Executive Summary for Core Network Upgrade Updated...2013/01/29 · Line Qty. Part Number...
Transcript of Executive Summary for Core Network Upgrade Updated...2013/01/29 · Line Qty. Part Number...
-
Executive Summary for Core Network UpgradeLast Updated: 1/8/2013
Attachment Description CostExhibit A Core Network Upgrade to Support Future Bandwidth Increases $428,326.86
Existing Network Equipment Trade In Potential ($43,062.00)Sub Total: $385,264.86
Attachment Description CostExhibit B M86 Web Filter Upgrade to Support Bandwidth Increases $4,734.78Sub Total: $4,734.78
Attachment Description CostExhibit C Wireless Core/Firmware/Software Upgrade $9,680.00Sub Total: $9,680.00
Sub Total: $399,679.64
Project Reserve/Change Fund of 6.5% Sub Total: $25,972.35
Total Funds Requested to Upgrade the Network Core to Support Future Bandwidth: $425,651.99
The proposed core network equipment upgrade is necessary to utilize the future increases of bandwidth for educational requirements such as BYOT and student cloud and mobile computing technologies. The location of the requested equipment will be located in the district central datacenter.
-
United Data Technologies 8825 NW 21 Terrace Do rat, Florida 33172
Tel: (305) 882-0435 Fax: www.udtonline.com
(305) 882-0436
UST Uriitf_ d Clootc3 TE chriak-3gies
Quotation No AAAQ23742
Date: Tuesday, December 11, 2012
Quoted by Jason Motter
Tel: Fax:
Quote For: Ship To:
Volusia County Schools Volusia County Schools Steve Marple Steve Marple
Tel: (386) 734-7190 Fax: [email protected] Terms:
Quotation No: AAAQ23742 for Steve Marple [email protected]
Line Qty. Part Number Description
Price Extended Price
1 2 WS-C6513-E Enh C6513 Chassis 13slot 19RU No Pow Supply No Fan Tray
$9,584.00 $19,168.00
2 2 CON-STLOC Cisco Smartnet SNT 8x5xNBD First Year Free Smartnet
$0.00 $0.00
3 4 CON-SNT-C6513E SMARTNET 8X5XNBD Enh C6513 Chassis 1- $7,738.50 $30,954.00
4 2 VS-S720-10G-3C Cat 6500 Supervisor 720 with 2 x 1OGbE and 3x1GE MSFC3 PFC3C
$22,762.00 $45,524.00
5 2 BF-S720-64MB-RP Bootfiash for SUP720-64MB-RP $0.00 $0.00
6 2 VS-F6K-MSFC3 Catalyst 6500 Multilayer Switch Feature Card (MSFC) III
$0.00 $0.00
7 2 VS-F6K-PFC3C Catalyst 6500 Sup 720-10G Policy Feature Card 3C $0.00 $0.00
8 2 VS-S720-10G Catalyst 6500 Supervisor 720 with 2 1OGbE ports $0.00 $0.00
9 2 CF-ADAPTER-SP SP adapter for SUP720 and SUP720-10G $0.00 $0.00
10 2 MEM-C6K-CPTFLIGB Catalyst 6500 Compact Flash Memory 1GB $0.00 $0.00
11 2 MEM-C6K-CPTFLIGB Catalyst 6500 Compact Flash Memory 1GB $655.91 $1,311.82
12 2 SV33AES-12233SXJ Cisco CAT6000-VSS720 IOS ADVANCED ENTERPRISE SERVICES
$8,985.00 $17,970.00
13 2 WS-SVC-ASA-SM1-K9 ASA Services Module for Catalyst 6500-E 3DES/AES $68,885.00 $137,770.00
01/08/13 Page 1
-
Quotation No: AAAQ23742 for Steve Marple SMARPLE©volusia.k12,fl.us
Line Qty. Part Number Description Price Extended Price
14 2 CON-STLOC Cisco Smartnet SNT 8x5xNBD First Year Free Smartnet
$0.00 $0.00
