  • 8/8/2019 Event Cycle - MS AX

    1/80

    Event Cycle

    Recorded by: godr1

    Recorded date: 12/6/2010Document created: 12/6/2010

    Task notes: Event Cycle

    Event Cycle ..........................................................................................................................1

    Form name: Projects .................................................................................................... 3

    Form name: Create project ...........................................................................................3Form name: Item budgets ............................................................................................ 5

    Form name: Infolog ..................................................................................................... 8

    Form name: Fee forecast ............................................................................................11

    Form name: Project statements ..................................................................................12

    Form name: Fee forecast ............................................................................................13Form name: Purchase requisitions .............................................................................14

    Form name: Create purchase requisition ................................................................... 15Form name: Infolog ...................................................................................................19

    Form name: Purchase requisition approval - Submit .................................................19

    Form name: Purchase requisitions .............................................................................21Form name: Create purchase requisition ................................................................... 22

    Form name: Purchase requisition approval - Submit .................................................29

    Form name: Projects .................................................................................................. 30

    Form name: Find: Project ..........................................................................................31Form name: Purchase order , Name , Item name .....................................................33

    Form name: Purchase order , Name , Item name .....................................................34Form name: Create purchase order ............................................................................ 35Form name: Infolog ...................................................................................................40

    Form name: Posting purchase order .......................................................................... 44

    Form name: Posting packing slip ...............................................................................45Form name: Posting invoice ......................................................................................46

    Form name: Invoice Journal ......................................................................................47

    Form name: Journal ...................................................................................................48Form name: Journal lines ...........................................................................................49

    Form name: Check journal 000077_110 ....................................................................50

    Form name: Infolog ...................................................................................................51

    Form name: Post journal 000077_110....................................................................... 52Form name: Infolog ...................................................................................................52

    Form name: Create invoice ........................................................................................53

    Form name: ProjInvoiceNormal ................................................................................ 54Form name: Find: Project ..........................................................................................55

    Form name: Infolog ...................................................................................................56

    Form name: Create invoice ........................................................................................56Form name: Infolog ...................................................................................................57

  • 8/8/2019 Event Cycle - MS AX

    2/80

    Form name: Create invoice ........................................................................................58

    Form name: Infolog ...................................................................................................58

    Form name: Create invoice ........................................................................................59Form name: Infolog ...................................................................................................60

    Form name: Create invoice ........................................................................................60

    Form name: Infolog ...................................................................................................61Form name: Create invoice ........................................................................................61

    Form name: Infolog ...................................................................................................62

    Form name: Post invoice ........................................................................................... 62Form name: Infolog ...................................................................................................63

    Form name: Projects .................................................................................................. 63

    Form name: Find: Project ..........................................................................................64

    Form name: Post invoice ........................................................................................... 67Form name: Infolog ...................................................................................................68

    Form name: Projects .................................................................................................. 69

    Form name: Find: Project ..........................................................................................69

    Form name: Project statements ..................................................................................70Form name: Fee transactions .....................................................................................77

    Form name: Fee transactions .....................................................................................78Form name: Item transactions ....................................................................................79

