Extended Operation Testing of Stirling Convertors in ...
Transcript of Extended Operation Testing of Stirling Convertors in ...
7/29/2008
1
Glenn Research Center at Lewis Field
Extended Operation Testing of Stirling Convertorsin Support of Stirling Radioisotope Power System
Development
100 We class Stirling
convertors
began extended operation testing at NASA Glenn Research Center (GRC) in 2003 with a pair of Technology Demonstration Convertors
(TDCs) operating in air. Currently, the number of convertors
on extended operation test has grown to 12, including both TDCs
and Advanced Stirling
Convertors
(ASCs) operating both in air and in thermal vacuum. Additional convertors
and an electrically heated radioisotope generator will be put on test in the near future. This testing has provided data to support life and reliability estimates and the quality improvements and design changes that have been made to the convertor.
The convertors
operated 24/7 at the nominal amplitude and power levels. Performance data were recorded on an hourly basis. Techniques to monitor the convertors
for change in internal operation included gas analysis, vibration measurements and acoustic emission measurements. This data provided a baseline for future comparison.
This paper summarizes the results of over 145,000 hours of TDC testing and 40,000 hours of ASC testing and discusses trends in the data. Data shows the importance of improved materials, hermetic sealing, and quality processes in maintaining convertor
performance over long life.
https://ntrs.nasa.gov/search.jsp?R=20080047358 2019-08-30T05:50:17+00:00Z
brought to you by C
OR
EV
iew m
etadata, citation and similar papers at core.ac.uk
provided by NA
SA
Technical R
eports Server
7/29/2008
2
Glenn Research Center at Lewis Field
Extended Operation Testing of Stirling Convertors in Support of Stirling Radioisotope Power System
Development
Edward J. Lewandowski, NASA Glenn Research CenterJeffrey G. Schreiber, NASA Glenn Research CenterScott D. Wilson, Sest, Inc.Salvatore M. Oriti, NASA Glenn Research CenterPeggy Cornell, NASA Glenn Research CenterNicholas Schifer, NASA Glenn Research Center
Presented at the 6th
International Energy Conversion Engineering Conference Cleveland, OhioJuly 28-30, 2008
7/29/2008
3
Glenn Research Center at Lewis Field
Outline
•
Convertors under test•
Extended operation test system
•
Test sequence•
Test results to date
7/29/2008
4
Glenn Research Center at Lewis Field
Introduction•
Convertors being developed for long duration missions of up to 14 years after 3 years of storage
•
Accelerated life tests cannot adequately quantify extended life characteristics of all components
•
Changes in performance characterized under nominal operation
7/29/2008
5
Glenn Research Center at Lewis Field
Convertors under testConvertor Testing environment Nominal Thot & Tcold
°CHours to
date Status
TDC #13 In air 650/80 38,400 Ongoing testTDC #14 In air 650/80 38,400 Ongoing testTDC #5 Thermal vacuum 630/70 10,500 Test endedTDC #6 Thermal vacuum 630/70 10,400 Test ended
TDC #15 In air 650/80 24,600 Ongoing testTDC #16 In air 650/80 24,600 Ongoing testASC-0 #1 In air and thermal vacuum 645/72 11,000 Ongoing testASC-0 #2 In air and thermal vacuum 645/72 11,000 Ongoing testASC-0 #3 In air; launch simulation 650/90 6,700 Ongoing testASC-0 #4 In air; launch simulation 650/90 6,700 Ongoing testASC-1 #3 In air 850/90 1,800 Being repairedASC-1 #4 In air 850/90 1,800 Being repaired
ASC-1HS #1 In air and thermal vacuum; launch simulation 850/90 2,200 Ongoing testASC-1HS #2 In air and thermal vacuum; launch simulation 850/90 2,200 Ongoing test
ASRG-EU, with ASC-E #2 & #3 In air; environmental testing at LM 640/90 Future test
