TG.45.8113W Apex III 4G 450MHz to 6GHz LTE Dipole Terminal ...
F_Berlin srf2009 6GHz seamless cavities_A A Rossi
-
Upload
istituto-nazionale-fisica-nucleare-university-of-padua -
Category
Technology
-
view
561 -
download
1
Transcript of F_Berlin srf2009 6GHz seamless cavities_A A Rossi
For this and much more material, visit the
free download area on:
http://www.surfacetreatments.it/
http://www.slideshare.net/PalmieriProfEnzo
Nb3Sn Films by Multilayer Sputtering
A.A. Rossi^*, S. M. Deambrosis*, S. Stark*, V. Rampazzo*, V. Rupp^*, R. G. Sharma *. F. Stivanello* and V. Palmieri^*
^ Padua University, Material Science Dept., Italy• INFN – Legnaro National Labs ., Italy • IUAC, New Delhi, India
Nb/Sn sputterin
sputtering deposition Interdiffusion
No Interdiffusion
SC/Insulator deposition-> Increase of Hc
Nb3Sn
H
MULTILAYERS FOR SRF
Our Aim
Possible Future Application
Interdiffusion
Sample deposition by PLANAR MAGNETRON
6 GHz CAVITY mini-lab
• TUMBLING• BCP• EP• SPUTTERING• CRYOGENICS
Cavity deposition by CYLINDRICAL MAGNETRON
6 GHz cavity RF TEST
Sample deposition by PLANAR MAGNETRON
6 GHz CAVITY minilab
• TUMBLING• BCP• EP• SPUTTERING• CRYOGENICS
Cavity deposition by CYLINDRICAL MAGNETRON
6 GHz cavity RF TEST
------------<<<0>>>-------------
• No electron beam welding, neither for flanges
• Obtained by spinning from Nb scraps
• Short fabrication time
• Fast and low cost BCP and EP treatments (~ 3lt acids)
• Inexpensive Cryogenics, fast cooling and warming up
• Quick RF Measurements (traditional rf system)
6 GHz CAVITY MINILAB
Cryogenic infrastructure:
Pick Up
Coupler (mobile)
Double Pumping line
Bottom Part
Pick-up Antenna
Coupler Antenna
Pick-up-PipeCoupler - Pipe
Pick-up Flange
Bellow
Coupler Flange
The Bottom Part
Quick RF MeasurementsThe insert has been conceived to even enter into a 450 lt Helium dewar
INSERT
DEWAR
RF measuring system
Sample deposition by PLANAR MAGNETRON
6 GHz CAVITY mini-lab
• TUMBLING• BCP• EP• SPUTTERING• CRYOGENICS
Cavity deposition by CYLINDRICAL MAGNETRON
6 GHz cavity RF TEST
Choosen magnetron sputtering configuration
POST-MAGNETRON
Nb/Sn Target
Nb Target (wings)
Sn TargetWater
OUT
Water
IN
Electrical Insulator
Grounded Screen
Electrical
feedthrough
CathodeCooling
Linear Feedthrough
Coil
Window
Water Cooling
Cavity
Nb / Sn Cathode
MULTILAYER – UHV CYLINDRICAL SYSTEM
To The Pump
Possibility to perform a low cost and dense statistics
Actual measurement rate 30 cavities / month
Possible rate with 3 Cryostats 100 cavities / month
Thank You
For this and much more material, visit the
free download area on:
http://www.surfacetreatments.it/
http://www.slideshare.net/PalmieriProfEnzo