15 4 CON-SNT-ASASM9 SMARTNET 8X5XNBD ASA Service Module for Catalyst 6500-E
$8,475.50 $33,902.00
16 2 ASA5500-ENCR-K9 ASA 5500 Strong Encryption License (3DES/AES) $0.00 $0.00
17 2 MEM-C6K-APP-24GB Cat6500 24GB Service Module Memory $0.00 $0.00
18 2 SF-ASASM-ASDM-6.5 ASDM Software 6.5 for Catalyst 6500-E ASASM $0.00 $0.00
19 2 WS-SVC-ASA-SM1 Base ASA Services Module PID for K8/K9 $0.00 $0.00
20 2 SF-ASASM-8.5-K8 ASA Software 8.5 for Catalyst 6500-E ASASM 2 free VFW
$0.00 $0.00
21 2 ASA5500-SC-5 ASA 5500 5 Security Contexts License $2,246.25 $4,492.50
22 4 WS-CAC-4000W-US 4000 Watt AC Power Supply for US (cable attached) $2,995.00 $11,980.00
23 2 WS-C6513-E-FAN Catalyst 6513-E Fan Tray $0.00 $0.00
24 1 VS-S720-10G-3C= Cat 6500 Supervisor 720 with 2 x 10GbE and 3x1GE MSFC3 PFC3C
$22,762.00 $22,762.00
25 1 MEM-C6K-CPTFL1GB Catalyst 6500 Compact Flash Memory 1GB $655.91 $655.91
26 1 SV33AES-12233SXJ Cisco CAT6000-V55720 lOS ADVANCED ENTERPRISE SERVICES
$8,985.00 $8,985.00
27 1 CF-ADAPTER-SP SP adapter for SUP720 and SUP720-10G $0.00 $0.00
28 1 MEM-C6K-CPTFL1GB Catalyst 6500 Compact Flash Memory 1GB $0.00 $0.00
29 1 BF-S720-64MB-RP Bootflash for SUP720-64MB-RP $0.00 $0.00
30 1 VS-F6K-MSFC3 Catalyst 6500 Multilayer Switch Feature Card (MSFC) III
$0.00 $0.00
31 1 VS-F6K-PFC3C Catalyst 6500 Sup 720-lOG Policy Feature Card 3C $0.00 $0.00
32 1 VS-S720-10G Catalyst 6500 Supervisor 720 with 2 10GbE ports $0.00 $0.00
33 7 XENPAK-10GB-ER+= 10GBASE-ER XENPAK Module with DOM support $5,990.00 $41,930.00
34 12 X2-10GB-SR 10GBASE-SR X2 Module $1,195.01 $14,340.12
35 2 WS-X6704-10GE= Cat6500 4-port 10 Gigabit Ethernet Module (req. XENPAK5)
$11,980.00 $23,960.00
36 2 MEM-XCEF720-256M Catalyst 6500 256MB DDR xCEF720 (67xx interface DFC3A)
$0.00 $0.00
37 2 WS-F6700-CFC Catalyst 6500 Central Fwd Card for WS-X67xx modules
$0.00 $0.00
01/08/13 Page
-
Quotation No: AA.AQ23742 for Steve Marple SMARPLE©volusia.k12,fl.us
Line Qty. Part Number Description Price Extended Price
38 8 WS-F6K-XENBLNKCVR Catalyst 6500 Xenpak Blank Covers for $0.00 $0.00 WS-X6704-10GE
39 1 WS-X4582+E= Catalyst 4510R+E Fan Tray (Spare) $296.51 $296.51
40 1 UDT PRO SERVICES UDT Professional Services: Installation, $12,325.00 $12,325.00 Configuration, Testing, and Knowledge Transfer for the above Equipment
41 SubTotal $428,326.86
42 1 Trade-In (2) WS-X6608-T1 and (30) C1SC03661-AC -$43,062.00 -$43,062.00
43 Network Infrastructure - Equipment and Services 250-000-09-1
44 Running SubTotal $385,264.86
Sub Total $385,264.86
Sales Tax $0.00
Shipping $0.00
Total $385,264.86
Ask your UDT representative how you can save thousands using Managed Services
This quotation is in U.S Dollars. This Quotation Expires 30 days from the date shown on the first page. Please refer to the Agreement for information on Terms and Conditions governing orders, or call your salesperson for more information. United Data Technologies is an Equal Opportunity employer.
