EUROCONTROL Guidelines Supporting the Implementation of ...
Transcript of EUROCONTROL Guidelines Supporting the Implementation of ...
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition number: 1.0 Edition date: 07 December 2020 Document reference: EUROCONTROL-GUID-0181
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information
Requirements
DOCUMENT IDENTIFIER: EUROCONTROL - GUID - 0181
Edition Number : 1.0
Edition Date : 07/12/2020
Status : Released Issue
Intended for : General Public
Category : EUROCONTROL Guidelines
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : ii Released Issue Edition : 1.0
DOCUMENT CHARACTERISTICS
TITLE
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Publication Reference: GUID - 0181
ISBN Number: 978-2-87497-108-2
Document identifier Edition Number: 1.0
EUROCONTROL - GUID - 0181 Edition Date: 07/12/2020
Abstract
Commission Implementing Regulation (EU) 2020/469 amended Commission Implementing Regulation (EU) 2017/373 by adding, inter alia, specific requirements for Aeronautical Information Service (AIS) Providers, including requirements for those parties that originate and provide data to the AIS Provider. This document supports affected Stakeholders in their transitioning to, and achieving compliance with, the amended regulations.
Keywords
Part-AIS Aeronautical Information Service Providers
Data Quality Requirements
Data Origination
Implementation Scenario
OR & TR AMC/GM AIS Provider
Competent Authority AIR Guide
Contact Person(s) E-mail
M. UNTERREINER [email protected]
STATUS, AUDIENCE AND ACCESSIBILITY
Status Intended for Accessible via
Working Draft ☐ General Public ☒ Intranet ☐
Draft ☐ EUROCONTROL ☐ Extranet ☐
Proposed issue ☐ Restricted ☐ Internet (www.eurocontrol.int) ☒
Released issue ☒
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : iv Released Issue Edition : 1.0
DOCUMENT CHANGE RECORD The following table records the complete history of the successive editions of the present document.
EDITION NUMBER
EDITION DATE
REASON FOR CHANGE PAGES AFFECTED
1.0 07/12/2020
Released version prepared by the Aeronautical Information Regulations Implementation Sub-Group
(AIRI SG) and approved by the AIM/SWIM Team 19th meeting
All
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : v
CONTENTS DOCUMENT CHARACTERISTICS ............................................................................................................ II
DOCUMENT APPROVAL ......................................................................................................................... III
DOCUMENT CHANGE RECORD ............................................................................................................. IV
CONTENTS................................................................................................................................................. V
EXECUTIVE SUMMARY ........................................................................................................................... XI
1 INTRODUCTION ............................................................................................................................... 12
1.1 Context ...................................................................................................................................... 12 1.2 Purpose of the Document ......................................................................................................... 12 1.3 Objective ................................................................................................................................... 12 1.4 Scope ........................................................................................................................................ 13 1.5 Target Audience ........................................................................................................................ 13 1.6 Role of the Military .................................................................................................................... 14 1.7 Conventions .............................................................................................................................. 14
1.7.1 References to Regulation .................................................................................................. 14
1.7.2 References to EASA AMC/GM ......................................................................................... 14 1.8 EUROCONTROL Guidelines .................................................................................................... 14 1.9 Structure of the Document ........................................................................................................ 15 1.10 Maintenance of This Document ................................................................................................ 16
2 DATA SUPPLY CHAIN AND THE AERONAUTICAL DATA PROCESS........................................ 18
3 COMMISSION IMPLEMENTING REGULATION (EU) 2017/373 .................................................... 22
3.1 Overview ................................................................................................................................... 22 3.2 Cover Regulation ...................................................................................................................... 22 3.3 Annexes .................................................................................................................................... 22 3.4 High-level Rule Matrix ............................................................................................................... 23 3.5 Aeronautical Data Catalogue .................................................................................................... 25 3.6 Example Applicability: AIS Provider .......................................................................................... 26
4 STRUCTURE OF PART-AIS ............................................................................................................ 28
4.1 Composition of Annex VI (Part-AIS) ......................................................................................... 28 4.2 Structure of AMC / GM .............................................................................................................. 30 4.3 Example of Relationship of AMC/GM with Part-AIS ................................................................. 30
5 DATA ORIGINATION COVERAGE.................................................................................................. 32
6 CONCEPTUAL DIFFERENCES ADQ VERSUS PART-AIS ............................................................ 34
6.1 Main Difference Concerning Data Origination .......................................................................... 34 6.2 Transition Period ....................................................................................................................... 35
6.2.1 Initial Actions ..................................................................................................................... 35
7 IMPLEMENTATION SCENARIOS ................................................................................................... 36
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : vi Released Issue Edition : 1.0
7.1 General ...................................................................................................................................... 36 7.2 Methodology .............................................................................................................................. 36 7.3 Composition of Objective Tables .............................................................................................. 36 7.4 Commonality of Objectives ....................................................................................................... 37 7.5 Approach Taken to Key Concepts ............................................................................................ 37
7.5.1 Evidence ............................................................................................................................ 37 7.5.2 Data and Metadata ............................................................................................................ 37 7.5.3 Safety Assessments / Safety Support Assessments ........................................................ 37
7.6 Scenario 1: Implementation by AIS Provider ............................................................................ 39 7.6.1 Objective 1: Apply for Service Provider Certificate ........................................................... 39 7.6.2 Objective 2: Implement and Maintain Management System ............................................ 41 7.6.3 Objective 3: Define and Implement Processes and Procedures ...................................... 46 7.6.4 Objective 4: Establish Verification and Validation Procedures ......................................... 51
7.6.5 Objective 5: Assure Tools and Software ........................................................................... 53 7.6.6 Objective 6: Establish Process to Monitor Data ................................................................ 56 7.6.7 Objective 7: Establish and Manage Formal Arrangements .............................................. 58 7.6.8 Objective 8: Establish Process to Ensure Consistency of Data and Products ................. 61 7.6.9 Objective 9: Establish Contingency Plans ........................................................................ 64 7.6.10 Objective 10: Define and Implement Training Programme ............................................... 66 7.6.11 Objective 11: Self-Assess and Monitor Compliance With Relevant Regulations ............. 69 7.6.12 Objective 12: Error Reporting, Measurement and Corrective Actions .............................. 71 7.6.13 Objective 13: Provide and Maintain Operations Manuals ................................................. 74 7.6.14 Objective 14: Define Catalogue of AIS Products and Services ........................................ 76 7.6.15 Objective 15: Manage Requests for Data Changes.......................................................... 78 7.6.16 Objective 16: Request Data Origination / Provision .......................................................... 81
7.6.17 Objective 17: Originate Data ............................................................................................. 84 7.6.18 Objective 18: Collect Data ................................................................................................. 88 7.6.19 Objective 19: Apply Data Assurance Process .................................................................. 91 7.6.20 Objective 20: Store Data ................................................................................................... 93 7.6.21 Objective 21: Assemble AIS Products .............................................................................. 95 7.6.22 Objective 22: Annotate AIS Data / Products for Limitations ............................................. 98 7.6.23 Objective 23: Distribute AIS Products ............................................................................. 100 7.6.24 Objective 24: Manage Occurrence Reporting ................................................................. 103 7.6.25 Objective 25: Manage Changes to the Functional System ............................................. 105
7.7 Scenario 2: Implementation by ATM/ANS Provider as Data Originator ................................. 107 7.7.1 Objective 1: Define and Implement Processes and Procedures .................................... 107 7.7.2 Objective 2: Establish Verification and Validation Procedures ....................................... 112 7.7.3 Objective 3: Assure Tools and Software ......................................................................... 114
7.7.4 Objective 4: Establish Process to Monitor Data .............................................................. 116
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : vii
7.7.5 Objective 5: Establish and Manage Formal Arrangements ............................................ 118 7.7.6 Objective 6: Coordinate With AIS Provider ..................................................................... 121 7.7.7 Objective 7: Self-Assess and Monitor Compliance With Relevant Regulations ............. 123 7.7.8 Objective 8: Error Reporting, Measurement and Corrective Actions .............................. 125 7.7.9 Objective 9: Request Data Origination / Provision .......................................................... 128 7.7.10 Objective 10: Originate Data ........................................................................................... 131 7.7.11 Objective 11: Collect Data ............................................................................................... 135 7.7.12 Objective 12: Transmit Data ............................................................................................ 137 7.7.13 Objective 13: Manage Occurrence Reporting ................................................................. 139
7.8 Scenario 3: Implementation by Aerodrome Operator as Data Originator ............................... 141 7.8.1 Objective 1: Implement and Maintain Management System .......................................... 141 7.8.2 Objective 2: Define and Implement Processes and Procedures .................................... 146 7.8.3 Objective 3: Establish Verification and Validation Procedures ....................................... 149
7.8.4 Objective 4: Assure Tools and Software ......................................................................... 151 7.8.5 Objective 5: Establish Process to Monitor Data .............................................................. 153 7.8.6 Objective 6: Establish and Manage Formal Arrangements ............................................ 155 7.8.7 Objective 7: Coordinate With AIS Provider ..................................................................... 158 7.8.8 Objective 8: Define and Implement Training Programme ............................................... 160 7.8.9 Objective 9: Self-Assess and Monitor Compliance with Relevant Regulations .............. 163 7.8.10 Objective 10: Error Reporting, Measurement and Corrective Actions ............................ 165 7.8.11 Objective 11: Manage Requests for Data Changes........................................................ 168 7.8.12 Objective 12: Request Data Origination / Provision ........................................................ 171 7.8.13 Objective 13: Originate Data ........................................................................................... 174 7.8.14 Objective 14: Collect Data ............................................................................................... 177 7.8.15 Objective 15: Store Data ................................................................................................. 179
7.8.16 Objective 16: Transmit Data ............................................................................................ 181 7.9 Scenario 4: Obligations for Data Originator Not Regulated by EASA..................................... 183
7.9.1 Objective 1: Establish Verification and Validation Procedures ....................................... 183 7.9.2 Objective 2: Self-Assess and Monitor Compliance with Relevant Regulations .............. 185 7.9.3 Objective 3: Originate Data ............................................................................................. 187 7.9.4 Objective 4: Transmit Data .............................................................................................. 190
7.10 Scenario 5: Implementation by Competent Authority ............................................................. 192 7.10.1 Objective 1: Establishment of Certification and Oversight Processes ............................ 192 7.10.2 Objective 2: Certification of ATM/ANS Providers and Aerodrome Operators ................. 195 7.10.3 Objective 3: Oversight of ATM/ANS Providers and Aerodrome Operators .................... 197
7.11 Scenario 6: Implementation for Member States...................................................................... 200 7.11.1 Objective 1: Establish National Policy and Regulatory Framework ................................ 200 7.11.2 Objective 2: Oversight of Out-of-Scope Data Providers ................................................. 202
ANNEX A DIFFERENCES ADQ VS PART-AIS .............................................................................. 204
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : viii Released Issue Edition : 1.0
A.1 General .................................................................................................................................... 204 A.2 Mapping of Part-AIS to Commission Regulation (EU) 73/2010 .............................................. 204 A.3 Mapping of Commission Regulation (EU) 73/2010 to CIR 2017/373 ..................................... 208
ANNEX B COMPLIANCE MATRIX FOR AIS PROVIDERS ........................................................... 214
B.1 General .................................................................................................................................... 214 B.2 Annex III to CIR 2017/373 ....................................................................................................... 214 B.3 Annex VI to CIR 2017/373 ...................................................................................................... 214
ANNEX C SCENARIO / OBJECTIVE MAPPING ............................................................................ 217
C.1 General .................................................................................................................................... 217 C.2 Scenario to Objective Mapping ............................................................................................... 217 C.3 Objective to Scenario Mapping ............................................................................................... 220
ANNEX D REFERENCE DOCUMENTS .......................................................................................... 223
ANNEX E AUDITING CHECKLIST ................................................................................................. 226
ANNEX F TERMS AND DEFINITIONS ............................................................................................... 228
ANNEX G ABBREVIATIONS........................................................................................................... 230
ANNEX H DOCUMENT UPDATE PROCEDURE............................................................................ 232
Table 1 – New AIS Applicable ATM/ANS Requirements .......................................................................... 24 Table 2 – Annexes with Requirements Applicable to AIS Provider .......................................................... 26 Table 3 – Subject Areas ............................................................................................................................ 29 Table 4 – New AIS Applicable ATM/ANS Requirements .......................................................................... 30 Table 5 – Example Requirement and Associated Guidance .................................................................... 31 Table 6 – Data Origination Requirements ................................................................................................. 33 Table 7 - Mapping of Part-AIS to Commission Regulation (EU) 73/2010 ............................................... 208 Table 8 - Mapping of Commission Regulation (EU) 73/2010 to CIR 2017/373 ...................................... 213 Table 9 – Compliance Matrix: Annex III to CIR 2017/373 ....................................................................... 214 Table 10 – Compliance Matrix: Annex VI to CIR 2017/373 .................................................................... 216 Table 11 – Scenario to Objective Mapping ............................................................................................. 220 Table 12 – Objective to Scenario Mapping ............................................................................................. 222 Table 13 - Referenced Documents ......................................................................................................... 225 Table 14 – Terms and Definitions ........................................................................................................... 228 Table 15 – Abbreviations ........................................................................................................................ 230
Figure 1 – Data Supply Chain ................................................................................................................... 18 Figure 2 – Data Originators ....................................................................................................................... 19 Figure 3 – Aeronautical Information Products ........................................................................................... 20 Figure 4 – Aeronautical Data Processes (ADP) ....................................................................................... 21 Figure 5 – Commission Implementing Regulation (EU) 2017/373 Rule Structure ................................... 23 Figure 6: Aeronautical Data Catalogue Sample ....................................................................................... 25 Figure 7 – Structure of Part-AIS ................................................................................................................ 29 Figure 8: Conceptual Differences ADQ v Part-AIS, including interfaces with Data Originators ............... 34
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : ix
Figure 9: Methodology for Presenting Scenarios ...................................................................................... 36 Figure 10: Scenario 1 Objective 1 Flow Diagram ..................................................................................... 40 Figure 11: Scenario 1 Objective 2 Flow Diagram ..................................................................................... 45 Figure 12: Scenario 1 Objective 3 Flow Diagram ..................................................................................... 50 Figure 13: Scenario 1 Objective 4 Flow Diagram ..................................................................................... 52 Figure 14: Scenario 1 Objective 5 Flow Diagram ..................................................................................... 55 Figure 15: Scenario 1 Objective 6 Flow Diagram ..................................................................................... 57 Figure 16: Scenario 1 Objective 7 Flow Diagram ..................................................................................... 60 Figure 17: Scenario 1 Objective 8 Flow Diagram ..................................................................................... 63 Figure 18: Scenario 1 Objective 9 Flow Diagram ..................................................................................... 65 Figure 19: Scenario 1 Objective 10 Flow Diagram ................................................................................... 68 Figure 20: Scenario 1 Objective 11 Flow Diagram ................................................................................... 70 Figure 21: Scenario 1 Objective 12 Flow Diagram ................................................................................... 73 Figure 22: Scenario 1 Objective 13 Flow Diagram ................................................................................... 75 Figure 23: Scenario 1 Objective 14 Flow Diagram ................................................................................... 77 Figure 24: Scenario 1 Objective 15 Flow Diagram ................................................................................... 80 Figure 25: Scenario 1 Objective 16 Flow Diagram ................................................................................... 83 Figure 26: Scenario 1 Objective 17 Flow Diagram ................................................................................... 87 Figure 27: Scenario 1 Objective 18 Flow Diagram ................................................................................... 90 Figure 28: Scenario 1 Objective 19 Flow Diagram ................................................................................... 92 Figure 29: Scenario 1 Objective 20 Flow Diagram ................................................................................... 94 Figure 30: Scenario 1 Objective 21 Flow Diagram ................................................................................... 97 Figure 31: Scenario 1 Objective 22 Flow Diagram ................................................................................... 99 Figure 32: Scenario 1 Objective 23 Flow Diagram ................................................................................. 102 Figure 33: Scenario 1 Objective 24 Flow Diagram ................................................................................. 104 Figure 34: Scenario 1 Objective 25 Flow Diagram ................................................................................. 106 Figure 35: Scenario 2 Objective 1 Flow Diagram ................................................................................... 111 Figure 36: Scenario 2 Objective 2 Flow Diagram ................................................................................... 113 Figure 37: Scenario 2 Objective 3 Flow Diagram ................................................................................... 115 Figure 38: Scenario 2 Objective 4 Flow Diagram ................................................................................... 117 Figure 39: Scenario 2 Objective 5 Flow Diagram ................................................................................... 120 Figure 40: Scenario 2 Objective 6 Flow Diagram ................................................................................... 122 Figure 41: Scenario 2 Objective 7 Flow Diagram ................................................................................... 124 Figure 42: Scenario 2 Objective 8 Flow Diagram ................................................................................... 127 Figure 43: Scenario 2 Objective 9 Flow Diagram ................................................................................... 130 Figure 44: Scenario 2 Objective 10 Flow Diagram ................................................................................. 134 Figure 45: Scenario 2 Objective 11 Flow Diagram ................................................................................. 136 Figure 46: Scenario 2 Objective 12 Flow Diagram ................................................................................. 138 Figure 47: Scenario 2 Objective 13 Flow Diagram ................................................................................. 140 Figure 48: Scenario 3 Objective 1 Flow Diagram ................................................................................... 145 Figure 49: Scenario 3 Objective 2 Flow Diagram ................................................................................... 148 Figure 50: Scenario 3 Objective 3 Flow Diagram ................................................................................... 150 Figure 51: Scenario 3 Objective 4 Flow Diagram ................................................................................... 152 Figure 52: Scenario 3 Objective 5 Flow Diagram ................................................................................... 154
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : x Released Issue Edition : 1.0
Figure 53: Scenario 3 Objective 6 Flow Diagram ................................................................................... 157 Figure 54: Scenario 3 Objective 7 Flow Diagram ................................................................................... 159 Figure 55: Scenario 3 Objective 8 Flow Diagram ................................................................................... 162 Figure 56: Scenario 3 Objective 9 Flow Diagram ................................................................................... 164 Figure 57: Scenario 3 Objective 10 Flow Diagram ................................................................................. 167 Figure 58: Scenario 3 Objective 11 Flow Diagram ................................................................................. 170 Figure 59: Scenario 3 Objective 12 Flow Diagram ................................................................................. 173 Figure 60: Scenario 3 Objective 13 Flow Diagram ................................................................................. 176 Figure 61: Scenario 3 Objective 14 Flow Diagram ................................................................................. 178 Figure 62: Scenario 3 Objective 15 Flow Diagram ................................................................................. 180 Figure 63: Scenario 3 Objective 16 Flow Diagram ................................................................................. 182 Figure 64: Scenario 4 Objective 1 Flow Diagram ................................................................................... 184 Figure 65: Scenario 4 Objective 2 Flow Diagram ................................................................................... 186 Figure 66: Scenario 4 Objective 3 Flow Diagram ................................................................................... 189 Figure 67: Scenario 4 Objective 4 Flow Diagram ................................................................................... 191 Figure 68: Scenario 5 Objective 1 Flow Diagram ................................................................................... 194 Figure 69: Scenario 5 Objective 2 Flow Diagram ................................................................................... 196 Figure 70: Scenario 5 Objective 3 Flow Diagram ................................................................................... 199 Figure 71: Scenario 6 Objective 1 Flow Diagram ................................................................................... 201 Figure 72: Scenario 6 Objective 2 Flow Diagram ................................................................................... 203
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : xi
EXECUTIVE SUMMARY The European Aviation Safety Agency (EASA) expanded a key regulation for providers of Air Traffic Management/Air Navigation Services (ATM/ANS) by adding, inter alia, technical requirements for Aeronautical Information Service (AIS) Providers, including requirements for those parties that originate and provide data to the AIS Provider. Commission Implementing Regulation (EU) 2017/373 [Ref 3] as amended by Commission Implementing Regulation (EU) 2020/469 of 14 February 2020 [Ref 6] addresses the quality of aeronautical data and will repeal Commission Regulation (EU) 73/2010 [Ref 1] on its applicability date of 27th January 2022. This also resulted in consequential changes to Commission Regulation (EU) 139/2014 [Ref 2], with the related Delegated Act in the process of adoption. The EUROCONTROL Aeronautical Information Regulations Implementation Sub-Group (AIRI SG) requested guidance material supporting the transition and implementation of the new requirements of Annex VI (Part-AIS) and the provisions related to data origination. The development of the guidance material has been progressed in close coordination with the AIRI SG which actively supported part of the development through three action groups. Future evolution of the guidance material will be performed in close coordination with the AIRI SG under the umbrella of the AIM/SWIM Team. The “EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements”, in short the “AIR Guide”, provide an overview of the changes to the regulatory structure and content, supporting affected Stakeholders in transitioning to and achieving compliance with the amended regulations. The most significant part of the AIR Guide is a series of implementation scenarios designed to support the key actors in their implementation activities. These actors are:
• AIS Provider; • ATM/ANS Provider originating/providing data; • Aerodrome Operator originating data; • Data Originators not regulated by the subject rules; • Competent Authority; • Member State.
Each implementation scenario provides a series of objectives broken down into steps and activities. For each objective, the following complementary elements are identified:
• Primary provision(s) driving the objective; • Supporting material that is considered useful during implementation; • Evidence that may be gathered to prove compliance; • Known issues that may be encountered during implementation; • Best practice and recommendations.
By following the AIR Guide, it is envisaged that the path to compliance for the intended parties will be easier and a greater degree of harmonisation and consistency in implementation by different actors will be achieved.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 12 Released Issue Edition : 1.0
1 Introduction 1.1 Context
The European Aviation Safety Agency (EASA) expanded a key regulation for providers of Air Traffic Management/Air Navigation Services (ATM/ANS) by adding, inter alia, technical requirements for Aeronautical Information Service (AIS) Providers, including requirements for those parties that originate and provide data to the AIS Provider. Commission Implementing Regulation (EU) 2017/373 [Ref 3] as amended by Commission Implementing Regulation (EU) 2020/469 of 14 February 2020 [Ref 6], and as amended by Commission Implementing Regulation (EU) 2020/1177 – hereinafter called in short “CIR 2017/373” – addresses the quality of aeronautical data and will repeal Commission Regulation (EU) 73/2010 [Ref 1] on its applicability date of 27th January 2022. This also resulted in consequential changes1 to Commission Regulation (EU) No 139/2014 [Ref 2] with the related Delegated Act in the process of adoption. The EUROCONTROL Aeronautical Information Regulations Implementation Sub-Group (AIRI SG) requested guidance material supporting the transition and implementation of the new requirements of Annex VI (Part-AIS) and the provisions related to data origination. The development of the guidance material has been progressed in close cooperation with the AIRI SG that actively supported part of the development through three action groups. Future evolution of the guidance material will be performed in close coordination with the AIRI SG under the umbrella of the AIM/SWIM Team.
1.2 Purpose of the Document The EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements - hereafter referred to as the “AIR Guide” - have been developed to support Stakeholders in the achievement of a consistent understanding of the new regulatory requirements, including the EASA Acceptable Means of Compliance (AMC) and Guidance Material (GM). Since the EASA AMC/GM are mostly defined at a higher level, the AIR Guide provides complementary material by framing it into a structured, actor-based approach to help achieve a greater degree of harmonisation and consistency in implementation by the different actors. The AIR Guide supports all relevant types of Stakeholders who are originating, processing, storing, collecting, integrating or providing aeronautical information/data. This covers in the main: ATM/ANS Service Providers, particularly AIS Providers and a wide range of entities originating data (ATM/ANS Providers, Aerodrome Operators and private and public entities such as surveyors or military etc.). It specifically also supports Regulatory Authorities in terms of regulatory and oversight activities. Note: The AIR Guide will co-exist with the current “Aeronautical Data Quality (ADQ) Guide” until
the time when Commission Regulation (EU) 73/2010 [Ref 1] is repealed on the 27th January 2022. To aid this transition, compliance matrices are provided in Annex B.
1.3 Objective The objective of the AIR Guide is to provide its target audience (see section 1.5) with material to assist in implementation of the necessary changes to comply with the amendments to Commission Implementing Regulation (EU) 2017/3732 [Ref 3] and the consequential changes to Commission Regulation (EU) No 139/2014 [Ref 2]. This support is provided through the identification of: • A conceptual understanding of the legal changes;
1 Based on EASA Opinion 02/2018. 2 As amended by Commission Implementing Regulation (EU) 2020/469 of 14 February 2020 and Commission Implementing Regulation (EU) 2020/1177 of 7 August 2020.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 13
• The key regulatory requirements that must be met; • The actions that may be taken to bring about compliance; • AMC and GM that support implementation of these regulatory requirements; • Known issues that are likely to be encountered during implementation; • Recommendations that assist in implementation; • Evidence that may be gathered to assist in proving conformity. The AIR Guide takes a pragmatic approach which is focussed on an actor-based methodology where these actors are the regulated party who must comply with the regulation. Each actor is addressed by a dedicated implementation scenario that is provided in Chapter 7. The AIR Guide has been developed to not overburden the reader with too much background information on provisions that may hinder application. This is also because it is assumed that recent progress made in implementing Commission Regulation (EU) 73/2010 [Ref 1] provided actors with a substantial basis in terms of knowledge and experience in achieving data quality which are equally applicable to Part-AIS implementation. As the needs of users of the AIR Guide and the implementation experience change over time, further evolution of the AIR Guide may be reflected in later releases.
1.4 Scope The scope of the AIR Guide may be seen from three perspectives: 1. Actors
i. The actors that are directly impacted by CIR 2017/373 [Ref 3] and the consequential legal changes;
ii. Actors that are not directly regulated but are inherently part of the data chain, if they originate data.
2. Activities Only those activities that contribute to the aeronautical data, and the products and services which are under the scope of CIR 2017/373 [Ref 3] and Commission Regulation (EU) No 139/2014 [Ref 2], are in the scope of the AIR Guide.
3. Regulatory Those actions needed to address the changes brought about by Commission Implementing Regulation (EU) 2020/469 [Ref 6].
Whilst some requirements which already existed in either CIR 2017/373 [Ref 3] and/or Commission Regulation (EU) No 139/2014 [Ref 2] are referred to at times, the intended purpose of the AIR Guide is not to provide full coverage of these requirements.
1.5 Target Audience The AIR Guide has been developed for use by six key parties: • AIS Provider:
The State appointed provider of AIS directly regulated by new Organisation Requirements (ORs)/Technical Requirements (TRs) contained in CIR 2017/373 [Ref 3] and related Annexes.
