Expansion of Aberdeen Harbour 擴展香港仔避風塘 March 2014 Paul Zimmerman District Councillor 司馬文區議員

Transcript of Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Page 1: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Expansion of Aberdeen Harbour

擴展香港仔避風塘

March 2014

Paul Zimmerman

District Councillor

司馬文區議員

Page 2: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Economic Engine since 19th Century自十九世紀的經濟動力

Page 3: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Over 10,000 related jobs提供超過一萬個就業機會

Page 4: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Sectors reliant on the Shelter依靠避風塘的行業• Ship Repairing/ Ship Building 造船及修船

• Sales of Boats 船隻銷售

• Insurance 保險

• Captains and Crew 船長及船員

• Spare parts/ Components 零件和部件

• Fishing 捕魚

• Connection services 駁艇

Page 5: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Shortage of berthing and moorings船隻停泊及繫泊位短缺At the end of 20138,491 licensed pleasure craft (Class IV); 6,536 licensed fishing and related vessels (Class III);~ 4,000 unlicensed vessels without engines

Total: Over 19,000 vessels

Total number of sheltered berthing and moorings is less than 5,000

2013年底8,491 艘遊艇(第IV類別)6,536 艘漁船及相關船隻(第IV類別)約4,000艘未有裝置引擎的船隻

總共有超過19,000艘船隻

總泊位只有5,000個

Page 6: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Aberdeen South Typhoon Shelter香港仔南避風塘• Average waiting time for a private mooring

is 66 months 私人繫泊位平均輪候時間為66個月

• 136 applications on the waiting list共有136個申請在輪候名單

Page 7: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Aberdeen West Typhoon Shelter香港仔西避風塘

• Single breakwater – limited wave attenuation, additional break water needed單一防波堤未能確船隻安全進出,需增加一條防波堤

Page 8: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Aberdeen Typhoon Shelter香港仔避風塘• Pleasure crafts start anchoring in the de-facto

fishing and commercial vessels area.Conflicts will arise.遊艇開始於「漁船及商用船隻區的區域」落錨停泊。衝突將會發生。

Page 9: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Aberdeen Typhoon Shelter Full香港仔避風塘爆滿

Page 10: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

此數字未包括深灣遊艇俱樂部的170 個泊位、未有裝置引擎的船隻、龍舟及停泊於陸上的船隻等。

This number excludes the 170 wet berths at Aberdeen Marina Club, vessels without engines, dry stacked vessels, dragon boats, etc

+ 170 = 720

Page 11: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Petition for additional moorings – April 2013業界於2013年4月的請願行動

Page 12: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Impacts 影響

• Lack of skilled labour in the ship repairing industry- potentially affecting marine safety in the long run修船業缺乏技工 - 長線影響海事安全

• Lack of skilled people in marine operations缺乏熟悉海事業的資深從業員

• Increases the costs for ordinary residents to enjoy the waters增加了普通市民出海的成本

• Chaos at the shelter during typhoon season颱風期間避風塘會出現混亂

Page 13: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Economical contribution of the existing Aberdeen shelter香港仔避風塘帶來的經濟效益

• Has Government assessed the direct and indirect economical contribution the existing Aberdeen shelter brings to the Southern District?

政府曾否評估香港仔避風塘為南區帶來的直接及間接經濟效益?

Page 14: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Feasibility study to expand Aberdeen Typhoon Shelter可行性研究 - 擴展香港仔避風塘

• Will the Government agree to commission a feasibility study to ascertain the feasibility, costs and benefits of expanding the Aberdeen Typhoon Shelters?

政府會否同意開展可行性研究,以確定擴展香港仔避風塘的可行性、成本和益處?

Page 15: Expansion of Aberdeen Harbour 擴充香港仔避風塘 31 March 2014

Tourism, recreationand water sports

遊艇、觀光及水上運動船隻

Commercial and fishing商用及漁船