Accepted by: Date:
Please write bill to and ship to addresses below if different from quotation. Order Number:
01/08/13 Page 3
-
Submitted By:
Primary Contact: Nemo Stankovic Company: Volusia Schools Volusia Schools
Phone: 312.470.8615 Contact:
Fax: 888.822.8426 Address:
E-mail: [email protected] City/Zip
Technical Contact: Phone:
E-mail: E-mail: PAYMENT
TERMS
NET30
SUBSCRIPTION
PART # (SKU) DESCRIPTION LIST PRICE
DISCOUNT
RATE
CUSTOMER
PRICE
#
UNITS
3-Year
1 WFR-WF-700 $8,495.00 50% $4,247.50 1 $4,247.50
2 WFR-WF700-WARR-A-2 $1,274.25 70% $382.28 1 $382.28
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20 Ship 105.00$ NA NA 1 $105.00
$4,734.78
8845 Irvine Center Drive
Irvine, CA 92618 E-Mail:
TBD
PRICE QUOTATION & ORDER FORM - MULTI-YEAR UPFRONT PAYMENT
Company:
SHIP TO: BILL TO:MANUFACTURER INFORMATION:
Irvine, CA
QUOTE DATE QUOTE EXP DATETrustwave OfficeQuote ID
Contact:
Address:
City/Zip
Phone:
SHIPPING INSTRUCTIONS Total Licensed Seats
M86 Web Filter Appliance - WF700 (1 Year Parts Warranty Included) SLED
Shipping & Handling
01/08/13VOL41282-A 02/15/13
M86 Web Filter Appliance - WF700 Extended Warranty - 2 Year SLED
Payment Options You can lock in the above annual payment rate on a three of five year term. See your Sales representative for details.
Notes: To place your order fax a signed copy of this form to your Trustwave Sales Representative at 949-932-1072 or e-mail to [email protected] and return the original to the Trustwave Accounting Department at the address shown on this form. Products are licensed for use at the customer’s installation address only unless otherwise specified. Product licenses are not transferable. This quote may not include any state or local taxes (if applicable), shipping charges or travel and living expenses. Payment of all applicable taxes, shipping charges, travel expenses and living expenses directly related to the delivery of the products and services included in this quote are the responsibility of the Customer. Your Purchase Order must reference the Quote ID shown on this form and/or explicitly state your organizations intention to pay all applicable taxes, shipping charges, travel expenses and living expenses directly related to the delivery of all products and services ordered (unless specifically stated otherwise on this document). Trustwave offers a 30-day money back guarantee for our solution. If you have any technical issues that prevent our solution from working within your network, please request an RMA
via an email to [email protected] prior to 30 days from your acceptance of this quote.
Customer PO # (if utilized): _______________________________
Acceptance of Quotation:
Signature _________________________________________ Date _____________________
Printed Name ______________________________________ Title ____________________
Credit Card Payment: Paying By Credit Card: Invoice Required For Payment:
Yes No
No Yes
Quote
Trustwave - Proprietary and Confidential 1 of 1
8845 Irvine Center Drive Irvine, CA 92618 949.932.1072 (F)
Trustwave Quote Tool - 1/8/2013
WF700 Volusia Schools 01.08.12
-
Proprietary and Confidential Page 1
g Version 1.6, Template 121211-120320 Drafted by Megan Finnerty
STATEMENT OF WORK
Project Name: ACS Infrastructure Migration Sales Contact:
Kim Lee
727.797.0782
Customer Name: Volusia County Schools
CDW Affiliate: CDW Government LLC
Effective Date: January 3, 2013 Solution Architect:
Albert Nelson Version: 1.6
This statement of work (“Statement of Work” or “SOW”) is made and entered into this January 3, 2013 (the “Effective
Date”) by and between the undersigned, CDW Government LLC (“Provider”, “Seller” and “we”) and Volusia County
Schools (“Customer” and “you”).