• ATM/ANS Provider: The State appointed provider(s) of ATM/ANS if they originate data regulated by the amended CIR 2017/373 [Ref 3], Annex III.
• Aerodrome Operator: An operator of an aerodrome that falls within the scope of Commission Regulation (EU) No 139/2014 [Ref 2], if they originate/provide data for publication in the State Aeronautical Information Publication (AIP).
• Data Originator not regulated by EASA:
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 14 Released Issue Edition : 1.0
The Originator of data who does not fall within the scope of CIR 2017/373 [Ref 3] or Commission Regulation (EU) No 139/2014 [Ref 2]. Such a party will be overseen by State Competent Authorities based on Article 3(5) of CIR 2017/373 [Ref 3].
• Competent Authority: The authority, and qualified entities acting on their behalf, which exercise certification, oversight and enforcement tasks in respect of the providers of the services and functions within the scope of CIR 2017/373 [Ref 3] or Commission Regulation (EU) No 139/2014 [Ref 2].
• Member State: A member of the European Union obliged to comply with relevant EU regulations or a State which has elected to voluntarily comply with those regulations.
1.6 Role of the Military In developing the AIR Guide, the ability for it to be applied by the military has been considered. Whilst the military does not fall within the scope of the subject regulations, there is a clear need for ensuring consistency of data in the products of both the military and civil domains. The Member State has new legal obligations as per CIR 2017/373 Article 3(5) to ensure that data made available for civil use that has been originated by non-regulated parties, including the military, meets its defined quality requirements. This may be achieved through national legislation. The military fulfils many of the roles that are addressed within the AIR Guide, including that of regulator, Air Navigation Service Provider (ANSP), AIS Providers, aerodrome authority, etc. Whilst it is envisaged that the military may be addressed in later releases of the AIR Guide, at this stage, it is recommended that military functions wishing to comply, voluntarily apply Scenario 4: Obligations for Data Originator Not Regulated by EASA. In so doing, there is a clear need for the military and civil domains to collaborate closely and to ensure that the service provided to the end-user, whether this be civil or military, is seamless and consistent. Further, there is a clear legal responsibility for Member States (Article 3(5)) to ensure that any data that is provided by the military, but which falls within the scope of CIR 2017/373 [Ref 3], is compliant with its applicable data quality requirements and is processed by trained and competent staff.
1.7 Conventions 1.7.1 References to Regulation
Within the AIR Guide references to CIR 2017/373 [Ref 3] and Commission Regulation (EU) No 139/2014 [Ref 2] should be understood to include all amendments applicable to those regulations up to, and including, changes introduced by Commission Implementing Regulation (EU) 2020/469 [Ref 6] and Commission Implementing Regulation (EU) 2020/1177. Note: Further changes may be brought about through the adoption of amendments based on EASA Opinion 03/2019, mainly linked with Commission Regulation (EU) No 139/2014.
1.7.2 References to EASA AMC/GM It should be noted that when drafting this edition of the AIR Guide, AMC/GM references to the applicable Aerodrome (ADR) regulatory provisions were not available. Those references will be updated or inserted within a future edition of the AIR Guide.
1.8 EUROCONTROL Guidelines EUROCONTROL guidelines, as defined in the EUROCONTROL Regulatory and Advisory Framework (ERAF), are advisory materials and contain: “Any information or provisions for physical characteristic, configuration, material, performance, personnel or procedure, the use of which is recognised as contributing to the establishment and
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 15
operation of safe and efficient systems and services related to ATM in the EUROCONTROL Member States.” Therefore, the application of EUROCONTROL guidelines is not mandatory. In addition, ERAF specifies that:
“EUROCONTROL Guidelines may be used, inter alia, to support implementation and operation of ATM systems and services, and to:
• complement EUROCONTROL Rules and Specifications;
• complement ICAO Recommended Practices and Procedures;
• complement EC legislation;
• indicate harmonisation targets for ATM Procedures;
• encourage the application of best practice;
• provide detailed procedural information.”
1.9 Structure of the Document This document is provided in seven chapters, as follows: Chapter 1 Introduction:
This introduction. Chapter 2 Data Supply Chain and the Aeronautical Data Process:
A description of the data chain from the point of origination to end use. Chapter 3 Commission Implementing Regulation (EU) 2017/373:
An overview of CIR 2017/373 [Ref 3] and its supporting Annexes. Chapter 4 Structure of Part-AIS:
An explanation of Annex VI to CIR 2017/373 [Ref 3] “Specific Requirements for Providers of Aeronautical Information Services” (Part-AIS) and its links to material such as the Aeronautical Data Catalogue.
Chapter 5 Data Origination Coverage: An outline of how CIR 2017/373 [Ref 3] addresses data origination by different parties.
Chapter 6 Conceptual Differences ADQ versus Part-AIS: An explanation of the key differences between Commission Regulation (EU) 73/2010 [Ref 1] and its replacement CIR 2017/373 [Ref 3].
Chapter 7 Implementation Scenarios: The primary source of guidance which provides a series of six scenarios, each of which is intended for application by a different actor, comprising objectives and the relevant regulation, AMC, GM and other supporting material/guidelines available to support implementation.
Annex A Differences ADQ vs Part-AIS: Tables providing a means of identifying the differences between CIR 2017/373 [Ref 3] and Commission Regulation (EU) 73/2010 [Ref 1].
Annex B Compliance Matrix for AIS Providers: Compliance material to assist AIS Providers in demonstrating their conformity with CIR 2017/373 .
Annex C Scenario / Objective Mapping: Mapping of each scenario to objectives.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 16 Released Issue Edition : 1.0
Annex D Reference Documents: A list of documents used in the preparation of the AIR Guide.
Annex E Auditing Checklist: Reference to the work undertaken by AIRI to support compliance auditing.
Annex F Terms and Definitions: A description of terms used within the AIR Guide that are intended to be used with a specific meaning.
Annex G Abbreviations: Abbreviations used within the AIR Guide.
Annex H Document update procedure.
1.10 Maintenance of This Document The AIR Guide has been developed in line with the EUROCONTROL Standards Development Process and is maintained by EUROCONTROL. The document update procedure can be found at Annex H. The main Stakeholder group requesting this work, the AIRI SG, will remain the prime interface for the evolution of this document under the umbrella of the AIM/SWIM Team.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 17
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 18 Released Issue Edition : 1.0
2 Data Supply Chain and the Aeronautical Data Process The aeronautical data chain can be split into two main distinct parts, the upstream part covering the origination of data, through to the AIS Provider making the data available, and the downstream part covering the integration of the data by commercial providers through to end-use, as shown in Figure 1 – Data Supply Chain. The aeronautical data chain foresees the receipt, processing, management and provision of digital data to a level of assurance that meets the data quality requirements. Whilst Commission Regulation (EU) 73/2010 [Ref 1], ICAO Annex 15 [Ref 10] and ICAO Doc 10066 [Ref 14] regulate the upstream part of the data chain, CIR 2017/373 [Ref 3] will span the upstream and the downstream parts. Note: The thicker lines depict the most common data flows.
Data Originators(Private and
Public)
AIS/AIM
Datahouses
Application Integrators
End Users (Air & Ground)
Data FlowEnd User Requirements
DownstreamUpstream
CIR 2017/373
ICAO Annex 15, PANS-AIM
Part-AIS Part-DAT
ADQ
Figure 1 – Data Supply Chain
EUROCAE ED-76A [Ref 21] may be consulted which provides more details on the concept.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 19
The Data Originators within a State are wide-ranging and can be private or public entities. Some examples are displayed in Figure 2 – Data Originators.
Geodetic Agencies
Data Originators(Public and
Private)
Obstacle Owners
Aerodrome Operators
Surveyors Flight Procedure Design Services
ATM/ANS Service Providers
Search and Rescue Services Providers
Figure 2 – Data Originators
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 20 Released Issue Edition : 1.0
The aeronautical information products prepared by the AIS Provider have evolved over time from the provision of a paper AIP to digital data sets and products in electronic form, as shown in Figure 3 – Aeronautical Information Products. The availability of digital data opens up opportunities for users to access web services to obtain data. The means used to make these available has also changed with push and pull technologies in operation. To support digital data processing and enhanced products and services, there is an increasing reliance on quality assured data with demanding integrity requirements often necessitating the introduction of automation.
AIS / AIMAIS / AIM
NOTAM
AIP
Charts
Data Sets
Tailored Products
Commercial Providers /
Users
Products
Push
Pull
AIC
Figure 3 – Aeronautical Information Products
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 21
EUROCONTROL has developed guidance material in the form of the Aeronautical Data Processes (ADP) [Ref 26], as shown in Figure 4 – Aeronautical Data Processes which cover the data chain from data origination activities through to making products available by the AIS Provider. These guidelines support a data-centric environment, recognising advancements in automation, with the intention that the quality of the data is achieved and maintained from origination to provision by the AIS Provider through the application of a data assurance process. They provide detailed guidance and are intended to be generic enough to be applied by States despite the differing institutional set-ups. They are complementary to the AIR Guide that provides high-level guidance for implementing the regulation only.
Figure 4 – Aeronautical Data Processes (ADP)
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 22 Released Issue Edition : 1.0
3 Commission Implementing Regulation (EU) 2017/373
3.1 Overview EASA has issued Commission Implementing Regulation (EU) 2020/469 [Ref 6] amending Commission Implementing Regulation (EU) 2017/373 [Ref 3] and Commission Regulation (EU) No 139/2014 [Ref 2], with Commission Regulation (EU) 73/2010 [Ref 1] being repealed with effect from 27 January 2022. The objectives of the rule amendments are to:
• promote cost-efficiency in the regulatory and certification processes and to avoid duplication at national and European level;
• facilitate the free movement of airspace users across the European airspace; • ensure regulatory harmonisation across Europe, while assisting Member States in fulfilling
their obligations under the Chicago Convention, by providing a common interpretation and uniform implementation of the Chicago Convention’s provisions.
This latest revision applied to CIR 2017/373 [Ref 3] takes into account and transposes material from Commission Regulation (EU) 73/2010 [Ref 1], ICAO Annex 15 [Ref 10], ICAO Doc 10066 [Ref 14], EUROCONTROL specifications and guidance material plus industry standards.
3.2 Cover Regulation As with all regulations, CIR 2017/373 [Ref 3] is made up of articles that not only provide contextual information, such as scope, definitions and entry into force, but also lays down the overarching principles of the regulation. One key change to the cover regulation brought about by Commission Implementing Regulation (EU) 2020/469 [Ref 6] is the introduction of Article 3(5) which states: “Member States shall ensure that:
(a) entities originating aeronautical data or aeronautical information meet the requirements laid down in: (i) point ATM/ANS.OR.A.085 of Annex III, except those in points (c), (d), (f)(1) and (i)
thereof; (ii) point ATM/ANS.OR.A.090 of Annex III
(b) aeronautical data and aeronautical information are originated, processed and transmitted by adequately trained, competent and authorised personnel. When aeronautical data or aeronautical information is intended to be used for the purpose of IFR or special VFR flights, the requirements referred to in letters (a) and (b) of the first subparagraph shall apply to all entities originating such data and information.”
This article places an obligation upon each Member State to ensure that all aeronautical data or aeronautical information meets its quality requirements, irrespective of whether the originating and processing parties are subject to this regulation, or not.
3.3 Annexes The structure of CIR 2017/373 [Ref 3] is shown in Figure 5. It comprises general and specific Annexes. The focus of the AIR Guide is on Annex VI Part-AIS and its interfaces, the Data Originators.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 23
Figure 5 – Commission Implementing Regulation (EU) 2017/373 Rule Structure
Within the Annexes, EASA regulations comprise three types of provisions: • Authority Requirements (AR) – those that apply to the competent authority. • Organisation Requirements (OR) – those that apply to a complying organisation. • Technical Requirements (TR) – those that apply to a complying organisation and provide
more details about the required compliance with a related OR. Note: not all ORs have associated TRs.
3.4 High-level Rule Matrix The following table provides a matrix outlining which Annexes of CIR 2017/373 [Ref 3] apply to which actor. For completeness, actors that are outside the scope of the AIR Guide are also listed.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 24 Released Issue Edition : 1.0
Anne
x I
(Par
t-Def
initi
ons)
Anne
x II
(PAR
T- A
TM/A
NS.
AR) Annex III
(PART- ATM/ANS.OR)
Anne
x IV
(P
art-A
TS)
Anne
x V
(Par
t-MET
)
Anne
x VI
(P
art-A
IS)
Anne
x VI
I (P
art-D
AT)
Anne
x VI
II (P
art-C
NS)
Anne
x IX
(P
art-A
TFM
)
Anne
x X
(Par
t-ASM
)
Anne
x XI
(P
art-F
PD)
Anne
x XI
I (P
art-N
M)
*
Subp
art A
Subp
art B
Subp
art C
Subp
art D
Anne
x XI
II (P
art-P
ERS)
Aeronautical Information Services Providers
Air Traffic Flow Management Service Providers
Air Traffic Service Providers3
Airspace Management Service
Communication, Navigation and Surveillance Services
Competent Authorities
Data Services Providers
Flight Procedure Design Services Providers
Meteorological Services Providers
Network Manager
Table 1 – New AIS Applicable ATM/ANS Requirements
* The applicability of Annex XIII is only to those service providers who make use of ATSEP.
3 Section 3 of Annex IV (Part-ATS) only applies to providers of air traffic control services and not to providers of alerting, air traffic advisory, and flight information services.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 25
3.5 Aeronautical Data Catalogue Fundamental to CIR 2017/373 [Ref 3] is the Aeronautical Data Catalogue that is provided in Appendix 1 to Annex III of the regulation. The Aeronautical Data Catalogue consists of a series of tables that provide the quality requirements for each item contained in the AIP data set. The following figure provides an example of the manner in which the tables are presented in the Data Catalogue. In this case, the example provides part of the runway feature:
Figure 6: Aeronautical Data Catalogue Sample
It is clearly seen that the accuracy and integrity requirements for origination are provided and that the resolution requirements are indicated for publication resolution and chart resolution. The Aeronautical Data Catalogue is then referred to by OR and TR requirements in several Annexes. For example, ATM/ANS.OR.A.085 “Aeronautical data quality management” states: “When originating, processing or transmitting data to the AIS provider, the service provider shall:
(a) ensure that aeronautical data referred to in Appendix 1 conform to the specifications of the Aeronautical Data Catalogue;
(b) ensure that the following data quality requirements are met: (1) the accuracy of aeronautical data is as specified in the Aeronautical Data Catalogue; (2) the integrity of aeronautical data is maintained; (3) based on the integrity classification specified in the Aeronautical Data Catalogue,
procedures are put in place so that: (i) for routine data, corruption is avoided throughout the processing of the data; (ii) for essential data, corruption does not occur at any stage of the entire process and
additional processes are included, as needed, to address potential risks in the overall system architecture to further assure data integrity at this level;
(iii) for critical data, corruption does not occur at any stage of the entire process and additional integrity assurance processes are included to fully mitigate the effects of faults identified as potential data integrity risks by thorough analysis of the overall system architecture
…” It is envisaged that when EASA Opinion 03/2019 is finalised, similar requirements will exist for Aerodrome Operators.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 26 Released Issue Edition : 1.0
3.6 Example Applicability: AIS Provider This section explains how a party can identify which elements of CIR 2017/373 [Ref 3] they must comply with. Firstly, all parties must comply with the cover regulation, i.e. the main articles of CIR 2017/373 [Ref 3]. Table 1, above, may be used to identify those elements of the Annexes that are of interest. In the case of an AIS Provider, this indicates the sections shown in Table 2, below:
Annex Annex Title Contents Relevant to AIS Provider
I Definitions Definitions relevant to AIS
III Part-OR Common requirements for Service Providers with data quality requirements for Service Providers and Data Originators, including the Aeronautical Data Catalogue
VI Part-AIS Specific requirements for Providers of Aeronautical Information Services (AIS.OR and AIS.TR) - full content relevant to AIS Providers
XIII Part-PERS Requirements that must be complied with only when an AIS Provider makes use of ATSEP
Table 2 – Annexes with Requirements Applicable to AIS Provider
In addition, the Aeronautical Data Catalogue must be referred to in order to comply with some of the provisions contained within these Annexes. The structure of Part-AIS is detailed in Chapter 4. A similar approach may be taken by any party in the scope of this regulation, with the exception of Aerodrome Operators who must comply with Commission Regulation (EU) No 139/2014 [Ref 2] rather than CIR 2017/373 [Ref 3].
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 27
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 28 Released Issue Edition : 1.0
4 Structure of Part-AIS 4.1 Composition of Annex VI (Part-AIS)
Annex VI (Part-AIS) of CIR 2017/373 [Ref 3] contains specific requirements for providers of aeronautical information services. It comprises:
• Subpart A: Additional Organisation Requirements for Providers of Aeronautical Information Services (AIS.OR);
• Subpart B: Additional Technical Requirements for Providers of Aeronautical Information Services (AIS.TR);
• Appendices 1 to 4. Together, these parts address a broadly similar set of provisions found within Commission Regulation (EU) 73/2010 [Ref 1], which in essence, has now been replaced by a different legal instrument. This is also true for the ANSP and aerodromes, where the requirements of Commission Regulation (EU) 73/2010 [Ref 1] are now found within CIR 2017/373 [Ref 3] and Commission Regulation (EU) No 139/2014 [Ref 2] respectively. Figure 7 provides an overview of the breakdown of Part-AIS with Subparts and Appendices.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 29
Figure 7 – Structure of Part-AIS
ORs and/or TRs are provided for the subject areas shown in Table 3 and are numbered in accordance with the structure numbers displayed in Figure 7:
Requirement Numbers Subject Area
AIS.OR.1xx General Requirements
AIS.OR.2xx / AIS.TR.2xx
Data Quality Management
AIS.OR.3xx / AIS.TR.3xx
Aeronautical Information Products
AIS.OR.4xx / AIS.TR.4xx
Distribution and Pre-Flight Information Services
AIS.OR.5xx / AIS.TR.5xx
Aeronautical Information Products Updates
AIS.OR.6xx Personnel Requirements
Table 3 – Subject Areas
From Part-AIS, reference is also made to Annex III Appendix 1, the Aeronautical Data Catalogue.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 30 Released Issue Edition : 1.0
Annex III also contains new requirements that must be met by AIS Providers if they originate data. Further reference to this Annex is made in the cover regulation Article 3(5) for parties originating data who are not regulated directly by the subject regulation:
Requirement Number Requirement Area
ATM/ANS.OR.A.080 Provision of Aeronautical Data
ATM/ANS.OR.A.085 Aeronautical Data Quality Management
ATM/ANS.OR.A.090 Common Reference Systems for Air Navigation
Table 4 – New AIS Applicable ATM/ANS Requirements
4.2 Structure of AMC / GM AMC and GM are provided, where possible, for the ORs and/or TRs, as shown in the example below in Table 5. EASA defines AMC and GM as follows: “Acceptable Means of Compliance (AMC) are non-binding. The AMC serves as a means by which the requirements contained in the Basic Regulation, and the Implementing Rules (IR), can be met. However, applicants may decide to show compliance with the requirements using other means. Both NAAs and organisations may propose alternative means of compliance. ‘Alternative Means of Compliance’ are those that propose an alternative to an existing AMC. Those Alternative Means of Compliance proposals must be accompanied by evidence of their ability to meet the intent of the IR. Use of an existing AMC gives the user the benefit of compliance with the IR. Guidance Material (GM) is non-binding explanatory and interpretation material on how to achieve the requirements contained in the Basic Regulation, the IR, the AMCs and the Community Specifications (CS). It contains information, including examples, to assist the user in the interpretation and application of the Basic Regulation, its IRs, AMCs and the CSs.” To assist in the understanding of this relationship, EASA prepares versions of regulations referred to as the Easy Access Rules. These Easy Access Rules bring together the provisions, AMC and GM in a logical and related order. EASA regulations and their associated Easy Access Rule version may be found via: https://www.easa.europa.eu/regulations
4.3 Example of Relationship of AMC/GM with Part-AIS The following Table 5 provides an example of EASA’s approach to ORs and TRs and the provision of AMC and GM to support them. In this example, AIS.OR.210 relates to the exchange of aeronautical data and aeronautical information. It may be seen that, linked to this OR, there is AIS.TR.210 which elaborates further what is to be achieved in the exchange of aeronautical data and aeronautical information. This is then further reinforced by the identification of both AMC and GM for sub-bullet (a) of AIS.OR.210 relating to the format of the exchange of aeronautical data and aeronautical information. In this instance, the AMC indicates that AIXM should be used for the exchange and the GM indicates that AIXM 5.1 should be used and provides guidance as to where this may be found.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 31
Data Quality Management
OR AIS.OR.210 Exchange of aeronautical data and aeronautical information
An AIS provider shall ensure that: (a) the format of aeronautical data is based on an aeronautical information exchange model designed to be globally interoperable; and (b) aeronautical data is exchanged through electronic means.
TR AIS.TR.210 Exchange of aeronautical data and aeronautical information
Except for terrain data, the exchange format of aeronautical data shall: (a) enable the exchange of data for both individual features and feature collections; (b) enable the exchange of baseline information as a result of permanent changes; and (c) be structured in accordance with the subjects and properties of the aeronautical data catalogue, and be documented through a mapping between the exchange format and the aeronautical data catalogue.
AMC AMC1 AIS.OR.210(a) Exchange of aeronautical data and aeronautical information EXCHANGE MODEL
An AIS Provider should use the aeronautical information exchange model (AIXM) to enable the management and distribution of aeronautical information services data in digital format.
GM GM1 AIS.OR.210(a) Exchange of aeronautical data and aeronautical information EXCHANGE MODEL
Currently, AIXM 5.1 is considered as being the minimum baseline for the exchange of aeronautical data and aeronautical information. More information on the AIXM may be found under http://www.aixm.aero.
Table 5 – Example Requirement and Associated Guidance
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 32 Released Issue Edition : 1.0
5 Data Origination Coverage The data origination requirements applicable to service providers, aerodromes or Data Originators that are neither an ANSP nor an aerodrome are distributed through CIR 2017/373 [Ref 3] and Commission Regulation (EU) No 139/2014 [Ref 2], as shown in Table 6 – Data Origination Requirements.
Actor Regulation Requirements Requirement Area Contents Relevant to Data Origination
Service Providers
2017/373 Annex III
ATM/ANS.OR.A.080 Provision of Aeronautical Data
• Monitoring • Notifying AIS Provider of changes • Notifying AIS Provider of issues
ATM/ANS.OR.A.085
Aeronautical Data Quality Management
• Conform with Aeronautical Data Catalogue specifications
• Meet data quality requirements • Data origination instructions • Validation and verification • Data transmission • Formal arrangements • Timeliness • Metadata • Tools and software
ATM/ANS.OR.A.090 Common Reference Systems for Air Navigation
• Horizontal, vertical and temporal references systems
Aerodrome Operators
139/2014 Annex IV
ADR.OPS.A.005 Aerodrome Data • Determine, document, maintain and provide data relevant to aerodrome and services
ADR.OPS.A.010 Data Quality Requirements
• Data quality requirements, • Monitoring • Notifying AIS Provider of changes • Notifying ATS and AIS Provider of issues
ADR.OPS.A.015
Coordination between Aerodrome
• Reporting of information with operational significance.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 33
Actor Regulation Requirements Requirement Area Contents Relevant to Data Origination Operators and AIS Providers
ADR.OPS.B.075 Safeguarding of Aerodromes
• Monitoring
139/2014 Annex III
ADR.OR.D.010
Contracted Activities • Conformity with applicable requirements
ADR.OR.E.005
Aerodrome Manual • Information for the safe use, operation and maintenance of the aerodrome, surfaces and associated areas
Data Originators (non-ANSP, non-ADR)
2017/373 Article 3(5)
ATM/ANS.OR.A.085
Aeronautical Data Quality Management
• Conform with Aeronautical Data Catalogue specifications
• Meet data quality requirements • Validation and verification • Data transmission • Metadata
ATM/ANS.OR.A.090 Common Reference Systems for Air Navigation
• Horizontal, vertical and temporal references systems
Table 6 – Data Origination Requirements
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 34 Released Issue Edition : 1.0
6 Conceptual Differences ADQ versus Part-AIS The following figure highlights the key conceptual differences between Commission Regulation (EU) 73/2010 [Ref 1] and the regulatory approach taken by CIR 2017/373 [Ref 3] and, in particular Annex VI (Part-AIS), including its interfaces with its Data Originators.
Reg. 73/2010
Data originators
Data set requirements
CRC32Q
Quality, Safety, Security management
Conformity/Suitability of constituents
Formal arrangements
Tools and software
Reg. 2017/373
Specific DQR for Originators
Data catalogue
Cyclic codes or cryptography
QSS covered in Part-OR
Oversight of IOP-R covered Part-AR
Det. content at AMC level
Must be suitable for use
Member States’ responsibility
Use of the ICAO Data Catalogue
Other means introduced
Common Requirements
Reg. 552/2004 sufficient (parts)
Flexible approach
Pragmatic approach
AIS oversight of third parties(Article 6(5))
Oversight of achievement of DQRs(Article 3(5))Member States’ responsibility
Data exchangePerformance Based Requirements
(AIXM not mentioned)
Data exchangePerformance Based Requirements
(AIXM as AMC/GM)Performance based approach
Figure 8: Conceptual Differences ADQ v Part-AIS, including interfaces with Data Originators
To further support the understanding of these differences, Annex A provides a matrix of how the provisions of the two regulations correspond.
6.1 Main Difference Concerning Data Origination The key main difference between Commission Regulation (EU) 73/2010 [Ref 1] and the amended CIR 2017/373 [Ref 3] relates to data origination, in particular the scope of entities originating data covered by the EASA regulatory package. In this particular context, EASA could legally regulate only those entities originating data which are within their Regulatory Framework, but not any private or public entities originating data, such as private survey offices, obstacle owners or the military. Therefore, this subject was addressed as follows:
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 35
a) CIR 2017/373 [Ref 3] introduced a number of requirements in Annex III for ATM/ANS Service Providers if they originate data, including the Aeronautical Data Catalogue as a key concept. Annex VI also refers to these requirements.
b) Consequential changes to Commission Regulation (EU) No 139/2014 [Ref 2] that replicate the above requirements for the case of Aerodrome Operators originating/providing data to the AIS Provider.
c) For parties not regulated by either CIR 2017/373 [Ref 3] or Commission Regulation (EU) No 139/2014 [Ref 2] if they originate/provide data to the AIS Provider in the spirit of this regulation, a complementary enforcement duty has been allocated to the Member State to ensure that these parties comply with the data quality requirements. This is done through a new sub-item (5) within Article 3 of the cover regulation, as follows: “Article 3 (5). Member States shall ensure that: (a) entities originating aeronautical data or aeronautical information meet the requirements
laid down in: (i) point ATM/ANS.OR.A.085 of Annex III, except those in points (c), (d), (f)(1) and (i) thereof; (ii) point ATM/ANS.OR.A.090 of Annex III;
(b) aeronautical data and aeronautical information are originated, processed and transmitted by adequately trained, competent and authorised personnel.
