Masjid Annur Islamic Center EXPANSION Project Building For The Next Generation Saturday February 12 th , 2011 www.masjidannur.com 6990 65 th Street Sacramento, CA 95823

description

 

Transcript of Expansionjan2nd2011

Page 1: Expansionjan2nd2011

Masjid Annur Islamic Center

EXPANSION Project

Building For The Next Generation

SaturdayFebruary 12th , 2011

www.masjidannur.com 6990 65th Street Sacramento, CA 95823

Page 2: Expansionjan2nd2011

www.masjidannur.com 6990 65th Street Sacramento, CA 95823

Vision:“To be the minaret of Islam in the Northwest”

Goals: Education for The Next Generation

Social Programs for the Entire Family Dawa and Outreach to the Community

Specialized Youth Programs

Page 3: Expansionjan2nd2011

www.masjidannur.com 6990 65th Street Sacramento, CA 95823

EXPANSION - Why Now?

Overflowing at Jumah, Tarawweh, and Eid Prayers

- Need for social space for brothers and sisters.- Better facility for conferences and classes No adequate space for Annur Annual

Conference

A Dire Need for: Larger men’s Prayer Hall Larger sister’s prayer area Easily accessible Kitchen & Cafeteria Bookstore Larger and easily accessible babysitting rooms Youth designated game space

Page 4: Expansionjan2nd2011

EXPANSION - Why Now? Al-Arqam Islamic School (AIS):

School enrollment has been increasing rapidly at an average rate of 12%.

Currently school has 17 classrooms many of which are small for number of students.

Science and computer labs are very small

High school needs more space (classrooms)

Having boys and girls designated classes/areas for grades 5th and up.

Page 5: Expansionjan2nd2011

Proposed Floor Plans

Page 6: Expansionjan2nd2011

1st Floor Expansion

Page 7: Expansionjan2nd2011
Page 8: Expansionjan2nd2011
Page 9: Expansionjan2nd2011
Page 10: Expansionjan2nd2011
Page 11: Expansionjan2nd2011
Page 12: Expansionjan2nd2011
Page 13: Expansionjan2nd2011
Page 14: Expansionjan2nd2011

Second Floor Expansion

Page 15: Expansionjan2nd2011

2ND Floor Areas

Page 16: Expansionjan2nd2011

New Stairs Four new stairs to be added to serve school staff and students

Page 17: Expansionjan2nd2011

New Stair Enclosure

Page 18: Expansionjan2nd2011

Circulation & Corridors Will have good amount of day lighting and fresh circulating air through operable skylights

Page 19: Expansionjan2nd2011
Page 20: Expansionjan2nd2011
Page 21: Expansionjan2nd2011

Masjid Section A small area of the second floor will be dedicated to the Masjid staff and occasional Guests in addition to a janitor room and a book storage

Page 22: Expansionjan2nd2011

Administration Section Offices, nurse room and meeting room centrally located between the boys and the girls sections

Page 23: Expansionjan2nd2011

Boys Section Includes 8 classrooms, teacher room, Kitchen, restroom and storage

Page 24: Expansionjan2nd2011
Page 25: Expansionjan2nd2011

Girls Section Includes 9 classrooms, teacher room, restroom and a storage

Page 26: Expansionjan2nd2011

Shared Spaces Section Includes an Auditorium, Library, 2 Science labs, 1 computer lab,1 activity & arts room and a recourse room. In addition 2 separate stairs connecting the 2nd floor to the existing Gymnasium will be provided

Page 27: Expansionjan2nd2011
Page 28: Expansionjan2nd2011
Page 29: Expansionjan2nd2011
Page 30: Expansionjan2nd2011

Design/Plans Status Update

The design is the actual sizing and shape of the steel, electrical wiring, panel sizing, ton age of the air-conditioning units, etc…

The plans is to transfer of these design specification into the paper trail (Plan sheets).

Target date for submitting plans is end of Feb 2011

Page 31: Expansionjan2nd2011

Architectural

97% Percent of Completion.

ITEM DESIGN % PLANS %

Floor plans 100% 100%

Walls 100% 100%

Accessibility and Fire safety

100% 100%

Arch Details 90% 75%

Stairway enclosure 100% 100%

Elevators and stairways

100% 100%

Page 32: Expansionjan2nd2011

Electrical

85% percent of completion

ITEM DESIGN % PLANS%

Lighting floor 100% 75%

Canopy lighting 80% 50%

Enclosure lighting 80% 50%

Air condition electrical 100% 100%

Energy compliant 100% 75%

Page 33: Expansionjan2nd2011

Mechanical

85 % percent of completion

ITEM DESIGN % PLANS%

a/c system 100% 100%

Water and sewer 80% 50%

Energy compliant 90% 80%

Page 34: Expansionjan2nd2011

Structural

90% percent of completion

ITEM DESIGN % PLANS%

Floor plans 100% 100%

Canopy 90% (?) 100%

Stairs 80% (?) 100%

Elevator 100% 100%

Demolition 100% 100%

Page 35: Expansionjan2nd2011

www.masjidannur.com 6990 65th Street Sacramento, CA 95823

Your Role

Make sincere Duaa for Allah’s Guidance and Tawfeeq

Take ownership – this is your Masjid!

Raise awareness Invest in your Masjid Invite your family & friends

Page 36: Expansionjan2nd2011

Donate Generously

Please send your donation to:Masjid AnnurPO Box 245082Sacramento, CA 95824-5082

Or donate online securely through our website

http://www.masjidannur.com/how-donate.php

www.masjidannur.com 6990 65th Street Sacramento, CA 95823

Page 37: Expansionjan2nd2011

Jazakum Allah khair

Thank You for Your Attendance and

Participation

May Allah (azza waa jal) Guide us to the Best of

Deeds & Actions