PROJECT DESCRIPTION
PROJECT SCOPE
Seller will migrate three (3) existing Cisco Access Control Server (ACS) 1113 (version 4.2) appliances to three (3) Cisco
Access Control Server (ACS) 1121 (version 5.2) appliances at the Deland facility. The ACS Servers will provide TACACS+
and RADIUS services communication with the network devices, and it will reference the existing Active Directory for
username and password management. Cisco ACS implementation will include the following steps.
Implement a total of three (3) ACS 5.2 1121 appliances.
Migrate the database from the existing primary Cisco Access Control Server (ACS) 1113 (version 4.2) appliance to
primary Cisco Access Control Server (ACS) 1121 (version 5.2) appliance
Integrate with Windows AD for User Name and Password Management
Confirm successful migration of user profiles, and assign device groups
Confirm successful migration configuration of templates for all managed devices (Routers, Switches, APs)
Contrast and compare rule sets between versions 4.2 and 5.2
Additional steps for this project include:
Replication of settings, profiles, groups, etc., from primary ACS Server to secondary servers
Document any errors or bugs within the application software during the migration process
ACS REPLICATION SERVICES
Database replication helps make the authentication, authorization, and accounting (AAA) environment more fault tolerant. It
also duplicates parts of the primary server setup to one (1) or more secondary servers, to help create mirror systems of the
Cisco Access Control Server. AAA clients can be configured to use these secondary servers if the primary server fails or is
unreachable. If a secondary server database is a replica of the primary server database, and the primary server goes out of
service, incoming requests are authenticated without network downtime. This happens provided that the AAA clients are
configured to failover to the secondary server.
The primary ACS server will be configured with all of the secondary servers that it will replicate with. Replication can be
done manually or it can be a scheduled process. The primary ACS server is the only server that can schedule replication
times. As noted below, replication is not bi-directional so only the primary server will send data to the secondary servers.
Clients and devices that use ACS for AAA (Authentication, Authorization, Accounting) services will need to have ACS
groups configured to list primary and secondary servers to use. If a primary server fails, the clients will use the next ACS
server that is configured on the list. Client connections will never load-balance or load-share with Customer’s ACS group list.
-
Proprietary and Confidential Page 2
g Version 1.6, Template 121211-120320 Drafted by Megan Finnerty
IMPLEMENTATION CONSIDERATIONS
Consider these points when the Cisco Secure database replication feature is implemented:
ACS only supports database replication to other ACS servers. All ACS servers that participate in Cisco Secure
database replication must run the same version and patch level of ACS.
The primary server transmits the compressed, encrypted copy of its database components to the secondary server.
This transmission occurs over a TCP connection, with port 2000. The Transmission Control Protocol (TCP) session
is authenticated and uses an encrypted, Cisco−proprietary protocol.
AAA Servers list under Replication Partners, on the Cisco Secure database replication page.
The primary server must be configured as an AAA server and must have a key. The secondary server must have the
primary server configured as an AAA server and its key for the primary server must match the primary servers own
key.
Replication to secondary servers takes place sequentially in the order listed in the Replication list under Replication
Partners, on the Cisco Secure database replication page.
The secondary server, which receives the replicated components, must be configured to accept database replication
from the primary server. To configure a secondary server for database replication, refer to the Configuring a
Secondary Cisco Secure ACS Server section of this document.
ACS does not support bi−directional database replication. The secondary server, which receives the replicated
components, verifies that the primary server is not on its Replication list. If not, the secondary server accepts the
replicated components. If so, it rejects the components.
ACS Servers that are behind NAT devices could cause replication issues as replication keys can become corrupted.