  • 8/8/2019 Event Cycle - MS AX

    3/80

    1. Click Area Page node: Project -> Project Details.

    Form name: Projects

    2. Create a new record in the Projects form.

    3. ClickYes in the Microsoft Dynamics form.Is Project of type 'Event'?

    Form name: Create project

  • 8/8/2019 Event Cycle - MS AX

    4/80

    4. Change Project group from '' to 'Events'.

    5. Change Name from '' to 'test demo'.

    6. Change Line property from '' to 'Charge'.

    7. Change Region from '' to 'CO - LR'.

    8. Change Department from '' to 'Administra'.

    9. Click the OKbutton.

    10. Click the Project stage (y) -> Estimated menu button.

    11. ClickOkin the Change of status form.Update to status Estimated?

    12. Click the Forecast (k) -> Item menu button.

  • 8/8/2019 Event Cycle - MS AX

    5/80

    Form name: Item budgets

    13. Create a new record in the Item budgets form.

    14. Change Item number from '' to 'CII- Delegation Kits'.

    15. Change Unit from '' to 'Nos'.

    16. Change Sales quantity from '1.00' to '10.00'.

    17. Change Sales quantity from '10.00' to '100.00'.

    18. Change Cost price from '0.00' to '500.00'.

    19. Change Cost amount from '0.00' to '50000.00'.

    20. Switch to the Project tab on the Item budgets form.

  • 8/8/2019 Event Cycle - MS AX

    6/80

    21. Switch to the Dimension tab on the Item budgets form.

  • 8/8/2019 Event Cycle - MS AX

    7/80

    22. Change Site from '' to '1'.

    23. Switch to the Overview tab on the Item budgets form.

  • 8/8/2019 Event Cycle - MS AX

    8/80

    24. Save the record in the Item budgets form.

    25. Create a new record in the Item budgets form.

    26. Change Item number from '' to 'CII-Advertisement'.

    27. Change Unit from '' to 'Nos'.

    28. Change Cost price from '0.00' to '1000000.00'.

    29. Change Cost amount from '0.00' to '1000000.00'.

    Form name: Infolog

    30. Click the Close button.

    31. Switch to the Project tab on the Item budgets form.

  • 8/8/2019 Event Cycle - MS AX

    9/80

    32. Change Category from '' to 'Advertise'.

    33. Switch to the Dimension tab on the Item budgets form.

  • 8/8/2019 Event Cycle - MS AX

    10/80

    34. Change Site from '' to '1'.

    35. Switch to the Overview tab on the Item budgets form.

  • 8/8/2019 Event Cycle - MS AX

    11/80

    36. Make sure the selection is changed in table Sales forecast to:

    Mode

    l

    Date Item

    number

    Item

    allocatio

    n key

    Sales

    quantit

    y

    Uni

    t

    Cost

    price

    Cost

    amount

    Currenc

    y

    Test 12/6/201

    0

    CII-

    Delegatio

    n Kits

    100.00 Nos 500.0

    0

    50000.0

    0

    INR

    37. Change Cost price from '500.00' to '5000.00'.

    38. Change Cost amount from '50000.00' to '500000.00'.

    39. Save the record in the Item budgets form.

    40. Close the Item budgets form.

    41. Click the Forecast (k) -> Fee menu button.

    Form name: Fee forecast

  • 8/8/2019 Event Cycle - MS AX

    12/80

    42. Create a new record in the Fee forecast form.

    43. Change Category from '' to 'Grants'.

    44. Change Qty from '' to '1.00'.

    45. Change Price Per Qty from '0.00' to '1000000.00'.

    46. Change Sales price from '0.00' to '1000000.00'.

    47. Save the record in the Fee forecast - Forecast model: Test, 12/6/2010, Expand ID:

    0 form.

    48. Close the Fee forecast - Forecast model: Test, 12/6/2010, Expand ID: 0 form.

    49. Click the Project Control (1) -> Project statements menu button.

    Form name: Project statements

  • 8/8/2019 Event Cycle - MS AX

    13/80

    50. Change From date from '' to '12/6/2010'.

    51. Change To date from '' to '12/6/2010'.

    52. Change Actual vs. Budget from 'Actual' to 'Budget'.

    53. Change Forecast model from '' to 'Test'.

    54. Click the Calculate button.

    55. Click the Forecast -> Fee menu button.

    Form name: Fee forecast

  • 8/8/2019 Event Cycle - MS AX

    14/80

    56. Change Sales price from '1000000.00' to '10000000.00'.

    57. Close the Fee forecast - Forecast model: Test, 12/6/2010, Expand ID: 0 form.

    58. Click the Calculate button.

    59. Close the Project statements form.

    60. Click the Project stage (y) -> In process menu button.

    61. ClickOkin the Change of status form.

    Update to status In process?

