Euston OverviewProf Andrew McNaughton
![Page 2: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/2.jpg)
Purpose of HS2
• ‘The new north-south railway is a long term solution to a long term problem’
Secretary of State for Transport, Foreword, Strategic Case for HS2, November 2013
• ‘The aim of the HS2 project is to deliver hugely enhanced capacity and connectivity between our major conurbations’
• ‘… capacity will be freed up on the existing network, especially on the congested lines to the north of London, creating sufficient capacity for extra commuter and freight services’
High Speed Rail Investing in Britain’s Future – Decisions and Next Steps, January 2012,p.11
2
![Page 3: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/3.jpg)
HS2 demand
3
On the trunk section of the HS2 network (south of the West
Midlands);
• by 2037 circa 250,000 passengers will use HS2 each day
• 90% of those passengers will be travelling to, from or via
central London
![Page 4: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/4.jpg)
27 London station locations considered with TfL
4
![Page 5: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/5.jpg)
Sift process for London terminus station (2009)
5
![Page 6: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/6.jpg)
London terminus station selection process
Key stages
• High Speed Rail - London to the West Midlands and Beyond (Hs2 Ltd, December 2009)
• High Speed Rail Command Paper (DfT, March 2010)
• High Speed Rail: investing in Britain’s future – public consultation (DfT, 2011)
• High Speed Rail: investing in Britain’s future – decisions and next steps (DfT, 2012)
• Volume 1 - Introduction to the Environmental Statement and the Proposed Scheme | Strategic and route-wide alternatives –Alternatives Report (2013)
6
![Page 7: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/7.jpg)
Euston destinations - am peak
7
Rail passengers arriving
in Euston (am peak):
• 2012 – 24,680
• 2041 (without HS2) –
42,000
• 2041 (with HS2) –
61,000
![Page 8: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/8.jpg)
8
Euston connections
• Victoria Line
• Two Northern Line branches
• Metropolitan, Hammersmith & City and Circle
• Close proximity to St Pancras and Kings Cross
• 13 bus routes
• Central London taxi
• Rental bikes
• Walking
![Page 9: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/9.jpg)
Old Oak Common destinations
• Access to Heathrow, Thames Valley and West London
• Convenient access via Crossrail towards City of London and Docklands
• Relieves pressure on HS2 Central London terminus
• Serve future major employment and regeneration development opportunities around Park Royal
9
![Page 10: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/10.jpg)
What HS2 releases from WCML
• The HS2 Phase 1 services replace most long distance non-
stop services to or from areas served by HS2
• At least 10 new services can operate into Euston
• Each new commuter train is c700 seats
• Each new long distance train is c500-600 seats
10
![Page 11: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/11.jpg)
Euston Station Footprint
11
![Page 12: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/12.jpg)
Why are we changing to the AP3 design?
1. Create an effective station within budgetary and
programme constraints
2. Support the wider development vision for the Euston area
3. Reduce the impact on existing rail services against a
background of continuing growth of over 5% p.a. on
longer distance commuting services
12
![Page 13: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/13.jpg)
The ‘staged’ delivery approach
13
(Not part of AP3 proposal)
Approximate boundary of existing station
![Page 14: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/14.jpg)
Platform sequencing
Up to 2026
2026 to 2033
2033 onwards
14
18
136
11 13
![Page 15: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/15.jpg)
2026 high speed concourse level
15
![Page 16: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/16.jpg)
2033 high speed concourse level
16
![Page 17: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/17.jpg)
London Underground connections
17
![Page 18: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/18.jpg)
Station cross section looking South
18
Cobourg Street
HS Station
Station Accomm’n
Existing Conventional Station
EversholtStreet
![Page 19: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/19.jpg)
Potential development zones
19
![Page 20: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/20.jpg)
20
Euston Area Plan Permeability
![Page 21: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/21.jpg)
21
AP3 2026 permeability
KeyPotential future connectivity provision
Connectivity provision
![Page 22: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/22.jpg)
22
AP3 2033 permeability
KeyPotential future connectivity provision
Connectivity provision
![Page 23: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/23.jpg)
Stage A programme (2016 – 2026)
23
Construction Activity 2016
quarters
2017
quarters
2018
quarters
2019
quarters
2020
quarters
2021
quarters
2022
quarters
2023
quarters
2024
quarters
2025
quarters
2026
quarters
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Enabling Works (incl.demolitions)
Utility Works
Hampstead Road Bridge
Granby Terrace Bridge
Mornington Street Bridge
Retaining walls, HS railway structures & portal north of Granby Terrace (incl. PVE)High speed part of Euston station
Euston undergroundstationEuston Road Subway & Euston Square connectionRail infrastructure &system works
![Page 24: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/24.jpg)
Stage B1 programme (2027 – 2033)
24
Construction Activity 2027 quarters 2028 quarters 2029 quarters 2030 quarters 2031 quarters 2032 quarters 2033 quarters
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
High speed part of EustonStation
Conventional Part of Euston Station
Euston Underground Station
Bus Station
Final reinstatement of Euston Square Gardens
Construction Northern taxi facility, car park & open space
Rail Infrastructure and systems works
![Page 25: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/25.jpg)
Euston Approaches
25
![Page 26: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/26.jpg)
Euston Approaches
26
Line X temporarily severed
![Page 27: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/27.jpg)
Euston Approaches
27
![Page 28: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/28.jpg)
Euston Approaches
28
HS2 lines beneath Line X
![Page 29: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/29.jpg)
END
29
![Page 30: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/30.jpg)
2026 servicing arrangements
30
![Page 31: Euston Overview - High Speed UK](https://reader031.fdocuments.net/reader031/viewer/2022013001/61cbf95b75e95b6cda35f841/html5/thumbnails/31.jpg)
2033 servicing arrangements
31