To replicate user−defined RADIUS vendor and vendor−specific attribute (VSA) configurations successfully, the
definitions to be replicated must be identical on the primary and secondary servers. This includes the RADIUS
vendor slots the user−defined RADIUS vendors occupy. For more information about user−defined RADIUS
vendors and VSAs, refer to the User−Defined RADIUS Vendors and VSA Sets section of the document Cisco
Secure ACS Command−Line Database Utility.
PREREQUISITES
Ensure that Customer meets these requirements before you attempt this configuration:
All appliances must use the same version of Secure ACS software and patch levels.
TCP port 2000 (destination port used for replication) must not be blocked anywhere along the path between the ACS
servers.
Ensure that remote access to the Secure ACS user interface uses TCP port 2002. For example, https://ipaddress:2002
Note: If you use Microsoft Internet Explorer Version 6.0 in order to access the Secure ACS HTML user interface,
ensure that your browser meets these requirements:
○ Microsoft Windows Service Pack 1 (English and Japanese language versions)
○ Microsoft Java Virtual Machine (JVM) version 5.00.3810
○ Sun Java plug−in version 1.5.
Network and Port Requirements
○ For full TACACS+ and Radius support on Cisco IOS devices, AAA clients must run Cisco IOS Release
11.1 or later
○ Non-Cisco IOS AAA clients must be configured with TACACS+, RADIUS, or both
○ Dial-in, VPN, or Wireless clients must be to connect to the applicable AAA clients.
○ Active Directory Users require that Dial-In permissions be selected for authentication to work.
https://ipaddress:2002/
-
Proprietary and Confidential Page 3
g Version 1.6, Template 121211-120320 Drafted by Megan Finnerty
○ Ports that ACS Listens To:
▪ RADIUS authentication and authorization – UDP 1645, 1812
▪ RADIUS accounting – UDP 1646, 1813
▪ TACACS+ - TCP 49
▪ Cisco Secure Database Replication – TCP 2000
▪ RDBMS Synch with Synch partners – TCP 2000
▪ User-Changeable Password web application – TCP 2000
▪ Logging – TCP 2001
▪ Administrative HTTP port for new sessions – TCP 2002
▪ Administrative HTTP port range – TCP Configurable 1024 – 65535
MIGRATE ACS SERVER 4.2 TO 5.2
Seller will migrate the database from the existing primary Cisco Access Control Server (ACS) 1113 (version 4.2)
appliance to primary Cisco Access Control Server (ACS) 1121 (version 5.2) appliance
Seller to help migrate templates for AAA configuration on Cisco Devices
Test user authentication if users exist in current database or create user
On Primary ACS Server, Seller will add Secondary Server to Network Configuration
On Primary ACS Server, Seller will add Secondary Server to Replication Server List
On Primary ACS Server, Seller will configure Replication Schedule
On Secondary ACS Server, Seller will configure Replication information.
On Primary ACS Server, Seller will force a replication to Secondary ACS Server.
Seller will verify replication logs and verify groups, users, and settings match.
Seller will add any configurations that did not migrate
Seller will repeat ACS implements for all additional Secondary ACS Servers.
Seller will add all Secondary Servers to Primary ACS Server.
Seller will perform a manual replication process to all Secondary ACS server and review logs to ensure replication
is successful.
Seller will modify AAA configuration template for Cisco devices
Seller will test user connectivity to one (1) Cisco Device and test Wireless authentication.
Seller and Customer will perform a failover test ensure users authenticate to Secondary ACS Server.
CUTOVER AND “FIRST DAY OF SERVICE”
This phase involves the cutover of the ACS appliance from a testing environment into a production environment. One (1)
hour of network access device downtime will need to be scheduled.
Once the system implementation activities as defined in the previous sections are complete, production cut-over to the new
system will take place and Seller will monitor the production system, and track and resolve incidents at the Deland, FL
location.
Once the new ACS Appliances are in production and first day issues have been resolved, Customer will move into a Support
Phase.
DAY TWO SUPPORT
Seller will provide Day Two Support for three (3) business days via remote support available Monday through Friday, 8:00
AM to 5:00 PM Eastern Time with a Next Business Day response window.
