FACILITIES MANAGEMENT Results/Bid... · $4,845 $351,845: $410,127 10 : $10 $497,639: PREQUALIFIED...

5
FACILITIES MANAGEMENT SEALED BID NO.: W10028013 / P4S-876 DATE: 4/2/20 PROJECT: SIO Hydraulics Prather Lab Renovation TIME: 10:00 a.m. PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $395,000 CONTRACTOR'S NAME LUMP SUM CITY - TIME REC'D BID YES NO BASE BID TOTAL TELLIARD CONSTRUCTION 4/1/2020 6:55PM BRYANT CONSTRUCTION, INC 9:35 AM REYNOLDS CONTRACTING, INC 9:58 AM CONAN CONSTRUCTION, INC 10:00 AM $497,629 $1 X $347,000 $484.54 X $410,117 $1 X 10 $10 $422,098 $351,845 10 $4,845 $410,127 10 $10 $497,639 PREQUALIFIED DAILY RATE OF COMPENSATION X 10 MULTIPLIER $422,088 $1 X 10 $10

Transcript of FACILITIES MANAGEMENT Results/Bid... · $4,845 $351,845: $410,127 10 : $10 $497,639: PREQUALIFIED...

Page 1: FACILITIES MANAGEMENT Results/Bid... · $4,845 $351,845: $410,127 10 : $10 $497,639: PREQUALIFIED DAILY RATE OF COMPENSATION X 10 MULTIPLIER √ $422,088. $1: ... Fredricks Electric

FACILITIES MANAGEMENT

SEALED BID NO.: W10028013 / P4S-876 DATE: 4/2/20

PROJECT: SIO Hydraulics Prather Lab Renovation TIME: 10:00 a.m.

PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $395,000

CONTRACTOR'S NAME LUMP SUMCITY - TIME REC'D BID YES NO BASE BID TOTAL

TELLIARD CONSTRUCTION4/1/2020 6:55PM

BRYANT CONSTRUCTION, INC9:35 AM

REYNOLDS CONTRACTING, INC9:58 AM

CONAN CONSTRUCTION, INC10:00 AM

$497,629 $1 X

$347,000 $484.54 X

$410,117 $1 X 10 $10

$422,098

$351,84510 $4,845

$410,127

10 $10 $497,639

PREQUALIFIED DAILY RATE OF COMPENSATION

X 10 MULTIPLIER

$422,088 $1 X 10 $10√

Page 2: FACILITIES MANAGEMENT Results/Bid... · $4,845 $351,845: $410,127 10 : $10 $497,639: PREQUALIFIED DAILY RATE OF COMPENSATION X 10 MULTIPLIER √ $422,088. $1: ... Fredricks Electric
Page 3: FACILITIES MANAGEMENT Results/Bid... · $4,845 $351,845: $410,127 10 : $10 $497,639: PREQUALIFIED DAILY RATE OF COMPENSATION X 10 MULTIPLIER √ $422,088. $1: ... Fredricks Electric
Page 4: FACILITIES MANAGEMENT Results/Bid... · $4,845 $351,845: $410,127 10 : $10 $497,639: PREQUALIFIED DAILY RATE OF COMPENSATION X 10 MULTIPLIER √ $422,088. $1: ... Fredricks Electric
Page 5: FACILITIES MANAGEMENT Results/Bid... · $4,845 $351,845: $410,127 10 : $10 $497,639: PREQUALIFIED DAILY RATE OF COMPENSATION X 10 MULTIPLIER √ $422,088. $1: ... Fredricks Electric

Legal Name Registration Number County City Registration Date Expiration DateConan Construction, Inc. 1000015224 San Diego Carlsbad 7/1/2019 6/30/2022CSLB: 761852B

Subcontractors:Accurate Asphalt & Concrete 1000057580 San Diego Spring Valley 7/1/2019 6/30/2020Sperior Air 1000040104 San Diego San Diego 7/1/2019 6/30/2020Fredricks Electric 1000001118 San Diego Sam Marcos 7/1/2019 6/30/2021Arrow Automatic Fire 1000011841 San Diego Santee 7/1/2019 6/30/2020

SIO Hydraulics Prather Lab W10028013 P4S-876DIR REGISTERED CONFIRMATION