Farnsworth Aerospace Lower Campus
1. Welcoming and Safe Front Entry 2. More Parking 3. Parent Drop-Off 4. Improve Site Safety 5. Move 5th Grade Back 6. Increase Cafeteria Space 7. Large group Assembly Space 8. Update Restrooms 9. Expanded Media Center10. Create Flexible Learning Space
Grade Levels: PK-4SY 2014/15 Enrollment: 506 Design Enrollment: 610
Project Summary:
Our students work on teams to solve complex problems, and each success builds confidence for the next challenge. Other classes include music and art, on-site flight simulators, and hands-on field trips that expand understanding of aerospace.
now 62,913 square feet.
1290 Arcade Street
General Notes:
change as the design and funding process progress.
occur once the funding is secured.
Issues Identified By School Community In 2015
1090
2
MEND
OTA
STRE
ET
HYACINTH AVENUE
IVY AVENUE
XX
XX
X
X X XX X X X X X X X X X
XX
X
XX
X
C2
C3
C1
S1
S2
S3S4
Legend:
C1. New Main EntryC2. Assemble/Gym ExpansionC3. Classroom ExpansionS1. New Parent Drop Off and ParkingS2. Improve Site Saftey with FenceS3. Landscape BufferS4. Remove Portable Classrooms
N
0' 50’ 100'25'
New Landscape and PlaygroundParking and HardscapeNew Building Construction
Farnsworth Aerospace Lower Campus
Property LineMain EntrySecondary EntryService Entry
Site Concept6,150 SF
5,400 SF
11,750 SF
4,025 SF
1090
3
Main EntrySecondary EntryService Entry
0' 50’ 100'25'
N
Farnsworth Aerospace Lower CampusExisting Utilization
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
GYM
CR
CR
MECH KITCH
LKR
CAFE
CR CR CR CR
CRCR
OFFICE
CR CR
ART
SCI
MECH
CR CR CR
SESCI
LIBRARY
CR LNG
LEVEL 1
LEVEL 2
SCI
CR
SCICRCRCR CR CR
CR CRCR CR
LEVEL 3
1090
4
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities SupportMain EntrySecondary EntryService Entry
0' 50’ 100'25'
N
Property Line
MUSIC
SE
T
TTT
3RD 3RD
T T
MEDIA
COMPUTER LAB
SE
ART
TT
SE
SCI
SET T
LEARNINGCOMMONS PLC
LEARNINGCOMMONS
LEARNINGCOMMONS
ADMIN
PK
K
K
T
T
DININGGYMKITCH
T
C3
C5
C2
C1C6
C6
C6
C6
C3
C4
C4
C3
C4
C4
LEVEL 1
LEVEL 2
LEVEL 3
T
MUSIC
C9
C10
C1
PK
Farnsworth Aerospace Lower CampusConceptual Utilization Plan
Legend:
C1. Create a Welcoming, Safe and Accessible Main Entry and Office
Gymnasium and Assembly Space
C4. Create Flexible Learning Space with Personalized and Varied SpacesC5. Expand and Provide for PK and KC6. Create Appropriate Environment for Early LearningC7. Staff Workroom/PLCC8. Small Group Learning
C10. New Media and Technology Center
EXIS
TIN
G
ADD
ITIO
N
EXISTING
ADDITION
EXISTING
ADDITION
EXISTING
ADDITION
1090
5
Level 1
0' 50’ 100'25'
N
EXISTING
ADDITION
Farnsworth Aerospace Lower CampusConceptual Construction Plan
New Construc onHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package Heavy Remodel Medium Remodel Light Remodel Finishes Only
Line Items Heavy Remodel Medium Remodel Light Remodel Finishes Only
A 7,375 SF 4,275 SF
1,050 SF
4,375 SF
4,150 SF
6,400 SF
13,775 SF 5,325 SF 4,375 SF 4,150 SF
B
E
TOTAL
D
C
AA
E C
B
DD
A
1090
610900' 50’ 100'25'
N
Farnsworth Aerospace Lower CampusConceptual Construction Plan
New Construc onHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package Heavy Remodel Medium Remodel Light Remodel Finishes Only
Line Items Heavy Remodel Medium Remodel Light Remodel Finishes Only
A 7,375 SF 4,275 SF
800 SF
2,200 SF
7,225 SF
7,375 SF 5,075 SF 2,200 SF 7,225 SF
B
E
TOTAL
D
C
Level 2
E
A
A
D C
EXISTING
ADDITION
0' 50’ 100'25'
N
Farnsworth Aerospace Lower CampusConceptual Construction Plan
New Construc onHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package Heavy Remodel Medium Remodel Light Remodel Finishes Only
Line Items Heavy Remodel Medium Remodel Light Remodel Finishes Only
A 4,300 SF 4,275 SF
800 SF
6,175 SF
3,175 SF
4,300 SF 5,075 SF 6,175 SF 3,175 SF
B
E
TOTAL
D
C
Level 3
EXISTING
ADDITION
D
CE
A
A
C C
70' 50’ 100'25'
N
Farnsworth Aerospace Lower CampusConceptual Construction Plan
New Construc onHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package Heavy Remodel Medium Remodel Light Remodel Finishes Only
Line Items Heavy Remodel Medium Remodel Light Remodel Finishes Only
A 4,300 SF 4,275 SF
800 SF
6,175 SF
3,175 SF
4,300 SF 5,075 SF 6,175 SF 3,175 SF
B
E
TOTAL
D
C
Level 3
EXISTING
ADDITION
D
CE
A
A
C C
1090