POST-CUTOVER SUPPORT AND PROJECT CLOSE
Seller will transition your support documentation to your System Administration staff. Additionally, the Seller Project
Manager will schedule a project closeout meeting.
-
Proprietary and Confidential Page 4
g Version 1.6, Template 121211-120320 Drafted by Megan Finnerty
Seller will provide final project documentation and a project close out meeting.
CUSTOMER RESPONSIBILITIES
1. Customer will make sure that all users using ACS will have ‘Grant Dial-In Permissions” under Users Settings in
Windows
2. Customer should choose one (1) device to configure AAA services for testing.
3. Provide IP addresses for the new appliances. 4. Provide workstation or server to access the Internet for downloads from Cisco site to apply to servers. 5. Active SMARTnet coverage for the Cisco Access Control Server (ACS) appliances
OUT OF SCOPE
1. Any changes needed to the Windows AD servers.
2. Any re-configuration or re-design of network access devices.
Services not specified in this SOW are considered out of scope and will be addressed with a separate SOW or Change Order.
ITEM(S) PROVIDED TO CUSTOMER
The following will be provided to Customer by the completion of this project.
Table 1 – Items(s) Provided to Customer
Item Description Format
Report Will provide detailed documentation of the migration process and project documentation. PDF
PROJECT SCHEDULING
Customer and Seller, who will jointly manage this project, will together develop timelines for an anticipated schedule
(“Anticipated Schedule”) based on Seller’s Project Management Methodology. Any dates, deadlines, timelines or schedules
contained in the Anticipated Schedule, in this SOW or otherwise, are estimates only, and the Parties will not rely on them for
purposes other than initial planning. Work will be performed onsite and scheduled within a 3-5 day effort, under the current
scope and assumptions.
PROFESSIONAL SERVICES FEES
The total fees due and payable under this SOW (“Total Fees”) include both fees for Seller’s performance of work
(“Consultant Fees”) and any other related costs and fees specified in the Expenses section (“Expenses”). Unless otherwise
specified, taxes will be invoiced but are not included in any numbers or calculations provided herein.
Customer will be invoiced for the Total Fees.
CONSULTANT FEES
Consultant Fees hereunder are FIXED FEES, meaning that Customer will be billed for this precise amount, as specified below,
in addition to the amount of the Seller Expenses.
CONSULTANT FEES
Seller will invoice Customer for Consultant Fees upon completion of certain Project Milestones according to the applicable
percentage of the Consultant Fees amount, as specified in Table 2.
-
Proprietary and Confidential Page 5
g Version 1.6, Template 121211-120320 Drafted by Megan Finnerty
Table 2 – Project Fees
Milestones Percentage of
Consultant Fees Fees
Signed SOW 50% $4.840.00
Project Completion 50% $4,840.00
Totals 100% $9,680.00
EXPENSES
Neither travel time nor expenses will be billed to the Customer for this project.
CUSTOMER-DESIGNATED LOCATIONS
Seller will provide Services benefiting the locations specified on the attached Exhibit (“Customer-Designated Locations”).
PROJECT-SPECIFIC TERMS
1. Customer is responsible for providing all physical and communications access, privileges, environmental conditions,
properly functioning hardware and software, qualified personnel, project details, material information,
decisions/directions, and personnel and stakeholder interviews that are reasonably necessary to assist and
accommodate Seller’s performance of the Services (“Customer Components”).
2. Seller is not responsible for delays in performance directly caused by the unavailability of the Customer
Components and will have the right to invoice Customer, with prior written notice, for time Seller personnel is
thereby idled or to reassign Seller personnel to work unrelated to this SOW and the services hereunder.
3. Customer will provide in advance and in writing, and Seller will follow, all applicable Customer safety and security
rules and procedures.
4. Customer will secure and maintain the confidentiality of all Seller personnel information.
5. When Services are performed at a Customer-Designated Location, the site will be secure; Seller is not responsible
for lost or stolen equipment.
