Extraction
Michael Bevins
May 17, 2007
12GeV Upgrade - Beam Transport
Injection, Linac, Extraction, & Correctors
Preliminary Design and Safety Review
Outline
• Introduction & Scope• Requirements & Specifications• New/Modified Extraction Elements/Girder Count• Beam Transport Layouts• Safety Considerations• Cost Estimates• Risk Assessment• Summary
Introduction & Scope
• The extraction region must be upgraded to support transport of higher energy beam to halls A, B, & C and 5th pass beam to the new arc 10 to support 12GeV operations
• Songsheet level machine layouts will be presented along with cost estimates
Extraction Region
Requirements & Specifications
• Alignment specs
– Quads & dipoles positioned to +/-0.5mm in x & y, +/- 1.0mm in z
• Vacuum specs
– Beam line partial pressure of hydrogen <10-6 torr
– Total average pressure of all other constituents less than 5x10-7 torr
• Fabrication, welding, cleaning & handling, and leak checking specs still apply
– 22631-S-001 Fabrication of Ultra-High Vacuum Equipment
– 22632-S-001 Cleaning and Handling of U.H.V. Components
– 22633-S-001 Welding Specification For U.H.V. Components
– 22634-S-001 Helium Leak Test For U.H.V. Components
– Note an update and modernization of our vacuum specs is underway
New/Modified Extraction Elements/Girder Count
• Preliminary - pending CASA review and more detailed vacuum study
Element Qty Element QtyQuads 4 Diagnostics
QB 1 BPM 5QC 3 Harp 1
Correctors 6 Viewer 1BM Horizontal 3 Vacuum
BM Vertical 3 Ion Pump 10Dipoles 7 Beam Valves 1
BP 7 Roughing Valve 5Septa 7
YA 4YR 3
RF Separators 5
QtyNew Quad Girders 3
Double Quad Girders 1
QB/QC 1Single Quad Girders 2
QC 2• Elements in red are part of I&C WBS
Beam Transport Layout - Extraction
Extraction Layouts – RF Separators
12GeV Configuration
Current Configuration
Relocated
New
Two new pedestal stands
Existing supports
New quad girder
New double quad girder
Extraction Layouts – RF Separators
Extraction Layouts – Septa Magnet Stacks
12GeV Configuration
Current Configuration
Relocated
New
Two new pedestal stands
YA Septa Stacks YB/YR Septa Stack
New quad girder
Two YBs
Three YRs
One relocated and one new support stand
Two new support stands
Extraction Layouts – Septa Magnet Stacks
Existing YA Septa Stack Existing YB Septa Stack
Extraction Layouts – Dipole Magnet Stacks
12GeV Configuration
Current Configuration
New Two new support stands
New BP Dipole Stack
Three BPs
Extraction Layouts – Dipole Magnet Stacks
12GeV Configuration
Current Configuration
New
Extraction Layouts – Dipole Magnet Stacks
New
New support stand
BQ/BP Dipole Stack
Three new BPs
12GeV Configuration
New pedestal for 5th pass BP downbeam support
Two existing BQs
BP Dipole Stack
New BP
Two new pedestal supports for 5th pass BP
Extraction Layouts – Dipole Magnet Stacks
Existing BP Dipole Stack Existing BQ Dipole Stack
BP Stack BQ Stack
Safety Considerations
• Personnel Training
– Jlab & sub-contractor
• Radiation
– Designated areas for containment and radiation survey of material that will be removed from the tunnel
• Material handling
– Provide provisions for lifting
• Electrical Hazards
– Package and support electronics, power leads and terminal blocks to control electrical hazards
Cost Estimates –Extraction WBS Rollup
WBS Elements I have covered today