When aeronautical data or aeronautical information is intended to be used for the purpose of IFR or special VFR flights, the requirements referred to in letters (a) and (b) of the first subparagraph shall apply to all entities originating such data and information.”
6.2 Transition Period In a transition period, all States should be compliant with Commission Regulation (EU) 73/2010 [Ref 1] and, as such, the ADQ Guide can still be applied. During the transition period of approximately 21 months (up to entry into force on the applicability date of 27 January 20224), the AIR Guide should start to be applied as Stakeholders start their implementation of CIR 2017/373 [Ref 3] and Commission Regulation (EU) No 139/2014 [Ref 2]. At the end of the transition period, Commission Regulation (EU) 73/2010 [Ref 1] and the ADQ Guide will be repealed.
6.2.1 Initial Actions For an organisation’s initial implementation actions, it is recommended that a gap analysis is performed to understand how the current status of compliance compares with that needed by January 2022. From this, an action plan may be derived, ideally addressing how any actions taken for compliance with Commission Regulation (EU) 73/2010 [Ref 1] will also contribute towards compliance with either Commission Regulation (EU) No 139/2014 [Ref 2] or CIR 2017/373 [Ref 3]. Note: It is foreseen that the AIR Guide will be expanded based on the implementation
experience of organisations.
4 Annex I (10)(b) and Annex III (5) and (6) have earlier applicability dates based on Commission Regulation (EU) 2020/1177.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 36 Released Issue Edition : 1.0
7 Implementation Scenarios 7.1 General
This chapter provides implementation guidance through a series of scenarios, each relating to an actor as identified in section 1.5. The scenario covers compliance with all the required provisions of CIR 2017/373 [Ref 3] and proposed amendments to Commission Regulation (EU) No 139/2014 [Ref 2] that fall within the scope of the AIR Guide, irrespective of which Annex they are covered in. For example, Scenario 1 which addresses the AIS Provider, is not only limited to Annex VI (Part-AIS) of CIR 2017/373 [Ref 3].
7.2 Methodology Each actor group has a scenario that is used to provide guidance tailored to the actor and the context in which it operates. Six actor groups/scenarios are addressed: o Scenario 1: Implementation by AIS Provider; o Scenario 2: Implementation by ATM/ANS Provider as Data Originator; o Scenario 3: Implementation by Aerodrome Operator as Data Originator; o Scenario 4: Obligations for Data Originator Not Regulated by EASA; o Scenario 5: Implementation by Competent Authority; o Scenario 6: Implementation for Member States.
Each scenario is presented by way of a series of objectives, with each objective described as a series of steps and each step being described by a series of activities:
Scenario
Step 1
Objective 1
Objective 2
Objective ...
Step 2
Step ...
Activity 1
Activity 2
Activity ...
Actor
Figure 9: Methodology for Presenting Scenarios
7.3 Composition of Objective Tables Each objective is described within a table, as follows: • Scenario: The actor-based (entity in EASA terms) scenario for which the objective is
provided.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 37
• Objective: The objective number and title. • Description: A description of the objective is provided by way of:
- A series of steps to be performed. The execution of some steps may be dependent upon the result of another step.
- Each step is broken down into a series of activities. • Primary Reference to Regulation: A list of the primary regulatory provisions that exist for
the objective. • Supporting Material: A list of documents and, where appropriate, references that support
implementation of the objective. This material includes AMC and GM as well as other guidance.
• Evidence of Compliance: A list of items that may be offered to support demonstration of compliance with the regulatory provisions.
• Known Issues: Issues that may hamper implementation of the objective. • Recommendations: Any recommendations that may be made to support implementation
of the objective. Each objective is then supported by a flow diagram that can be found after each objective. These flow diagrams aid the understanding of the description provided, particularly where the steps may be dependent upon earlier actions or optional, with execution based upon the decision of the actor. The flow diagrams are not intended to provide a process description, this being the responsibility of each organisation to define.
7.4 Commonality of Objectives It should be noted that many objectives are common across one or more scenarios. It was decided that the AIR Guide should repeat these objectives for each scenario, rather than cross-referencing. This means that whilst overall the AIR Guide is larger this way, actors can simply extract the specific section relevant to them without having to locate and collate the applicable pages from other scenarios. The objectives, which are common across multiple scenarios have been developed to provide as much harmonised content as possible. However, where needed and where a particular aspect is not applicable to all scenarios, the content of the objective has been tailored and differences have been reflected.
7.5 Approach Taken to Key Concepts 7.5.1 Evidence
The objectives do not list all the evidence that should be gathered. For each objective, however, the key documentation or deliverables that may be used to prove the execution of the objective is described. It is foreseen that evidence will be gathered through the application of formal processes and, therefore, the gathering of evidence when following a process is implicit in the AIR Guide.
7.5.2 Data and Metadata In use of the term ‘data’ throughout the AIR Guide, this is intended to cover both the data and its associated metadata. In a few cases in the AIR Guide, metadata is specifically mentioned. This is where particular emphasis needs to be made or the action is applicable to the metadata only.
7.5.3 Safety Assessments / Safety Support Assessments CIR 2017/373 [Ref 3] recognises that, in most cases, a traditional safety assessment cannot be performed as the end-use of the data is not fully understood. It defines two different
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 38 Released Issue Edition : 1.0
approaches on the way the ATM/ANS Providers should consider managing changes to their functional system: • a safety assessment to be performed by the Air Traffic Services (ATS) providers; • or a safety support assessment to be performed by service providers other than providers
of ATS. A safety support assessment can be considered as the set of activities carried out in order to study the impact on service behaviour resulting from any change in the AIS functional system or any new parts or components of the functional system. A functional system consists of people, procedures and equipment operating within a specific context of operations. A change in the context of operations, including a change in the concept of operations, will require a safety support assessment. The selection of whether a safety assessment or a safety support assessment is performed cannot be fully defined by this guidance and will need to be considered on a case-by-case basis by those responsible. Consequently, unless specific mention to one or the other needs to be made, the AIR Guide will refer jointly to safety assessments / safety support assessments. Support to the conduct of safety support assessments is under development and will be made available in the form of EUROCONTROL Guidelines on the Implementation of Safety Support Assessment for AIS [Ref 20].
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 39
7.6 Scenario 1: Implementation by AIS Provider 7.6.1 Objective 1: Apply for Service Provider Certificate
Scenario 1: Implementation by AIS Provider
Objective 1: Apply for Service Provider Certificate
Description The Apply for Service Provider Certificate objective describes the activities that need to be undertaken to
prepare, apply and be certified as a Service Provider by a Competent Authority.
Step Activity
1. Identify functional system 1. Assess regulation and identify functional system. 2. Record details of functional system.
2. Establish national requirements
1. Determine applicable national requirements. 2. Document national requirements for functional system.
3. Identify means of compliance 1. Identify how the national requirements are to be met. 2. Document the means of compliance.
4. Seek approval of means of compliance
1. Submit the means of compliance for the national requirements for approval.
2. Identify alternative means of compliance. 3. Implement alternative means of compliance.
5. Prepare evidence of compliance
1. Prepare package of evidence of compliance. 2. Review package of evidence. 3. Update package of evidence.
6. Prepare application for certification
1. Prepare application for certification. 2. Review application for certification.
7. Submit application to Competent Authority
1. Submit application and package of evidence to Competent Authority.
8. Support audits 1. Participate in audits. 2. Review findings.
9. Receive certification 1. Store certification documentation. 2. Communicate / make available certificate.
10. Undertake corrective action 1. Define and implement corrective action. 2. Resubmit application for certification.
Primary Reference to Regulation
Annex III to CIR 2017/3735 ATM/ANS.OR.A.005 General Requirements - Application for a service provider certificate
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373 GM3 ATM/ANS.OR.A.005 Application for a service provider
certificate
5 Commission Implementing Regulation 2017/373 as amended by Commission Implementing Regulation 2020/469.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 40 Released Issue Edition : 1.0
Evidence of Compliance
1. Completed application form.
2. Certificate issued by Competent Authority.
Known Issues
N/A
Recommendations
N/A
The following flow diagram provides a graphical representation of the Scenario 1 Objective 1 steps.
Submit application to Competent Authority
Means of compliance approved?
Audit successful?
Yes
No
S1O1.1
Identify functional system
S1O1.2
Establish national requirements
S1O1.3
Identify means of compliance
S1O1.4
Seek approval of means of compliance
S1O1.5
Prepare evidence of compliance
S1O1.6
Prepare application for certification
S1O1.7
Submit application to Competent Authority
S1O1.8
Support audits
S1O1.10
Undertake corrective actionYes
No
S1O1.9
Receive certification
Figure 10: Scenario 1 Objective 1 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 41
7.6.2 Objective 2: Implement and Maintain Management System Scenario 1: Implementation by AIS Provider
Objective 2: Implement and Maintain Management System
Description The Implement and Maintain Management System objective describes the activities needed to assess the
current management documentation in place in order to identify requirements for the development, implementation and maintenance of a compliant management system. The Management System addresses
quality, safety and security management systems which are typically implemented at the corporate level.
Step Activity
1. Create project team 1. Identify project lead. 2. Identify project personnel, including responsibilities.
2. Identify existing documentation covering quality objectives
1. Identify existing quality management system documentation covering all aeronautical data activities, including: • the quality policy; • quality assurance programme; • evidence of the functioning of the quality system by means
of manuals and monitoring documents.
3. Identify existing documentation covering safety objectives
1. Identify existing safety management system documentation covering all aeronautical data activities.
2. Identify Safety Managers’ roles and responsibilities. 3. Description of the safety management system relevant to
aeronautical data activities: • scope of the safety management system; • safety policy and objectives; • safety responsibilities of key safety personnel; • documentation control procedures; • safety risk management process, including hazard
identification and risk assessment schemes; • monitoring of implementation and effectiveness of safety
actions, and risk mitigation measures; • safety performance monitoring; • safety reporting (including hazard reporting) and
investigation; • emergency response planning; • management of change (including organisational changes
with regard to safety responsibilities); • safety promotion; and • safety management system outputs.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 42 Released Issue Edition : 1.0
4. Identify existing documentation covering security objectives
1. Identify existing security management system documentation covering all aeronautical data activities.
2. Identify existing security processes, measures and standards so that data are protected from interference and restricted only to those authorised and therefore the risk of any aviation incident arising from data errors (intentional or accidental) is minimised.
3. Identify established means designed to detect security breaches. 4. Identify existing procedures relating to data security risk
assessment and mitigation, security monitoring and improvement, security reviews and lesson dissemination.
5. Identify established means designed to control the effects of security breaches, identifying recovery action and mitigation procedures to prevent reoccurrence.
6. Identify implemented measures to protect aeronautical data against cyber security threats.
5. Perform gap analysis
1. Identify roles to be involved in gap analysis. 2. Arrange gap analysis meetings. 3. Perform gap analysis of existing documentation for aeronautical
data activities against management system standard and applicable aeronautical data quality regulations.
4. Record findings. 5. Prepare gap analysis report. 6. Review gap analysis report.
6. Obtain management buy-in 1. Present gap analysis, resource estimates, timescales, benefits and envisaged work.
7. Develop company policies 1. Define requirements related to the management system. 2. Develop company policies.
8. Define and map company processes
1. Determine how management system requirements are to be met.
2. Identify required company processes / updates. 3. Draft implementation plan.
9. Document company processes 1. Develop / update company processes. 2. Review company processes. 3. Assess company processes.
10. Provide training to support the established management system
1. Identify training requirements. 2. Train personnel. 3. Update training records.
11. Trial management system
1. Trial management system. 2. Record trial findings. 3. Review trial findings. 4. Update management system. 5. Review management system.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 43
12. Implement management system
1. Inform affected personnel of roll-out of the management system. 2. Withdraw former documentation. 3. Adjust records of configuration management.
13. Plan internal audit / compliance review of management system
1. Plan internal audit / compliance review schedule. 2. Prepare plan. 3. Provide plan.
14. Perform internal audit / compliance review of management system
1. Perform internal audit / compliance review as per established schedule.
2. Prepare report recording all findings and observations. 3. Publish report. 4. Agree and record corrective actions to be taken (with associated
target dates). 5. Conduct follow-up review of actions.
15. Appoint external review body 1. Identify external body to perform an external audit / compliance review of the management system.
16. External audit / compliance review of management system
1. Arrange for external audit / compliance review. 2. Provide necessary input material. 3. Participate in audit / compliance review. 4. Review findings. 5. Define corrective actions. 6. Implement corrective actions. 7. Arrange audit / compliance review of corrective actions.
17. Oversight of management system
1. Identify internal audit / compliance review intervals and schedule.
2. Perform internal audit / compliance review. 3. Support external audit / compliance review.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.B.005 Management - Management system
Annex VI to CIR 2017/373 AIS.OR.100 Aeronautical information management
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373 GM1 ATM/ANS.OR.B.005 Management system
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
GM1 AIS.OR.235 Error reporting and corrective action
GM1 AIS.OR.100 Aeronautical information management
ICAO Doc 10066 3.1 Quality Management System
ICAO Doc 8126 - Volume I 3.2 Organization of an AIS
Evidence of Compliance
1. Quality Policy.
2. Quality assurance programme.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 44 Released Issue Edition : 1.0
3. Management system manual(s) and supporting documents (including work instructions).
4. Job descriptions.
5. Company organogram.
6. Risk register.
7. Management system external and internal audit report & documented remedial actions.
8. Management system monitoring documents.
9. ISO certificate (if ISO).
10. Certificate issued by certification body.
Known Issues
1. Lack of awareness and inclusion of the safety of data in company management systems.
Recommendations
1. Ensure business priorities are consistently applied and managed, which requires an active engagement / commitment of management.
2. Raise awareness of safety experts on approach to safety assessment / safety support assessment of processes and procedures.
3. A phased approach to internal audit / compliance review is recommended, focussing on small areas at a time.
4. Company policies should address topics such as safety, quality, security and risk management.
5. Integrated company policies may address more than one of these topics.
6. The scope of training provided will vary and must meet the structure of the company policies defined.
7. Provide targeted awareness events, including short overviews dedicated specifically to senior management.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 45
The following flow diagram provides a graphical representation of the Scenario 1 Objective 2 steps.
S1O2.1
Create project team
S1O2.2Identify existing
documentation covering quality objectives
S1O2.3Identify existing
documentation covering Safety objectives
S1O2.4Identify existing
documentation covering Security objectives
S1O2.5
Perform gap analysis
S1O2.6
Obtain management buy-in
S1O2.7
Develop company policies
S1O2.8
Define and map company processes
S1O2.9
Document company processes
S1O2.10Provide training to support the
established management system
S1O2.11
Trial management system
S1O2.12
Implement management system
S1O2.13Plan internal audit /
compliance review of management system
S1O2.14Perform internal audit / compliance review of management system
S1O2.15
Appoint external review body
S1O2.16External audit / compliance
review of management system
S1O2.17
Oversight of management system
Figure 11: Scenario 1 Objective 2 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 46 Released Issue Edition : 1.0
7.6.3 Objective 3: Define and Implement Processes and Procedures Scenario 1: Implementation by AIS Provider
Objective 3: Define and Implement Processes and Procedures
Description The Define and Implement Processes and Procedures objective describes the activities needed to assess, amend, train, trial, implement and oversee processes and procedures related to data processing and which
are utilised by later objectives.
Step Activity
1. Assess current processes and procedures relating to aeronautical data
1. Identify requirements. 2. Perform gap analysis. 3. Record findings.
2. Identify non-conformities 1. Identify non-conformities. 2. Establish plan for addressing non-conformities.
3. Document revised processes and procedures relating to aeronautical data
1. Amend / create processes and procedures to address non-conformities.
2. Review amended processes and procedures.
4. Assess processes and procedures relating to aeronautical data
1. Arrange for the assessment of amended processes and procedures.
2. Participate in the assessment. 3. Review assessment findings. 4. Update processes and procedures.
5. Train processes and procedures relating to aeronautical data
1. Identify training requirements. 2. Conduct training. 3. Update training records.
6. Trial processes and procedures relating to aeronautical data
1. Trial processes and procedures. 2. Record findings of trial. 3. Review findings of trial. 4. Update processes and procedures. 5. Review processes and procedures.
7. Implement processes and procedures relating to aeronautical data
1. Inform affected personnel of roll-out of processes and procedures.
2. Withdraw former processes and procedures. 3. Adjust records of configuration management.
8. Plan internal audit / compliance review of processes and procedures relating to aeronautical data
1. Plan internal audit / compliance review schedule. 2. Prepare plan. 3. Provide plan.
9. Perform internal audit / compliance review of processes and procedures relating to aeronautical data
1. Perform internal audit / compliance review as per established schedule.
2. Prepare report recording all findings and observations. 3. Publish report.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 47
4. Agree and record corrective actions to be taken (with associated target dates).
5. Conduct follow-up review of actions.
10. Oversee processes and procedures relating to aeronautical data
1. Identify internal audit / compliance review intervals and schedule.
2. Perform internal audit / compliance review.
Primary Reference to Regulation
Annex III to CIR 2017/373
ATM/ANS.OR.A.080 Provision of aeronautical data
ATM/ANS.OR.A.085 Aeronautical data quality management
ATM/ANS.OR.A.090 Common reference systems for air navigation
Annex VI to CIR 2017/373
AIS.OR.100 Aeronautical information management
AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
AIS.OR.200 General
AIS.OR.230 Data error detection and authentication
AIS.OR.235 Error reporting, error measurement, and corrective actions
AIS.TR.200 Data Quality Management - General
AIS.TR.235 Error reporting, error measurement and corrective actions
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) of CIR 2017/373
GM1 ATM/ANS.OR.085 Aeronautical data quality management - Urgent Distribution
GM1 ATM/ANS.OR.A.085(a) Aeronautical data quality management - Aeronautical Data Catalogue
GM1 ATM/ANS.OR.A.085(b) Aeronautical data quality management - General
GM1 ATM/ANS.OR.A.085(b)(4)
Aeronautical data quality management - Resolution
GM1 ATM/ANS.OR.A.085(b)(5)
Aeronautical data quality management - Traceability
AMC1 ATM/ANS.OR.A.085(b)(8)
Aeronautical data quality management - Format
AMC1 ATM/ANS.OR.A.085(d)
Aeronautical data quality management - Validation and Verification
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 48 Released Issue Edition : 1.0
GM1 ATM/ANS.OR.A.085(d) Aeronautical data quality management - Validation and Verification
GM2 ATM/ANS.OR.A.085(d) Aeronautical data quality management - Validation and Verification Techniques
GM1 ATM/ANS.OR.A.085(e) Aeronautical data quality management - Electronic Means
AMC1 ATM/ANS.OR.A.085(f)
Aeronautical data quality management - Formal Arrangements
GM1 ATM/ANS.OR.A.085(f) Aeronautical data quality management - Formal Arrangements
GM1 ATM/ANS.OR.A.085(i) Aeronautical data quality management - Software
GM2 ATM/ANS.OR.A.085(i) Aeronautical data quality management - Tools
GM1 ATM/ANS.OR.A.085(j) Aeronautical data quality management - Data Error Detection Techniques
GM2 ATM/ANS.OR.A.085(j) Aeronautical data quality management - Data Error Processing
GM1 ATM/ANS.OR.A.085(l) Aeronautical data quality management - Error Handling
GM1 ATM/ANS.OR.A.090(a) Common reference systems for air navigation - Horizontal Reference System
GM2 ATM/ANS.OR.A.090(a) Common reference systems for air navigation - Temporary Non-Compliance
AMC1 ATM/ANS.OR.A.090(b)
Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Mean Sea Level
GM2 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(c) Common reference systems for air navigation - Temporal Reference System
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
AMC1 AIS.OR.200(c) General - Automated Data Processing
GM1 AIS.OR.200(a) General - Aeronautical Data Catalogue
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 49
GM1 AIS.OR.200(b) General - Data Quality
GM1 AIS.OR.230 Data error detection and authentication - General
GM1 AIS.OR.230(a) Data error detection and authentication - Error
GM1 AIS.OR.235 Error reporting, error measurement and corrective action
GM1 AIS.TR.200(b) General - Accuracy, Resolution
ICAO Doc 8126 - Volume II
6.2.1 General Aspects
6.2.2 Data error detection and reporting
ICAO Doc 10066 Quality Management System 3.1 EUROCONTROL Aeronautical Data Processes
EUROCONTROL Guidelines on Safety Support Assessments performed by AIS Providers (in development)
EUROCONTROL-GUID-0121 EUROCONTROL Guidelines Operating Procedures for AIS Dynamic Data (OPADD)
Evidence of Compliance
1. Documented processes and procedures.
2. Safety assessment / safety support assessment findings.
3. Evidence of error reporting and rectification.
Known Issues
1. Lack of formally captured processes and procedures or documented processes and procedures do not reflect day-to-day activities.
2. Selection of appropriate and efficient methodology to be applied.
3. Difficulty in selecting the granularity at which to capture the processes and procedures.
4. Lack of independent resource with knowledge to perform reviews.
5. Error processes may be restricted to incidents.
Recommendations
1. Start with a review of any existing documented processes and procedures to ensure these reflect current practices and, where possible, adapt these rather than start from new.
2. A phased approach to internal audit / compliance review is recommended, focussing on small areas at a time.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 50 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 1 Objective 3 steps.
S1O3.1
Assess current processes and procedures
S1O3.2
Identify non-conformities
S1O3.3
Document revised processes and procedures
S1O3.4
Assess processes and procedures
S1O3.5
Train processes and procedures
S1O3.6
Trial processes and procedures
S1O3.7
Implement processes and procedures
S1O3.8Plan internal audit /
compliance review of processes and procedures
S1O3.9Perform internal audit / compliance review of
processes and procedures
S1O3.10
Oversee processes and procedures
Figure 12: Scenario 1 Objective 3 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 51
7.6.4 Objective 4: Establish Verification and Validation Procedures Scenario 1: Implementation by AIS Provider
Objective 4: Establish Verification and Validation Procedures
Description The Establish Verification and Validation Procedures objective describes the establishment of procedures to
ensure that data meets all its applicable requirements and has been processed appropriately.
Step Activity
1. Define the requirements 1. Identify6 the data quality requirements for all applicable data items.
2. Identify the procedures to be applied to validate and verify data
1. Identify the checks that may be performed for the different types of data and the different data integrity levels.
2. Document the validation and verification procedures.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.085(d) Aeronautical data quality management - Validation and Verification
Annex VI to CIR 2017/373
AIS.OR.220 Validation and verification
AIS.TR.200 AIS.TR.220
General
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
AMC1 ATM/ANS.OR.A.085(d)
Aeronautical data quality management - Validation and Verification
GM1 ATM/ANS.OR.A.085(d) Aeronautical data quality management - Validation and Verification - General
GM2 ATM/ANS.OR.A.085(d) Aeronautical data quality management - Validation and Verification Techniques
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
GM1 AIS.OR.220 Validation and verification - General
GM1 AIS.TR.200(b) General
AMC1 AIS.OR.220 Validation and verification processes
ICAO Doc 8126 - Volume II 4.1 Verification and validation
ICAO Doc 10066 2.1.2 Processing
Evidence of Compliance
1. Documented processes and procedures.
2. Recorded findings of all checks performed.
6 Relevant DQRs should have already been defined and those applicable will be identified from those established.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 52 Released Issue Edition : 1.0
Known Issues
1. Parties are not aware of their individual responsibilities for validation and verification.
2. The AIS Provider is not able to fully validate and verify data provided to it. It can only perform plausibility checks.
3. Processes are not adequate for the assigned integrity level of the data item (as per EUROCONTROL Specifications).
4. The validation and verification of accuracy, etc. can only be performed by the Data Originator.
Recommendations
1. Regulator involvement is recommended for ensuring parties are aware of and fulfil their responsibilities.
2. In some cases, plausibility checks may need to be applied to confirm the suitability of data.
The following flow diagram provides a graphical representation of the Scenario 1 Objective 4 steps.
S1O4.1
Define the requirements
S1O4.2Identify the procedures to be applied to validate and verify
data
Figure 13: Scenario 1 Objective 4 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 53
7.6.5 Objective 5: Assure Tools and Software Scenario 1: Implementation by AIS Provider
Objective 5: Assure Tools and Software
Description The Assure Tools and Software objective describes the activities needed to ensure that those tools and
software that form part of the data assurance process are fit for their intended purpose.
Step Activity
1. Identify tools and software 1. Identify tools and software currently used in data processes.
2. Determine tools and software requiring assurance, documenting findings.
2. Define the requirements 1. Identify and document relevant requirements applicable to tools and software.
3. Determine methodology to be applied
1. Identify and document methodology to be applied to bespoke software.
2. Prepare assurance plan.
4. Perform tool assessment / validation and verification
1. Identify and document safety risks associated with the use of the tool/software.
2. Perform tool assessment / validation and verification. 3. Document findings.
5. Confirm readiness 1. Confirm and document tool’s compliance and readiness for use.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.085(i) Aeronautical data quality management - Software
Annex VI to CIR 2017/373 AIS.OR.215 Tools and software
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
GM1 ATM/ANS.OR.A.085(i) Software
GM2 ATM/ANS.OR.A.085(i) Tools
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
GM1 AIS.OR.215 Software
GM2 AIS.OR.215 Tools
ICAO Doc 8126 - Volume I 3.6 Tools and software
EUROCAE ED-76A Standards for Processing Aeronautical Data
EUROCAE ED-215 Software Tool Qualification Considerations
Evidence of Compliance
1. Tool operational requirements documentation.
2. Tool qualification plan.
3. Tool qualification results.
4. Manufacturer’s declarations of conformity / suitability for use.
5. Technical File.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 54 Released Issue Edition : 1.0
Known Issues
1. Lack of understanding of tool qualification process.
2. Cost of tool qualification.
3. Lack of defined requirements for tools.
4. Agreement on scope of tools to be qualified.
5. Choice of software safety assurance / safety support assessment standard to be applied.
6. No retention policy for old tools / old version of tools.
7. The pace of change in the context of airspace and related (change) requirements moving faster than the development of AIXM (e.g. DHO).