    62. Click the Item task -> Purchase Requisition menu button.

    Form name: Purchase requisitions

    63. Make sure the selection is changed in table Projects to:

    Project Name Project

    contract

    Project

    group

    Project

    type

    Header Project

    stage

    Event

    EV-0103 Round

    Table

    Events Time

    and

    No Estimated Yes

  • 8/8/2019 Event Cycle - MS AX

    15/80

    India-

    US

    material

    64. Create a new record in the Purchase requisitions form.

    Form name: Create purchase requisition

    65. Change Purchase requisition name from '' to 'test demo'.

    66. Click the OKbutton.

    67. Change Purchase requisition ID from '' to '00000329_074'.

    68. Change Purchase requisition name from '' to 'test demo'.

    69. Change Created date and time from '' to '12/6/2010'.

    70. Switch to the Lines tab on the Purchase requisitions form.

  • 8/8/2019 Event Cycle - MS AX

    16/80

    71. Create a new record in the Purchase requisitions form.

    72. Change Item number from '' to 'CII- Delegation Kits'.

    73. Change Item name from '' to 'CII- Delegation Kits'.

    74. Change Quantity from '' to '1.00'.

    75. Change Unit from '' to 'Nos'.

    76. Change Unit price from '0.00' to '500.00'.

    77. Change Net amount from '0.00' to '500.00'.

    78. Change Currency from '' to 'INR'.

    79. Change Quantity from '1.00' to '100.00'.

    80. Change Net amount from '500.00' to '50000.00'.

    81. Switch to the Project tab on the Purchase requisitions form.

  • 8/8/2019 Event Cycle - MS AX

    17/80

    82. Switch to the Dimension tab on the Purchase requisitions form.

    83. Change Site from '' to '1'.

  • 8/8/2019 Event Cycle - MS AX

    18/80

    84. Change Warehouse from '' to 'Main'.

    85. Switch to the General tab on the Purchase requisitions form.

    86. Switch to the Lines tab on the Purchase requisitions form.

  • 8/8/2019 Event Cycle - MS AX

    19/80

    87. Switch to the Business justification tab on the Purchase requisitions form.

    Form name: Infolog

    88. Click the Close button.

    89. Change Business justification from '' to 'test.'.

    90. Click the Submit button.

    Form name: Purchase requisition approval - Submit

    91. Change Comment from '' to 'test'.

    92. Click the Submit button.

  • 8/8/2019 Event Cycle - MS AX

    20/80

    93. Switch to the Overview tab on the Purchase requisitions form.

    94. Close the Purchase requisitions form.

    95. Make sure the selection is changed in table Projects to:

    Project Name Project

    contract

    Project

    group

    Project

    type

    Header Project

    stage

    Event

    EV-0107 test

    demo

    Events Time

    and

    material

    No In

    process

    Yes

    96. Switch to the Purchase Requisition tab on the Projects form.

  • 8/8/2019 Event Cycle - MS AX

    21/80

    97. Click the Item task -> Purchase Requisition menu button.

    Form name: Purchase requisitions

  • 8/8/2019 Event Cycle - MS AX

    22/80

    98. Create a new record in the Purchase requisitions form.

    Form name: Create purchase requisition

    99. Change Purchase requisition name from '' to 'test demo'.

    100. Click the OKbutton.

    101. Change Purchase requisition ID from '' to '00000330_074'.

    102. Change Purchase requisition name from '' to 'test demo'.

    103. Change Created date and time from '' to '12/6/2010'.

  • 8/8/2019 Event Cycle - MS AX

    23/80

    104. Switch to the Lines tab on the Purchase requisitions form.

    105. Create a new record in the Purchase requisitions form.

