACTURED STONE MASONRY, TYP.

METAL WALL PANEL (MWP-1)

COPING, TYP.

MECH. SCREEN WALL

FACE BRICK (BK-1) FIELD, TYP.

C.J.C.J.C.J.C.J. C.J. C.J.

FACE BRICK (BK-2) ACCENT, TYP.

STOREFRONT, TYP.

CAST STONE SILL, TYP.

FACE BRICK (BK-3) REVEAL, TYP.

MANUFACTURED STONE MASONRY, TYP.

METAL WALL PANEL (MWP-1), TYP.

COPING, TYP.

SCREEN WALL, TYP.

FACE BRICK (BK-1), TYP.

C.J. C.J.C.J.C.J.C.J.C.J.

ALTERNATEBASE BID

FACE BRICK (BK-2) ACCENT

OVERFLOW SCUPPER, TYP.

CONDUCTOR HEAD AND DOWNSPOUT, TYP.

AJ AM

6

10

2

A805

3

A805

MECHANICAL SCREEN, TYP.

D109/1

D109/2

EXT-3

EXT-3EXT-3

EXT-3

6"46

' - 8

"6"

6" 24' - 8" 6"

27' - 9 3/4"

49' -

9 3

/4"

1/4" / 12"

1/4" / 12"

MAINT. WALKWAY, TYP. - SEE FLOOR AND RAIL TYPES

LOUVER - SEE MECH.

1A 1A

1A 1A

1A 1A1A

1A

PENTHOUSED109

3 OCC.839 SF

© C

OP

YR

IGH

T

PR

OF

FIT

T &

AS

SO

CIA

TE

S A

RC

HIT

EC

TS

ISSUE

PROJECT NO.:

49 SOUTH CARROLL STREETFREDERICK, MARYLAND 21701

PHONE (301) 662-8532FAX (301) 662-4192

[email protected]

EXPI

RAT

ION

DAT

E

DESCRIPTIONDATEREV

DATE:

SEAL

I CER

TIFY

TH

AT T

HES

ED

OC

UM

ENTS

WER

E PR

EPAR

ED

OR

APP

RO

VED

BY

ME,

AN

D

THAT

I AM

A D

ULY

LIC

ENSE

D

ARC

HIT

ECT

UN

DER

TH

E LA

WS

OF

THE

STAT

E O

F M

ARYL

AND

.

312 W MAIN ST., SUITE 300SALISBURY, MARYLAND 21801

PHONE (410) 546-9100FAX (410) 546-5824

[email protected]

LIC

ENSE

No.

NE

W F

AC

ILIT

Y F

OR

:

00-0

0-00

00

0000

0

2019

RO

CK

CR

EE

K S

CH

OO

L

55 W

ES

T F

RE

DE

RIC

K S

TR

EE

TW

ALK

ER

SV

ILLE

, MA

RY

LAN

D 2

1793

A804

MIDDLE SCHOOLALTERNATE #4

2017171.0001-30-2019

FR

ED

ER

ICK

CO

UN

TY

PU

BLI

C S

CH

OO

LS

65%

CD

PR

ICIN

G S

ET

SCALE: 1/8" = 1'-0"1FIRST FLOOR PLAN - MIDDLESCHOOL ALTERNATE

SCALE: 1/8" = 1'-0"2REFLECTED CEILING PLAN -MIDDLE SCHOOL ALTERNATE

SCALE: 1/16" = 1'-0"3ROOF PLAN - MIDDLE SCHOOLALTERNATE

SCALE: 1/8" = 1'-0"7EAST ELEVATION - MIDDLESCHOOL ALTERNATE

SCALE: 1/8" = 1'-0"4SOUTH ELEVATION - MIDDLESCHOOL ALTERNATE

SCALE: 1/8" = 1'-0"8WEST ELEVATION - MIDDLESCHOOL ALTERNATE

SCALE: 1/8" = 1'-0"5 PENTHOUSE PLAN - AREA C

DOOR SCHEDULE - MS ALTERNATE

MARK

DOOR FRAME

FIRERATING

HDWE SET COMMENTS

SIZEMATL TYPE FIN GLAZ

UNDERCUT MATL TYPE FIN

DETAILWIDTH HT THICK HEAD JAMB SILL

FIRST FLOOR019/1 8' - 0" 7' - 10" 1 3/4" SCWD A - - 0" HM HM-1 PT J7 90 MIN019/2 6' - 8" 7' - 2" 1 3/4" ALUM D - IG-1 0" ALUM SF-3 - J2 -

D101/1 3' - 4" 7' - 2" 1 3/4" SCWD B - TEMP 0" HM HM-1 PT J7 -D101A/1 6' - 0" 7' - 2" 1 3/4" SCWD A - - 0" HM HM-1 PT J10 -D101B/1 3' - 4" 7' - 2" 1 3/4" SCWD A - - 0" HM HM-1 PT J10 -D102/1 3' - 4" 7' - 2" 1 3/4" SCWD B - TEMP 0" HM HM-1 PT J7 -

D102A/1 6' - 0" 7' - 2" 1 3/4" SCWD A - - 0" HM HM-1 PT J10 -D102B/1 3' - 4" 7' - 2" 1 3/4" SCWD A - - 0" HM HM-1 PT J10 -D103/1 6' - 8" 7' - 2" 1 3/4" ALUM D - IG-1 0" ALUM SF-4 - J1 -D104/1 3' - 4" 7' - 2" 1 3/4" SCWD B - TEMP 0" HM HM-1 PT J7 -

D104A/1 6' - 0" 7' - 2" 1 3/4" SCWD A - - 0" HM HM-1 PT J10 -D104B/1 3' - 4" 7' - 2" 1 3/4" SCWD A - - 0" HM HM-1 PT J10 -D105/1 3' - 4" 7' - 2" 1 3/4" SCWD A - - 0" HM HM-1 PT J7 -D106/1 3' - 4" 7' - 2" 1 3/4" SCWD F - LAM 0" HM HM-1 PT J7 -D107/1 3' - 4" 7' - 2" 1 3/4" SCWD B - TEMP 0" HM HM-1 PT J7 -

D107A/1 6' - 0" 7' - 2" 1 3/4" SCWD A - - 0" HM HM-1 PT J10 -D107B/1 3' - 4" 7' - 2" 1 3/4" SCWD A - - 0" HM HM-1 PT J10 -D108/1 3' - 4" 7' - 2" 1 3/4" SCWD B - TEMP 0" HM HM-1 PT J7 -

D108A/1 6' - 0" 7' - 2" 1 3/4" SCWD A - - 0" HM HM-1 PT J10 -D108B/1 3' - 4" 7' - 2" 1 3/4" SCWD A - - 0" HM HM-1 PT J10 -

KEY PLAN

A B

CD

ALT. M.S.

0'0'16' 8' 16'

SCALE : 1/16" = 1'-0"

N

ALT

ER

NA

TE

B

AS

E B

ID

Classroom Control Zone

Teaching Wall Zone

LIGHTING ZONE DIAGRAMS MARCH 28, 2019