Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP...
Transcript of Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP...
ARENDAL
Execution you can trust
March, 2016
COMPANY OVERVIEW
MANAGEMENT TEAM
ONGOING PROJECTS
INDEX
OUR EXPERIENCE
Company
Overview
COMPANY OVERVIEW
Arendal is a company
specialized in solution design
based in Monterrey, founded in
1995 with a solid corporate
governance.
One of the most important
Mexican EPC Companies with an
exceptional track record as well as
vast experience in complex
projects for oil and gas,
infrastructure, and power.
Specialized in the development
of energy projects with presence
in all oil & gas value chain:
Upstream, Midstream, Onshore/
Offshore and Downstream
100 + Projects executed
throughout Mexico since its
inception, all of them finished on time
and within budget scopes. Access to
innovative construction methods and
focus on efficiency and last
generation equipment
UPSTREAMArendal provides services throughout the energy sector,
based on its high capabilities of execution of complex
projects.
Experience in the development of infrastructure investment
projects such as the construction of a Federal penitentiary
in Mexico.
ONSHORE Production facilities of oil
and gas
OFFSHORE IMR (Inspection,
Maintenance & Repair)
Subsea pipeline
construction
Shore approaches
Specialized diving
Offshore topside works
UPSTREAM
Compression Stations
Pumping Stations
Directional Drilling
(HDD)
Gas pipelines
Oil pipelines
Water pipelines
Storage tanks
MIDSTREAM
Refining
Petrochemical
DOWNSTREAM
Penitentiaries
Hospitals
Civil Works
Water treatment
plants
INFRASTRUCTUREPOWER
GENERATION
Generation plants
Transmission and
substations
— BUSINESS SEGMENTSCOMPANY OVERVIEW
Management Team
Carlos Sandoval
Commercial VP
Gabriel García
Onshore Construction VP
Domingo Chin
Offshore Construction VP
Samuel Ronquillo
HSEQ & Innovation VP
Sergio Cavuoto
Proposal VP
Adrián García Pons
Co-President
Jesús García Pons
Co-President
Jesús García Vázquez
Chairman of the Board
Establishment of the Codes of Conduct
COMPONENTS
CORPORATE GOVERNANCE
Shareholders
BoardManagement
Team
Inform regularly
Supervise
Institutionalizing best practices in formal and
structured processes, policies and procedures that
clearly establish empowerment and authority limits
(the rules)
Represent a mechanism of check and balances in
ArendalAnalyzing our risks and the industry risks and define the
action plan for mitigation or elimination
Ongoing
Projects
ONGOING PROJECTS (BACKLOG)
UPSTREAM MIDSTREAM DOWNSTREAM
PROJECT
DESCRIPTION
PARTNER
CLIENT
LAKACH RAMONES II NTEULTRA LOW
SULFUR DIESEL
• EPC• Gas gathering
plant• 450 MMSCF
• $200 MMUSD
• PEMEX
• EPC• Gas pipeline• 42” x 452 km
• $ 1,000 MMUSD
• Odebrecht
• Techint
• PEMEX
• AMEC FW
• Revamp Plants: 4 Plants
• New construction: 3 plants
• OSBL• $ 1,100 MMUSD
• TAG Pipelines
ATASTA
• PC• Gas processing
plant reconfiguration
• $40 MMUSD
RAMAL TULA MORELOS MINATITLÁN
• EPC• Plant Modernization
• $ 116 MMUSD
• PEMEX
• Construction• Gas pipeline• 30” x 15 km
• $ 31 MMUSD
• Bonatti
• Morelos EPC• ATCO• PEMEX
• Construction• Gas pipeline• 30” x 171 km
• $ 97 MMUSD
ACTUAL
PROGRESS• 31% • 2%• 99% • 85%• 100%• 90%• 98%
Our Experience
Diesel with 15PPM
of sulphur dioxide
3 HDDARENDAL EXPERIENCE— PLANTS
Ultra Low
Sulphur Diesel
Plant Salina Cruz
Client: Pemex
500 MMSCFDGas Collection
Station Lakach
Client: Pemex
30,250
BPD
Catalytic
Reforming Plant
Minatitlán
Client: Pemex
Atasta Gas
Plant
Client: Pemex
450
MMSCFD
Combined Cycle
Power Plant
Cantarell
Client: LINDE
70
Mw
543
Mw
Combined Cycle
Power Plant
Valladolid III
Client: Mitsui, Calpaine, Toshiba
540
Mw
Client: ABB
Combined Cycle
Power Plant
Monterrey II
Combined Cycle
Power Plant
Rosarito III
Client: ABB
584
Mw
EPC
Turbogenerator
SalamancaClient: Pemex
22
Mw
POWER GENERATION
OIL & GAS
13,000
hp.