    106. Change Item number from '' to 'CII- Delegation Kits'.

    107. Change Item name from '' to 'CII- Delegation Kits'.

    108. Change Quantity from '' to '1.00'.

    109. Change Unit from '' to 'Nos'.

    110. Change Unit price from '0.00' to '500.00'.

    111. Change Net amount from '0.00' to '500.00'.

    112. Change Currency from '' to 'INR'.

    113. Change Quantity from '1.00' to '100.00'.

    114. Change Net amount from '500.00' to '50000.00'.

    115. Switch to the Project tab on the Purchase requisitions form.

  • 8/8/2019 Event Cycle - MS AX

    24/80

    116. Switch to the Dimension tab on the Purchase requisitions form.

  • 8/8/2019 Event Cycle - MS AX

    25/80

    117. Change State from '' to 'Andamaan &'.

    118. Change Site from '' to '1'.

    119. Switch to the Dimension tab on the Purchase requisitions form.

  • 8/8/2019 Event Cycle - MS AX

    26/80

    120. Change Warehouse from '' to 'Main'.

    121. Switch to the Lines tab on the Purchase requisitions form.

  • 8/8/2019 Event Cycle - MS AX

    27/80

    122. Switch to the Business justification tab on the Purchase requisitions form.

  • 8/8/2019 Event Cycle - MS AX

    28/80

    123. Change Business justification from '' to 'test demo.'.

    124. Switch to the Overview tab on the Purchase requisitions form.

  • 8/8/2019 Event Cycle - MS AX

    29/80

    125. Click the Submit button.

    Form name: Purchase requisition approval - Submit

    126. Change Comment from '' to 'test'.

    127. Change Comment from 'test' to 'test demo.'.

    128. Click the Submit button.

  • 8/8/2019 Event Cycle - MS AX

    30/80

    129. Close the Purchase requisitions form.

    130. Switch to the Expense Transactions tab on the Projects form.

    131. Close the Projects form.

    132. Click Area Page node: Project -> Project Details.

    Form name: Projects

  • 8/8/2019 Event Cycle - MS AX

    31/80

    Form name: Find: Project

    133. Change Project from '' to '*107*'.

    134. Click the OKbutton.

    135. Switch to the Purchase Requisition tab on the Projects form.

  • 8/8/2019 Event Cycle - MS AX

    32/80

    136. Switch to the Expense Transactions tab on the Projects form.

  • 8/8/2019 Event Cycle - MS AX

    33/80

    137. Click the Item task -> Purchase order menu button.

    Form name: Purchase order , Name , Item name

  • 8/8/2019 Event Cycle - MS AX

    34/80

    138. Close the Purchase order , Name , Item name form.

    139. Click the Item task -> Purchase order menu button.

    Form name: Purchase order , Name , Item name

    140. Click the Advanced button.

    141. Switch to the General tab on the Purchase order , Name , Item name form.

    142. Switch to the Overview tab on the Purchase order , Name , Item name form.

  • 8/8/2019 Event Cycle - MS AX

    35/80

    143. Create a new record in the Purchase order , Name , Item name form.

    Form name: Create purchase order

  • 8/8/2019 Event Cycle - MS AX

    36/80

    144. ClickYes in the Microsoft Dynamics form.Transfer vendor information?

    Kotak

    145. Change Vendor account from '' to '000003_041'.

    146. Change Site from '' to '1'.

    147. Change Warehouse from '' to 'Main'.

    148. Click the OKbutton.

    149. Change Purchase order from '' to '00000086_069'.

  • 8/8/2019 Event Cycle - MS AX

    37/80

    150. Change Vendor account from '' to '000003_041'.

    151. Change Invoice account from '' to '000003_041'.

    152. Change Currency from '' to 'INR'.

    153. Switch to the Lines tab on the Purchase order , Name , Item name form.

    154. Create a new record in the Purchase order 00000086_069 , Name Kotak , Item

    name form.