Recommendations
1. Ensure that each requirement is uniquely identified.
2. Agree any software safety assurance standard / safety support assessment standards with the Regulator.
3. Address the identified issues in the relevant documents (as listed in the evidence of compliance above).
4. When assessing errors in tools and procedures, ensure that consequential errors in data are identified.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 55
The following flow diagram provides a graphical representation of the Scenario 1 Objective 5 steps.
S1O5.1
Identify tools and software
S1O5.2
Define the requirements
S1O5.3
Determine methodology to be applied
S1O5.4
Perform tool assessment/validation and verification
S1O5.5
Confirm readiness
Figure 14: Scenario 1 Objective 5 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 56 Released Issue Edition : 1.0
7.6.6 Objective 6: Establish Process to Monitor Data Scenario 1: Implementation by AIS Provider
Objective 6: Establish Process to Monitor Data
Description The Establish Process to Monitor Data objective describes the activities to be undertaken to ensure that
those items which are the responsibility of the AIS Provider to originate are regularly reviewed and updated, where necessary. Other parties providing data to the AIS Provider should also have monitoring processes in
place.
Step Activity
1. Establish review cycle for all data
1. Use the established Aeronautical Data Catalogue. 2. Record review cycle for all data items provided for publication
and identify relevant data activities.
2. Assign responsibilities for monitoring of data
1. Identify units / role responsible for monitoring data. 2. Implement mechanisms to instigate data reviews.
3. Review data 1. Determine if scope of data published is correct. 2. Ensure currency of published data. 3. Determine completeness of published data. 4. Ensure data meets operational needs. 5. Ensure data meets any new / changed requirements in terms of
scope, quality and content.
4. Record review findings 1. Record scope of data reviewed. 2. Record findings of review.
5. Update / withdraw / originate data
1. Request Data Origination / Provision, and / or 2. Originate Data
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.080(b) Provision of aeronautical data
Supporting Material
Evidence of Compliance
1. Evidence demonstrating that data monitoring activities are executed.
2. Data changes resulting from data monitoring activities.
Known Issues
N/A
Recommendations
N/A
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 57
The following flow diagram provides a graphical representation of the Scenario 1 Objective 6 steps.
S1O6.1
Establish review cycle for all data
S1O6.2
Assign responsibilities for monitoring of data
S1O6.3
Review data
S1O6.4
Record review findings
S1O6.5
Update / withdraw / originate data
Figure 15: Scenario 1 Objective 6 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 58 Released Issue Edition : 1.0
7.6.7 Objective 7: Establish and Manage Formal Arrangements Scenario 1: Implementation by AIS Provider
Objective 7: Establish and Manage Formal Arrangements
Description The Establish and Manage Formal Arrangements objective describes the activities needed to identify the
need for and develop, implement and monitor Formal Arrangements that accurately describe the responsibilities of parties in providing and receiving data.
Step Activity
1. Identify all parties/individuals with whom data is exchanged
1. Determine if the Regulator has assigned responsibility, e.g. through a National Data Catalogue (Data Originator Index).
2. Refer to the assignments of responsibility made by the Regulator.
3. If no assignment exists, for each property/sub-property in the National Data Catalogue, identify the parties transmitting / providing data.
4. Agree assignments with the identified parties.
5. Discuss/agree the assignments with the Regulator.
2. Identify data items and data activities for which the party is responsible
1. Using the assignments, identify data items within the responsibility of the party which are provided by the party itself or parties acting on their behalf (contracted activities) for publication in AIS products.
2. Identify all data activities conducted by the party or other parties acting on their behalf, such as origination, storage, processing and transfer.
3. Agree the Formal Arrangements template
1. Create template.
2. Confirm compliance with regulatory needs.
3. Agree template with relevant parties, e.g. Regulator, legal, etc.
4. Establish Formal Arrangements with all relevant parties
1. Use National Data Catalogue from Step 1. to identify where Formal Arrangements are required.
2. Identify the means of documenting the Formal Arrangements for each party, e.g., SLA, contract, etc.
3. Discuss the relevant details that are to be covered within the Formal Arrangements (e.g. scope, data items, standards, reporting, performance, etc).
4. Prepare Formal Arrangements based on the agreed template.
5. Agree Formal Arrangements with each party.
6. Sign and implement Formal Arrangements.
5. Manage Formal Arrangements 1. Record performance.
2. Address non-achievement or issues.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 59
6. Monitor and report performance of Formal Arrangements
1. Where required by the Formal Arrangements, prepare and issue a performance report using gathered statistics.
2. Identify requirements for Formal Arrangements revision.
7. Revise Formal Arrangements
1. Revise Formal Arrangements.
2. Discuss/agree updated Formal Arrangements with each party.
3. Sign and implement updated Formal Arrangements.
1. Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.085(f) Aeronautical data quality management - Formal Arrangements
Annex VI to CIR 2017/373 AIS.OR.205 Formal Arrangements
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
AMC1 ATM/ANS.OR.A.085(f)
Aeronautical data quality management - Formal Arrangements
GM1 ATM/ANS.OR.A.085(f) Aeronautical data quality management - Formal Arrangements — Template
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373 AMC1 AIS.OR.205 Formal Arrangements - Minimum
Content
ICAO Annex 15 2.1.5 State responsibilities
2.3.2 Exchange of aeronautical data and aeronautical information
ICAO Doc 8126 - Volume I 4.4 Formal Arrangements
ICAO Doc 8126 - Volume II 3.3 Formal Arrangements with data originators
ICAO Doc 10066 2.1.1 Collection
EUROCONTROL ADQ Formal Arrangements Template
Evidence of Compliance
1. Signed Formal Arrangements.
2. National Data Catalogue.
Known Issues
1. Management commitment and resources.
2. Understanding the responsibilities of the Data Originator and the relevant DQRs.
3. Lack of stable and agreed National Data Catalogue.
4. Large number of different data origination tools, some of which are quite complex.
5. Large number of different types of Data Originators to be managed, with some Data Originators responsible for a large amount of data.
Recommendations
1. Regulator involvement is recommended.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 60 Released Issue Edition : 1.0
2. Consideration is given to the achievement of AIRAC timescales during development of the Formal Arrangements.
3. When the Formal Arrangements relates to services provided to the AIS Provider by an organisation that does not fall under the scope of CIR 2017/373, the Formal Arrangements should include AIS oversight of the tasks performed.
The following flow diagram provides a graphical representation of the Scenario 1 Objective 7 steps.
S1O7.1
Identify all parties/individuals with whom data is exchanged
S1O7.2Identify data items and data
activities for which the party is responsible
S1O7.3
Agree the Formal Arrangements template
S1O7.4Establish Formal
Arrangements with all relevant parties
S1O7.5
Manage Formal Arrangements
S1O7.6Monitor and report
performance of Formal Arrangements
S1O7.7
Revise Formal Arrangements
Figure 16: Scenario 1 Objective 7 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 61
7.6.8 Objective 8: Establish Process to Ensure Consistency of Data and Products
Scenario 1: Implementation by AIS Provider
Objective 8: Establish Process to Ensure Consistency of Data and Products
Description The Establish Process to Ensure Consistency of Data and Products objective describes how to define, train,
trial, implement and monitor a process that ensures that data and products are consistent.
Step Activity
1. Establish process
1. Identify products and common data to be consistent. 2. Document findings. 3. Conduct review with key personnel, including third parties,
confirming data and identifying means for checks. 4. Draft consistency process. 5. Review consistency process. 6. Update consistency process.
2. Train process 1. Train process. 2. Update training records. 3. Update Formal Arrangements.
3. Trial process 1. Trial consistency process. 2. Review findings of trial. 3. Update process.
4. Implement process
1. Inform affected personnel of roll-out of process. 2. Withdraw former process. 3. Archive former process. 4. Adjust records of configuration management.
5. Oversee process
1. Perform internal audits in line with management system. 2. Document findings. 3. Conduct review meetings with external parties. 4. Document findings. 5. Update/maintain process.
Primary Reference to Regulation
Annex VI to CIR 2017/373 AIS.OR.250 Consistency requirement
AIS.OR.300 General — Aeronautical information product consistency
Supporting Material
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
AMC1 AIS.OR.250 Consistency requirement - Duplicated Information
GM1 AIS.OR.250 Consistency requirement - Duplicated Information
GM1 AIS.OR.300 Aeronautical Data and Information Provided in Multiple Formats
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 62 Released Issue Edition : 1.0
ICAO Doc 10066 2.1.3 Quality control
Evidence of Compliance
1. Data-driven process.
2. Formal Arrangements, including between States.
3. Means to identify products impacted by data change.
Known Issues
1. Misunderstanding of consistency / resolution of data.
2. Different resolutions of data across borders.
3. Inconsistent publications.
4. Lack of notification of data changes from other States.
Recommendations
1. Integrated database to be implemented.
2. All processes at AIS Provider level to use data from one common, consistent data source.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 63
The following flow diagram provides a graphical representation of the Scenario 1 Objective 8 steps.
S1O8.1
Establish process
S1O8.2
Train process
S1O8.3
Trial process
S1O8.4
Implement process
S1O8.5
Oversee process
Figure 17: Scenario 1 Objective 8 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 64 Released Issue Edition : 1.0
7.6.9 Objective 9: Establish Contingency Plans Scenario 1: Implementation by AIS Provider
Objective 9: Establish Contingency Plans
Description The Establish Contingency Plans objective describes how contingency plans should be developed, tested
and monitored for identified risks.
Step Activity
1. Identify risks 1. Identify key personnel. 2. Conduct risk meeting. 3. Document findings.
2. Plan contingency and continuity
1. Identify contingency for key risks. 2. Document decisions made. 3. Prepare contingency plan. 4. Review contingency plan.
3. Validate contingency plan 1. Safety assess / safety support assess contingency plan. 2. Record findings. 3. Update contingency plan.
4. Test contingency plan
1. Execute contingency plans. 2. Record findings. 3. Review findings. 4. Update contingency plans. 5. Update Formal Arrangements.
5. Oversee plans
1. Review current modes of operations against latest requirements. 2. Perform review of contingency plans. 3. Record findings. 4. Update contingency plans. 5. Update Formal Arrangements.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.070 Contingency plans
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373 GM1 ATM/ANS.OR.A.070 Contingency plans
Evidence of Compliance
1. Contingency plans.
2. Evidence of testing of contingency plans.
Known Issues
1. Understanding the impact of small delays on AIP production.
2. Ability to test contingency plans.
3. Oversight of contingency plans - plans out of date.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 65
Recommendations
N/A
The following flow diagram provides a graphical representation of the Scenario 1 Objective 9 steps.
S1O9.1
Identify risks
S1O9.2
Plan contingency and continuity
S1O9.3
Validate contingency plan
S1O9.4
Test contingency plan
S1O9.5
Oversee plans
Figure 18: Scenario 1 Objective 9 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 66 Released Issue Edition : 1.0
7.6.10 Objective 10: Define and Implement Training Programme Scenario 1: Implementation by AIS Provider
Objective 10: Define and Implement Training Programme
Description The Define and Implement Training Programme objective describes how a Competence Scheme and
training programme should be established to ensure that all staff are competent and trained for the activities they perform.
Step Activity
1. Create Competence Scheme
1. Determine the regulatory requirements related to training and competence.
2. Identify minimum competency levels (requirements) for personnel involved in performing data activities in accordance with the relevant regulations.
3. Record competence levels. 4. Identify training for competence levels.
2. Determine training programme
1. Identify existing training programme for personnel involved in data activities (including contractors, if relevant).
2. Create or update the training programme for the identified training requirements, including refresher training.
3. Identify training needs
1. Using the Competence Scheme and training programme, determine the training needs for each role, identifying if any role changes require different competences to be recorded in the Competence Scheme.
2. Assess individuals, identifying any changes in their role and any gaps in competence.
3. Update Competence Scheme and training programme, as needed.
4. Update individual training records with required training.
4. Provide training
1. Provide training following training programme. 2. Gather feedback. 3. Update training records. 4. Record received feedback. 5. Update training programme.
Primary Reference to Regulation
Annex VI to CIR 2017/373 AIS.OR.600 Personnel - General requirements
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
AMC1 ATM/ANS.OR.B.005(a)(6)
Management system - Training and Competency
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373 GM1 AIS.OR.600(b) General requirements –
Competence, Authorisation
ICAO Doc 8126 - Volume I 3.4.2 Competencies
ICAO Training Manual
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 67
Evidence of Compliance
1. Competence matrix.
2. Staff licences.
3. Training plans.
4. Training records.
Known Issues
1. Granularity at which to hold competence matrix.
2. Lack of management support for training.
3. Training provided in a reactive, not pro-active manner.
Recommendations
1. Monitoring of the delivery of the training programme – including reminders to personnel requiring training and reports to their line managers and training managers. Make it as easy as possible for your personnel – they should not have to organise/chase training.
2. Training should include, as a minimum, the promotion of safety awareness around the organisation by sharing lessons arising from safety activities.
3. All staff should be involved in proposing solutions to identified safety issues and improvements to the effectiveness and efficiency of the processes.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 68 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 1 Objective 10 steps.
S1O10.1
Create Competence Scheme
S1O10.2
Determine training programme
S1O10.3
Identify training needs
S1O10.4
Provide training
Figure 19: Scenario 1 Objective 10 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 69
7.6.11 Objective 11: Self-Assess and Monitor Compliance With Relevant Regulations
Scenario 1: Implementation by AIS Provider
Objective 11: Self-Assess and Monitor Compliance With Relevant Regulations
Description The Self-Assess and Monitor Compliance With Relevant Regulations objective describes how the work
performed should be regularly and formally monitored and, where necessary, adapted to ensure compliance with the latest regulations.
Step Activity
1. Determine required legal baseline
1. Determine the regulations with which compliance is to be monitored.
2. Plan compliance review 1. Plan internal compliance review schedule. 2. Prepare compliance review plan. 3. Provide compliance review plan.
3. Perform compliance review
1. Perform internal compliance review as per established schedule. 2. Prepare compliance report recording all findings and
observations. 3. Publish compliance report. 4. Agree and record corrective actions to be taken (with associated
target dates). 5. Conduct follow-up review of actions.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.B.005(c) Management system
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
AMC1 ATM/ANS.OR.B.005(c)
Management system - Compliance Monitoring
GM1 ATM/ANS.OR.B.005(c) Management system - Compliance Monitoring Organisational Set-Up
Evidence of Compliance
1. Internal compliance review schedule.
2. Internal compliance review plan.
3. Reports of internal compliance reviews.
Known Issues
1. Lack of personnel trained to perform internal compliance reviews.
2. Lack of time available to perform internal compliance review activities.
3. Incomplete or incorrect legal baseline.
Recommendations
1. Make use of compliance function (compliance officer or similar) within the organisation.
2. Targeted self-reviews (self-audit per expert area?).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 70 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 1 Objective 11 steps.
S1O11.1
Determine required legal baseline
S1O11.2
Plan compliance review
S1O11.3
Perform compliance review
Figure 20: Scenario 1 Objective 11 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 71
7.6.12 Objective 12: Error Reporting, Measurement and Corrective Actions
Scenario 1: Implementation by AIS Provider
Objective
Objective 12: Error Reporting, Measurement and Corrective Actions
Description The Error Reporting, Measurement and Corrective Actions objective describes how reported errors should be investigated, rectified and their reoccurrence prevented in a timely manner, whilst keeping the aviation
community informed.
Step Activity
1. Receive error report 1. Log details of the identified error.
2. Initial assessment of error
1. Identify the role to investigate the error. 2. Confirm existence of a true error. 3. Determine affected products. 4. Identify party responsible for the data. 5. Notify the party responsible for the data so that they can
undertake a full investigation.
3. Perform mitigating action
1. Determine if any immediate action needs to be taken to communicate the error to the aviation community / users.
2. Notify community / users. 3. Identify if any other mitigating action can be implemented. 4. Implement mitigating action.
4. Investigate error
1. Investigate root causes of error. 2. Investigate affected publications. 3. Determine corrective action to be taken. 4. Determine if any preventive action needs to be taken. 5. Determine if a safety occurrence needs to be raised. 6. Determine if the community / users should be notified of planned
action. 7. Record findings. 8. Notify community / users of planned action.
5. Perform corrective action
1. Determine if a safety assessment / safety support assessment of corrective action needs to be undertaken.
2. Amend corrective action. 3. Implement corrective action.
6. Perform preventive action
1. Determine if a safety assessment / safety support assessment of preventive action needs to be undertaken.
2. Amend preventive action. 3. Implement preventive action.
7. Close error report 1. Notify users that the error has been resolved. 2. If relevant, notify other parties about the error. 3. Close the error report.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 72 Released Issue Edition : 1.0
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.085(l) Aeronautical data quality management – Error Handling
Annex VI to CIR 2017/373
AIS.OR.200 General
AIS.OR.230 Data error detection and authentication
AIS.OR.235 Error reporting, error measurement, and corrective actions
AIS.TR.200 General
AIS.TR.235 Error reporting, error measurement and corrective actions
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373 GM1 ATM/ANS.OR.A.085(l) Aeronautical data quality
management – Error Handling
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
AIS.OR.200 General
GM1 AIS.OR.230 Data error detection and authentication
GM1 AIS.OR.230(a) Data error detection and authentication
GM1 AIS.OR.235 Error reporting, error measurement, and corrective actions
AIS.TR.200 General
AIS.TR.235 Error reporting, error measurement and corrective actions
Evidence of Compliance
1. Documented processes and procedures.
2. Safety assessment / safety support assessment findings.
3. Evidence of error reporting and rectification.
Known Issues
1. Error processes may be restricted to only incidents.
2. Formal recording of errors captured during normal data processing do not need to be captured in an error process. The error process should be used to manage ‘escaping’ errors.
Recommendations
1. Errors need to be reported by any participant in the data chain to the AIS Provider. Each party has a duty to actively inform the input (party) and output (party).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 73
The following flow diagram provides a graphical representation of the Scenario 1 Objective 12 steps.
S1O12.1
Receive error report
S1O12.2
Initial assessment of error
S1O12.3
Perform mitigating action
S1O12.4
Investigate error
S1O12.5
Perform corrective action
S1O12.6
Perform preventive action
S1O12.7
Close error report
Figure 21: Scenario 1 Objective 12 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 74 Released Issue Edition : 1.0
7.6.13 Objective 13: Provide and Maintain Operations Manuals Scenario 1: Implementation by AIS Provider
Objective 13: Provide and Maintain Operations Manuals
Description The Provide and Maintain Operations Manuals objective describes the activities required to develop,
update, assess, distribute and monitor manuals.
Step Activity
1. Manage list of document holders
1. Identify document holders for manuals. 2. Record and maintain list of document holders for manuals.
2. Provide manuals 1. Notify document holders of release of manual. 2. Provide / make available new manual.
3. Withdraw previous versions 1. Withdraw previous version of manual. 2. Archive previous version of manual. 3. Adjust records of configuration management.
4. Oversee manuals
1. Review manual. 2. Identify required changes. 3. Record required changes. 4. Safety assess / safety support assess changes, if needed. 5. Amend identified changes.
5. Amend manuals
1. Amend manual. 2. Review manual. 3. Approve manual. 4. Review list of manuals. 5. Update list of manuals.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.B.035 Operations manuals
Supporting Material
ICAO Doc 10066 3.1 Quality Management System
Evidence of Compliance
1. Operations manuals with current validity.
2. List of persons to which operations manuals have been issued (where provided in paper).
3. Configuration management of operations manuals.
Known Issues
4. Operations manuals are not reviewed and updated regularly, so they do not reflect current operations.
Recommendations
1. Provide operations manuals via Intranet.
2. Notify all staff of updates.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 75
3. Mandate staff to write “Uncontrolled copy” on versions that they print.
4. Perform regular review of manuals.
The following flow diagram provides a graphical representation of the Scenario 1 Objective 13 steps.
S1O13.1
Manage list of document holders
S1O13.2
Provide manuals
S1O13.3
Withdraw previous versions
S1O13.4
Oversee manuals
S1O13.5
Amend manuals
Figure 22: Scenario 1 Objective 13 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 76 Released Issue Edition : 1.0
7.6.14 Objective 14: Define Catalogue of AIS Products and Services Scenario 1: Implementation by AIS Provider
Objective 14: Define Catalogue of AIS Products and Services
Description The Define Catalogue of AIS Products and Services objective describes how to define the requirements of a
product, its Data Product Specification (DPS) and the services offered by the AIS Provider, and to include them in a Catalogue of AIS Products and Services.
Step Activity
1. Establish product requirements
1. Gather input / seek the user’s view. 2. Define/amend product or service requirements. 3. Review product or service requirements. 4. Assess feasibility of product or service requirements. 5. Approve product or service requirements.
2. Develop Data Product Specification (DPS)
1. Define/amend Data Product Specification (DPS). 2. Review Data Product Specification (DPS). 3. Submit for user approval, if relevant.
3. Add product to catalogue 1. Amend catalogue to include new/amended product or service. 2. Review catalogue.
4. Make catalogue available 1. Provide and maintain catalogue. 2. Notify users of availability of amended catalogue.
Primary Reference to Regulation
Annex VI to CIR 2017/373 Section 3 Aeronautical Information Products
Supporting Material
ISO 19131:2007 All Data Product Specifications
EUROCONTROL-GUID-0158 All EUROCONTROL Terrain and Obstacle Data Manual
Evidence of Compliance
1. Documented processes and procedures.
2. Catalogue of AIS Products.
Known Issues
1. Catalogue is not maintained.
Recommendations
1. Publish catalogue online with notification functionality.
2. The needs of the next intended user are sought when determining the products and services to be offered.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 77
The following flow diagram provides a graphical representation of the Scenario 1 Objective 14 steps.
S1O14.1
Establish product requirements
S1O14.2
Develop Data Product Specification (DPS)
S1O14.3
Add product to catalogue
S1O14.4
Make catalogue available
Figure 23: Scenario 1 Objective 14 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 78 Released Issue Edition : 1.0
7.6.15 Objective 15: Manage Requests for Data Changes Scenario 1: Implementation by AIS Provider
Objective 15: Manage Requests for Data Changes
Description The Manage Requests for Data Changes objective describes how requests for data changes should be
checked before further processing.
Step Activity
1. Receive request
1. Receive internal/external notification about changes to aeronautical data (e.g. new survey, new permanent or temporary obstacle or operational changes at the airport).
2. Confirm the appropriate role (e.g. function, name, organisation, etc.) to process data (as established in Objective 2 and documented in management system documents) and forward the request to the relevant (competent) personnel without undue delay.
3. If not already established, assess whether there is a need to establish Formal Arrangements with the party providing data.
2. Verify request
1. Confirm that the request relates to aeronautical information defined in the Data Catalogue (either National or as defined by EASA).
2. Confirm that the request is clear, complete and the timescales are feasible.
3. Determine if the request has been submitted by the correct provider of data, in accordance with the Formal Arrangements.
4. If the provider of data is not the correct one, determine action to be taken.
5. Record findings of verification of request.
3. Assess verification outcome
1. Determine if the request is ready for validation, if the provider of data or State Designated Authority needs to be contacted for clarification or if the request should be rejected.
2. Record outcome of the verification activity.
4. Apply change request 1. Hand over the change request to the relevant process team.
5. Reject request 1. Notify provider of data that the request has been rejected,
providing the reasons for this.
2. Record details of the rejection sent.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.085 Aeronautical data quality management
Annex VI to CIR 2017/373 AIS.OR.500 General — Aeronautical information products updates
Supporting Material
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 79
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
GM1 ATM/ANS.OR.A.085(a) Aeronautical data quality management - Aeronautical Data Catalogue
GM1 ATM/ANS.OR.A.085(b) Aeronautical data quality management - General
GM1 ATM/ANS.OR.A.085(b)(4)
Aeronautical data quality management - Resolution
GM1 ATM/ANS.OR.A.085(b)(5)
Aeronautical data quality management - Traceability
AMC1 ATM/ANS.OR.A.085(b)(8)
Aeronautical data quality management - Format
GM1 ATM/ANS.OR.A.085(e) Aeronautical data quality management - Electronic Means
AMC1 ATM/ANS.OR.A.085(f)
Aeronautical data quality management - Formal Arrangements — Content
GM1 ATM/ANS.OR.A.085(f) Aeronautical data quality management - Formal Arrangements — Template
GM1 ATM/ANS.OR.A.090(a) Common reference systems for air navigation - Horizontal Reference System - WGS-84
GM2 ATM/ANS.OR.A.090(a)
Common reference systems for air navigation - Temporary Non-compliance of Geographical Coordinates
AMC1 ATM/ANS.OR.A.090(b)
Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Mean Sea Level
GM2 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(c) Common reference systems for air navigation - Temporal Reference System
Evidence of Compliance
1. Formal Arrangements.
2. Software tools to manage the receipt of data changes.
3. National Data Catalogue.
Known Issues
1. Requests received not in defined format.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 80 Released Issue Edition : 1.0
2. Requests received by unauthorised Data Providers.
Recommendations
1. Greater granularity is recommended for National Data Catalogues so that the Data Provider and Data Originator(s) and any Regulator approvals are clearly defined.
The following flow diagram provides a graphical representation of the Scenario 1 Objective 15 steps.
Request approved?Yes
No
S1O15.1
Receive request
S1O15.2
Verify request
S1O15.3
Assess verification outcome
S1O15.4
Apply change request
S1O15.5
Reject request
Figure 24: Scenario 1 Objective 15 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 81
7.6.16 Objective 16: Request Data Origination / Provision Scenario 1: Implementation by AIS Provider
Objective 16: Request Data Origination / Provision
Description The Request Data Provision / Provision objective describes how data should be formally requested from a
provider of data.
Step Activity
1. Establish originator/provider of data
1. Using the Data Catalogue and Formal Arrangements, determine and record the originator/provider of the data and arrangements for requesting data.
2. Define the requirements 1. Identify and record data quality requirements and data
origination standards to be met. 2. Determine and record date for submission of the data.
3. Draft Request for Origination/Provision
1. Prepare Data Product Specification (DPS), if necessary. 2. Draft the Request for Origination/Provision, referring to the
Formal Arrangements in place and any Data Product Specification (DPS).
4. Review Request for Origination/Provision
1. Review the Request for Origination/Provision, ensuring that the correct originator / provider of data has been identified, that the request is clear, complete and accurate and in accordance with the applicable Formal Arrangements.
