Evolving Needs of Subsea Flow Assurance Ajan Das, Trelleborg Offshore

Transcript of Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance...

Page 1: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

Evolving Needs of Subsea Flow Assurance

Ajan Das, Trelleborg Offshore

Page 2: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

Development and Qualification

2016-11-30 TRELLEBORG OFFSHORE2

Responding to the needs of the Industry

Page 3: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

Why Insulation?

Deep Water subsea production systems are reaching further and

going deeper than ever before.

Thermal Insulation is an integral part of designing an offshore

production system, especially in deep waters;

Helps maintain flowrates

Optimises productivity

Reduces processing costs

On subsea architecture is does this by;

Guaranteeing against build-up of waxes and hydrate crystals that can occur

when hot fluid (oil, gas or condensates) are exposed to low seawater

temperatures during production stops or normal production

During well shut in, for maintenance or an emergency

The greater the depth the more valuable the assest

Flow assurance

TRELLEBORG GROUP3 2016-11-30

Page 4: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

Enhance Existing Systems

Lessons have been learned through project anomalies

Operators are looking for more robust systems to give their projects the confidence they need to succeed

“Cost” no longer front of mind when specifying systems, reliability is the key driver

Generic specifications and product testing is no longer acceptable

Improved materials specifications to meet greater demands

Enhancing existing systems

2012-12-06 TRELLEBORG GROUP4

Page 5: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

Enhance Existing Systems

Greater long term performance screening

Improved application techniques

Advanced equipment

Unyielding control on material parameters

Increased design input / planning for material capability

2016-11-30 TRELLEBORG OFFSHORE5

Page 6: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

Enhance Existing Systems

2016-11-30 TRELLEBORG OFFSHORE6

Page 7: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

Enhance Existing Systems

7 2016-11-30

Understanding Shrinkage

TRELLEBORG OFFSHORE

Page 8: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

Enhance Existing Systems

2016-11-30 TRELLEBORG OFFSHORE8

Improved application techniques

Surface preparation

Abrasion - consider each substrate

case by case

Dust checks

Pigmented primer

Primer application tests

Environmental checks

Temperature requirements

Qualification works

None transfer release agents

Extrusion process developed

Page 9: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

Enhance Existing Systems

SPC units

Mass flow meters

Standby & pour data log

USB download

Remote field access GPS

Mag drive pumps

Containerised for site works

Up rated / pumps / chillers

9 2016-11-30TRELLEBORG OFFSHORE

Page 10: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

Enhance Existing Systems

QA / QC site inspectors

Environmentally controlled lab

Typical product analysis

Hardness

Density

Specific heat capacity

Thermal conductivity

NCO contents check

Transportable – ISO 20ft

Industry First

Page 11: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

Enhance Existing Materials

2016-11-30 TRELLEBORG OFFSHORE11

Page 12: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

New Systems Development

Screening & Selection

Long Term Qualifications

Project Specific Qualifications

Working with Industry Leaders

2016-11-30 TRELLEBORG OFFSHORE12

Page 13: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

New Systems Development

2016-11-30 TRELLEBORG OFFSHORE13

3-HourSteadyState

1.5-Hour Natural

Cooldown

1-Hour Forced

Cooldown1.5-Hour Steady State

1.5-Hour Steady State

250

SSD

0

Pre

ss

ure

11 Day10 Day9 Day8 Day7 Day6 Day5 Day4 Day3 Day2 Day1 Day0:000

4° C

HFT

SOT

TMxOT

120

Te

mp

era

ture

11-Day Simulated Service Test

Test Specimen Temp

Vessel Pressure

Test Days/Time

Page 14: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

New Systems Development

2016-11-30 TRELLEBORG OFFSHORE14

Page 15: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

New Systems Development

2016-11-30 TRELLEBORG OFFSHORE15

Page 16: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure

2016-11-30 TRELLEBORG OFFSHORE16

Page 17: Evolving Needs of Subsea Flow Assurance · Flow assurance 3 2016-11-30 TRELLEBORG GROUP. Enhance Existing Systems ... 11-Day Simulated Service Test Test Specimen Temp Vessel Pressure