    155. Change Item number from '' to 'CII- Delegation Kits'.

    156. Change Quantity from '' to '1.00'.

    157. Change Unit from '' to 'Nos'.

    158. Change Unit price from '' to '500.00'.

    159. Change Net amount from '0.00' to '500.00'.

    160. Change Assessable value from '0.00' to '500.00'.

  • 8/8/2019 Event Cycle - MS AX

    38/80

    161. Change Item name from '' to 'CII- Delegation Kits'.

    162. Change Quantity from '1.00' to '1000.00'.

    163. Change Net amount from '500.00' to '500000.00'.

    164. Change Assessable value from '500.00' to '500000.00'.

    165. Change Unit price from '500.00' to '5000.00'.

    166. Change Net amount from '500000.00' to '5000000.00'.

    167. Change Assessable value from '500000.00' to '5000000.00'.

    168. Change Quantity from '1000.00' to '100.00'.

    169. Change Unit price from '5000.00' to '500.00'.

    170. Change Net amount from '5000000.00' to '50000.00'.

    171. Change Assessable value from '5000000.00' to '50000.00'.

    172. Create a new record in the Purchase order 00000086_069 , Name Kotak , Item

    name form.

    173. Change Item number from '' to 'CII-Advertisement'.

    174. Change Quantity from '' to '1.00'.

    175. Change Unit from '' to 'Nos'.

    176. Change Unit price from '' to '80000.00'.

    177. Change Net amount from '0.00' to '80000.00'.

    178. Change Assessable value from '0.00' to '80000.00'.

    179. Change Item name from '' to 'CII-Advertisement'.

    180. Change Unit price from '80000.00' to '10000000.00'.

    181. Change Net amount from '80000.00' to '10000000.00'.

    182. Change Assessable value from '80000.00' to '10000000.00'.

    183. Change Unit price from '10000000.00' to '1000000.00'.

  • 8/8/2019 Event Cycle - MS AX

    39/80

    184. Change Net amount from '10000000.00' to '1000000.00'.

    185. Change Assessable value from '10000000.00' to '1000000.00'.

    186. Switch to the Dimension tab on the Purchase order 00000086_069 , NameKotak , Item name form.

    187. Switch to the Lines tab on the Purchase order 00000086_069 , Name Kotak ,

    Item name form.

  • 8/8/2019 Event Cycle - MS AX

    40/80

    Form name: Infolog

    188. Click the Close button.

    189. Switch to the Project tab on the Purchase order 00000086_069 , Name Kotak ,

    Item name form.

  • 8/8/2019 Event Cycle - MS AX

    41/80

    190. Change Category from '' to 'Advertise'.

    191. Switch to the Lines tab on the Purchase order 00000086_069 , Name Kotak ,

    Item name form.

  • 8/8/2019 Event Cycle - MS AX

    42/80

    192. Make sure the selection is changed in table Purchase lines to:

    Item

    numbe

    r

    CF

    OP

    Rece

    ipt

    and

    issue

    code

    Quant

    ity

    Un

    it

    Unit

    pric

    e

    Disco

    unt

    Dis

    c.

    pct

    .

    Net

    amou

    nt

    Assessa

    ble

    value

    Item

    name

    CII-Delegat

    ion

    Kits

    100.00 Nos

    500.00

    50000.00

    50000.00

    CII-Delegat

    ion Kits

    193. Switch to the Project tab on the Purchase order 00000086_069 , Name Kotak ,

    Item name CII- Delegation Kits form.

  • 8/8/2019 Event Cycle - MS AX

    43/80

    194. Switch to the Lines tab on the Purchase order 00000086_069 , Name Kotak ,Item name CII- Delegation Kits form.

  • 8/8/2019 Event Cycle - MS AX

    44/80

    195. Click the Posting -> Purchase order menu button.

    Form name: Posting purchase order

  • 8/8/2019 Event Cycle - MS AX

    45/80

    196. Click the OKbutton.

    197. Click the Posting -> Packing slip menu button.

    Form name: Posting packing slip

  • 8/8/2019 Event Cycle - MS AX

    46/80

    198. Change Packing slip from '' to '123qwe'.

    199. Click the OKbutton.

    200. Click the Posting -> Invoice menu button.

    Form name: Posting invoice

  • 8/8/2019 Event Cycle - MS AX

    47/80

    201. Change Invoice from '' to '123qwe'.

    202. Click the OKbutton.

    203. Click the Inquiries -> Invoice menu button.

    Form name: Invoice Journal

  • 8/8/2019 Event Cycle - MS AX

    48/80

    204. Close the Invoice Journal form.

    205. Close the Purchase order 00000086_069 , Name Kotak , Item name CII-

    Delegation Kits form.