5. Send Request for Origination/Provision
1. Send Request for Origination/Provision and supporting documentation to the originator / provider of data.
2. Record details of the request sent.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.085 Aeronautical data quality management
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
GM1 ATM/ANS.OR.A.085(a) Aeronautical data quality management – Purpose
GM1 ATM/ANS.OR.A.085(b) Aeronautical data quality management - General
GM1 ATM/ANS.OR.A.085(b)(4)
Aeronautical data quality management - Resolution
GM1 ATM/ANS.OR.A.085(b)(5)
Aeronautical data quality management - Traceability
AMC1 ATM/ANS.OR.A.085(b)(8)
Aeronautical data quality management - Format
GM1 ATM/ANS.OR.A.085(e) Aeronautical data quality management - Electronic Means
AMC1 ATM/ANS.OR.A.085(f)
Aeronautical data quality management – Formal Arrangements
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 82 Released Issue Edition : 1.0
GM1 ATM/ANS.OR.A.085(f) Aeronautical data quality management – Formal Arrangements
GM1 ATM/ANS.OR.A.090(a) Common reference systems for air navigation - Horizontal Reference System - WGS-84
GM2 ATM/ANS.OR.A.090(a)
Common reference systems for air navigation - Temporary Non-compliance of Geographical Coordinates
AMC1 ATM/ANS.OR.A.090(b)
Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Mean Sea Level
GM2 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(c) Temporal Reference System
Annex VI to CIR 2017/373 AMC1 AIS.OR.205 Formal arrangements
EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data
All
Evidence of Compliance
1. Issued Requests for Origination/Provision.
2. Formal Arrangements.
3. Results of checks made to ensure data is in accordance with Request for Origination/Provision.
Known Issues
1. Lack of common approach to Requests for Origination/Provision.
2. Lack of understanding of Data Product Specifications.
Recommendations
1. Make use of templates (e.g. a Data Product Specification template).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 83
The following flow diagram provides a graphical representation of the Scenario 1 Objective 16 steps.
S1O16.1
Establish originator/provider of data
S1O16.2
Define the requirements
S1O16.3
Draft Request forOrigination/Provision
S1O16.4
Review Request for Origination/Provision
S1O16.5
Send Request forOrigination/Provision
Request approved?Yes
No
Figure 25: Scenario 1 Objective 16 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 84 Released Issue Edition : 1.0
7.6.17 Objective 17: Originate Data Scenario 1: Implementation by AIS Provider
Objective 17: Originate Data
Description The Originate Data objective describes how data should be originated to meet all applicable requirements
so that compliant, approved and coordinated data is provided for further processing.
Step Activity
1. Validate Request for Origination
1. Determine if instructions are clear. 2. Determine if instructions are feasible. 3. Determine if the correct Data Originator for the items has been
identified.
2. Determine the origination requirements
1. Determine the origination requirements, including the standards to be met and the data quality requirements by referencing, as applicable: • The Formal Arrangements. • The Request for Origination/Provision. • The Data Product Specification (DPS).
3. Originate data
1. Obtain any required data sets. 2. Originate data in accordance with Request for
Origination/Provision, Data Product Specification (DPS), Formal Arrangements, applicable standards and data quality requirements.
3. Record details of origination activities. 4. Save data and metadata.
4. Process data
1. Verify and validate that data meets its quality requirements and Data Product Specification (DPS).
2. Record details of all the validation and verification activities performed, including the findings.
3. Process data (as required) or make data available for processing.
5. Coordinate data
1. Ensure consistency of originated data with other applicable data. 2. Identify parties data should be coordinated with. 3. Coordinate with other parties, including the exchange of
necessary data. 4. Document results of coordination activities.
6. Obtain approvals 1. Determine if approvals are required and have been performed. 2. Obtain and store any necessary approval(s).
7. Prepare origination report 1. Finalise origination report and data, if required.
8. Close request 1. If relevant, notify the process initiator about the outcome.
9. Reject Request for Origination If step 1 fails: 1. Record reasons for rejecting Request for Origination/Provision. 2. Inform the party requesting data origination.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 85
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.085 Aeronautical data quality management
ATM/ANS.OR.A.090 Common reference systems for air navigation
Annex VI to CIR 2017/373 AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
Annex VI to CIR 2017/373 AIS.OR.500 General — Aeronautical information products updates
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
GM1 ATM/ANS.OR.A.085(a) Aeronautical data quality management – Aeronautical Data Catalogue
GM1 ATM/ANS.OR.A.085(b) Aeronautical data quality management – General
GM1 ATM/ANS.OR.A.085(b)(4)
Aeronautical data quality management – Resolution
GM1 ATM/ANS.OR.A.085(b)(5)
Aeronautical data quality management – Traceability
AMC1 ATM/ANS.OR.A.085(b)(8)
Aeronautical data quality management – Format
GM1 ATM/ANS.OR.A.085I Aeronautical data quality management - Electronic Means
AMC1 ATM/ANS.OR.A.085(f)
Aeronautical data quality management - Formal Arrangements — Content
GM1 ATM/ANS.OR.A.085(f) Aeronautical data quality management - Formal Arrangements — Template
GM1 ATM/ANS.OR.A.090(a) Common reference systems for air navigation - Horizontal Reference System - WGS-84
GM2 ATM/ANS.OR.A.090(a)
Common reference systems for air navigation - Temporary Non-compliance of Geographical Coordinates
AMC1 ATM/ANS.OR.A.090(b)
Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Mean Sea Level
GM2 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Vertical Reference System
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 86 Released Issue Edition : 1.0
GM1 ATM/ANS.OR.A.090(c) Common reference systems for air navigation - Temporal Reference System
ICAO Doc 81–6 - Volume I Chapter 4 Aeronautical data originators responsibilities
ICAO Doc 10066 Chapter 4 Aeronautical Data Requirements
EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data
All
Evidence of Compliance
1. Data origination standards.
2. Formal Arrangements.
3. Requests for Origination/Provision.
4. Origination reports.
5. National Data Catalogue.
Known Issues
1. Lack of awareness of requirements for data origination.
2. Ambiguous Requests for Origination/Provision.
Recommendations
1. Greater granularity is recommended for National Data Catalogues so that the Data Provider and Data Originator(s) and any Regulator approvals are clearly defined.
2. Awareness session (familiarisation training for Data Originators).
3. List of approved / accepted data providers.
4. Approvals may require safety assessment / safety support assessments to be conducted.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 87
The following flow diagram provides a graphical representation of the Scenario 1 Objective 17 steps.
Validatedrequest?
Yes
No
S1O17.1
Validate Request for Origination
S1O17.3
Originate data
S1O17.2
Determine the origination requirements
S1O17.9
Reject Request for Origination
S1O17.4
Process data
S1O17.5
Coordinate data
S1O17.6
Obtain approvals
S1O17.7
Prepare origination report
S1O17.8
Close request
Figure 26: Scenario 1 Objective 17 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 88 Released Issue Edition : 1.0
7.6.18 Objective 18: Collect Data Scenario 1: Implementation by AIS Provider
Objective 18: Collect Data
Description The Collect Data objective describes how the availability of new data is identified and collected and how
changes to the collected data are identified. This is objective is applied when data is originated by a function other than the AIS provider and the originating party notifies that new data is available.
Step Activity
1. Determine if data is ready for collection
1. Receive notification of data available for collection or monitor the availability of data, in accordance with any Formal Arrangements in place.
2. Confirm that the data collection process should be initiated.
2. Collect data
1. Collect the data in accordance with established processes. 2. Store the collected data. 3. Record details of the collection, including details provided of
changes to data.
3. Identify changes to collected data 1. Identify changes to the data.
4. Process data
1. Verify and validate that data meets its quality requirements and Data Product Specification (DPS), including the minimum metadata requirements.
2. Record details of all the validation and verification activities performed, including the findings.
3. Process data (as required).
Primary Reference to Regulation
Annex VI to CIR 2017/373
AIS.OR.100 Aeronautical information management
AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
AIS.OR.200 General
Supporting Material
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
GM1 AIS.OR.100(c) Aeronautical information management
GM1 AIS.OR.105 Responsibilities of aeronautical information services providers
GM1 AIS.OR.200(a) General - Aeronautical Data Catalogue
GM1 AIS.OR.200(b) General - Data Quality
AMC1 AIS.OR.200(c) General - Automated Data Processing
GM1 AIS.TR.200(b) General - Accuracy - Resolution
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 89
AMC1 AIS.TR.200(d) General - Traceability
ICAO Doc 8126 - Volume II Chapter 3 Collection
ICAO Doc 10066 2.1.1 Collection
EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data
All
AIXM 5.1 Data Model (UML)
AIXM 5.1 XML Schema (XSD)
Evidence of Compliance
1. Formal Arrangements.
2. Software tools to manage the receipt of data.
Known Issues
1. Data not provided in accordance with provision method defined.
2. Data not provided in required format.
3. Incompleteness of some data provided by Data Originators / Data Providers.
Recommendations
1. Consider direct delivery of reports and data into the AIS Provider’s system based on Formal Arrangements.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 90 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 1 Objective 18 steps.
S1O18.1
Determine if data is ready for collection
S1O18.2
Collect data
S1O18.3
Identify changes to collected data
S1O18.4
Process data
Figure 27: Scenario 1 Objective 18 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 91
7.6.19 Objective 19: Apply Data Assurance Process Scenario 1: Implementation by AIS Provider
Objective 19: Apply Data Assurance Process
Description The Apply Data Assurance Process objective describes how to define, train, trial and implement a data
assurance process.
Step Activity
1. Establish process to be applied
1. Determine data assurance approach. 2. Document approach and map high-level data process, indicating
use of tools and identifying risk points. 3. Draft/update process(es). 4. Review process(es). 5. Train process(es).
2. Execute defined process
1. Trial process(es). 2. Review process(es). 3. Update and finalise process(es). 4. Execute process(es).
Primary Reference to Regulation
Annex VI to CIR 2017/373
AIS.OR.100 Aeronautical information management
AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
AIS.TR.200 Data quality management - General
AIS.OR.600 Personnel Requirements - General
Supporting Material
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
GM1 AIS.OR.200(b) General - Data Quality
AMC1 AIS.OR.200(c) General - Automated Data Processing
GM1 AIS.TR.200(b) General - Accuracy - Resolution
AMC1 AIS.TR.200(d) Traceability – Retention Period
GM1 AIS.OR.600(b) General requirements - Competence
ICAO Doc 8126 - Volume II 6.2.1 General Aspects
ICAO Doc 10066 2.1.2 Processing
EUROCONTROL Guidelines on Safety Support Assessments performed by AIS Providers
Evidence of Compliance
1. Data protection techniques.
2. Data quality assurance concept of operations.
3. Documented processes and procedures.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 92 Released Issue Edition : 1.0
4. Physical security.
5. Training plan.
Known Issues
1. Data is not processed using a quality assurance process.
2. Lack of quality assurance process.
Recommendations
1. Ensure data assurance process is part of QMS.
2. Treat all data as if DAL 1.
The following flow diagram provides a graphical representation of the Scenario 1 Objective 19 steps.
S1O19.1
Establish process to be applied
S1O19.2
Execute defined process
Figure 28: Scenario 1 Objective 19 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 93
7.6.20 Objective 20: Store Data Scenario 1: Implementation by AIS Provider
Objective 20: Store Data
Description The Store Data objective describes the activities to be undertaken to ensure that verified and validated data
is stored correctly and then made available for further processing.
Step Activity
1. Confirm readiness for storage 1. Confirm that all necessary data, metadata and approvals are in
place for data prior to storage and that the data has been validated and verified.
2. Store data 1. Store the data in the appropriate data store. 2. Check that the data has been correctly stored. 3. Record results of checks performed.
3. Approve data for further processing 1. Approve the stored data for further processing.
4. Make data available for use
1. Set status of stored data to available so that it is available for further processing.
2. Notify that data is available. 3. Record the notification.
Primary Reference to Regulation
Annex VI to CIR 2017/373
AIS.OR.100 Aeronautical information management
AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
AIS.OR.200 Data Quality Management - General
AIS.OR.230 Data error detection and authentication
AIS.TR.235(a) Error reporting, error measurement and corrective actions
Supporting Material
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
AMC1 AIS.OR.200(c) Automated data processing
GM1 AIS.OR.230 Data error detection and authentication
GM1 AIS.OR.235 Error reporting, error measurement and corrective actions
EUROCONTROL-GUID-0121 All
AIXM 5.1 Data Model (UML)
Evidence of Compliance
1. Documented processes and procedures.
2. Software tools.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 94 Released Issue Edition : 1.0
Known Issues
1. Not all data and related metadata are stored for a change.
Recommendations
1. Do not delete data to help meet retention requirements.
2. Backup data regularly.
3. Test backups to ensure that they have worked.
The following flow diagram provides a graphical representation of the Scenario 1 Objective 20 steps.
Data approved?
Yes
No
S1O20.1
Confirm readiness for storage
S1O20.2
Store data
S1O20.3
Approve data for further processing
S1O20.4
Make data available for use
Figure 29: Scenario 1 Objective 20 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 95
7.6.21 Objective 21: Assemble AIS Products Scenario 1: Implementation by AIS Provider
Objective 21: Assemble AIS Products
Description The Assemble AIS Products objective describes how to prepare, verify and approve an AIS product which is
consistent with other products.
Step Activity
1. Refer to Data Product Specification (DPS)
1. Identify product requirements from Data Product Specification (DPS).
2. Identify other publication standards.
2. Create product 1. Coordinate with other product editors. 2. Prepare product. 3. Review product.
3. Verify product
1. Confirm completeness of product. 2. Confirm accuracy of product. 3. Confirm clarity of product. 4. Confirm compliance of product with Data Product Specification
(DPS) and standards. 5. Record findings.
4. Confirm consistency checks with other products 1. Perform consistency checks with other products.
5. Seek approval 1. Seek product approval. 2. Record product approval. 3. Amend product.
6. Archive product 1. Store approved product.
Primary Reference to Regulation
Annex VI to CIR 2017/373
AIS.OR.300 General — Aeronautical information products
AIS.OR.305 Aeronautical information publication (AIP)
AIS.OR.310 AIP amendments
AIS.OR.315 AIP supplements
AIS.OR.320 Aeronautical information circular (AIC)
AIS.OR.325 Aeronautical charts
AIS.OR.330 NOTAM
AIS.OR.335 General — Digital data sets
AIS.OR.340 Metadata requirements
AIS.TR.300 General — Aeronautical information products
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 96 Released Issue Edition : 1.0
AIS.TR.305 Aeronautical information publication (AIP)
AIS.TR.310 AIP amendments
AIS.TR.315 AIP supplements
AIS.TR.320 Aeronautical information circular (AIC)
AIS.TR.330 NOTAM
AIS.TR.335 General— Digital data sets
Supporting Material
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
GM1 AIS.OR.300 Aeronautical information products
AMC1 AIS.OR.325 Aeronautical charts
GM1 AIS.OR.335(a) General — Digital data sets
GM1 AIS.TR.335(b) General — Digital data sets
ICAO Doc 10066 5.2 Aeronautical Information in a
Standardised Presentation
5.3 Digital Data
EUROCONTROL-SPEC-146 All
EUROCONTROL-GUID-0121 All
AIXM 5.1 Data Model (UML)
AIXM 5.1 XML Schema (XSD)
GM1 AIS.TR.240 Annotations
EUROCONTROL Specification for AIP Data Set Coding using AIXM 5.1.1
EUROCONTROL Specification for Obstacle Data Set Coding using AIXM 5.1.1
EUROCONTROL Specification for Instrument Flight Procedures Design Data Set Coding using AIXM 5.1.1
EUROCONTROL Specification for Digital NOTAM Data Set Coding using AIXM 5.1.1
EUROCAE ED-98C User Requirements for Terrain And Obstacle Data
EUROCAE ED-99D User Requirement for Aerodrome Mapping Information
EUROCAE ED-119C Interchange Standards for Terrain, Obstacle and Aerodrome Mapping Data
Evidence of Compliance
1. Documented processes and procedures.
2. Configuration management of products.
Known Issues
1. Individual products are inconsistent.
2. Products do not conform to specifications.
Recommendations
1. Production processes to link to (or be based on) common, consistent data source.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 97
The following flow diagram provides a graphical representation of the Scenario 1 Objective 21 steps.
S1O21.1
Refer to Data Product Specification (DPS)
S1O21.2
Create product
S1O21.3
Verify product
S1O21.4
Confirm consistency checks with other products
S1O21.5
Seek approval
S1O21.6
Archive product
Product verified?
Yes
No
Product approved?
Yes
No
Product consistent?
Yes
No
Figure 30: Scenario 1 Objective 21 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 98 Released Issue Edition : 1.0
7.6.22 Objective 22: Annotate AIS Data / Products for Limitations Scenario 1: Implementation by AIS Provider
Objective 22: Annotate AIS Data / Products for Limitations
Description The Annotate AIS Data / Products for Limitations objective describes how data that does not meet its data
quality requirements and/or has limitations attached to its use is identified and annotated, and how any products the data is included in are annotated.
Step Activity
1. Identify data quality requirements 1. Identify data quality requirements for product data.
2. Determine non-compliant data 1. Identify data non-compliant with data quality requirements. 2. Record details of non-compliant data.
3. Annotate non-compliant data 1. Annotate data non-compliant with data quality requirements.
4. Determine limitations on use of data
1. Assess the metadata to determine data limitations. 2. Record data limitations.
5. Annotate product with limitations 1. Annotate product to reflect limitations of data.
Primary Reference to Regulation
Annex VI to CIR 2017/373 AIS.OR.240 Data limitations
AIS.TR.240 Data limitations
Supporting Material
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373 GM1 AIS.TR.240 Data limitations - Annotation
Evidence of Compliance
1. Formal Arrangements.
2. Documented processes and procedures.
3. Configuration management.
Known Issues
1. Inconsistent approaches to annotation.
2. Parties are not aware of their individual responsibilities.
3. Annotations will not solve issues and need to be kept to minimum to avoid limitations in use of data.
Recommendations
1. All production processes to link to (or be based on) common, consistent data source.
2. Flag and resolve any data inconsistency as early as possible in the process.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 99
The following flow diagram provides a graphical representation of the Scenario 1 Objective 22 steps.
S1O22.1
Identify data quality requirements
S1O22.2
Determine non-compliant data
S1O22.3
Annotate non-compliant data
S1O22.4
Determine limitations on use of data
S1O22.5
Annotate product with limitations
Non-compliant data?
Yes
No
Limitations apply?
Yes
No
Figure 31: Scenario 1 Objective 22 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 100 Released Issue Edition : 1.0
7.6.23 Objective 23: Distribute AIS Products Scenario 1: Implementation by AIS Provider
Objective 23: Distribute AIS Products
Description The Distribute AIS Products objective describes how a product is distributed or made available to users.
Step Activity
1. Identify recipients for product 1. Record / register product users and/or subscriptions.
2. Determine means of delivery 1. Determine and record means of delivery for each user. 2. Implement delivery confirmation.
3. Upload product to distribution library
1. Archive replaced product. 2. Upload released product to library. 3. Amend any supporting technical information. 4. Record details of uploaded package.
4. Confirm correctness of upload 1. Review upload files. 2. Confirm accessibility of upload.
5. Notify pull users of product availability
1. Send notifications to users. 2. Record notification information.
6. Distribute product to push users
1. Distribute products. 2. Record distribution information.
7. Confirm successful delivery 1. Confirm delivery. 2. Record delivery confirmation.
8. Update lists of latest products 1. Review list of products. 2. Update list of products. 3. Publish list of products.
Primary Reference to Regulation
Annex VI to CIR 2017/373
AIS.OR.100 Aeronautical information management
AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
AIS.TR.305(a) eAIP
AIS.OR.400 Distribution services
AIS.OR.405 Pre-flight information services
AIS.OR.500 General – Aeronautical information products updates
AIS.OR.505 Aeronautical information regulation and control (AIRAC)
AIS.OR.515 Data set updates
AIS.TR.400 Distribution services
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 101
AIS.TR.500 General – Aeronautical information products updates
AIS.TR.515 Data set updates
Supporting Material
AMC1 AIS.TR.305(a) Aeronautical information publication (AIP)
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
GM1 AIS.OR.400(a) Distribution services - Delivery Method
GM1 AIS.TR.400(a) Distribution services - NOTAM
ICAO Doc 8126 - Volume II Chapter 5 Distribution
Evidence of Compliance
1. Documented processes and procedures.
2. List of latest products.
3. Delivery confirmations.
Known Issues
1. Configuration management?
2. Product synchronisation?
Recommendations
1. Feedback should be sought from the users regarding the products and services provided by the AIS Provider.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 102 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 1 Objective 23 steps.
S1O23.1
Identify recipients for product
S1O23.2
Determine means of delivery
S1O23.3
Upload product to distribution library
S1O23.4
Confirm correctness of upload
S1O23.5
Notify pull users of product availability
Upload correct?
Yes
No Delivery successful?
Yes
No
S1O23.6
Distribute product to push users
S1O23.7
Confirm successful delivery
S1O23.8
Update lists of latest products
Figure 32: Scenario 1 Objective 23 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 103
7.6.24 Objective 24: Manage Occurrence Reporting Scenario 1: Implementation by AIS Provider
Objective 24: Manage Occurrence Reporting
Description The Manage Occurrence Reporting objective describes how reported occurrences should be investigated,
rectified and their reoccurrence prevented.
Step Activity
1. Receive and log report 1. Receive report. 2. Record report.
2. Define mitigating action 1. Analyse occurrence. 2. Identify mitigating action. 3. Record mitigating action.
3. Investigate report
1. Determine affected parties. 2. Invite affected parties to participate in investigation. 3. Investigate occurrence, identifying root cause. 4. Determine corrective action to be taken. 5. Determine preventive action to be taken. 6. Determine responsibilities for action. 7. Record findings.
4. Raise safety incident report 1. Raise safety incident. 2. Record details.
5. Perform corrective action 1. Perform safety assessment / safety support assessment. 2. Amend corrective action. 3. Implement corrective action.
6. Take preventive action 1. Perform safety assessment / safety support assessment. 2. Amend preventive action. 3. Implement preventive action.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.065 General Requirements - Occurrence reporting
Annex VI to CIR 2017/373 AIS.OR.235 Error reporting, error measurement,
and corrective actions
AIS.TR.235 Error reporting, error measurement, and corrective actions
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
AMC1 ATM/ANS.OR.A.065 Occurrence reporting
GM1 ATM/ANS.OR.A.065 Occurrence reporting
AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
GM1 AIS.OR.235 Error reporting, error measurement and corrective actions
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 104 Released Issue Edition : 1.0
EUROCONTROL Guidelines on Safety Support Assessments performed by AIS Providers
Evidence of Compliance
1. Documented processes and procedures.
2. Evidence of occurrence reporting and rectification.
3. Safety assessment / safety support assessment findings.
Known Issues
1. Lack of formal process.
Recommendations
1. Encourage users to report any issues via simple tools, ideally online.
2. Perform user surveys at regular intervals.
The following flow diagram provides a graphical representation of the Scenario 1 Objective 24 steps.
S1O24.5
Perform corrective action
S1O24.1
Receive and log report
S1O24.2
Define mitigating action
S1O24.3
Investigate report
S1O24.4
Raise safety incident report
S1O24.6
Take preventative action
Figure 33: Scenario 1 Objective 24 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 105
7.6.25 Objective 25: Manage Changes to the Functional System Scenario 1: Implementation by AIS Provider
Objective 25: Manage Changes to the Functional System
Description The Manage Changes to Functional System objective describes how to monitor, identify, implement and
seek approval for changes to a functional system.
Step Activity
1. Oversee functional system 1. Review functional system. 2. Document findings.
2. Identify changes required 1. Record changes required. 2. Review changes.
3. Plan change, including cooperation
1. Define implementation plan for changes. 2. Communicate implementation plan. 3. Coordinate with other parties.
4. Assess impact of change
1. Perform impact assessment / safety assessment / safety support assessment.
2. Record findings. 3. Amend planned changes.
5. Seek approval for change 1. Submit request for approval, including all evidence. 2. Inform other relevant parties of planned change, if affected.
6. Implement change 1. Implement changes. 2. Submit application for acceptance of functional system. 3. Record acceptance.
Primary Reference to Regulation
Annex III to CIR 2017/373
ATM/ANS.OR.A.040 General Requirements - Changes — general
ATM/ANS.OR.A.045 General Requirements - Changes to a functional system
ATM/ANS.OR.B.010 Management - Change management procedures
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
AMC1 ATM/ANS.OR.A.040 Changes - general
AMC1 ATM/ANS.OR.A.045(a) Changes to a functional system
AMC1 ATM/ANS.OR.B.010(a) Change management procedures
AMC2 ATM/ANS.OR.B.010(a) Change management procedures
GM1 ATM/ANS.OR.B.010(a) Change management procedures
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 106 Released Issue Edition : 1.0
GM1 to AMC1 ATM/ANS.OR.B.010(a) Change management procedures
Evidence of Compliance
1. Acceptance of functional system by Competent Authority.
2. Change management plan for functional system.
Known Issues
1. Lack of awareness of components comprising functional system.
2. Changes not managed and notified as a consequence.
Recommendations
1. Make all parties aware of their responsibilities within the functional system and impact on others.
The following flow diagram provides a graphical representation of the Scenario 1 Objective 25 steps.
S1O25.1
Oversee functional system
S1O25.2
Identify changes required
S1O25.3
Plan change, including cooperation
S1O25.4
Assess impact of change
S1O25.5
Seek approval for change
S1O25.6
Implement change
Figure 34: Scenario 1 Objective 25 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 107
7.7 Scenario 2: Implementation by ATM/ANS Provider as Data Originator
7.7.1 Objective 1: Define and Implement Processes and Procedures Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 1: Define and Implement Processes and Procedures
Description The Define and Implement Processes and Procedures objective describes the activities needed to assess, amend, train, trial, implement and oversee processes and procedures related to data processing and which
are utilised by later objectives.
Step Activity
1. Assess current processes and procedures relating to aeronautical data
1. Identify requirements. 2. Perform gap analysis. 3. Record findings.
2. Identify non-conformities 1. Identify non-conformities. 2. Establish plan for addressing non-conformities.
3. Document revised processes and procedures relating to aeronautical data
1. Amend /create processes and procedures to address non-conformities.
2. Review amended processes and procedures.
4. Assess processes and procedures relating to aeronautical data
1. Arrange for the assessment of amended processes and procedures.
2. Participate in the assessment. 3. Review assessment findings. 4. Update processes and procedures.
5. Train processes and procedures relating to aeronautical data
1. Identify training requirements. 2. Conduct training. 3. Update training records.
6. Trial processes and procedures relating to d aeronautical data
1. Trial processes and procedures. 2. Record findings of trial. 3. Review findings of trial. 4. Update processes and procedures. 5. Review processes and procedures.
