EW Luan Nguyen
-
Upload
binh-nguyen -
Category
Documents
-
view
230 -
download
0
Transcript of EW Luan Nguyen
-
7/29/2019 EW Luan Nguyen
1/47
-
7/29/2019 EW Luan Nguyen
2/47
s u s t a i n a b I l I t y
Consultant Defined System Parameters
PLANT REFRIGERATION CAPACITY 2,700 ton (9,500 kW)
CHILLED WATER DISTRIBUTION 12.2C Evaporator EWT 6.7C Evaporator LWT 37.2C Condenser LWT
31.7C Condenser EWT
-
7/29/2019 EW Luan Nguyen
3/47
s u s t a i n a b I l I t y
The First Step...The First Step...
-
7/29/2019 EW Luan Nguyen
4/47
s u s t a i n a b I l I t y
If one chiller is fault, remain 50% load ?
Chiller must be off 2 compressor when it is serviced,
proper evacuation of a refrigeration
system is practically impossible with
active chilled-water flow
-
7/29/2019 EW Luan Nguyen
5/47
s u s t a i n a b I l I t y
The Next Step...The Next Step...
-
7/29/2019 EW Luan Nguyen
6/47
s u s t a i n a b I l I t y
Evaluated Pumping Systems
Primary/Secondary System
Variable Primary Flow System
Conclusion: VPF proves best life cycle value
Fewer pumps
Reduced plumbing connections
Reduced electrical connections
Slight Increase in VFD costs
Greatly reduced pump operating costs
-
7/29/2019 EW Luan Nguyen
7/47
s u s t a i n a b I l I t y
Use Low Flow, Low Temperature,High Efficiency Systems
+/+/--$$
air handlers
+/+/--$$
+/+/--$$controls
chillers
+/+/--$$piping
~/~/$$
ductwork
~/~/$$
Earthwise can help the
owner not only reduce
first cost, it is also
saving operating cost
TheThe 3th3th Step...Step...
-
7/29/2019 EW Luan Nguyen
8/47
s u s t a i n a b I l I t y
8.0
ASHRAE Standard 90.1
C
hillerefficiency
,COP
6.0
4.0
2.0
0.0best
available
Centrifugal>600 tons
Screw
150-300 tonsScroll
-
7/29/2019 EW Luan Nguyen
9/47
s u s t a i n a b I l I t y
Cool More or Pump More?
Pump efficiency 70%
COP 0.7
Chiller COP 7.0
Chiller COP 10x the pump COP
Conclusion work your most efficientequipment harder
-
7/29/2019 EW Luan Nguyen
10/47
s u s t a i n a b I l I t y
How ?
Leaving condenser watertempature
Leaving Chilled watertemperature
Flow rates Towers
Pumps
Piping
Valve
-
7/29/2019 EW Luan Nguyen
11/47
s u s t a i n a b I l I t y
Do you want your building green
-
7/29/2019 EW Luan Nguyen
12/47
s u s t a i n a b I l I t y
Ashrae green guide
Page 169- Ashrae green guide
-
7/29/2019 EW Luan Nguyen
13/47
s u s t a i n a b I l I t y
Ashrae green guide
Page 170- Ashrae green guide
-
7/29/2019 EW Luan Nguyen
14/47
s u s t a i n a b I l I t y
M-Quay newsletter
-
7/29/2019 EW Luan Nguyen
15/47
s u s t a i n a b I l I t y
Show Me the Impact
Cooling towers
Cooling coils
Chilled pumps Condenser pumps
Chillers
Controls
-
7/29/2019 EW Luan Nguyen
16/47
s u s t a i n a b I l I t y
37.2/31.7/29
240 LPS
5.5C range
2.7C approach
60 hp
45 kW
40/32/29
113 LPS
8C range
3C approach
30 hp
22 kW
Cooling Tower Performance
2x1800 tons 3x1000 tons
STD EARTHWISE
-
7/29/2019 EW Luan Nguyen
17/47
s u s t a i n a b I l I t y
lessons learned
Cooling Tower Performance
!Tower watershould be hot!
Towers should use
inverters!
