F-35 Sustainmentmidwestcityok.net/tinkerandtheprimes/wp-content/uploads/2017/08/1345... · MTBM...
Transcript of F-35 Sustainmentmidwestcityok.net/tinkerandtheprimes/wp-content/uploads/2017/08/1345... · MTBM...
© 2017 Lockheed Martin Corporation
A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed Martin network.
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17
F-35 Sustainment
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17
Use or disclosure of the information contained herein is subject to the restrictions of the Cover Page TAP (22 Aug 2017) - 2
THOMAS J. “TOM” OWENVice President for Sustainment StrategiesLockheed Martin Aeronautics
Use or disclosure of the information contained herein is subject to the restrictions of the Cover Page TAP (22 Aug 2017) - 3
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17
Presentation Topics
• Program Overview
• Sustainment Fleet Growth and Performance Optimization
• Integrated Product Support– Agile Supply Chain
Use or disclosure of the information contained herein is subject to the restrictions of the Cover Page TAP (22 Aug 2017) - 4
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17
F-35 Sustainment World Wide
Supporting Over 225 F-35s at 12 Bases Today
Eglin – ITC
Luke – PTC
Beaufort – PTC
Ogden Cherry PointField Mods
Mod
s
Training Support
Supply
FleetManagement
F135 Engine
ALIS
MCAS Beaufort
MCAS Yuma
PAX NAS
Eglin AFBLuke AFB
Edwards AFB
NellisAFB
Hill AFB Aircraft Operating Bases
NAS Lemoore
Amendola
Iwakuni
Nevatim
Lemoore– PTC
Use or disclosure of the information contained herein is subject to the restrictions of the Cover Page TAP (22 Aug 2017) - 5
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17
5th Generation Performance
LO Stealth - Fighter Performance - Integrated Sensor Fusion – Net-Enabled Operations – Advanced Sustainment
Red Flag 17-1 F-35A Stats:• 90% AVA• 98.6% ME• 29 Inert Bombs Deployed• 20 to 1 Kill Ratio
Red Flag 17-3 F-35B Stats:• 107 Total Sorties• 121.6 Flt Hrs• 63.4% Mission Effective
NAS Fallon Nevada F-35C Stats:• 81% AVA• 90% ME• Permanent Component of
Top Gun Training
Later LRIPs Yielding Better Performance
2.7
3.6 3.8
4.55.0
5.5
3.23.7
4.6
7.2 7.4
8.3
0
1
2
3
4
5
6
7
8
9
LRIP 3 LRIP 4 LRIP 5 LRIP 6 LRIP 7 LRIP 8
MFH
BF (H
rs)
Planned Actuals
8 AC 11 AC 22 AC 23 AC 24 AC 29 AC
38.9% AVA54.7% MC
44.5% AVA55.2% MC
42.5% AVA53.8% MC
54.7% AVA57.7% MC
63.4% AVA69.3% MC
60.7% AVA76.8% MC F-35 Field Performance
April 2016 – March 2017
23 Jan ‘17 – 10 Feb ‘17
10 – 28 July 2017
10 – 20 April 2017
Use or disclosure of the information contained herein is subject to the restrictions of the Cover Page TAP (22 Aug 2017) - 6
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17
F-35 Sustainment Growth Through 2022Preparing for Long Haul Sustainment
0
5
10
15
20
25
0
100
200
300
400
500
600
700
800
900
1000
Operational Bases
Airc
raft
in F
ield
Sustainment Growth Through 2022
2017 2018 2019 2020 2021 20222016
*Forecasted Number
Exponential Growth Requires Focused Sustainment Approach
Fielded Aircraft
Use or disclosure of the information contained herein is subject to the restrictions of the Cover Page TAP (22 Aug 2017) - 7
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17
F-35 Sustainment Growth Through 2022Preparing for Long Haul Sustainment
0
5
10
15
20
25
0
100
200
300
400
500
600
700
800
900
1000
Operational Bases
Airc
raft
in F
ield
Sustainment Growth Through 2022