7. Implement processes and procedures relating to aeronautical data
1. Inform affected personnel of roll-out of processes and procedures.
2. Withdraw former processes and procedures. 3. Adjust records of configuration management.
8. Plan internal audit / compliance review of processes and procedures relating to aeronautical data
1. Plan internal audit / compliance review as per established schedule.
2. Prepare plan. 3. Provide plan.
9. Perform internal audit / compliance review of
1. Perform internal audit / compliance review as per established schedule.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 108 Released Issue Edition : 1.0
processes and procedures relating to aeronautical data
2. Prepare report recording all findings and observations. 3. Publish report. 4. Agree and record corrective actions to be taken (with associated
target dates). 5. Conduct follow-up review of actions.
10. Oversee processes and procedures relating to aeronautical data
1. Identify internal audit / compliance review intervals and schedule.
2. Perform internal audit / compliance review.
Primary Reference to Regulation
Annex III to CIR 2017/3737 ATM/ANS.OR.A.080 Provision of aeronautical data
ATM/ANS.OR.A.085 Aeronautical data quality management
ATM/ANS.OR.A.090 Common reference systems for air navigation
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) of CIR 2017/373
GM1 ATM/ANS.OR.085 Aeronautical data quality management - Urgent Distribution
GM1 ATM/ANS.OR.A.085(a) Aeronautical data quality management - Aeronautical Data Catalogue
GM1 ATM/ANS.OR.A.085(b) Aeronautical data quality management - General
GM1 ATM/ANS.OR.A.085(b)(4)
Aeronautical data quality management - Resolution
GM1 ATM/ANS.OR.A.085(b)(5)
Aeronautical data quality management - Traceability
AMC1 ATM/ANS.OR.A.085(b)(8)
Aeronautical data quality management - Format
AMC1 ATM/ANS.OR.A.085(d)
Aeronautical data quality management - Validation and Verification
GM1 ATM/ANS.OR.A.085(d) Aeronautical data quality management - Validation and Verification
GM2 ATM/ANS.OR.A.085(d) Aeronautical data quality management - Validation and Verification Techniques
GM1 ATM/ANS.OR.A.085(e) Aeronautical data quality management - Electronic Means
AMC1 ATM/ANS.OR.A.085(f)
Aeronautical data quality management - Formal Arrangements
7 Commission Implementing Regulation 2017/373 as amended by Commission Implementing Regulation 2020/469.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 109
GM1 ATM/ANS.OR.A.085(f) Aeronautical data quality management - Formal Arrangements
GM1 ATM/ANS.OR.A.085(i) Aeronautical data quality management - Software
GM2 ATM/ANS.OR.A.085(i) Aeronautical data quality management - Tools
GM1 ATM/ANS.OR.A.085(j) Aeronautical data quality management - Data Error Detection Techniques
GM2 ATM/ANS.OR.A.085(j) Aeronautical data quality management - Data Error Processing
GM1 ATM/ANS.OR.A.085(l) Aeronautical data quality management - Error Handling
GM1 ATM/ANS.OR.A.090(a) Common reference systems for air navigation - Horizontal Reference System
GM2 ATM/ANS.OR.A.090(a) Common reference systems for air navigation - Temporary Non-Compliance
AMC1 ATM/ANS.OR.A.090(b)
Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Mean Sea Level
GM2 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(c) Common reference systems for air navigation - Temporal Reference System
Evidence of Compliance
1. Documented processes and procedures.
2. Safety support assessment / safety support assessment findings.
3. Evidence of error reporting and rectification.
Known Issues
1. Lack of formally captured processes and procedures or documented processes and procedures do not reflect day-to-day activities.
2. Selection of appropriate and efficient methodology to be applied.
3. Difficulty in selecting the granularity at which to capture the processes and procedures.
4. Lack of independent resource with knowledge to perform reviews.
5. Error processes may be restricted to incidents.
Recommendations
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 110 Released Issue Edition : 1.0
1. Start with a review of any existing documented processes and procedures to ensure these reflect current practices and, where possible, adapt these rather than start from new.
2. A phased approach to internal audit / compliance review is recommended, focussing on small areas at a time.
3. Competence management, including the provision of training to ensure staff are suitably qualified, is necessary to ensure data quality is achieved and maintained, any changes to the defined processes should triggering a review and update as necessary.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 111
The following flow diagram provides a graphical representation of the Scenario 2 Objective 1 steps.
S2O1.1
Assess current processes and procedures
S2O1.2
Identify non-conformities
S2O1.3
Document revised processes and procedures
S2O1.4
Assess processes and procedures
S2O1.5
Train processes and procedures
S2O1.6
Trial processes and procedures
S2O1.7
Implement processes and procedures
S2O1.8Plan internal audit /
compliance review of processes and procedures
S2O1.9Perform internal audit / compliance review of
processes and procedures
S2O1.10
Oversee processes and procedures
Figure 35: Scenario 2 Objective 1 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 112 Released Issue Edition : 1.0
7.7.2 Objective 2: Establish Verification and Validation Procedures Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 2: Establish Verification and Validation Procedures
Description The Establish Verification and Validation Procedures objective describes the establishment of procedures to
ensure that data meets all its applicable requirements and has been processed appropriately.
Step Activity
1. Define the requirements 1. Identify8 the data quality requirements for all applicable data items.
2. Identify the procedures to be applied to validate and verify data
1. Identify the checks that may be performed for the different types of data and the different data integrity levels.
2. Document the validation and verification procedures.
Primary Reference to Regulation
Annex III to CIR 2017/373
ATM/ANS.OR.A.080 Provision of aeronautical data
ATM/ANS.OR.A.085(a) Aeronautical data quality - Aeronautical Data Catalogue (DQR)
ATM/ANS.OR.A.085(d) Aeronautical data quality - Validation and Verification
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) of CIR 2017/373
AMC1 ATM/ANS.OR.A.085(d)
Aeronautical Data Quality Management - Validation and Verification
GM1 ATM/ANS.OR.A.085(d) Aeronautical data quality - Validation and Verification – General
GM2 ATM/ANS.OR.A.085(d) Aeronautical data quality - Validation and Verification Techniques
Evidence of Compliance
1. Documented processes and procedures.
2. Recorded findings of all checks performed.
Known Issues
1. Parties are not aware of their individual responsibilities for validation and verification.
2. The validation and verification of accuracy, etc. can only be performed by the Data Originator.
Recommendations
1. Regulator involvement is recommended for ensuring parties are aware of and fulfil their responsibilities.
2. In some cases, plausibility checks may need to be applied to confirm the suitability of data.
8 Relevant DQRs should have already been defined and those applicable will be identified from those established.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 113
The following flow diagram provides a graphical representation of the Scenario 2 Objective 2 steps.
S2O2.1
Define the requirements
S2O2.2Identify the procedures to be applied to validate and verify
data
Figure 36: Scenario 2 Objective 2 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 114 Released Issue Edition : 1.0
7.7.3 Objective 3: Assure Tools and Software Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 3: Assure Tools and Software
Description The Assure Tools and Software objective describes the activities needed to ensure that those tools and
software that form part of the data assurance process are fit for their intended purpose.
Step Activity
1. Identify tools and software 1. Identify tools and software currently used in data processes. 2. Determine tools and software requiring assurance, documenting
findings.
2. Define the requirements 1. Identify and document relevant requirements applicable to tools and software.
3. Determine methodology to be applied
1. Identify and document methodology to be applied to bespoke software.
2. Prepare assurance plan.
4. Perform tool assessment/validation and verification
1. Identify and document safety risks associated with the use of the tool/software.
2. Perform tool assessment / validation and verification. 3. Document findings.
5. Confirm readiness 1. Confirm and document tool’s compliance and readiness for use.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.085(i) Tools and Software
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) of CIR 2017/373
AMC1 ATM/ANS.OR.A.085(g) Evidence
GM1 ATM/ANS.OR.A.085(i) Software
GM2 ATM/ANS.OR.A.085(i) Tool Qualification
Evidence of Compliance
1. Tool operational requirements documentation.
2. Tool qualification plan.
3. Tool qualification results.
4. Manufacturer’s declarations of conformity / suitability for use.
5. Technical File.
Known Issues
1. Lack of understanding of tool qualification process.
2. Cost of tool qualification.
3. Lack of defined requirements for tools.
4. Agreement on scope of tools to be qualified.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 115
5. Choice of software safety assurance standard to be applied.
6. No retention policy for old tools / old version of tools.
7. The pace of change in the context of airspace and related (change) requirements moving faster than the development of AIXM (e.g. DHO).
Recommendations
1. Ensure that each requirement is uniquely identified.
2. Agree any software safety assurance / safety support assessment standard with the Regulator.
3. Address the identified issues in the relevant documents (as listed in the evidence of compliance above).
4. When assessing errors in tools and procedures, ensure that consequential errors in data are identified.
The following flow diagram provides a graphical representation of the Scenario 2 Objective 3 steps.
S2O3.1
Identify tools and software
S2O3.2
Define the requirements
S2O3.3
Determine methodology to be applied
S2O3.4
Perform tool assessment/validation and verification
S2O3.5
Confirm readiness
Figure 37: Scenario 2 Objective 3 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 116 Released Issue Edition : 1.0
7.7.4 Objective 4: Establish Process to Monitor Data Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 4: Establish Process to Monitor Data
Description The Establish Process to Monitor Data objective describes the activities to be undertaken to ensure that those items which are the responsibility of the ATM/ANS Provider to provide are regularly reviewed and
updated, where necessary.
Step Activity
1. Establish review cycle for all data
1. Use the established Data Catalogue. 2. Record review cycle for all data items provided for publication
and identify relevant data activities.
2. Assign responsibilities for monitoring of data
1. Identify units / role responsible for monitoring data. 2. Implement mechanisms to instigate data reviews.
3. Review data 1. Determine if scope of data published is correct. 2. Ensure currency of published data. 3. Determine completeness of published data. 4. Ensure data meets operational needs. 5. Ensure data meets any new / changed requirements in terms of
scope, quality and content.
4. Record review findings 1. Record scope of data reviewed. 2. Record findings of review.
5. Update / withdraw / originate data
1. Request Data Origination / Provision, and / or 2. Originate Data
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.080(b) Provision of aeronautical data
Supporting Material
EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data
All
Evidence of Compliance
1. Evidence demonstrating that data monitoring activities are executed.
2. Data changes resulting from data monitoring activities.
Known Issues
N/A
Recommendations
N/A
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 117
The following flow diagram provides a graphical representation of the Scenario 2 Objective 4 steps.
S2O4.1
Establish review cycle for all data
S2O4.2
Assign responsibilities for monitoring of data
S2O4.3
Review data
S2O4.4
Record review findings
S2O4.5
Update / withdraw / originate data
Figure 38: Scenario 2 Objective 4 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 118 Released Issue Edition : 1.0
7.7.5 Objective 5: Establish and Manage Formal Arrangements Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 5: Establish and Manage Formal Arrangements
Description The Establish and Manage Formal Arrangements objective describes the activities needed to identify the
need for and develop, implement and monitor Formal Arrangements which accurately describe the responsibilities of parties in providing and receiving data.
Step Activity
1. Identify all parties/individuals with whom data is exchanged
1. Determine if the Regulator has assigned responsibility, e.g. through a National Data Catalogue (Data Originator Index).
2. Refer to the assignments of responsibility made by the Regulator.
3. If no assignment exists, for each property/sub-property in the Data Catalogue identify the parties transmitting / providing data.
4. Agree assignments with the identified parties. 5. Discuss/agree the assignments with the Regulator.
2. Identify data items and data activities for which the party is responsible
1. Using the assignments, identify and document data items within the responsibility of the party which are provided by the party itself or parties acting on their behalf (contracted activities) for publication in AIS products.
2. Identify all data activities conducted by the party or other parties acting on their behalf, such as origination, storage, processing and transfer.
3. Agree the Formal Arrangements template
1. Create template.
2. Confirm compliance with regulatory needs.
3. Agree template with relevant parties, e.g. Regulator, legal, etc.
4. Establish Formal Arrangements with all relevant parties
1. Use Data Catalogue from Step 1. to identify where Formal Arrangements are required.
2. Identify the means of documenting the Formal Arrangements for each party, e.g., SLA, contract, etc.
3. Discuss the relevant details that are to be covered within the Formal Arrangements (e.g. scope, data items, standards, reporting, performance, etc.).
4. Prepare Formal Arrangements based on the agreed template.
5. Agree Formal Arrangements with each party.
6. Sign and implement Formal Arrangements.
5. Manage Formal Arrangements 1. Record performance.
2. Address non-achievement or issues.
1. Where required by the Formal Arrangements, prepare and issue a performance report using gathered statistics.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 119
6. Monitor and report performance of Formal Arrangements
2. Identify requirements for Formal Arrangements revision.
7. Revise Formal Arrangements
1. Revise Formal Arrangements.
2. Discuss/agree updated Formal Arrangements with each party.
3. Sign and implement updated Formal Arrangements.
Primary Reference to Regulation
Annex III to CIR 2017/373
ATM/ANS.OR.A.085(c) Data Origination
ATM/ANS.OR.A.085(f) Aeronautical data quality management
ATM/ANS.OR.A.090 Common reference systems for air navigation
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) of CIR 2017/373
AMC1 ATM/ANS.OR.A.085(f) Formal Arrangements — Content
GM1 ATM/ANS.OR.A.085(f) Formal Arrangements — Template
GM1 ATM/ANS.OR.A.090(a) Common reference systems for air navigation - Horizontal Reference System
GM2 ATM/ANS.OR.A.090(a) Common reference systems for air navigation - Temporary Non-Compliance
AMC1 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Mean Sea Level
GM2 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(c) Common reference systems for air navigation - Temporal Reference System
EUROCONTROL ADQ Formal Arrangements Template
Evidence of Compliance
1. Signed Formal Arrangements.
2. National Data Catalogue.
Known Issues
1. Management commitment and resources.
2. Understanding the responsibilities of the Data Originator and the relevant DQRs.
3. Lack of stable and agreed National Data Catalogue.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 120 Released Issue Edition : 1.0
Recommendations
1. Regulator involvement is recommended.
The following flow diagram provides a graphical representation of the Scenario 2 Objective 5 steps.
S2O5.1
Identify all parties/individuals with whom data is exchanged
S2O5.2Identify data items and data
activities for which the party is responsible
S2O5.3
Agree the Formal Arrangements template
S2O5.4Establish Formal
Arrangements with all relevant parties
S2O5.5
Manage Formal Arrangements
S2O5.6Monitor and report
performance of Formal Arrangements
S2O5.7
Revise Formal Arrangements
Figure 39: Scenario 2 Objective 5 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 121
7.7.6 Objective 6: Coordinate With AIS Provider Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 6: Coordinate With AIS Provider
Description The Coordinate With AIS Provider objective describes the activities to be undertaken to ensure that matters
that need to be reported to the AIS Provider are done so in accordance with the Formal Arrangements or reporting procedures in place.
Step Activity
1. Identify AIS-reporting procedure(s)
1. Using the Data Catalogue, identify existing AIS-reporting processes to ensure that all required data items are provided and maintained.
2. Make arrangements to report to AIS on matters of operational significance
1. Engage with AIS Provider and confirm that the Data Originator is making full use of and has full access to the existing interface between the AIS Provider and Data Originators.
2. Follow Formal Arrangements agreed with AIS Provider. 3. Update Formal Arrangements if/when necessary.
3. Establish reporting procedures
1. Identify and document matters of operational significance (other than those established in Step 1) that shall be reported to the AIS Provider and identify the AIS products normally used to promulgate this information.
2. Identify changes which need to be approved by the Competent Authority prior to publication (if any).
4. Follow AIRAC system and any other publication schedule established by AIS
1. Identify relevant cut-off dates made available by the AIS Provider for each AIRAC cycle and follow the schedule when notifying about matters which shall be promulgated in accordance with the AIRAC cycle.
2. Identify relevant cut-off dates made available by the AIS Provider for any other publication schedule established by the AIS Provider (if any) and follow the schedule.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.080 Provision of aeronautical data
Supporting Material
Evidence of Compliance
1. Timely submissions of data to the AIS Provider.
Known Issues
1. Roles and responsibilities are not clearly defined, and reporting does not follow any standard procedure (e.g. the same matter is reported randomly by an Operational Manager/Duty Officer/ATCO – without any instruction to do so).
Recommendations
1. Establish regular coordination meetings at the working level.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 122 Released Issue Edition : 1.0
2. Establish a good working relationship with the AIS Provider (including attendance in AIS Provider user forums).
The following flow diagram provides a graphical representation of the Scenario 2 Objective 6 steps.
S2O6.1
Identify AIS-reporting procedure(s)
S2O6.2Make arrangements to report
to AIS on matters of operational significance
S2O6.3
Establish reporting procedures
S2O6.4Follow AIRAC system and
any other publication schedule established by AIS
Figure 40: Scenario 2 Objective 6 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 123
7.7.7 Objective 7: Self-Assess and Monitor Compliance With Relevant Regulations
Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 7: Self-Assess and Monitor Compliance With Relevant Regulations
Description The Self-Assess and Monitor Compliance With Relevant Regulations objective describes how the work
performed should be regularly and formally monitored and, where necessary, adapted to ensure compliance with the latest regulations.
Step Activity
1. Determine required legal baseline
1. Determine the regulations with which compliance is to be monitored.
2. Plan compliance review 1. Plan internal compliance review schedule. 2. Prepare compliance review plan. 3. Provide compliance review plan.
3. Perform compliance review
1. Perform internal compliance review as per established schedule. 2. Prepare compliance report recording all findings and
observations. 3. Publish compliance report. 4. Agree and record corrective actions to be taken (with associated
target dates). 5. Conduct follow-up review of actions.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.B.005(c) Management system
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) of CIR 2017/373
AMC1 ATM/ANS.OR.B.005(c)
Management system - Compliance Monitoring
GM1 ATM/ANS.OR.B.005(c) Management system - Compliance Monitoring Organisational Set-Up
Evidence of Compliance
1. Internal compliance review schedule.
2. Internal compliance review plan.
3. Reports of internal compliance reviews.
Known Issues
1. Lack of personnel trained to perform internal compliance reviews.
2. Lack of time available to perform internal compliance review activities.
3. Incomplete or incorrect legal baseline.
Recommendations
1. Make use of compliance function (compliance officer or similar) within the organisation.
2. Targeted self-reviews (self-audit per expert area?).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 124 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 2 Objective 7 steps.
S2O7.1
Determine required legal baseline
S2O7.2
Plan compliance review
S2O7.3
Perform compliance review
Figure 41: Scenario 2 Objective 7 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 125
7.7.8 Objective 8: Error Reporting, Measurement and Corrective Actions Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective
Objective 8: Error Reporting, Measurement and Corrective Actions
Description The Error Reporting, Measurement and Corrective Actions objective describes how reported errors should be investigated, rectified and their reoccurrence prevented in a timely manner, whilst keeping the aviation
community informed.
Step Activity
1. Receive error report 1. Log details of the identified error.
2. Initial assessment of error
1. Identify the role to investigate the error. 2. Confirm existence of a true error. 3. Determine affected products. 4. Identify party responsible for the data. 5. Notify the party responsible for the data so that they can
undertake a full investigation.
3. Perform mitigating action
1. Determine if any immediate action needs to be taken to communicate the error to the aviation community / users.
2. Notify community / users. 3. Identify if any other mitigating action can be implemented. 4. Implement mitigating action.
4. Investigate error
1. Investigate root causes of error. 2. Investigate affected publications. 3. Determine corrective action to be taken. 4. Determine if any preventive action needs to be taken. 5. Determine if a safety occurrence needs to be raised. 6. Determine if the community / users should be notified of planned
action. 7. Record findings. 8. Notify community / users of planned action.
5. Perform corrective action
1. Determine if a safety assessment / safety support assessment of corrective action needs to be undertaken.
2. Amend corrective action. 3. Implement corrective action.
6. Perform preventive action
1. Determine if a safety assessment / safety support assessment of preventive action needs to be undertaken.
2. Amend preventive action. 3. Implement preventive action.
7. Close error report 1. Notify users that the error has been resolved. 2. If relevant, notify other parties about the error. 3. Close the error report.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 126 Released Issue Edition : 1.0
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.085(j) Aeronautical data quality - Digital
data error detection
ATM/ANS.OR.A.085(l) Aeronautical data quality management – Error Handling
Supporting Material
GM1 ATM/ANS.OR.A.085(j) Aeronautical data quality management - Data Error Detection Techniques
AMC-GM to Annex III (Part-ATM/ANS.OR) of CIR 2017/373 GM1 ATM/ANS.OR.A.085(l) Aeronautical data quality
management – Error Handling
Evidence of Compliance
1. Documented processes and procedures.
2. Safety assessment / safety support assessment findings.
3. Evidence of error reporting and rectification.
Known Issues
1. Error processes may be restricted to only incidents.
2. Formal recording of errors captured during normal data processing do not need to be captured in an error process. The error process should be used to manage ‘escaping’ errors.
Recommendations
1. Any reported error needs to be reported by any participant in the data chain to the AIS Provider. Each party has a duty to actively inform the input (party) and output (party).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 127
The following flow diagram provides a graphical representation of the Scenario 2 Objective 8 steps.
S2O8.1
Receive error report
S2O8.2
Initial assessment of error
S2O8.3
Perform mitigating action
S2O8.4
Investigate error
S2O8.5
Perform corrective action
S2O8.6
Perform preventive action
S2O8.7
Close error report
Figure 42: Scenario 2 Objective 8 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 128 Released Issue Edition : 1.0
7.7.9 Objective 9: Request Data Origination / Provision Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 9: Request Data Origination / Provision
Description The Request Data Origination / Provision objective describes how data should be formally requested from a
provider of data.
Step Activity
1. Establish originator/provider of data
1. Using the Data Catalogue and Formal Arrangements, determine and record the originator/provider of the data and arrangements for requesting data.
2. Define the requirements 1. Identify and record data quality requirements and data
origination standards to be met. 2. Determine and record date for submission of the data.
3. Draft Request for Origination/Provision
1. Prepare Data Product Specification (DPS), if necessary. 2. Draft the Request for Origination/Provision, referring to the
Formal Arrangements in place and any Data Product Specification (DPS).
4. Review Request for Origination/Provision
1. Review the Request for Origination/Provision, ensuring that the correct originator / provider of data has been identified, that the request is clear, complete and accurate and in accordance with the applicable Formal Arrangements.
5. Send Request for Origination/Provision
1. Send Request for Origination/Provision and supporting documentation to the originator / provider of data.
2. Record details of the request sent.
Primary Reference to Regulation
ATM/ANS.OR.A.080 Provision of aeronautical data
Annex III to CIR 2017/373 ATM/ANS.OR.A.085 Aeronautical data quality
management
ATM/ANS.OR.A.090 Common reference systems for air navigation
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
GM1 ATM/ANS.OR.A.085(a) Aeronautical data quality management – Purpose
GM1 ATM/ANS.OR.A.085(b) Aeronautical data quality management - General
GM1 ATM/ANS.OR.A.085(b)(4)
Aeronautical data quality management - Resolution
GM1 ATM/ANS.OR.A.085(b)(5)
Aeronautical data quality management - Traceability
AMC1 ATM/ANS.OR.A.085(b)(8)
Aeronautical data quality management - Format
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 129
GM1 ATM/ANS.OR.A.085(e) Aeronautical data quality management - Electronic Means
AMC1 ATM/ANS.OR.A.085(f)
Aeronautical data quality management – Formal Arrangements
GM1 ATM/ANS.OR.A.085(f) Aeronautical data quality management – Formal Arrangements
GM1 ATM/ANS.OR.A.090(a) Common reference systems for air navigation - Horizontal Reference System - WGS-84
GM2 ATM/ANS.OR.A.090(a)
Common reference systems for air navigation - Temporary Non-compliance of Geographical Coordinates
AMC1 ATM/ANS.OR.A.090(b)
Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Mean Sea Level
GM2 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(c) Temporal Reference System
EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data
All
Evidence of Compliance
1. Issued Requests for Origination/Provision.
2. Formal Arrangements.
3. Results of checks made to ensure data is in accordance with Request for Origination/Provision.
Known Issues
1. Lack of common approach to Requests for Origination/Provision.
2. Lack of understanding of Data Product Specifications.
Recommendations
1. Make use of templates (e.g. a Data Product Specification (DPS) template).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 130 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 2 Objective 9 steps.
S2O9.1
Establish originator/providerof data
S2O9.2
Define the requirements
S2O9.3
Draft Request forOrigination/Provision
S2O9.4
Review Request for Origination/Provision
S2O9.5
Send Request forOrigination/Provision
Request approved?Yes
No
Figure 43: Scenario 2 Objective 9 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 131
7.7.10 Objective 10: Originate Data Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 10: Originate Data
Description The Originate Data objective describes how data should be originated to meet all applicable requirements
so that compliant, approved and coordinated data is provided for further processing.
Step Activity
1. Validate Request for Origination
1. Determine if instructions are clear. 2. Determine if instructions are feasible. 3. Determine if the correct Data Originator for the items has been
identified.
2. Determine the origination requirements
1. Determine the origination requirements, including the standards to be met and the data quality requirements by referencing, as applicable: • The Formal Arrangements. • The Request for Origination/Provision. • The Data Product Specification (DPS).
3. Originate data
1. Obtain any required data sets. 2. Originate data in accordance with Request for
Origination/Provision, Data Product Specification (DPS), Formal Arrangements, applicable standards and data quality requirements.
3. Record details of origination activities. 4. Save data and metadata.
4. Process data
1. Verify and validate that data meets its quality requirements and Data Product Specification (DPS).
2. Record details of all the validation and verification activities performed, including the findings.
3. Process data (as required) or make data available for processing.
5. Coordinate data
1. Ensure consistency of originated data with other applicable data. 2. Identify parties data should be coordinated with. 3. Coordinate with other parties, including the exchange of
necessary data. 4. Document results of coordination activities.
6. Obtain approvals 1. Determine if approvals are required and have been performed. 2. Obtain and store any necessary approval(s).