-
7/29/2019 EW Luan Nguyen
18/47
s u s t a i n a b I l I t y
3unit ( 1standby)
Flow rate 205 L/S
Pump head 15 m
Pump efficiency 78.2%
Pump power 39 kW
Primary Chilled Water Pump
4unit ( 1standby)
95 L/S
22 m
81.5%
25 kW
EARTHWISESTANDARD
-
7/29/2019 EW Luan Nguyen
19/47
s u s t a i n a b I l I t y
5unit ( 1standby)
Flow rate 102.5 L/S
Pump head 29 m
Pump efficiency 84.3%
Pump power 35 kW
Less pumps less space
Secondary Chilled Water Pump
STD
Total system flow : 411l/s vs 285l/s
NONE
EARTHWISE + VPF
-
7/29/2019 EW Luan Nguyen
20/47
s u s t a i n a b I l I t y
3unit (1standby)
Flow rate 240 L/S
Pump head 32 m
Pump efficiency 80.6%
Pump power 94 kW
4unit (1standby)
113 L/S
22 m
81.2%
30 kW
In this installation:a 30% reduction in flow =nearly 50% reduction in condenserwater pumping energy consumption
Condenser Water Pump
STD EARTHWISE
-
7/29/2019 EW Luan Nguyen
21/47
s u s t a i n a b I l I t y
Chiller Energy
Capacity 2X1350 tons
LWT 6.7C ( DeltaT 5.5)
Power 2x785kW (0.58kW/RT)Capacity 2X1350 tons
LWT 5C ( DeltaT 8)
Power 3x557 kW (0.619kW/RT)
No lunch is free
Earthwise Chiller consume more 29kW
Standard
Earthwise
-
7/29/2019 EW Luan Nguyen
22/47
s u s t a i n a b I l I t y
System Power
Chil ler 2x785 kW
P-Chilled water pump 2x39 kW
S-Chilled water pump 4x35 kW
Cond water pump 2x94 kW
Cooling tower 2x45kW
Total 2066kW
Standard
3x557 kW
3x25 kW
0
3x30kW
3x22kW
3x634 = 1902 kW
EARTHWISE
kW/RT 0.765 0.70
-
7/29/2019 EW Luan Nguyen
23/47
s u s t a i n a b I l I t y
Chiller plant analyzer
-
7/29/2019 EW Luan Nguyen
24/47
s u s t a i n a b I l I t y
Monthly energy consumption
ALT1: Lef tALT2: Right
-
7/29/2019 EW Luan Nguyen
25/47
s u s t a i n a b I l I t y
Monthly energy cost ($)
Alternative Standard Earthwise Saving
Month $ $ %
Jan 44,250.60 37,004.50 16%
Feb 40,877.00 35,192.10 14%
Mar 51,121.40 44,361.90 13%
Apr 46,792.00 40,090.90 14%
May 51,351.20 44,232.60 14%
Jun 48,920.50 41,896.30 14%
Jul 43,512.10 37,673.90 13%
Aug 49,276.30 42,603.60 14%
Sep 42,338.30 36,906.30 13%
Oct 48,493.40 41,996.40 13%
Nov 46,157.40 39,835.90 14%
Dec 43,512.20 37,129.90 15%
-
7/29/2019 EW Luan Nguyen
26/47
s u s t a i n a b I l I t y
Annual cost
Saving
14%/yr
-
50,000.00
100,000.00150,000.00
200,000.00
250,000.00
300,000.00
350,000.00
400,000.00
450,000.00
500,000.00
$ $ $ $
Electric Water Electric Water
Standard Earthwise
Standard Earthwise
Electric Water Electric Water
$ $ $ $
556,602.38 11,141.40 478,924.31 9,407.40
-
7/29/2019 EW Luan Nguyen
27/47
s u s t a i n a b I l I t y
Chilled Water Plant Costs Estimated
Chiller's price is based on TraneVSDs price is based on Trane
Pump's price is based on Drunfos,
Cooling Tower is based on Ocean
the prices are not include piping, valves
-
7/29/2019 EW Luan Nguyen
28/47
s u s t a i n a b I l I t y
Compare prices with 2 alternative
Items STANDARD EARTHWISE STD ($) EWS ($)
Chiller 2x1350RT(0.58kw/RT) 3x900RT(0.619kw/RT) 1,200,000 1,250,000
P-Chilled water
pump3x205 l/s-15m(39kw) 4x95 l/s-22m(25kw) 47,000 40,000
S-Chilled water
pump5x102.5 l/s-29m(35kw) 0 70,000 0
Condenser water
pump3x240 l/s-32m(94kw) 4x113 l/s-22m(30kw) 115,000 48,000
VSD for chilled
pumps5x45kw 4x30kw 30,000 15,000
Cooling tower 2x1800RT (45kw) 3x1000RT (22kw) 120,000 100,000
VSD for Cooling
tower 0 3x22kw 0 10,000
Chiller plant control OtherTrane chiller plant
control0 40,000
Total chiller plant 2066kw 1902kw 1,580,000 1,500,000
System Kw/RT 0.765 0.7 - 80,000
-
7/29/2019 EW Luan Nguyen
29/47
s u s t a i n a b I l I t y
EARTHWISE SYSTEM
FIRST
COST
5%
OPARATING
COST
14%
1,580,000 $
1,500,000 &
567,743.00/yr
488,330.00/yr
This saving is not account for the reduction of piping, valves..