2017 2018 2019 2020 2021 20222016
697 902 1224 1609 2022 2392497PilotsMaintainers 5493 7391 10032 13184 16571 195964246
*
*
*
*
*
*
*
*
*
*
*Forecasted Number
Exponential Growth Requires Focused Sustainment Approach
OCONUS BasesCONUS BasesFielded Aircraft
Use or disclosure of the information contained herein is subject to the restrictions of the Cover Page TAP (22 Aug 2017) - 8
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17
Rapidly Expanding Government/Industry Sources of Supply and Repair
Australia EngineIDC: 20181st Induction: 2019Company: P&W / TAE
Netherlands EngineNat’l IDC: 4Q2019Regional IDC: 20201st Induction: 2019Company: LCW/StdAero
Turkey EngineIDC: 20181st Induction: 2019Company: ASMC/TEI/PW
Norway EngineNat’l IDC: 4Q2019 Regional IDC: 20201st Induction: 2019Company: AIM
Japan Engine2d Regional MROUIDC: 20221st Induction: 2022Company: IHI
Italy Airframe (F-35A/B)IDC: 20181st Induction: 2018Company: ITAF/Leonardo Co
Japan Airframe (F-35A)F-35A: NagoyaF-35B: IwakuniIDC: 2018 1st Induction: 2018Company: MHI
Australia Airframe (F-35A)Nat’l/Regional IDC: 2018Regional IDC: 20211st Induction: 2021Company: BAE - AUS
Tier 1 Components64 Assignments Made in 2016
Airframe Assignments Made in Dec 2014
Engine Assignments Made in Dec 2014
Europe WarehouseAward: TBDCompany: TBD
Pacific WarehouseAward: TBDCompany: TBD
Supply Warehouse Assignments Made in Aug 2017
OO-ALC ComponentsDP&C-1 Radome-1 Landing GearWheels & BrakesHMDS (DMCH)Canopy SystemS&RESSMSPCDSFDS
IOC: 2012Company: USG
WR-ALC Component RIOVMCGPSAMSCNIDAS WindowEODASEWCMLighting
IOC: 2013Company: USG
OC-ALC ComponentsFuel PumpsFADECActuatorsLife Support
IOC: 2016Company: USG / UTAS
FRC-SW ComponentEPG&CSEPMS EHAS P/M LEFAS
IOC: 2015Company: USG
OO-ALCOC-ALC
FRC-E Airframe (F-35B)IOC: 2013Induction: 2013Company: USG / LM
OC-ALC EngineIOC: 20151st Induction: 2015Company: USG / PW
FRC-E
FRC-SE ComponentRADAREOTSFuelAISHOTAS
IOC: 2014Company: USG
FRC-SW FRC-SE
WR-ALC
OO-ALC Airframe (F-35A/B/C)IOC: 20131st Induction: 2013Company: USG / LM
US Government CORE Workload AssignmentsSep 2008
FRC-E Lift SystemIOC: 20221st Induction: 2022Company: USG / Rolls-Royce
FRC-E ComponentsPTMSADSHydraulic Pumps
IOC: 2018Company: USG
Europe SE / ALIS / Training DevicesAward: TBDCompany: TBD
Pacific SE / ALIS / Training DevicesAward: TBDCompany: TBD
Europe Region ComponentInitial: (2022-2026)UK: RTC A, B1, B2, C, E, F, H, X, S(2026) NLD: RTC G, L
Asian Pacific Region ComponentInitial: (2026-2030)AUS: RTC A, B1, B2, C, E, F, G, H, L, S(2022)KOR: RTC X
Tier 2 Components376 Assignments To Be Made in 2018+
Use or disclosure of the information contained herein is subject to the restrictions of the Cover Page TAP (22 Aug 2017) - 9
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17
Field Performance Issues Requiring Engineering
ALIS
Training
Sustainment
Support Equipment
Supply Chain Management
Pratt & Whitney Relationship
Sustaining Engineering
Diagnostics Maintainability
Reliability
Sustainment & ModernizationThru the Life
Cycle
Taxes, Tariffs, Licensing
Single, Integrated Product Support
Systems Engineering
(Safety, Materials, Risk Mgmt, etc)
Product Development
Engineering Labs
ChiefEngineer
Air Vehicle Structures
Air Vehicle Systems & Software
OEM Sourceof
Supply
Spares and Repair
forecasting
Class II Supplier Changes
3.3 Design MTBM (80 projects)
3.12 Design MTBM (34 Projects)
2.38
1.5
2
2.5
3
3.5
6/30
/200
7
8/30
/200
7
10/3
0/20
07