6. This SOW can be terminated by either party without cause upon at least fourteen (14) days’ advance written notice.
-
Proprietary and Confidential Page 6
g Version 1.6, Template 121211-120320 Drafted by Megan Finnerty
SOW TERMS AND CONDITIONS
CONTACT PERSON(S)
Each Party will appoint a person to act as that Party’s point of contact (“Contact Person”) as the time for performance nears,
and will communicate that person’s name and information to the other Party’s Contact Person. The Customer Contact Person
is authorized to approve materials and Services provided by Seller, and Seller may rely on the decisions and approvals made
by the Customer Contact Person (except that Seller understands that Customer may require a different person to sign any
Change Orders amending this SOW). The Customer Contact Person will manage all communications with Seller, and when
Services are performed at a Customer-Designated Location, the Customer Contact Person will be present or available.
The Parties’ Contact Persons shall be authorized to approve changes in personnel and associated rates for Services under this
SOW.
PAYMENT TERMS
Except as otherwise agreed by the Parties, customer will pay invoices containing amounts authorized by this SOW within
thirty (30) days of receipt. Any objections to an invoice must be made to the Seller Contact Person within fifteen (15) days
after the invoice date.
EXPIRATION AND TERMINATION
This SOW expires and will be of no force or effect unless it is signed by Customer, transferred in its entirety to Seller so that
it is received within thirty (30) days from the date written on its cover page, and then signed by Seller, except as otherwise
agreed by Seller.
CHANGE ORDERS
This SOW may be modified or amended only in a writing drafted by Seller, generally in the form provided by Seller and
signed by both Customer and Seller (“Change Order”). Each Change Order will be of no force or effect until signed by
Customer, transferred in its entirety to Seller so that it is received within thirty (30) days from the date on its cover page and
then signed by Seller, except as otherwise agreed by Seller.
In the event of a conflict between the terms and conditions set forth in a fully-executed Change Order and those set forth in
this SOW or a prior fully-executed Change Order, the terms and conditions of the most recent fully-executed Change Order
shall prevail.
-
Proprietary and Confidential Page 7
g Version 1.6, Template 121211-120320 Drafted by Megan Finnerty
MISCELLANEOUS AND SIGNATURES
This SOW shall be governed by Seller’s “Terms and Conditions of Product Sales and Service Projects”, accessed via the
“Terms & Conditions” link at www.cdwg.com (the “Agreement”). If there is a conflict between this SOW and the
Agreement, then the Agreement will control, except as expressly amended in this SOW by specific reference to the
Agreement. References in the Agreement to a SOW or a Work Order apply to this SOW. This SOW and any Change Order
may be signed in separate counterparts, each of which shall be deemed an original and all of which together will be deemed
to be one original. Electronic signatures on this SOW or on any change Order (or copies of signatures sent via electronic
means) are the equivalent of handwritten signatures. This SOW is the proprietary and confidential information of Seller.
In acknowledgement that the parties below have read and understood this SOW and agree to be bound by it, each party has
caused this SOW to be signed and transferred by its respective authorized representative.
CDW Government LLC Volusia County Schools
By:
signature
Name:
Title:
Phone:
E-mail:
Date:
Mailing Address:
230 N. Milwaukee Ave.
Vernon Hills, IL 60061
By:
signature
Name:
Title:
Phone:
E-mail:
Date:
Mailing Address:
Street:
City/ST/ZIP:
Billing Contact:
Street:
City/ST/ZIP:
A purchase order for payment under this SOW is attached.
A purchase order is not required for payment under this SOW.
Seller Services Manager 110501 Standard
-
Proprietary and Confidential Page 8
g Version 1.6, Template 121211-120320 Drafted by Megan Finnerty
EXHIBIT A.
CUSTOMER-DESIGNATED LOCATIONS
Seller will provide Services benefiting the following locations (“Customer-Designated Locations”).
Table 3 – Customer-Designated Locations
Location(s) Service(s)
Volusia County Schools -Data Center
200 North Clara Ave
Deland, FL 32720
Assessment
Configuration
Design
Implementation
Project Management
Staff Augmentation
Support
Training
Custom Work