R E F E R E N D U M 2 2 0 O u r K i d s . O u r C o m m u n i t y . O u r F u t u r e . STEVE MCWILLIAMS, PRINCIPAL | YEAR OPENED: 1949 | SQUARE FOOTAGE: 529,700 Add bollards in school pick up/drop off zones Add traffic safety barriers Improve traffic circulation at pick-up/drop-off zones Replace remaining analog cameras with digital system Perform additional safety and security upgrades* *Detail not listed due to security reasons Install backup generator Make all entrances and exits ADA compliant Repair exterior doors/windows Repair masonry Replace aging HVAC units Replace water heaters Upgrade restrooms and make ADA compliant Build addition which would include: - New Student Services area (counseling, attendance, health services, dean’s office) - Additional classroom space and cafeteria improvements Build PE/Wellness addition Create architectural design work for Barrington High School Fine Arts Center Renovate Field of Dreams and varsity baseball field Replace and relocate tennis courts Replace phone system with new digital system SAFETY REPAIRS/MAINTENANCE OTHER ESTIMATED TOTAL: $62,018,256 BARRINGTON HIGH SCHOOL 616 W. Main Street | Barrington, IL 60010

Transcript of F E R E N DUM2 BARRINGTON HIGH SCHOOL 0 616 W ......616 W. Main Street | Barrington, IL 60010 R E F...

Page 1: F E R E N DUM2 BARRINGTON HIGH SCHOOL 0 616 W ......616 W. Main Street | Barrington, IL 60010 R E F E R É N D U M 2 2 0 N u e s t r o s t H i j o s. . N u e st r a Com u n i d a d

REFERENDUM 220

Our Kids. Our Community. O

ur Fut

ure.

STEVE MCWILLIAMS, PRINCIPAL | YEAR OPENED: 1949 | SQUARE FOOTAGE: 529,700

• Add bollards in school pick up/drop off zones

• Add traffic safety barriers

• Improve traffic circulation at pick-up/drop-off zones

• Replace remaining analog cameras with digital system

• Perform additional safety and security upgrades*

*Detail not listed due to security reasons

• Install backup generator

• Make all entrances and exits ADA compliant

• Repair exterior doors/windows

• Repair masonry

• Replace aging HVAC units

• Replace water heaters

• Upgrade restrooms and make ADA compliant

• Build addition which would include: - New Student Services area (counseling, attendance, health services, dean’s office) - Additional classroom space and cafeteria improvements

• Build PE/Wellness addition

• Create architectural design work for Barrington High School Fine Arts Center

• Renovate Field of Dreams and varsity baseball field

• Replace and relocate tennis courts

• Replace phone system with new digital system

SAFETY REPAIRS/MAINTENANCE OTHER

ESTIMATED TOTAL: $62,018,256

BARRINGTON HIGH SCHOOL 616 W. Main Street | Barrington, IL 60010

Page 2: F E R E N DUM2 BARRINGTON HIGH SCHOOL 0 616 W ......616 W. Main Street | Barrington, IL 60010 R E F E R É N D U M 2 2 0 N u e s t r o s t H i j o s. . N u e st r a Com u n i d a d

REFERÉNDUM 220

Nuestros Hijos. Nuestra Comunidad. N

uestro

Fut

uro.

STEVE MCWILLIAMS, DIRECTOR | AÑO CUANDO SE ABRIÓ: 1949 | PIES CUADRADOS: 529,700

• Agregar bolardos en las zonas de subida/bajada del autobús en la escuela

• Agregar barreras de seguridad vial

• Mejorar la circulación de tráfico en las zonas de subida/bajada del autobús

• Reemplazar el sistema actual análogo de cámaras con un sistema digital

• Realizar actualizaciones de seguridad adicional*

*Detalles no mencionados por razones de seguridad

• Instalar generador de respaldo

• Hacer todas las entradas y salidas complaciente a los estándares de la Ley sobre Estadounidenses con Discapacidades (ADA)

• Reparación de puertas exteriores/ventanas

• Reparación albañilería

• Reemplazar las unidades de calefacción, ventilación y aire acondicionado (HVAC) envejecidas

• Reemplazar los calefones

• Actualizar los baños y hacerlos complacientes a los estándares de la Ley sobre Estadounidenses con Discapacidades (ADA)

• Construcción de una adición que incluiría: - Nueva área de Servicios Estudiantiles (asesoramiento, asistencia, salud servicios, oficina de los decanos) - Espacio adicional de aulas y mejoras de la cafetería

• Construir una adición para Educación Física/Bienestar

• Crear trabajos de diseño arquitectónico para el Centro de Bellas Artes de Barrington High School

• Renovar el campo Field of Dreams y el campo de béisbol del equipo universitario

• Reemplazar y reubicar las canchas de tenis

• Reemplazar el sistema telefónico con un nuevo sistema digital

SEGURIDAD REPARACIONES/MANTENIMIENTO OTROS

ESTIMADO TOTAL: $62,018,256

BARRINGTON HIGH SCHOOL 616 W. Main Street | Barrington, IL 60010