Exhibit E - Downtown 360 Plan Farmers Market

download Exhibit E - Downtown 360 Plan Farmers Market

of 3

Transcript of Exhibit E - Downtown 360 Plan Farmers Market

  • 8/2/2019 Exhibit E - Downtown 360 Plan Farmers Market

    1/3

  • 8/2/2019 Exhibit E - Downtown 360 Plan Farmers Market

    2/3

    D O W N T O W N D A L L A S 3 6 0 A P A T H W A Y T O T H E F U T U R E88

    Improved crosswalks and sidewalks are also critical to ensure that traffic along

    streets like Harwood Street and Cesar Chavez Boulevard is calmed to support new

    adjacent residences.

    A key feature of the new neighborhood would be a central gathering space and

    shared-use promenade along the current right-of-way for Pearl Street between

    Young and Marilla. With the opportunity to provide a direct, dedicated and com-

    fortable connection to the Farmers Market facility, this new promenade could also

    support additional vendors or special events that could extend into the neigh-

    borhood. Similarly, Marilla would be improved to ensure a strong connection to

    Harwood where a formal gateway and future streetcar stop would be located. In

    addition, small informal open spaces currently used for Farmers Market storage

    could be retained and/or repurposed as tot lots or small gathering spaces for

    residents.

    As new development proves its success in establishing a critical mass of new

    residents and activity, additional residential and mixed-use development could fill

    in gaps to the north, connecting the Farmers Market and Main Street focus areaswith an active spine along Harwood.

    C H A P T E R V | F O C U S A R E A S

    Traditional rowhouse elements of raised stoops, visible yet private ground floors, and well-tendedlandscaping are effective ways of ensuring a safe, attractive sidewalk presence.

    Pedestrian passages, pocket parks and the central promenade should be organizing features forresidential buildings, becoming front yards while enhancing the safety and livability of Farmers

    Market.

    The new Pearl Street promenade with small retail kiosks, special streetscape design, and trafficcalming would link residences and the potential light rail station near Canton to the Farmers Marketentrance.

  • 8/2/2019 Exhibit E - Downtown 360 Plan Farmers Market

    3/3

    SHARW

    OODST

    JACKSO

    NST

    WOODST

    CANTO

    NST MA

    RILLAST

    CORSIC

    ANA

    ST

    YOUNGST

    FARM

    ERSMARKETWAY

    PARISST

    PARKAVE

    CANT

    ONST

    SCESA

    RCHAVEZBLVD

    TAYLOR

    ST

    SPEARLEX

    PY

    SHARWOODST

    Scottish RiteCathedral

    DallasFarmersMarket

    City View atFarmers Market

    CamdenFarmers Market

    DallasFarmersMarket

    City View atFarmers Market

    CamdenFarmers Market

    Scottish RiteCathedral

    Develop newmid-rise housing

    Emphasize gateway withspecial intersection andcrosswalk paving

    Improve streetscapewhile maintainingadequate truck accessfor Farmers Market

    Enhance pedestrianconnection to FarmersMarket with sharedpromenade

    Improve pedestriancirculation with new andenhanced crosswalks

    Develop newtownhouses

    Integrate potentialtransit station intoplaza/promenade

    Strengthen connection toMain Street District withstreetscape improvementsand new streetcar line

    Preserve existingbuildings and informalcommercial/open spaceuses

    Provide space forkiosks/commercial uses toactivate promenade

    TOD Potential

    Farmers Market Focus Area

    N

    0 200 400 feet100

    Revised 09-30-10

    Reproduced with permission granted by NCTCOG and the

    City of Dallas, Department of Public Works and Transportation

    Existing Building

    Proposed Building

    Potential Streetcar and Station

    Existing Park or Open Space

    Existing or Proposed Plaza

    Enhanced Street Paving

    Enhanced Crosswalks

    Recommended DART Alignment

    Alternative DART Alignment