    206. Close the Projects form.

    207. Click Area Page node: Project -> Journals -> Fee.

    Form name: Journal

  • 8/8/2019 Event Cycle - MS AX

    49/80

    208. Create a new record in the Journal form.

    209. Change Name from '' to 'Fee'.

    210. Click the Lines button.

    Form name: Journal lines

  • 8/8/2019 Event Cycle - MS AX

    50/80

    211. Change Project date from '' to '12/6/2010'.

    212. Create a new record in the Journal lines form.

    213. Change Project from '' to 'EV-0107'.

    214. Change Line property from '' to 'Charge'.

    215. Change Category from '' to 'Grants'.

    216. Change Customer from '' to '000003_035'.

    217. Change Sales price from '0.00' to '10000000.00'.

    218. Click the Validate button.

    Form name: Check journal 000077_110

  • 8/8/2019 Event Cycle - MS AX

    51/80

    219. Click the OKbutton.

    Form name: Infolog

  • 8/8/2019 Event Cycle - MS AX

    52/80

    220. Click the Close button.

    221. Click the Post button.

    Form name: Post journal 000077_110.

    222. Click the OKbutton.

    Form name: Infolog

  • 8/8/2019 Event Cycle - MS AX

    53/80

    223. Click Area Page node: Project -> Periodic -> Invoice -> Create invoice.

    Form name: Create invoice

  • 8/8/2019 Event Cycle - MS AX

    54/80

    224. Click the Select button.

    Form name: ProjInvoiceNormal

  • 8/8/2019 Event Cycle - MS AX

    55/80

    225. Make sure the selection is changed in table Criteria to:

    Table Field Criteria

    Projects Project EV-0045

    Form name: Find: Project

    226. Change Project from '' to '*107*'.

    227. Click the OKbutton.

    228. Change Criteria from 'EV-0045' to 'EV-0107'.

    229. Click the OKbutton.

    230. Change Expense from 'true' to 'false'.

  • 8/8/2019 Event Cycle - MS AX

    56/80

    231. Change Hour from 'true' to 'false'.

    232. Change From date from '11/30/2010' to '11/1/2010'.

    233. Change To date from '12/28/2010' to '12/6/2010'.

    234. Change From date from '11/1/2010' to '12/6/2010'.

    235. Click the OKbutton.

    Form name: Infolog

    236. Click the Close button.

    237. Click Area Page node: Project -> Periodic -> Invoice -> Create invoice.

    Form name: Create invoice

  • 8/8/2019 Event Cycle - MS AX

    57/80

    238. Change Update item quantity from 'Deliver now' to 'All'.

    239. Change Invoice date from '12/3/2010' to '12/6/2010'.

    240. Click the OKbutton.

    Form name: Infolog

    241. Click Area Page node: Project -> Periodic -> Invoice -> Create invoice.

  • 8/8/2019 Event Cycle - MS AX

    58/80

    Form name: Create invoice

    242. Change From date from '12/6/2010' to '12/1/2010'.

    243. Change To date from '12/6/2010' to '12/31/2010'.

    244. Change Invoice date from '12/6/2010' to ''.

    245. Click the OKbutton.

    Form name: Infolog

  • 8/8/2019 Event Cycle - MS AX

    59/80

    246. Click Area Page node: Project -> Periodic -> Invoice -> Create invoice.

    Form name: Create invoice

    247. Change Invoice date from '12/6/2010' to ''.

    248. Change To date from '12/31/2010' to ''.

    249. Change From date from '12/1/2010' to ''.

    250. Click the OKbutton.

  • 8/8/2019 Event Cycle - MS AX

    60/80

    Form name: Infolog

    251. Click the Close button.