Compressor Station
Los Algodones 580
MMSCFD
Client: Bajanorte
6,130
hp.
Compressor
Station Mayakan
300 MMSCFD
Client: Energía Mayakan
7,000
hp.
Compressor
Station Rosarito
212 MMSCFD
Client: TGN-Sempra
123,000
hp.
2 Compressor
Stations Los
Ramones II Norte
Client: TAG Pipelines
COMPRESSOR STATIONS
3 HDD
EXECUTION YOU CAN TRUST
Gas Pipeline
Los Ramones
II NorteClient: TAG Pipelines
42” x 452
km
30” x 15
kmGas Pipeline
Ramal-Tula
Client: ATCO
30” x 160 km
Client: Enagas
Gas Pipeline
Morelos 30” x 80 km
Client: Gaz de France
Gas Pipeline
Mayakan36” x 27
kmClient: Pemex
Gas Pipeline
Trinidad/Cact
us
Internal
Distribution
Head PipelineClient: Pemex
36” 16” x 54
km
Oil-Gas
Pipeline
Luna/Oxiacaq
ueClient: Pemex
18” x 56
km
Client: Pemex
Oil Pipeline
Oxicaque48” x 12
km
Client: API Altamira
Gas Pipeline
Altamira
48” x 1.3
km
Client: Pemex
Line
Construction
TMDB
Gas Pipeline
Burgos-Monterrey
(GLP)Client: TDF
12” x 180
km
30” x 130
km
Kinder
Morgan
PipelineClient: Kinder Morgan
6” x 6.8
km
Client: Pemex
Nitrogen
Pipelines
ARENDAL EXPERIENCE— PIPELINES
Infrastructure
Construction
SL-7Client: Pemex
20” x 28
km
• “La Trinidad”: 1,633 meters
• Samaria River : 1,065 meters
• Villahermosa – Cárdenas Highway : 942
meters
• Carrizal: 552 meters
• Mona (Reg. Line + Alternate line): 1,609
meters
• San Juan River (Reg. Line + Alternate
line): 1,149 meters
• Mezcalapa River (Reg. Line + Alternate
line): 814 meters
Cactus Project
36”x 11,409
• Ixhuatlan: 1,170 meters
• Coatzacoalcos – Carretera
Villahermosa : 1,662 meters
• Marine: 1,520 meters
• La Sierra River : 455 meters
• La Sierra Creek: 450 meters
• Teapa River : 430 meters
• Tepate River : 459.6 meters
• Teapa River : 515 meters
• Pichucalco River : 1,000 meters
• San Juan River : 780 meters
• Cabezones River : 700 meters
10 HDD
Saline Water Project
30”x 4,3523 HDD
Mayakan
30”x 3,309.66 HDD
Los Ramones II Nte
42”x 1,480 2 HDD
EXECUTION YOU CAN TRUST
ARENDAL EXPERIENCE— HDD
3 HDD
EXECUTION YOU CAN TRUST
Ayatsil Lines 4&9
(2 pipelines)
Client: Pemex
20” & 10”
x 8.3 km
20” x 46
kmAyatsil Line 7
Oil Pipeline
Client: Pemex
8” x 12
km
Client: Pemex
Taratunich
Gas Pipeline
20” x 7.8
km
Client: Pemex
Onel Pipeline 8” x 11.4
km
Client: Pemex
Batab Pipeline
Kuil Pipeline
Client: Pemex
20” x 3.5
km
20” x 14
kmXanab -
Yaxche
Client: Pemex
20-24” x
24 km
Client: Pemex
Kumaza - J
(5 pipes)
12-24” x
10 km
Client: Pemex
Kumaza - F
(6 pipes)
10-24” x
30 km
Client: Pemex
Costero - May
(4 pipes)
Kuil Oil
Pipeline
Client: Pemex
20” x 3.5
km
20” x 28
km
Saline Water
Pipeline
Client: Pemex
24” HDPE
Client: Pemex