12/3
0/20
07
2/29
/200
8
4/30
/200
8
6/30
/200
8
8/30
/200
8
10/3
0/20
08
12/3
0/20
08
2/28
/200
9
4/30
/200
9
6/30
/200
9
8/30
/200
9
10/3
0/20
09
12/3
0/20
09
2/28
/201
0
4/30
/201
0
6/30
/201
0
8/30
/201
0
10/3
0/20
10
12/3
0/20
10
2/28
/201
1
4/30
/201
1
6/30
/201
1
8/30
/201
1
10/3
0/20
11
12/3
0/20
11
MTB
M
Baseline Fleet Data: 11-1-06 thru 4-30-07
2.93 Design MTBM (20 Projects)
Current Reliability Improvements provide ~ ∆ .82 MTBM
0
0.5
1
Phased and Future ProjectsOther (Common Conf, DMS, etc.)RAMMP CY07Sustainment S/W ImprovementsRAMMP CY06RAMMP CY05Baseline2008 CandidatesSpec ReqrmtRoad Map MTBM2008 Candidates
2.38
3.3 Design MTBM (80 projects)
3.12 Design MTBM (34 Projects)
2.38
1.5
2
2.5
3
3.5
6/30
/200
7
8/30
/200
7
10/3
0/20
07
12/3
0/20
07
2/29
/200
8
4/30
/200
8
6/30
/200
8
8/30
/200
8
10/3
0/20
08
12/3
0/20
08
2/28
/200
9
4/30
/200
9
6/30
/200
9
8/30
/200
9
10/3
0/20
09
12/3
0/20
09
2/28
/201
0
4/30
/201
0
6/30
/201
0
8/30
/201
0
10/3
0/20
10
12/3
0/20
10
2/28
/201
1
4/30
/201
1
6/30
/201
1
8/30
/201
1
10/3
0/20
11
12/3
0/20
11
MTB
M
Baseline Fleet Data: 11-1-06 thru 4-30-07
2.93 Design MTBM (20 Projects)
Current Reliability Improvements provide ~ ∆ .82 MTBM
0
0.5
1
Phased and Future ProjectsOther (Common Conf, DMS, etc.)RAMMP CY07Sustainment S/W ImprovementsRAMMP CY06RAMMP CY05Baseline2008 CandidatesSpec ReqrmtRoad Map MTBM2008 Candidates0
0.5
1
Phased and Future ProjectsOther (Common Conf, DMS, etc.)RAMMP CY07Sustainment S/W ImprovementsRAMMP CY06RAMMP CY05Baseline2008 CandidatesSpec ReqrmtRoad Map MTBM2008 Candidates
2.38
MaturationDesign
Production
Systems Integration
All Air Vehicle & Sustainment Systems Design VSTs Accessing PHM,
Maintainability, Reliability Engineers Item Managers
Design AuthorityDiagnostics
MaintainabilityReliability
Modernization
As OEM, Lockheed Martin Works with USG To Optimize Global Fleet Support
Use or disclosure of the information contained herein is subject to the restrictions of the Cover Page TAP (22 Aug 2017) - 11
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17
Single F-35 Supply Chain for All Users:Agile Warfighter Support
DataHardware
Decisions: Sourcing /
Invest
R&MPHM
Engr Change
Field Data
Repairs
Established IT Architecture LMAero Investment in Enterprise IT HPSI Enterprise Links Critical Data
Between Supply Chain Elements— Configuration Management — Engineering Release— Gov’t Depots and OEM Suppliers
Supports F-35 A/B/C spares Training Devices Support Equip Pilot Flt Equip AME ALIS
Integrated and Cost Effective Global Supply Chain Management
Repairs / Replenishments
Mods / Upgrades
Initial Procurement
Ope
ratio
nal B
ases
INTEGRATEDItem Managers Modeling
PBA Req’tsSource of Supply
and Repair• Component OEM• Military Depots• Int’l Industry• DLA
Use or disclosure of the information contained herein is subject to the restrictions of the Cover Page TAP (22 Aug 2017) - 12
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17
Summary
• F-35 Sustainment Is Real and Delivering Success Today• Fleet Growth – Sustainment Opportunities and Challenges
– Focused on Warfighter Success
• Focused Attention on Agile Supply Chain– Government—Industry Teamwork Is Vital to F-35 Team Success
Agile and Affordable F-35 Readiness for the Warfighter
Use or disclosure of the information contained herein is subject to the restrictions of the Cover Page TAP (22 Aug 2017) - 13
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, 7-13-17