    252. Click Area Page node: Project -> Periodic -> Invoice -> Create invoice.

    Form name: Create invoice

    253. Click the OKbutton.

  • 8/8/2019 Event Cycle - MS AX

    61/80

  • 8/8/2019 Event Cycle - MS AX

    62/80

    Form name: Infolog

    258. Click the Close button.

    259. Click Area Page node: Project -> Periodic -> Invoice -> Post invoice.

    Form name: Post invoice

  • 8/8/2019 Event Cycle - MS AX

    63/80

    260. Click the OKbutton.

    261. ClickOkin the Microsoft Dynamics form.

    Warning: Update has been selected, but no print.

    Form name: Infolog

    262. Click Area Page node: Project -> Project Details.

    Form name: Projects

  • 8/8/2019 Event Cycle - MS AX

    64/80

    Form name: Find: Project

    263. Change Project from '' to '*107*'.

    264. Click the OKbutton.

    265. Switch to the Dimension tab on the Projects form.

  • 8/8/2019 Event Cycle - MS AX

    65/80

    266. Change State from '' to 'Andamaan &'.

    267. Switch to the Event tab on the Projects form.

  • 8/8/2019 Event Cycle - MS AX

    66/80

    268. Switch to the Overview tab on the Projects form.

  • 8/8/2019 Event Cycle - MS AX

    67/80

    269. Save the record in the Projects form.

    270. Click Area Page node: Project -> Periodic -> Invoice -> Post invoice.

    Form name: Post invoice

  • 8/8/2019 Event Cycle - MS AX

    68/80

    271. Click the OKbutton.

    272. ClickOkin the Microsoft Dynamics form.

    Warning: Update has been selected, but no print.

    Form name: Infolog

    273. Click the Close button.

  • 8/8/2019 Event Cycle - MS AX

    69/80

    Form name: Projects

    Form name: Find: Project

    274. Change Project from '' to '*107*'.

    275. Click the OKbutton.

    276. Click the Project Control (1) -> Project statements menu button.

  • 8/8/2019 Event Cycle - MS AX

    70/80

    Form name: Project statements

    277. Change From date from '' to '12/6/2010'.

    278. Change To date from '' to '12/6/2010'.

    279. Change Actual vs. Budget from 'Actual' to 'Deviation'.

    280. Change Forecast model from '' to 'Test'.

    281. Click the Calculate button.

    282. Switch to the Profit and loss tab on the Project statements form.

  • 8/8/2019 Event Cycle - MS AX

    71/80

    283. Switch to the WIP tab on the Project statements form.

  • 8/8/2019 Event Cycle - MS AX

    72/80

    284. Switch to the General tab on the Project statements form.

  • 8/8/2019 Event Cycle - MS AX

    73/80

    285. Switch to the WIP tab on the Project statements form.

  • 8/8/2019 Event Cycle - MS AX

    74/80

    286. Switch to the General tab on the Project statements form.

  • 8/8/2019 Event Cycle - MS AX

    75/80

    287. Switch to the Profit and loss tab on the Project statements form.

  • 8/8/2019 Event Cycle - MS AX

    76/80

    288. Switch to the General tab on the Project statements form.

  • 8/8/2019 Event Cycle - MS AX

    77/80

    289. Click the Transactions -> Fee menu button.

    Form name: Fee transactions

  • 8/8/2019 Event Cycle - MS AX

    78/80

    290. Click the Transactions -> Fee menu button.

    Form name: Fee transactions

  • 8/8/2019 Event Cycle - MS AX

    79/80

    291. Click the Transactions -> Item menu button.

    Form name: Item transactions

  • 8/8/2019 Event Cycle - MS AX

    80/80