D/PM & J Material
1.3.5 EXTRACTION 38.9 12.8 65.0 114.0 21.1 465.7 122.8 45.0 0.0 4.0
1.3.5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.01.3.5.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.01.3.5.4 LAMBERTSON 12.9 4.0 6.4 23.3 5.4 43.2 10.0 6.0 0.0 4.01.3.5.5 CHICANE 20.6 8.1 4.0 32.7 8.1 350.9 94.3 39.0 0.0 0.01.3.5.6 STANDS 5.4 0.7 54.6 58.0 7.6 71.6 18.6 0.0 0.0 0.0
TotalContingency
Total Contingency
LABOR [Man Wks] PROCUREMENTS [$k] EXPENSES [$k]
WBS ELEMENT ME MD MT Total Contingency
*
* Septa and dipole vacuum chambers
Cost Estimates - Highlighted WBS
Stands - Procurements
WBSELEMENT /Activity ID
ACTIVITY DEFINITION / SCOPE ITEMS Basis D/PM JD/PM & JTotal [$k]
1.3.5.6 STANDS 71.6 18.63 Proc Stands Matls (Stands) 11.3 3.2m Procure brackets to support (2) YAs rotated 90 degrees 800 2 1.6 eng jud 0.35 0.6m Procure brackets to support new YBs in YB/YR stack 800 2 1.6 eng jud 0.35 0.6m Procure brackets to support new YRs in YB/YR stack 1500 3 4.5 eng jud 0.35 1.6
m
Procure alignment cartridges for (5) new BPs, (1) RF sep, & (2) YAs 150 24 3.6 eng jud 0.15 0.5
5 Fab Stands (Stands) 47.8 12.0m Procure pedestal stands for RF seperators 900 2 1.8 eng jud 0.25 0.5m Procure pedestal stand for new 5th pass YA 900 1 0.9 eng jud 0.25 0.2
m
Procure vertical spt stands and floor and ceiling plates for new YA stack 5360 2 10.7 eng jud 0.25 2.7
m
Procure vertical spt stands and floor and ceiling plates for YB/YR stack 5360 2 10.7 eng jud 0.25 2.7
m
Procure vertical spt stands and floor and ceiling plates to replace upbeam stand at MQXXA01 5360 1 5.4 eng jud 0.25 1.3
m
Procure pedestal style spt stands for 5th pass BP under existing BP stack 750 2 1.5 eng jud 0.25 0.4
m
Procure vertical spt stands and floor and ceiling plates for new BP stack 5360 2 10.7 eng jud 0.25 2.7
m
Procure vertical spt stands and floor and ceiling plates for upstream support of new 3rd, 4th, &5th pass BPs 5360 1 5.4 eng jud 0.25 1.3
m
Procure pedestal style spt stand for downbeam end of 5th pass BP in BP/BQ stack 750 1 0.8 eng jud 0.25 0.2
7 Install RF Separators, Septa & Dipoles (Stands) 8.5 3.0m Procure beamline drifts, bellows,flgs for modified tubes etc. 5000 1 5.0 eng jud 0.35 1.8m Procure CF flange pair gaskets & hardware 3500 1 3.5 eng jud 0.35 1.2
ContingencyQTY
Total [$k]
PROCUREMENTS
Unit Cost [$]
Risk Assessment
• Technical - Low
– Girders & Supports – very similar designs exist and are already proven
– Vacuum - existing designs already proven, detailed vacuum analysis TBD
– Alignment - same as existing machine
• Procurement Schedule - Low
– No long-lead items identified
• Cost – Low– Good cost estimates for machined parts
• Vendor & Jlab shop budgetary estimates
Summary
• Preliminary extraction beam transport layouts and cost and installation estimates are complete based on present scope
• We are in a good position to support our DOE External Project Reviews this summer
• We will continue to work closely with our friends throughout the lab (safety, CASA, installation, vacuum, alignment, RadCon, I&C, magnet measurement, operations, procurement & facilities) as we move forward
• Detailed design will be completed to support assembly and installation schedules
• We look forward to comments & recommendations from the committee