ASC-E #1 In air; launch simulation 650/90 Future testASC-E #4 In air; launch simulation 650/90 Future test
ASC-E2 #1 In air; launch simulation Future testASC-E2 #2 In air; launch simulation Future testASC-E2 #3 In air; launch simulation Future testASC-E2 #4 In air; launch simulation Future testASC-E3 #1 In air; launch simulation Future testASC-E3 #2 In air; launch simulation Future test
7/29/2008
6
Glenn Research Center at Lewis Field
Extended operation test system•
Mounting
•
Heat source
•
Heat rejection
•
Controller
7/29/2008
7
Glenn Research Center at Lewis Field
Instrumentation•
Heater voltage, current, and power•
Heat source temperature•
Hot-end temperature•
Cold-end temperature•
Cold-end coolant inlet and outlet temperatures
•
Cold-end coolant flow rates•
Pressure vessel temperature•
Alternator RMS voltage, RMS current, and power
•
Piston amplitudes•
Helium charge pressure•
Operating frequency
•
Record saved every hour•
24-hour buffer of two-second data
7/29/2008
8
Glenn Research Center at Lewis Field
Instrumentation•
Heater voltage, current, and power•
Heat source temperature•
Hot-end temperature – high or low•
Cold-end temperature - high•
Cold-end coolant inlet and outlet temperatures
•
Cold-end coolant flow rates•
Pressure vessel temperature - high•
Alternator RMS voltage, RMS
current, and power
•
Piston amplitudes - high•
Helium charge pressure – high or low•
Operating frequency
•
Record saved every hour•
24-hour buffer of two-second data
Convertor Protection
•
Controlled shutdown when abnormal event detected
•
Uninterruptible Power Supply (UPS) for backup power
•
Backup generator
Failsafe protection circuit
7/29/2008
9
Glenn Research Center at Lewis Field
Monitoring1.
Gas analysis –
monitor for organics
2.
Vibration monitoring –
change in displacer or piston amplitude or phasing
3.
Acoustic emissions –
change in acoustic signature
4.
Heater head creep –
submicron accuracy; 0.05 µm resolution
•Acoustic emissions sensor
7/29/2008
10
Glenn Research Center at Lewis Field
Extended operation test sequence1. Instrumentation –
install thermocouples on the hot end and cold end
2. Installation –
add heat source, insulation, and other hardware3. Bake-out –
for non-hermetically sealed convertors, remove contaminants before operation
4. Thermal loss characterization –
characterize insulation heat loss to accurately calculate convertor efficiency
5. Low temperature check-out –
operate convertors at low temperature to verify sensor signals, piston amplitudes, convertor synchronization, cooling system, and other aspects of the test system
6. Full power demonstration –
document full power performance7. Extended operation8. Acceptance test and launch simulation vibration exposure9. Continued extended operation
7/29/2008
11
Glenn Research Center at Lewis Field
Acceptance test and launch simulation vibration exposure
•
Convertors on extended operation to see operational and environmental profile similar to the actual mission
•
Workmanship test•
After 5,000 to 10,000 hours, perform Acceptance Vibration test
•
Launch simulation vibration exposure–
X, Y, and Z-axes for 1 minute in each axis–
Convertor operating during vibration–
8.70 grms
flight vibration profile, modified based on dynamic testing of ASRG-EU
7/29/2008
12
Glenn Research Center at Lewis Field
Extended operation of TDCs #13 and #14•
38,400 hours (4.4 years) operation
•
Slight degradation in power and efficiency prior to 19,000 hours due to regenerator oxidation prior to hermetically sealing
•
Negligible change in performance since then•
Regular maintenance performed at 32,000 hours
0
10
20
30
40
50
60
70
80
0 10,000 20,000 30,000 40,000
Time, (hrs)
Pow
er O
utpu
t (W
)
TDC #13
TDC #14
0
5
10
15
20
25
30
35
40
0 10,000 20,000 30,000 40,000
