Objectives Marathon awarded Expro a contract to provide conveyance service for modular perforating operations with slickline on the Alba Field, off Equatorial Guinea Some of the wells were 14,000ft deep and deviated, as well as underbalanced Expro Excellence Expro’s team determined a new, larger gauge slickline wire would be required which would overcome the challenge of larger gun size and pulling wireline weights never previously attempted The very first, production and operation of the largest gauge slickline with a diameter of 0.160” was invented and installed by Expro Ran a number of 48ft, 3 3/8” perforating guns on slickline and stacked them in lengths exceeding 1,000ft Firing head was run last on the top and the guns, detonated – the same slickline wire retrieved the firing head and guns before the guns deteriorated to a dangerous condition Due to presence of CO 2 in the reservoir the wire had to be made of a particular alloy (GD 31MO) to reduce corrosion risk, however this created further challenges for the team All equipment certified for zone 1 and 2, and work was carried out to UK North Sea standards The entire operation was completed quickly - wells were perforated in underbalanced conditions Value to client Innovative approach by Expro provided Marathon with a world-first solution Saved Marathon time and money – much quicker than conventional braided line, as well as solving many of the well control issues braided wire might create Guns run faster and using less equipment Estimated savings of 25% in running costs compared to braided wire method Contact For further information, please contact: André Minnis Product Line Manager – Slickline Well Intervention [email protected] www.exprogroup.com/wellintervention Increasing the wire size created additional challenges for the Expro team: Larger pulling weights increase forces through the stuffing box back bracket Larger circumference wire required modifications for good well containment Greater friction between the wire and packings became more intense Rope socket technology had to be refined to stay with tried and tested conventional method Increased well pressure effect on larger wire cross-sections increased size and weight of tool-strings Increase equipment performance to meet larger slickline forces Increased work hardening effects on wire increase minimum radius to 20” Expro collaborated with Marathon to ensure the wire was designed correctly and operated safely to support the specifications – with a typical breaking strain of 4,400lb, the new slickline had a safe working limit of 2,640lb pulling weight, compared with 1,536lb for conventional slickline. Well Intervention / Expro Excellence Expro’s world-first, large diameter slickline installation provides innovative solution that saves Marathon time and money Well Intervention Expro Excellence exprogroup.com

Transcript of Expro Excellence Well Intervention… · 2016. 7. 19. · 1,536lb for conventional slickline. Well...

Page 1: Expro Excellence Well Intervention… · 2016. 7. 19. · 1,536lb for conventional slickline. Well Intervention / Expro Excellence Expro’s world-first, large diameter slickline

Objectives

• Marathon awarded Expro a contract toprovide conveyance service for modularperforating operations with slickline on theAlba Field, off Equatorial Guinea

• Some of the wells were 14,000ft deep anddeviated, as well as underbalanced

Expro Excellence

• Expro’s team determined a new, largergauge slickline wire would be required whichwould overcome the challenge of larger gunsize and pulling wireline weights neverpreviously attempted

• The very first, production and operation ofthe largest gauge slickline with a diameter of0.160” was invented and installed by Expro

• Ran a number of 48ft, 3 3/8” perforatingguns on slickline and stacked them inlengths exceeding 1,000ft

• Firing head was run last on the top and theguns, detonated – the same slickline wireretrieved the firing head and guns before theguns deteriorated to a dangerous condition

• Due to presence of CO2 in the reservoir thewire had to be made of a particular alloy(GD 31MO) to reduce corrosion risk,however this created further challenges forthe team

• All equipment certified for zone 1 and 2,and work was carried out to UK North Seastandards

• The entire operation was completed quickly- wells were perforated in underbalancedconditions

Value to client• Innovative approach by Expro providedMarathon with a world-first solution

• Saved Marathon time and money – muchquicker than conventional braided line, aswell as solving many of the well controlissues braided wire might create

• Guns run faster and using less equipment

• Estimated savings of 25% in running costscompared to braided wire method

ContactFor further information, pleasecontact:

André MinnisProduct Line Manager – SlicklineWell Intervention

[email protected]

www.exprogroup.com/wellintervention

Increasing the wire size created additional challenges for the Expro team:

• Larger pulling weights increase forces through the stuffing box back bracket

• Larger circumference wire required modifications for good well containment

• Greater friction between the wire and packings became more intense

• Rope socket technology had to be refined to stay with tried and testedconventional method

• Increased well pressure effect on larger wire cross-sections increased size andweight of tool-strings

• Increase equipment performance to meet larger slickline forces

• Increased work hardening effects on wire increase minimum radius to 20”

Expro collaborated with Marathon to ensure the wire was designed correctly and operated safely to support the specifications – with a typical breaking strain of 4,400lb, the new slickline had a safe working limit of 2,640lb pulling weight, compared with 1,536lb for conventional slickline.

Well Intervention

/ Expro Excellence

Expro’s world-first, large diameter slicklineinstallation provides innovative solutionthat saves Marathon time and money

Well Intervention

Expro Exce l lence exprogroup.com

WI Marathon Slickline Case Study 01/04/2015 12:06 Page 1