euroFOT: Large Scale Field Operational Tests – Impact Assessment
ITS World Congress
Ahmed Benmimoun
Stockholm, September 2009
Institut für Kraftfahrzeuge, RWTH Aachen University
Martijn van de NoortTNO - Netherlands Organisation for Applied Scientific Research
www.eurofot-ip.euSeptember 2009 A. Benmimoun - ITS WC
Contents
• Motivation and Objectives• Approach
Safety ImpactsTraffic Efficiency ImpactsEnvironmental Impacts
• Summary and Outlook
www.eurofot-ip.eu
Objectives of Data Analysis (1/2)
To quantify the impacts on EU level of the functions tested in the FOT on traffic efficiency, safety and the environment
Taking into account various penetration ratesProviding input for the socio-economic cost-benefit analysis (CBA)
September 2009 A. Benmimoun - ITS WC
www.eurofot-ip.eu
Objectives of Data Analysis (2/2)
The following impacts will be quantified for use in the CBA:
Traffic safety: changes in the number of accidents with fatalities, injuries (severe, slight) or material damage onlyTraffic efficiency:
direct effects: travel time changes, but also homogenisation/reduction of congestion effects for environmentalimpact assessmentindirect effects: changes in the amount of accident related congestion (based on changes in number of accidents)
Environment: changes in fuel consumption and emissions of CO2
due to direct traffic efficiency effectsdue to changes in accident related congestion
September 2009 A. Benmimoun - ITS WC
www.eurofot-ip.eu
Data Analysis Approach
September 2009 A. Benmimoun - ITS WC
...VMC-Fleet
SQL Database
CO-, CV-, CV+E-data
VMC-Specific Common
Questionnaires
Data Analysis
Data quality analysis
Data quality analysis
Data processingData processing
Data qualityanalysis
Data qualityanalysis
PI‐calculationPI‐calculation
Data miningData mining Testing of VMC
specific hyp
othe
ses
Testing of VMC
specific hyp
othe
ses
Global assessmentGlobal
assessment
Testing of commonhypotheses
Testing of commonhypotheses
QualityassessmentQuality
assessment
Cost Benefit Analysis
www.eurofot-ip.eu
General Approach for the Impact AssessmentThe two following methods are planned for the impact assessment,which needs to provide input for the CBA:•Direct route: Impact assessment directly from the FOT-data (scaling up via situational variables)
Direct impacts are more reliable because data from the FOT is used without assumptions
•Modelling route: Impact assessment using models to assess effects for higher penetration rates (also includes scaling up via situational variables)
Especially for functions that influence behaviour of other vehicles (e.g. ACC) the direct route is not sufficientUse of FOT data as input for models (e.g. changes in driving behaviour)Interaction with other (equipped and non-equipped) vehicles can be modelledHigher penetration rates than found on the road in the FOT can be modelledPossibility to analyse network effects
September 2009 A. Benmimoun - ITS WC
www.eurofot-ip.eu
Tools for Modelling Activties
September 2009 A. Benmimoun - ITS WC
PELOPS
www.eurofot-ip.eu
Safety Impacts
September 2009 A. Benmimoun - ITS WC
www.eurofot-ip.eu
Efficiency Impacts
September 2009 A. Benmimoun - ITS WC
www.eurofot-ip.eu
Environmental Impacts
September 2009 A. Benmimoun - ITS WC
www.eurofot-ip.eu
Summary and Outlook
Current status:• Basic methodology defined so far and described in a Data
Analysis Plan for each Vehicle Management Centre in euroFOTNext steps• Refinement of methodology and approach for impact assessment
Translation of surrogate measures (changes in driver and driving behaviour) into changes in accident riskTranslation of decrease of incidents into decrease of accidents...
• Test and evaluation of the methodology with data from FOT Pilot• Finalisation of methodology for impact assessment• Conduction of impact assessment for the considered functions• Conduction of a socio-economic cost-benefit analysis• Final results are to be expected for summer 2011
September 2009 A. Benmimoun - ITS WC