Time, (hrs)
Effic
ienc
y (%
)
TDC #13
TDC #14
7/29/2008
13
Glenn Research Center at Lewis Field
Extended operation of TDCs #15 and #16
•
24,600 hours (2.8 years) of operation•
Operated at reduced hot-end temperature prior to hermetically sealing at 4,400 hours
•
Slight decrease in power from 6,000 to 13,000 hours•
Recent performance unchanged
0
10
20
30
40
50
60
70
80
0 5,000 10,000 15,000 20,000 25,000 30,000
Time, (hrs)
Pow
er O
utpu
t (W
)
TDC #15
TDC #16
0
5
10
15
20
25
30
35
40
0 5,000 10,000 15,000 20,000 25,000 30,000
Time, (hrs)
Effic
ienc
y (%
)
TDC #15
TDC #16
7/29/2008
14
Glenn Research Center at Lewis Field
Extended operation of TDC’s #5 and #6
•
First low-power convertors operated in thermal vacuum
•
10,016 hours between Nov. 2004 to Aug. 2006•
Steady operation; no degradation in performance
0
10
20
30
40
50
60
70
80
0 2,000 4,000 6,000 8,000 10,000
Time (hrs)
Pow
er O
utpu
t (W
)
TDC #5
TDC #6
0
5
10
15
20
25
30
35
40
0 2,000 4,000 6,000 8,000 10,000
Time (hrs)
Effic
ienc
y, %
TDC #5
TDC #6
7/29/2008
15
Glenn Research Center at Lewis Field
Extended operation of ASC-0 #1 and #2•
11,000 hours, with first 600 hours in air followed by thermal vacuum operation
•
Hermetically sealed flanges•
Some potential degradation in performance in ASC-0 #1•
Change in ASC-0 #1 performance can affect ASC-0 #2 (Change in operating frequency through zener diode controller)
•
Near future: convertors will return to in-air operation•
Convertors were built prior to Sunpower implementing their Quality Assurance system
0
10
20
30
40
50
60
70
80
0 2,000 4,000 6,000 8,000 10,000 12,000Time (hrs)
Pow
er O
utpu
t (W
)
ASC-0 #1
ASC-0 #2
7/29/2008
16
Glenn Research Center at Lewis Field
Extended operation of ASC-0 #3 and #4•
6,700 hours of in-air operation•
Gas analysis shows evolution of CO2 over the first 2,500 hours, then decrease in concentration
•
Not unexpected with adsorption from stainless steel and stainless steel-like materials
•
Gas analysis typical of other ASCs
0
10
20
30
40
50
60
70
80
0 1,000 2,000 3,000 4,000 5,000 6,000 7,000
Time (hrs)
Pow
er O
utpu
t (W
)
ASC-0 #3ASC-0 #4
0
5
10
15
20
25
30
35
40
0 1,000 2,000 3,000 4,000 5,000 6,000 7,000
Time (hrs)
Effic
ienc
y, %
ASC-0 #3ASC-0 #4
0
500
1000
1500
2000
2500
3000
0 1,000 2,000 3,000 4,000 5,000 6,000 7,000Full Temp Operation (hrs)
Con
cent
ratio
n (p
pm)
ASC-0 #3 CO2ASC-0 #4 CO2
7/29/2008
17
Glenn Research Center at Lewis Field
Extended operation of ASC-1 #3 and #4•
Product of NASA NRA development, not intended for extended operation
•
Has 850 °C-capable MarM247 heater head•
Thermal loss characterization conducted under vacuum→
damage to displacer epoxy joint
•
epoxy joint would not be used in a long life convertor•
Designed with 9 o-ring seals•
Enclosure being added to surround pressure vessel o-rings with argon
7/29/2008
18
Glenn Research Center at Lewis Field
Conclusion•
Extended operation of Stirling convertors providing valuable data to establish long life database of convertors
•
Over 185,000 hours of extended operation accumulated to date•
On track to operate 80,000 total hours in 2008 and well over 100,000 hours in 2009
•
Testing to continue, with convertors approaching
flight level quality processes in the near future
010,00020,000
30,00040,00050,00060,00070,000
80,00090,000
100,000
2003 2004 2005 2006 2007 2008*Year
Hou
rs
ASC convertorsTDC convertors
*projected
7/29/2008
19
Glenn Research Center at Lewis Field
Acknowledgment
This work was funded through the NASA Science Mission Directorate. Any opinions, findings, and conclusions or recommendations expressed
in this article are those of the authors and do not necessarily reflect the views of the National Aeronautics and Space Administration.