Marine
Diffuser
ARENDAL EXPERIENCE— OFFSHORE
3 HDD
EXECUTION YOU CAN TRUST
ARENDAL EXPERIENCE— OFFSHORE
TEXAS TOBALA
Positioning System: DP2
Length Overall: 102.7m
Breadth: 19.5m
Diving System: Saturation (15)
Hyperbaric Boat
Main Crane: 133 ton
Auxiliary Crane: 48 ton
Accommodation: 96 persons
Deck Space: 2,132 m2
Helideck: Sirkorsky S-76/61
“Campus” design style
5 modules for medium and low security
Used land area: 86 hectares
Capacity for 2,500 inmates and 1,500 guards
95,500 m2 of construction
3 HDD
FEDERAL PENITENTIARY 2,500 inmates
MAIN FACTS
EXECUTION YOU CAN TRUST
ARENDAL EXPERIENCE— INFRASTRUCTURE
WATER TREATMENT PLANT 20,000 BPD
MAIN FACTS
Procurement and construction of a wastewater treatment
plan
20,000 BPD capacity for water injection wells
Located in The Sierra Madre mountains
VOLUNTEERING
GREEN PROGRAM
SPECIALIZED TRAINING CENTER
We work closely with
our clients to attend
community needs during
the project execution.
As part of our
HESQ system, we
enable environmental
crews that take care
of the living species
found in the project
area.
LOCATION: Salina Cruz, Oaxaca, México
(ULSD Project)
DESCRIPTION: Training center
specialized in welding discipline, supported
by the AWS (American Welding Society).
We, Arendal, believe that by providing
training and career opportunities, we give the
communities the ability to generate income in
a sustainable manner.
SOCIAL RESPONSIBILITY
ENVIRONMENTAL HEALTH AND
SAFETY MANAGEMENT
SYSTEM
Safety
induction
program
Wildlife: rescue &
relocalization
Restitution of
endemic species
Control & storage
of dangerous or
hazardous material
Continuing
Education
CERTIFICATIONS
Continuous improvement,
customer satisfaction, effective
documentation & production
qualityCreate a culture of
“care & concern”
Zero incident
OBJECTIVES
*LTI May 2016/May 2015
HSEQ SYSTEM
Internal safety &
environmental campaigns
PERFORMANCE 2016
*LTI May 2016/May 2015
TRIR: Total Recordable Incidents Rate
HSEQ SYSTEM
0.00
0.50
1.00
1.50
2.00
2.50
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
TRIR 2016
TRIR
2016 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hours worked 384,520 344,829 368,996 283,138 313,690 378,982 491,121 659,470 647,715 614,689 727,961 586,620
Number of OSHA Recordable Incidents
3 2 2 2 2 5 4 10 9 7 7 4
Total Hours Worked 384,520 729,349 1,098,345 1,381,483 1,695,173 2,074,155 2,565,276 3,224,746 3,872,461 4,487,150 5,215,111 5,801,731
Total Number of OSHA Recordable Incidents
3 5 7 9 11 16 20 30 39 46 53 57
TRIR 1.56 1.37 1.27 1.30 1.30 1.54 1.56 1.86 2.01 2.05 2.03 1.96