-
7/29/2019 EW Luan Nguyen
30/47
s u s t a i n a b I l I t y
Tranes chiller plant control
Your chiller system is
not optimal like our
analyzer without
chiller plant
control
-
7/29/2019 EW Luan Nguyen
31/47
s u s t a i n a b I l I t y
EarthWise Chiller Plant Control SystemFeatures and Benefits
Software Features
3-D animated system and equipment graphics
Energy monitoring & reports
System and equipment performance analysis
Web access
Energy Optimization
Advanced chiller sequencing
Cooling tower optimization
Variable primary chilled water flow control
Reliable & Flexible Operation
Matrix pump & cooling tower control
Auto equipment failure recovery
Auto equipment rotation
Alarm Management
Chiller diagnostic messages
SMS alarm notification
Factory Panel
Pre-wired and tested
-
7/29/2019 EW Luan Nguyen
32/47
s u s t a i n a b I l I t y
Energy OptimizationEnergy Optimization
Factory-engineered Optimization Algorithms Advanced Chiller Sequencing
Cooling Tower Optimization
Variable Primary Chilled Water Flow Control
Optimized based on Best System efficiency;
and NOT best equipment efficiency
-
7/29/2019 EW Luan Nguyen
33/47
s u s t a i n a b I l I t y
Advanced Chiller Sequencing
Results
Good chiller sequencing and chiller loading
CHILLER LOADING
30
40
50
60
70
80
90
100
TIME
%R
LA
CH-1
CH-2
CH-3
CH-4
CH-5
CH-6
5 10%chiller plant energy saving
-
7/29/2019 EW Luan Nguyen
34/47
s u s t a i n a b I l I t y
Energy Optimisation
Cooling Tower Optimization
But, Im tired Water is so cool, Im ok
-
7/29/2019 EW Luan Nguyen
35/47
s u s t a i n a b I l I t y
Energy Optimisation
Cooling Tower Optimization
Minimum chiller + cooling tower kW input
condenser water temperature, F
400
74
en
ergyconsumption,
kW
76 78 80 8272
300
200
100
084
tower
chiller
total
optimalcontrol point
3 5%chiller plant energy saving
-
7/29/2019 EW Luan Nguyen
36/47
s u s t a i n a b I l I t y
Scan and evaluate all AHU valves position every minute Reset pump speed according to satisfy most critical Fan coil
Fan coils should equip with modulating control valves
EarthWise Chiller Plant ControlSystem
P
Variable
speedpump
Fan coil with modulating valve
VFD
Energy Optimisation
Variable Primary Chilled Water Flow ControlEnergy Optimisation
Variable Primary Chilled Water Flow Control
3 5%chiller plant energy saving
-
7/29/2019 EW Luan Nguyen
37/47
s u s t a i n a b I l I t y
Connected with the other system
If you want to have a saving energy chiller system ,
you must have Tranes chiller plant control
-
7/29/2019 EW Luan Nguyen
38/47
s u s t a i n a b I l I t y
Conclusion
Use Earthwise concept help the owner savingboth first and operating cost
Remember that the meter is on the building,not on the chiller
The first cost saving is not account thereduction of piping, valve.
Use the innovative chiller plant control for
optimal HVAC system Tranes solution can help your building
greener
-
7/29/2019 EW Luan Nguyen
39/47
s u s t a i n a b I l I t y
Yeah!
Show me the references
-
7/29/2019 EW Luan Nguyen
40/47
s u s t a i n a b I l I t y
BITEXCO FINANCIAL TOWER
THE HIGHEST BUILDING IN HCM CITY
68 STOREYS
4 x 900 TONS R123
CENTRIFUGAL CHILLER
5-13oC; 37-45oC
YEAR: 2008-2009-2010
-
7/29/2019 EW Luan Nguyen
41/47
s u s t a i n a b I l I t y
Vincom Eden
Complex in HCMC
8x 1000RT
CenTraVac R123
Chiller
Year: 2009
5-13oC/ 32-39oC
-
7/29/2019 EW Luan Nguyen
42/47
s u s t a i n a b I l I t y
Crowne Plaza
InterContinential
5 Stars Hotel,
in Hanoi
4x 750RT
R123 Centrifugal
ChillerYear 2009
5-12oC/32-37oC
-
7/29/2019 EW Luan Nguyen
43/47
s u s t a i n a b I l I t y
Intel Viet Nam Factory- A9T9
4 x 2350 Tons
R123 Duplex Chillers +
AHU
Installation year: 2008-
2009
5-13oC on Chilled Side
-
7/29/2019 EW Luan Nguyen
44/47
s u s t a i n a b I l I t y
Centre Point Office
The 1st Green
Building in HCMC
R123 Chiller
3 x 450RT
Installation year :2008- 2009
5-12oC/32-37oC
-
7/29/2019 EW Luan Nguyen
45/47
s u s t a i n a b I l I t y
Sheraton NhaTrangHotel
3 x 700 Tons
Centrifugal R123
Chiller
5-12oC/32-37oC
Installation year :
2008-2009
-
7/29/2019 EW Luan Nguyen
46/47
s u s t a i n a b I l I t y
2x 250 Tons
RTHD
Water-Cooled
Screw Chiller
5-12oC/32-40oC
Year: 2009
Cuu Long
Commercial
Center in
Camau
-
7/29/2019 EW Luan Nguyen
47/47
s u s t a i n a b I l I t y
Questions orComments?