7. Prepare origination report 1. Finalise origination report and data, if required.
8. Close request 1. If relevant, notify the process initiator about the outcome.
9. Reject Request for Origination If step 1 fails: 1. Record reasons for rejecting Request for Origination/Provision. 2. Inform the party requesting data origination.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 132 Released Issue Edition : 1.0
Primary Reference to Regulation
ATM/ANS.OR.A.080 Provision of aeronautical data
Annex III to CIR 2017/373 ATM/ANS.OR.A.085 Aeronautical data quality
management
ATM/ANS.OR.A.090 Common reference systems for air navigation
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
GM1 ATM/ANS.OR.A.085(a) Aeronautical data quality management - Aeronautical Data Catalogue
GM1 ATM/ANS.OR.A.085(b) Aeronautical data quality management - General
GM1 ATM/ANS.OR.A.085(b)(4)
Aeronautical data quality management - Resolution
GM1 ATM/ANS.OR.A.085(b)(5)
Aeronautical data quality management - Traceability
AMC1 ATM/ANS.OR.A.085(b)(8)
Aeronautical data quality management - Format
GM1 ATM/ANS.OR.A.085(e) Aeronautical data quality management - Electronic Means
AMC1 ATM/ANS.OR.A.085(f)
Aeronautical data quality management - Formal Arrangements — Content
GM1 ATM/ANS.OR.A.085(f) Aeronautical data quality management - Formal Arrangements — Template
GM1 ATM/ANS.OR.A.090(a) Common reference systems for air navigation - Horizontal Reference System - WGS-84
GM2 ATM/ANS.OR.A.090(a)
Common reference systems for air navigation - Temporary Non-compliance of Geographical Coordinates
AMC1 ATM/ANS.OR.A.090(b)
Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Mean Sea Level
GM2 ATM/ANS.OR.A.090(b) Common reference systems for air navigation - Vertical Reference System
GM1 ATM/ANS.OR.A.090(c) Common reference systems for air navigation - Temporal Reference System
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 133
EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data
All
Evidence of Compliance
1. Data origination standards.
2. Formal Arrangements.
3. Requests for Origination/Provision.
4. Origination reports.
5. National Data Catalogue.
Known Issues
1. Lack of awareness of requirements for data origination.
2. Ambiguous Requests for Origination/Provision.
Recommendations
1. Greater granularity is recommended for National Data Catalogues so that the Data Provider and Data Originator(s) and any Regulator approvals are clearly defined.
2. Awareness session (familiarisation training for Data Originators).
3. List of approved / accepted data providers.
4. Approvals may require safety assessment / safety support assessments to be conducted.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 134 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 2 Objective 10 steps.
Validatedrequest?
Yes
No
S2O10.1
Validate Request for Origination
S2O10.3
Originate data
S2O10.2
Determine the origination requirements
S2O10.9
Reject Request for Origination
S2O10.4
Process data
S2O10.5
Coordinate data
S2O10.6
Obtain approvals
S2O10.7
Prepare origination report
S2O10.8
Close request
Figure 44: Scenario 2 Objective 10 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 135
7.7.11 Objective 11: Collect Data Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 11: Collect Data
Description The Collect Data objective describes how the availability of new data is identified and collected and how
changes to the collected data are identified. This is objective is applied when data is originated by a function other than the ATM/ANS provider and the originating party notifies that new data is available.
Step Activity
1. Determine if data is ready for collection
1. Receive notification of data available for collection or monitor the availability of data, in accordance with any Formal Arrangements in place.
2. Confirm that the data collection process should be initiated.
2. Collect data
1. Collect the data in accordance with established processes. 2. Store the collected data. 3. Record details of the collection, including details provided of
changes to data.
3. Identify changes to collected data 1. Identify changes to the data.
4. Process data
1. Verify and validate that data meets its quality requirements and Data Product Specification (DPS), including the minimum metadata requirements.
2. Record details of all the validation and verification activities performed, including the findings.
3. Process data (as required).
Primary Reference to Regulation
Annex III to CIR 2017/373
ATM/ANS.OR.A.085(e) Electronic Means
ATM/ANS.OR.A.085(h) Metadata
ATM/ANS.OR.A.085(j) Data Error Detection
ATM/ANS.OR.A.085(k) Authentication
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) of CIR 2017/373
GM1 ATM/ANS.OR.A.085(e) Electronic Means
GM1 ATM/ANS.OR.A.085(j) Data Error Detection Techniques
GM2 ATM/ANS.OR.A.085(j) Data Error Processing
EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data
All
AIXM 5.1 Data Model (UML)
AIXM 5.1 XML Schema (XSD)
Evidence of Compliance
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 136 Released Issue Edition : 1.0
1. Formal Arrangements.
2. Software tools to manage the receipt of data.
Known Issues
1. Data not provided in accordance with provision method defined.
2. Data not provided in required format.
Recommendations
1. Consider direct delivery of reports and data into the AIS Provider’s system based on Formal Arrangements.
The following flow diagram provides a graphical representation of the Scenario 2 Objective 11 steps.
S2O11.1
Determine if data is ready for collection
S2O11.2
Collect data
S2O11.3
Identify changes to collected data
S2O11.4
Process data
Figure 45: Scenario 2 Objective 11 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 137
7.7.12 Objective 12: Transmit Data Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 12: Transmit Data
Description The Transmit Data objective describes the activities to be undertaken to submit data to the AIS Provider in
accordance with the Formal Arrangements in place.
Step Activity
1. Determine if data is ready for transmission
1. Receive notification of data available for provision to the next intended user.
2. Confirm that the data transmission process should be initiated.
2. Assess readiness to submit data
1. Review and confirm readiness to submit data (there is a need to submit data and mechanisms are in place to transmit data to AIS Provider).
3. Transmit data 1. Exchange data with AIS Provider in accordance with management system documents and Formal Arrangements.
Primary Reference to Regulation
Annex III to CIR 2017/373
ATM/ANS.OR.A.080 Provision of aeronautical data
ATM/ANS.OR.A.085(e) Aeronautical data quality - Electronic Means
ATM/ANS.OR.A.085(h) Aeronautical data quality - Metadata
ATM/ANS.OR.A.085(j) Aeronautical data quality - Error Detection
ATM/ANS.OR.A.085(k) Aeronautical data quality - Authentication
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) of CIR 2017/373
GM1 ATM/ANS.OR.A.085(e) Aeronautical data quality - Electronic Means
GM1 ATM/ANS.OR.A.085(j) Aeronautical data quality - Data Error Detection Techniques
GM2 ATM/ANS.OR.A.085(j) Aeronautical data quality - Data Error Processing
EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data
All
AIXM 5.1 Data Model (UML)
AIXM 5.1 XML Schema (XSD)
Evidence of Compliance
1. Timely submissions of data to AIS Provider.
Known Issues
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 138 Released Issue Edition : 1.0
1. Not allowing sufficient time for AIS Provider to process and publish data in desired AIRAC cycle (e.g. incomplete last-minute submissions). Late delivery and late cancellations.
2. Where manual data entry is used, additional verification checks are often inappropriate to ensure that no errors have been introduced.
Recommendations
1. Share and use a common (online) AIRAC calendar.
2. Build the AIRAC cycle into the data submission component of any Data Provision Tool used so that the Data Provider can only select the available AIRAC dates.
The following flow diagram provides a graphical representation of the Scenario 2 Objective 12 steps.
S2O12.1
Determine if data is ready for transmission
S2O12.2
Assess readiness to submit data
S2O12.3
Transmit data
Figure 46: Scenario 2 Objective 12 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 139
7.7.13 Objective 13: Manage Occurrence Reporting Scenario 2: Implementation by ATM/ANS Provider as Data Originator
Objective 13: Manage Occurrence Reporting
Description The Manage Occurrence Reporting objective describes how reported occurrences should be investigated,
rectified and their reoccurrence prevented.
Step Activity
1. Receive and log report 1. Receive report. 2. Record report.
2. Define mitigating action 1. Analyse occurrence. 2. Identify mitigating action. 3. Record mitigating action.
3. Investigate report
1. Determine affected parties. 2. Invite affected parties to participate in investigation. 3. Investigate occurrence, identifying root cause. 4. Determine corrective action to be taken. 5. Determine preventive action to be taken. 6. Determine responsibilities for action. 7. Record findings.
4. Raise safety incident report 1. Raise safety incident. 2. Record details.
5. Perform corrective action 1. Perform safety assessment / safety support assessment. 2. Amend corrective action. 3. Implement corrective action.
6. Take preventive action 1. Perform safety assessment / safety support assessment. 2. Amend preventive action. 3. Implement preventive action.
Primary Reference to Regulation
Annex III to CIR 2017/373 ATM/ANS.OR.A.065 General Requirements - Occurrence reporting
Supporting Material
AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
AMC1 ATM/ANS.OR.A.065 Occurrence reporting
GM1 ATM/ANS.OR.A.065 Occurrence reporting
EUROCONTROL Guidelines on Safety Support Assessments performed by AIS Providers
Evidence of Compliance
1. Documented processes and procedures.
2. Evidence of occurrence reporting and rectification.
3. Safety assessment / safety support assessment findings.
Known Issues
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 140 Released Issue Edition : 1.0
1. Lack of formal process.
Recommendations
1. Encourage users to report any issues via simple tools, ideally online.
2. Perform user surveys at regular intervals.
The following flow diagram provides a graphical representation of the Scenario 2 Objective 13 steps.
S2O13.5
Raise safety incident report
S2O13.1
Receive and log report
S2O13.2
Define mitigating action
S2O13.3
Investigate report
S2O13.4
Raise safety incident report
S2O13.6
Take preventative action
Figure 47: Scenario 2 Objective 13 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 141
7.8 Scenario 3: Implementation by Aerodrome Operator as Data Originator
7.8.1 Objective 1: Implement and Maintain Management System Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 1: Implement and Maintain Management System
Description The Implement and Maintain Management System objective describes the activities needed to assess the
current management documentation in place in order to identify requirements for the development, implementation and maintenance of a compliant management system. The Management System addresses
quality, safety and security management systems that are typically implemented at the corporate level.
Step Activity
1. Create project team 1. Identify project lead. 2. Identify project personnel, including responsibilities.
2. Identify existing documentation covering quality objectives
1. Identify existing quality management system documentation covering all aeronautical data activities, including: • the quality policy; • quality assurance programme; • evidence of the functioning of the quality system by means
of manuals and monitoring documents.
3. Identify existing documentation covering safety objectives
1. Identify existing safety management system documentation covering all aeronautical data activities.
2. Identify Safety Managers’ roles and responsibilities. 3. Description of the safety management system relevant to
aeronautical data activities: • scope of the safety management system; • safety policy and objectives; • safety responsibilities of key safety personnel; • documentation control procedures; • safety risk management process, including hazard
identification and risk assessment schemes; • monitoring of implementation and effectiveness of safety
actions, and risk mitigation measures; • safety performance monitoring; • safety reporting (including hazard reporting) and
investigation; • emergency response planning; • management of change (including organisational changes
with regard to safety responsibilities); • safety promotion; and • safety management system outputs.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 142 Released Issue Edition : 1.0
4. Identify existing documentation covering security objectives
1. Identify existing security management system documentation covering all aeronautical data activities.
2. Identify existing security processes, measures and standards so that data are protected from interference and restricted only to those authorised and therefore the risk of any aviation incident arising from data errors (intentional or accidental) is minimised.
3. Identify established means designed to detect security breaches. 4. Identify existing procedures relating to data security risk
assessment and mitigation, security monitoring and improvement, security reviews and lesson dissemination.
5. Identify established means designed to control the effects of security breaches, identifying recovery action and mitigation procedures to prevent reoccurrence.
6. Identify implemented measures to protect aeronautical data against cyber security threats.
5. Perform gap analysis
1. Identify roles to be involved in gap analysis. 2. Arrange gap analysis meetings. 3. Perform gap analysis of existing documentation for aeronautical
data activities against management system standard and applicable aeronautical data quality regulations.
4. Record findings. 5. Prepare gap analysis report. 6. Review gap analysis report.
6. Obtain management buy-in 1. Present gap analysis, resource estimates, timescales, benefits and envisaged work.
7. Develop company policies 1. Define requirements related to the management system. 2. Develop company policies.
8. Define and map company processes
1. Determine how management system requirements are to be met.
2. Identify required company processes / updates. 3. Draft implementation plan.
9. Document company processes 1. Develop / update company processes. 2. Review company processes. 3. Assess company processes.
10. Provide training to support the established management system
1. Identify training requirements. 2. Train personnel. 3. Update training records.
11. Trial management system
1. Trial management system. 2. Record trial findings. 3. Review trial findings. 4. Update management system. 5. Review management system.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 143
12. Implement management system
1. Inform affected personnel of roll-out of the management system. 2. Withdraw former documentation. 3. Adjust records of configuration management.
13. Plan internal audit / compliance review of management system
1. Plan internal audit / compliance review schedule. 2. Prepare plan. 3. Provide plan.
14. Perform internal audit / compliance review of management system
1. Perform internal audit / compliance review as per established schedule.
2. Prepare report recording all findings and observations. 3. Publish report. 4. Agree and record corrective actions to be taken (with associated
target dates). 5. Conduct follow-up review of actions.
15. Appoint external review body 1. Identify external body to perform an external audit / compliance review of the management system.
16. External audit / compliance review of management system
1. Arrange for external audit / compliance review. 2. Provide necessary input material. 3. Participate in audit / compliance review. 4. Review findings. 5. Define corrective actions. 6. Implement corrective actions. 7. Arrange audit / compliance review of corrective actions.
17. Oversight of management system
1. Identify internal audit / compliance review intervals and schedule.
2. Perform internal audit / compliance review. 3. Support external audit / compliance review.
Primary Reference to Regulation
Regulation 139/2014 ADR.OR.D.005 Management system
ADR.OR.D.007 Management of aeronautical data and aeronautical information
Supporting Material
AMC/GM to Reg. 139/2014 All related AMC/GM
Evidence of Compliance
3. Quality Policy.
4. Quality assurance programme.
5. Management system manual(s) and supporting documents (including work instructions).
6. Job descriptions.
7. Company organogram.
8. Risk register.
9. Management system external and internal audit report & documented remedial actions.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 144 Released Issue Edition : 1.0
10. Management system monitoring documents.
11. ISO certificate (if ISO).
Known Issues
1. Management commitment and resources.
2. Understanding the responsibilities of the Data Originator and the relevant DQRs.
3. Assigning too many responsibilities to one person.
4. Company has established a QMS but aeronautical data activities are not in its scope.
5. Working in silos - safety and security measures are often cross-departmental: • personnel responsible for security (including cyber – security) do not engage with other parts of
the organisation; • data-related risks are identified and managed in isolation (e.g. by the operations team) while
they often need to be assessed and addressed at a higher cross-departmental level (e.g. aerodrome operations, IT and HR Teams together).
Recommendations
1. Company policies should address topics such as safety, quality, security and risk management.
2. Integrated company policies may address more than one of these topics.
3. The scope of training provided will vary and must meet the structure of the company policies defined.
4. The quality policy is a statement made by top management which expresses its commitment to achieving quality throughout the company's operation.
5. The established management system shall provide the necessary assurance and confidence that distributed aeronautical data and aeronautical information meet their data quality requirements. The management system is an enabler used by the organisation to fulfil the tasks required to achieve its objectives. It is considered good practice to have one overarching management system in the organisation covering quality, safety and security management system objectives, embedded in the corporate governance, rather than three separate management system structures.
6. A phased approach to internal audit / compliance review is recommended, focussing on small areas at a time.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 145
The following flow diagram provides a graphical representation of the Scenario 3 Objective 1 steps.
S3O1.1
Create project team
S3O1.2Identify existing
documentation covering quality objectives
S3O1.3Identify existing
documentation covering Safety objectives
S3O1.4Identify existing
documentation covering Security objectives
S3O1.5
Perform gap analysis
S3O1.6
Obtain management buy-in
S3O1.7
Develop company policies
S3O1.8
Define and map company processes
S3O1.9
Document company processes
S3O1.10Provide training to support the
established management system
S3O1.11
Trial management system
S3O1.12
Implement management system
S3O1.13Plan internal audit /
compliance review of management system
S3O1.14Perform internal audit / compliance review of management system
S3O1.15
Appoint external review body
S3O1.16External audit / compliance
review of management system
S3O1.17
Oversight of management system
Figure 48: Scenario 3 Objective 1 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 146 Released Issue Edition : 1.0
7.8.2 Objective 2: Define and Implement Processes and Procedures Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 2: Define and Implement Processes and Procedures
Description The Define and Implement Processes and Procedures objective describes the activities needed to assess, amend, train, trial, implement and oversee processes and procedures related to data activities and which
are utilised by later objectives.
Step Activity
1. Assess current processes and procedures relating to aeronautical data
1. Identify requirements. 2. Perform gap analysis. 3. Record findings.
2. Identify non-conformities 1. Identify non-conformities. 2. Establish plan for addressing non-conformities.
3. Document revised processes and procedures relating to aeronautical data
1. Amend / create processes and procedures to address non-conformities.
2. Review amended processes and procedures.
4. Assess processes and procedures relating to aeronautical data
1. Arrange for the assessment of amended processes and procedures.
2. Participate in the assessment. 3. Review assessment findings. 4. Update processes and procedures.
5. Train processes and procedures relating to aeronautical data
1. Identify training requirements. 2. Conduct training. 3. Update training records.
6. Trial processes and procedures relating to d aeronautical data
1. Trial processes and procedures. 2. Record findings of trial. 3. Review findings of trial. 4. Update processes and procedures. 5. Review processes and procedures.
7. Implement processes and procedures relating to aeronautical data
1. Inform affected personnel of roll-out of processes and procedures.
2. Withdraw former processes and procedures. 3. Adjust records of configuration management.
8. Plan internal audit / compliance review of processes and procedures relating to aeronautical data
1. Plan internal audit / compliance review schedule. 2. Prepare plan. 3. Provide plan.
9. Perform internal audit / compliance review of processes and procedures relating to aeronautical data
1. Perform internal audit / compliance review as per established schedule.
2. Prepare report recording all findings and observations. 3. Publish report.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 147
4. Agree and record corrective actions to be taken (with associated target dates).
5. Conduct follow-up review of actions.
10. Oversee processes and procedures relating to aeronautical data
1. Identify internal audit / compliance review intervals and schedule.
2. Perform internal audit / compliance review.
Primary Reference to Regulation
Regulation 139/2014 ADR.OR.D.007 Management of aeronautical data and aeronautical information
ADR.OR.D.017 Training and proficiency check programmes
Supporting Material
AMC/GM to Reg. 139/2014 All related AMC/GM
Evidence of Compliance
1. Documented processes and procedures.
2. Safety assessment / safety support assessment findings.
3. Evidence of error reporting and rectification.
Known Issues
1. Lack of formally captured process and procedures or documented processes and procedures do not reflect day-to-day activities.
2. Selection of appropriate and efficient methodology to be applied.
3. Difficulty in selecting the granularity at which to capture the processes and procedures.
4. Lack of independent resource with knowledge to perform reviews.
5. Error processes may be restricted to incidents.
Recommendations
1. Start with a review of any existing documented processes and procedures to ensure these reflect current practices and, where possible, adapt these rather than start from new.
1. Inclusion of staff involved in daily work in process and procedures development.
2. A phased approach to internal audit / compliance review is recommended, focussing on small areas at a time.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 148 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 3 Objective 2 steps.
S3O2.1
Assess current processes and procedures
S3O2.2
Identify non-conformities
S3O2.3
Document revised processes and procedures
S3O2.4
Assess processes and procedures
S3O2.5
Train processes and procedures
S3O2.6
Trial processes and procedures
S3O2.7
Implement processes and procedures
S3O2.8Plan internal audit /
compliance review of processes and procedures
S3O2.9Perform internal audit / compliance review of
processes and procedures
S3O2.10
Oversee processes and procedures
Figure 49: Scenario 3 Objective 2 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 149
7.8.3 Objective 3: Establish Verification and Validation Procedures Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 3: Establish Verification and Validation Procedures
Description The Establish Verification and Validation Procedures objective describes the establishment of procedures to
ensure that data meets all its applicable requirements and has been processed appropriately.
Step Activity
1. Define the requirements 1. Identify9 the data quality requirements for all applicable data items.
2. Identify the procedures to be applied to validate and verify data
1. Identify the checks that may be performed for the different types of data and the different data integrity levels.
2. Document the validation and verification procedures.
Primary Reference to Regulation
Regulation 139/2014 ADR.OR.D.007 Management of aeronautical data and aeronautical information
Proposed AMDT to Reg. 139/201410
ADR.OPS.A.030 Aeronautical data catalogue
ADR.OPS.A.035 Data validation and verification
Supporting Material
AMC/GM to Reg. 139/2014
AMC1 ADR.OR.D.007(a) Quality management system for aeronautical data and aeronautical information provision activities
GM1 ADR.OR.D.007(a) Quality management system for aeronautical data and aeronautical information provision activities
AMC1 ADR.OR.D.007(b) Security management for aeronautical data and aeronautical information provision activities
Draft AMC/GM to proposed AMDT to Reg. 139/2014 tbd once published
Evidence of Compliance
1. Software tools to verify and validate data
2. Formal Arrangements
3. Management system manual(s) and supporting documents (including work instructions)
4. Recorded findings of all checks performed.
Known Issues
1. Lack of awareness of validation and verification requirements.
9 Relevant DQRs should have already been defined and those applicable will be identified from those established. 10 Based on EASA Opinion 02/2018, consequential changes are being proposed to amend Commission Implementing Regulation 139/2014 (Delegated Act in process of adoption).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 150 Released Issue Edition : 1.0
2. Processes are not adequate for the assigned integrity level of the data item (as per EUROCONTROL Specifications).
3. Inability to fully validate and verify data provided to it, only perform plausibility checks.
4. The validation and verification of accuracy, etc. can only be performed by the Data Originator.
Recommendations
1. Regulator involvement is recommended for ensuring parties are aware of and fulfil their responsibilities.
2. In some cases, plausibility checks may need to be applied to confirm the suitability of data.
The following flow diagram provides a graphical representation of the Scenario 3 Objective 3 steps.
S3O3.1
Define the requirements
S3O3.2Identify the procedures to be applied to validate and verify
data
Figure 50: Scenario 3 Objective 3 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 151
7.8.4 Objective 4: Assure Tools and Software Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 4: Assure Tools and Software
Description The Assure Tools and Software objective describes the activities needed to ensure that those tools and
software that form part of the data assurance process are fit for their intended purpose.
Step Activity
1. Identify tools and software 1. Identify tools and software currently used in data processes. 2. Determine tools and software requiring assurance, documenting
findings.
2. Define the requirements 1. Identify and document relevant requirements applicable to tools and software.
3. Determine methodology to be applied
1. Identify and document methodology to be applied to bespoke software.
2. Prepare assurance plan.
4. Perform tool assessment/validation and verification
1. Identify and document safety risks associated with the use of the tool/software.
2. Perform tool assessment / validation and verification. 3. Document findings.
5. Confirm readiness 1. Confirm and document tool’s compliance and readiness for use.
Primary Reference to Regulation
Proposed AMDT to Reg. 139/2014 ADR.OPS.A.055 Tools and software
Supporting Material
Draft AMC/GM to proposed AMDT to Reg. 139/2014 tbd
EUROCAE ED-76A Standards for Processing Aeronautical Data All
Evidence of Compliance
1. Documented tool assessments.
2. Management system manual(s) and supporting documents (including work instructions and IT Protocols).
3. Evidence of assurance activities.
Known Issues
1. Lack of awareness of requirements for tools.
2. Using CD/DVD/pen-drives in any data activities.
3. No retention policy for old tools / old version of tools
Recommendations
1. Address the identified issues in the relevant documents (as listed in the evidence of compliance above).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 152 Released Issue Edition : 1.0
2. When assessing errors in tools and procedures, ensure that consequential errors in data are identified.
The following flow diagram provides a graphical representation of the Scenario 3 Objective 4 steps.
S3O4.1
Identify tools and software
S3O4.2
Define the requirements
S3O4.3
Determine methodology to be applied
S3O4.4
Perform tool assessment/validation and verification
S3O4.5
Confirm readiness
Figure 51: Scenario 3 Objective 4 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 153
7.8.5 Objective 5: Establish Process to Monitor Data Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 5: Establish Process to Monitor Data
Description The Establish Process to Monitor Data objective describes the activities to be undertaken to ensure that those items that are the responsibility of the aerodrome to provide are regularly reviewed and updated,
where necessary.
Step Activity
1. Establish review cycle for all data
1. Use the established aerodrome Data Catalogue. 2. Record review cycle for all data items provided by the
aerodrome and identify relevant data activities.
2. Assign responsibilities for monitoring of data
1. Identify units / role responsible for monitoring data. 2. Implement mechanisms to instigate data reviews.
3. Review data 1. Determine if scope of data published is correct. 2. Ensure currency of published data. 3. Determine completeness of published data. 4. Ensure data meets operational needs. 5. Ensure data meets any new / changed requirements in terms of
scope, quality and content.
4. Record review findings 1. Record scope of data reviewed. 2. Record findings of review.
5. Update / withdraw / originate data
1. Objective 12: Request Data Origination / Provision 2. Objective 13: Originate Data
Primary Reference to Regulation
Regulation 139/2014 ADR.OPS.A.005 Aerodrome data
ADR.OPS.A.010 Data quality requirements
Proposed AMDT to Reg. 139/2014 ADR.OPS.A.010 Revised Data quality requirements
Supporting Material
Draft AMC/GM to proposed AMDT to Reg. 139/2014 tbd
Evidence of Compliance
1. Evidence demonstrating that data monitoring activities are executed.
2. Data changes resulting from data monitoring activities.
Known Issues
N/A
Recommendations
N/A
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 154 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 3 Objective 5 steps.
S3O5.1
Establish review cycle for all data
S3O5.2
Assign responsibilities for monitoring of data
S3O5.3
Review data
S3O5.4
Record review findings
S3O5.5
Update / withdraw / originate data
Figure 52: Scenario 3 Objective 5 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 155
7.8.6 Objective 6: Establish and Manage Formal Arrangements Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 6: Establish and Manage Formal Arrangements
Description The Establish and Manage Formal Arrangements objective describes the activities needed to identify the
need for and develop, implement and monitor Formal Arrangements which accurately describe the responsibilities of parties in providing and receiving data.
Step Activity
1. Identify all parties/individuals with whom data is exchanged
1. Determine if the Regulator has assigned responsibility, e.g. through a National Data Catalogue (Data Originator Index).
2. Refer to the assignments of responsibility made by the Regulator.
3. If no assignment exists, for each property/sub-property in the Data Catalogue identify the parties transmitting / providing data.
4. Agree assignments with the identified parties. 5. Discuss/agree the assignments with the Regulator.
2. Identify data items and data activities for which the party is responsible
1. Using the assignments, identify and document data items within the responsibility of the party which are provided by the party itself or parties acting on their behalf (contracted activities) for publication in AIS products.
2. Identify all data activities conducted by the party or other parties acting on their behalf, such as origination, storage, processing and transfer.
3. Create template. 4. Confirm compliance with regulatory needs. 5. Agree template with relevant parties, e.g. Regulator, legal, etc.
3. Agree the Formal Arrangements template
4. Establish Formal Arrangements with all relevant parties
1. Use Data Catalogue from Step 1. to identify where Formal Arrangements are required.
2. Identify the means of documenting the Formal Arrangements for each party, e.g., SLA, contract, etc.
3. Discuss the relevant details that are to be covered within the Formal Arrangements (e.g. scope, data items, standards, reporting, performance, etc.).
4. Prepare Formal Arrangements based on the agreed template. 5. Agree Formal Arrangements with each party. 6. Sign and implement Formal Arrangements.
5. Manage Formal Arrangements 1. Record performance. 2. Address non-achievement or issues.
6. Monitor and report performance of Formal Arrangements
1. Where required by the Formal Arrangements, prepare and issue a performance report using gathered statistics.
2. Identify requirements for Formal Arrangements revision.
7. Revise Formal Arrangements 1. Revise Formal Arrangements.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 156 Released Issue Edition : 1.0
2. Discuss/agree updated Formal Arrangements with each party. 3. Sign and implement updated Formal Arrangements.
Primary Reference to Regulation
Regulation 139/2014 ADR.OPS.A.010 Data quality requirements
Supporting Material
AMC and GM to Reg. 139/2014 AMC2 ADR.OPS.A.010 Data quality requirements Data quality requirements
AMC and GM to Reg. 139/2014 AMC1 ADR.OR.D.005(b)(11) Management system
Examples from other stakeholders CAP 1732 Aerodrome survey guidance
Appendix 1. Guidance on the content of Formal Arrangements between the Aerodrome Operator and the external organisation providing a survey of aeronautical data for the aerodrome).
EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data
All
Draft AMC/GM to proposed AMDT to Reg. 139/2014 tbd
Evidence of Compliance
1. Signed Formal Arrangements (all data items are provided in accordance with Formal Arrangements from the point of origination to the point of submission to the AIS Provider).
Known Issues
1. Management commitment and resources.
2. Lack of stable and agreed National Data Catalogue.
3. Lack of a Formal Arrangements template or use of many different Formal Arrangements templates.
4. Changing Formal Arrangements every time there is a change to the personnel (high number of changes).
5. Lack of efficient maintenance of Formal Arrangements leading to out-of-date documents remaining in force.
6. Difficulties in changing/amending valid business contracts.
Recommendations
1. Initially, when establishing Formal Arrangements, liaison with the Competent Authority is recommended (unless sufficient guidance has been provided at the national level).
2. Establishment of the Formal Arrangements between the aerodrome operator and the AIS Provider is normally led by the AIS Provider (following the AIS Provider’s process).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 157
The following flow diagram provides a graphical representation of the Scenario 3 Objective 6 steps.
S3O6.1
Identify all parties/individuals with whom data is exchanged
S3O6.2Identify data items and data
activities for which the party is responsible
S3O6.3
Agree the Formal Arrangements template
S3O6.4Establish Formal
Arrangements with all relevant parties
S3O6.5
Manage Formal Arrangements
S3O6.6Monitor and report
performance of Formal Arrangements
S3O6.7
Revise Formal Arrangements
Figure 53: Scenario 3 Objective 6 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 158 Released Issue Edition : 1.0
7.8.7 Objective 7: Coordinate With AIS Provider Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 7: Coordinate With AIS Provider
Description The Coordinate With AIS Provider objective describes the activities to be undertaken to ensure that matters
that need to be reported to the AIS Provider are done so in accordance with the Formal Arrangements or reporting procedures in place.
Step Activity
1. Identify AIS-reporting procedure(s)
1. Using the aerodrome Data Catalogue, identify existing AIS- Provider reporting processes to ensure that all required data items are provided and maintained.
2. Make arrangements to report to AIS on matters of operational significance or affecting aircraft and aerodrome operations
1. Engage with the AIS Provider and confirm that the aerodrome is making full use of and has full access to the existing interface between the AIS Provider and Data Originators.
2. Follow Formal Arrangements agreed with AIS Provider. 3. Update Formal Arrangements if/when necessary.
3. Establish reporting procedures
1. Identify and document matters of operational significance or affecting aircraft and aerodrome operations (other than those established in Step 1) that shall be reported to the AIS Provider and identify the AIS products normally used to promulgate this information.
2. Identify changes which need to be approved by the Competent Authority prior to publication (if any).
4. Follow AIRAC system and any other publication schedule established by AIS
1. Identify relevant cut-off dates made available by the AIS Provider for each AIRAC cycle and follow the schedule when notifying about matters which shall be promulgated in accordance with the AIRAC cycle.
2. Identify relevant cut-off dates made available by the AIS Provider for any other publication schedule established by the AIS Provider (if any) and follow the schedule.
Primary Reference to Regulation
Regulation 139/2014 ADR.OPS.A.015 Coordination between aerodrome operators and providers of aeronautical information services
Proposed AMDT to Reg. 139/2014 ADR.OPS.A.010 Revised Data quality requirements
Supporting Material
AMC and GM to Reg. 139/2014 AMC1 ADR.OPS.A.015 Coordination between aerodrome operators and providers of aeronautical information services
Draft AMC/GM to proposed AMDT to Reg. 139/2014 tbd
Evidence of Compliance
1. Timely submissions of data to the AIS Provider.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 159
Known Issues
1. Roles and responsibilities are not clearly defined, and reporting does not follow any standard procedure (e.g. the same matter is reported randomly by an Operational Manager/Duty Officer/ATCO – without any instruction to do so)
Recommendations
1. Establish regular coordination meetings at the working level.
2. Establish a good working relationship with the AIS Provider (including attendance in the AIS Provider’s user forums).
The following flow diagram provides a graphical representation of the Scenario 3 Objective 7 steps.
S3O7.1
Identify AIS-reporting procedure(s)
S3O7.2Make arrangements to report
to AIS on matters of operational significance
S3O7.3
Establish reporting procedures
S3O7.4Follow AIRAC system and
any other publication schedule established by AIS
Figure 54: Scenario 3 Objective 7 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 160 Released Issue Edition : 1.0
7.8.8 Objective 8: Define and Implement Training Programme Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 8: Define and Implement Training Programme
Description The Define and Implement Training Programme objective describes how a Competence Scheme and
training programme should be established to ensure that all staff are competent and trained for the activities that they perform.
Step Activity
1. Create Competence Scheme
1. Determine the regulatory requirements related to training and competence.
2. Identify minimum competency levels (requirements) for personnel involved in performing data activities in accordance with the relevant regulations.
3. Record competence levels. 4. Identify training for competence levels.
2. Determine training programme
1. Identify existing training programme for personnel involved in data activities (including contractors, if relevant).
2. Create or update the training programme for the identified training requirements, including refresher training.
3. Identify training needs
1. Using the Competence Scheme and training programme, determine the training needs for each role, identifying if any role changes require different competences to be recorded in the Competence Scheme.
2. Assess individuals, identifying any changes in their role and any gaps in competence.
3. Update Competence Scheme and training programme, as needed.
4. Update individual training records with required training.
4. Provide training
1. Provide training following training programme. 2. Gather feedback. 3. Update training records. 4. Record received feedback. 5. Update training programme.
Primary Reference to Regulation
Regulation 139/2014 ADR.OR.D.015 Personnel requirements
Supporting Material
AMC-GM to Reg. 139/2014 All related AMC/GM
Evidence of Compliance
1. Competence scheme/matrix including documented minimum competency levels.
2. Training plans.
3. Training records/history (evidence that personnel receive adequate training within the established timescale).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 161
Known Issues
1. High level statements in training policy rather than an established and followed training plan relevant to roles with defined timescale.
2. Training provided in a reactive, not pro-active manner.
3. Employees responsible for the delivery of their training plan (with no support from the training manager/line managers) – leading to delays in the delivery of the plan and also a lack of control/visibility of the delivery of the training programme.
Recommendations
1. Monitoring of the delivery of the training programme – including reminders to personnel requiring training and reports to their line managers and training managers. Make it as easy as possible for your personnel – they should not have to organise/chase training.
2. Training should include, as a minimum, the promotion of safety awareness around the organisation by sharing lessons arising from safety activities.
3. All staff should be involved in proposing solutions to identified safety issues and improvements to assist the effectiveness and efficiency of the processes.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 162 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 3 Objective 8 steps.
S3O8.1
Create Competence Scheme
S3O8.2
Determine training programme
S3O8.3
Identify training needs
S3O8.4
Provide training
Figure 55: Scenario 3 Objective 8 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 163
7.8.9 Objective 9: Self-Assess and Monitor Compliance with Relevant Regulations
Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 9: Self-Assess and Monitor Compliance with Relevant Regulations
Description The Self-Assess and Monitor Compliance with Relevant Regulations objective describes how the work
performed should be regularly and formally monitored and, where necessary, adapted to ensure compliance with the latest regulations.
Step Activity
1. Determine required legal baseline
1. Determine the regulations with which compliance is to be monitored.
2. Plan compliance review
1. Plan internal compliance review schedule in accordance with management system requirements.
2. Prepare compliance review plan. 3. Provide compliance review plan.
3. Perform compliance review
1. Perform internal compliance review as per established schedule. 2. Prepare compliance report recording all findings and
observations. 3. Publish compliance report. 4. Agree and record corrective actions to be taken (with associated
target dates). 5. Conduct follow-up review of actions.
Primary Reference to Regulation
Regulation 139/2014 ADR.OR.D.005 Management system
Supporting Material
Draft AMC-GM to Reg. 139/2014 AMC1 ADR.OR.D.005(b)(11) Compliance Monitoring
Evidence of Compliance
1. Evidence demonstrating that the compliance monitoring process is implemented, maintained and continually reviewed and improved as necessary.
2. Management system manual(s) and supporting documents (including work instructions) regarding compliance monitoring process.
3. Internal compliance review schedule.
4. Internal compliance review plan.
5. Reports of internal compliance reviews.
Known Issues
1. Aeronautical data activities are not in the scope of the compliance monitoring process.
2. Compliance monitoring process does not cover the full extent of data activities (e.g. does not cover contracted activities).
3. Lack of personnel trained to perform internal compliance reviews.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 164 Released Issue Edition : 1.0
4. Lack of time available to perform internal compliance review activities.
5. Incomplete or incorrect legal baseline.
Recommendations
N/A
The following flow diagram provides a graphical representation of the Scenario 3 Objective 9 steps.
S3O9.1
Determine required legal baseline
S3O9.2
Plan compliance review
S3O9.3
Perform compliance review
Figure 56: Scenario 3 Objective 9 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 165
7.8.10 Objective 10: Error Reporting, Measurement and Corrective Actions
Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 10: Error Reporting, Measurement and Corrective Actions
Description The Error Reporting, Measurement and Corrective Actions objective describes how reported errors should be investigated, rectified and their reoccurrence prevented in a timely manner, whilst keeping the aviation
community informed.
Step Activity
1. Receive error report 1. Log details of the identified error.
2. Initial assessment of error
1. Identify the role to investigate the error. 2. Confirm existence of a true error. 3. Determine affected products. 4. Identify party responsible for the data. 5. Notify the party responsible for the data so that they can
undertake a full investigation.
3. Perform mitigating action
1. Determine if any immediate action needs to be taken to communicate the error to the aviation community / users.
2. Notify community / users. 3. Identify if any other mitigating action can be implemented. 4. Implement mitigating action.
4. Investigate error
1. Investigate root causes of error. 2. Investigate affected publications. 3. Determine corrective action to be taken. 4. Determine if any preventive action needs to be taken. 5. Determine if a safety occurrence needs to be raised. 6. Determine if the community / users should be notified of planned
action. 7. Record findings. 8. Notify community / users of planned action.
5. Perform corrective action
1. Determine if a safety assessment / safety support assessment of corrective action needs to be undertaken.
2. Amend corrective action. 3. Implement corrective action.
6. Perform preventive action
1. Determine if a safety assessment / safety support assessment of preventive action needs to be undertaken.
2. Amend preventive action. 3. Implement preventive action.
7. Close error report 1. Notify users that the error has been resolved. 2. If relevant, notify other parties about the error. 3. Close the error report.
Primary Reference to Regulation
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 166 Released Issue Edition : 1.0
Regulation 139/2014 ADR.OR.D.007 Management of aeronautical data and aeronautical information
Proposed AMDT to Reg. 139/2014 ADR.OPS.A.040 Error handling requirements
Supporting Material
Draft AMC-GM to Reg. 139/2014 tbd
Evidence of Compliance
1. Records of identified data errors and the consequential corrective actions taken.
2. Each provided data item traceable from the point of submission to AIS Provider to the point of origination.
Known Issues
1. Relying on manual entry of data. 2. Formal recording of errors captured during normal data processing do not need to be captured in an
error process. The error process should be used to manage ‘escaping’ errors.
Recommendations
1. Manual data processes can be compliant with data quality requirements, but it is recommended to limit manual data entries to the minimum.
2. When assessing errors in tools and procedures, ensure that consequential errors in data are identified.
3. Give priority to errors in critical or essential data.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 167
The following flow diagram provides a graphical representation of the Scenario 3 Objective 10 steps.
S3O10.1
Receive error report
S3O10.2
Initial assessment of error
S3O10.3
Perform mitigating action
S3O10.4
Investigate error
S3O10.5
Perform corrective action
S3O10.6
Perform preventive action
S3O10.7
Close error report
Figure 57: Scenario 3 Objective 10 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 168 Released Issue Edition : 1.0
7.8.11 Objective 11: Manage Requests for Data Changes Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 11: Manage Requests for Data Changes
Description The Manage Requests for Data Changes objective describes how requests for data changes should be
checked before further processing.
Step Activity
1. Receive request
1. Receive internal/external notification about changes to aeronautical data (e.g. new survey, new permanent or temporary obstacle or operational changes at the airport).
2. Confirm the appropriate role (e.g. function, name, organisation, etc.) to process data (as established in Objective 1 and documented in management system documents) and forward the request to the relevant (competent) personnel without undue delay.
3. If not already established, assess whether there is a need to establish Formal Arrangements with the party providing data.
2. Verify request
1. Confirm that the request relates to aeronautical information defined in the Data Catalogue.
2. Confirm that the request is clear, complete and the timescales are feasible.
3. Determine if the request has been submitted by the correct provider of data, in accordance with the Formal Arrangements.
4. If the provider of data is not the correct one, determine action to be taken.
5. Record findings of verification of request.
3. Assess verification outcome
1. Determine if the request is ready for validation, if the provider of data or State Designated Authority needs to be contacted for clarification or if the request should be rejected.
2. Record outcome of the verification activity.
4. Apply change request 1. Hand over the change request to the relevant process team.
5. Reject request 1. Notify provider of data that the request has been rejected,
providing the reasons for this.
2. Record details of the rejection sent.
Primary Reference to Regulation
Regulation 139/2014 ADR.OR.D.007 Management of aeronautical data and aeronautical information
Proposed AMDT to Reg. 139/2014 ADR.OPS.A.010 Data quality requirements
Supporting Material
Draft AMC-GM to Reg. 139/2014 tbd
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 169
EUROCONTROL Guidelines for the provision of Metadata to support the Exchange of Aeronautical Data.
Evidence of Compliance
1. Formal Arrangements.
2. Software tools to manage the receipt of data changes.
3. Management system manual and supporting documents (including work instructions).
4. Job descriptions.
5. Each provided data item traceable from the point of submission to AIS Provider to the point of origination.
Known Issues
1. Requests received not in defined format.
2. Requests received by unauthorised Data Providers.
Recommendations
N/A
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 170 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 3 Objective 11 steps.
Request approved?Yes
No
S3O11.1
Receive request
S3O11.2
Verify request
S3O11.3
Assess verification outcome
S3O11.4
Apply change request
S3O11.5
Reject request
Figure 58: Scenario 3 Objective 11 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 171
7.8.12 Objective 12: Request Data Origination / Provision Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 12: Request Data Origination / Provision
Description The Request Data Origination / Provision objective describes how data should be formally requested from a
provider of data.
Step Activity
1. Establish originator/provider of data
1. Using the Data Catalogue and Formal Arrangements, determine and record the originator/provider of the data and arrangements for requesting data.
2. Define the requirements 1. Identify and record data quality requirements and data
origination standards to be met. 2. Determine and record date for submission of the data.
3. Draft Request for Origination/Provision
1. Prepare Data Product Specification (DPS), if necessary. 2. Draft the Request for Origination/Provision, referring to the
Formal Arrangements in place and any Data Product Specification (DPS).
4. Review Request for Origination/Provision
1. Review the Request for Origination/Provision, ensuring that the correct originator/provider of data has been identified, that the request is clear, complete and accurate and in accordance with the applicable Formal Arrangements.
5. Send Request for Origination/Provision
1. Send Request for Origination/Provision and supporting documentation to the originator/provider of data.
2. Record details of the request sent.
Primary Reference to Regulation
Regulation 139/2014 ADR.OR.D.007 Management of aeronautical data and aeronautical information
Proposed AMDT to Reg. 139/2014
ADR.OR.D.007 Revised
ADR.OPS.A.010 Data quality requirements
ADR.OPS.A.020 Common reference systems
ADR.OPS.A.030 Aeronautical data catalogue
Supporting Material
Draft AMC-GM to Reg. 139/2014
EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data
All
Evidence of Compliance
1. Issued Requests for Origination/Provision.
2. Data Product Specifications
3. Formal Arrangements.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 172 Released Issue Edition : 1.0
4. Results of checks made to ensure data is in accordance with Request for Origination/Provision.
5. Formal Arrangements.
6. AIP change requests resulting from the data origination.
7. Each provided data item traceable from the point of submission to the AIS Provider to the point of origination.
8. Survey reports.
9. IFP/airspace design.
10. Relevant processes included in QMS or management system manual(s) and supporting documents (including work instructions).
11. Safeguarding Map/Software.
12. Obstacle assessment reports.
Known Issues
1. Lack of awareness/understanding of requirements for data origination.
2. Gaps between aerodrome surveys and IFP reviews.
3. Delay in updates to the aerodrome obstacle dataset (should be updated as soon as possible).
4. Delays at any stage of the safeguarding process.
5. NOTAM proliferation.
Recommendations
1. Minimise the number of parties involved in the upstream data chain. If it is considered beneficial for the aerodrome operator (e.g. cost reduction), feasible for the AIS Provider and permitted by the Competent Authority, the aerodrome operator may appoint other parties to originate or process aeronautical data at the aerodrome’s request and to submit data to the AIS Provider on its behalf (this shall be reflected in the Formal Arrangements).
2. Identify: • the latest full survey date and status of its compliance with data quality requirements; • aeronautical data items which are not compliant with data quality requirements; • all data products, including non-compliant data (if there are any) e.g. AIP, IFP design, etc.; • transition plan for achieving full compliance with data quality requirements (if not already achieved),
including date of the full compliant survey and date when all aeronautical information products, including aerodrome data, will be compliant;
• procedures for continuous monitoring of the obstacle environment and annual review of the aeronautical data;
• aerodrome safeguarding procedures (including IFP safeguarding); • existing data provision and maintenance arrangements (with timescales and evidence); • required data provision and maintenance arrangements (with timescales and evidence).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 173
The following flow diagram provides a graphical representation of the Scenario 3 Objective 12 steps.
S3O12.1
Establish originator/provider of data
S3O12.2
Define the requirements
S3O12.3
Draft Request forOrigination/Provision
S3O12.4
Review Request for Origination/Provision
S3O12.5
Send Request forOrigination/Provision
Request approved?Yes
No
Figure 59: Scenario 3 Objective 12 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 174 Released Issue Edition : 1.0
7.8.13 Objective 13: Originate Data Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 13: Originate Data
Description The Originate Data objective describes how data should be originated to meet all applicable requirements
so that compliant, approved and coordinated data is provided for further processing.
Step Activity
1. Validate Request for Origination
1. Determine if instructions are clear. 2. Determine if instructions are feasible. 3. Determine if the correct Data Originator for the items has been
identified.
2. Determine the origination requirements
1. Determine the origination requirements, including the standards to be met and the data quality requirements by referencing, as applicable: • The Formal Arrangements. • The Request for Origination. • The Data Product Specification (DPS).
3. Originate data
1. Obtain any required data sets. 2. Originate data in accordance with Request for
Origination/Provision, Data Product Specification (DPS), Formal Arrangements, applicable standards and data quality requirements.
3. Record details of origination activities. 4. Save data and metadata.
4. Process data
1. Verify and validate that data meets its requirements and Data Product Specification (DPS).
2. Record details of all the validation and verification activities performed, including the findings.
3. Process data (as required) or make data available for processing.
5. Coordinate data
1. Ensure consistency of originated data with other applicable data. 2. Identify parties data should be coordinated with. 3. Coordinate with other parties, including the exchange of
necessary data. 4. Document results of coordination activities.
6. Obtain approvals 1. Determine if approvals are required and have been performed. 2. Obtain and store any necessary approval(s).
7. Prepare origination report 1. Finalise origination report and data, if required.
8. Close request 1. If relevant, notify the process initiator about the outcome.
9. Reject Request for Origination If step 1 fails: 1. Record reasons for rejecting Request for Origination/Provision. 2. Inform the party requesting data origination.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 175
Primary Reference to Regulation
Regulation 139/2014 ADR.OR.D.007 Management of aeronautical data and aeronautical information
Proposed AMDT to Reg. 139/2014
ADR.OR.D.007 Revised
ADR.OPS.A.010 Data quality requirements
ADR.OPS.A.020 Common reference systems
ADR.OPS.A.025 Data error detection and authentication
ADR.OPS.A.030 Aeronautical data catalogue
ADR.OPS.A.035 Data validation and verification
ADR.OPS.A.045 Metadata
ADR.OPS.A.050 Data transmission
ADR.OPS.A.055 Tools and software
Supporting Material
Draft AMC-GM to Reg. 139/2014 tbd
EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data
All
Evidence of Compliance
1. Data Product Specification (DPS).
2. Formal Arrangements.
3. Software tools to manage/process data.
4. Origination Reports
5. Management system manual(s) and supporting documents (including work instructions).
6. Job descriptions.
Known Issues
1. Lack of awareness/clarity of requirements for data origination.
2. Data origination process does not address EUROCONTROL Specifications and/or it is unknown whether the established mechanisms are compliant with data quality requirements.
3. Aerodrome operator does not originate data but receives it from the originator for submission to the AIS Provider – and is unaware of its part in the data chain (data can be changed or corrupted by the aerodrome operator).
4. Where manual data entry is used, additional verification checks are often inappropriate to ensure that no errors have been introduced.
Recommendations
1. Approvals may require safety assessment / safety support assessments to be conducted.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 176 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 3 Objective 13 steps.
Validatedrequest?
Yes
No
S3O13.1
Validate Request for Origination
S3O13.3
Originate data
S3O13.2
Determine the origination requirements
S3O13.9
Reject Request for Origination
S3O13.4
Process data
S3O13.5
Coordinate data
S3O13.6
Obtain approvals
S3O13.7
Prepare origination report
S3O13.8
Close request
Figure 60: Scenario 3 Objective 13 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 177
7.8.14 Objective 14: Collect Data Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 14: Collect Data
Description The Collect Data objective describes how the availability of new data is identified and collected and how
changes to the collected data are identified. This is objective is applied when data is originated by a function other than the Aerodrome operator and the originating party notifies that new data is available.
Step Activity
1. Determine if data is ready for collection
1. Receive notification of data available for collection or monitor the availability of data, in accordance with any Formal Arrangements in place.
2. Confirm that the data collection process should be initiated.
2. Collect data
1. Collect the data in accordance with established processes. 2. Store the collected data. 3. Record details of the collection, including details provided of
changes to data.
3. Identify changes to collected data 1. Identify changes to the data.
4. Process data
1. Verify and validate that data meets its quality requirements and Data Product Specification (DPS), including the minimum metadata requirements.
2. Record details of all the validation and verification activities performed, including the findings.
3. Process data (as required).
Primary Reference to Regulation
Regulation 139/2014 ADR.OR.D.007 Management of aeronautical data and aeronautical information
Proposed AMDT to Reg. 139/2014
ADR.OR.D.007 Revised
ADR.OPS.A.035 Data validation and verification
ADR.OPS.A.045 Metadata
ADR.OPS.A.055 Tools and software
Supporting Material
Draft AMC-GM to Reg. 139/2014 tbd
Evidence of Compliance
1. Formal Arrangements.
2. Software tools to manage the receipt of data.
Known Issues
1. Lack of awareness of requirements for data origination, exchange and collection.
2. Data collection process is unknown or it is unknown whether the established mechanisms are compliant with data quality requirements.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 178 Released Issue Edition : 1.0
3. Aerodrome operator often does not originate data but simply receives it from the originator for submission to the AIS Provider – and is unaware of its part in the data chain (data can be changed or corrupted by the aerodrome operator) - see Objective 10 for more information.
4. Data not provided in accordance with provision method defined.
5. Data not provided in required format.
6. Incompleteness of some data provided by Data Originators / Data Providers.
Recommendations
1. Clarify the roles and responsibilities in the Formal Arrangements.
The following flow diagram provides a graphical representation of the Scenario 3 Objective 14 steps.
S3O14.1
Determine if data is ready for collection
S3O14.2
Collect data
S3O14.3
Identify changes to collected data
S3O14.4
Process data
Figure 61: Scenario 3 Objective 14 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 179
7.8.15 Objective 15: Store Data Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 15: Store Data
Description The Store Data objective describes the activities to be undertaken to ensure that verified and validated data
is stored correctly and then made available for further processing.
Step Activity
1. Confirm readiness for storage 1. Confirm that all necessary data, metadata and approvals are in
place for data prior to storage and that the data has been validated and verified.
2. Store data 1. Store the data in the appropriate data store. 2. Check that the data has been correctly stored. 3. Record results of checks performed.
3. Approve data for further processing 1. Approve the stored data for further processing.
4. Make data available for use
1. Set status of stored data to available so that it is available for further processing.
2. Notify that data is available. 3. Record the notification.
Primary Reference to Regulation
Regulation 139/2014 ADR.OR.D.007 Management of aeronautical data
and aeronautical information
ADR.OR.D.035 Record keeping
Proposed AMDT to Reg. 139/2014
ADR.OR.D.007 Revised
ADR.OPS.A.010 Data quality requirements
ADR.OPS.A.035 Data validation and verification
ADR.OPS.A.055 Tools and software
ADR.OPS.A.045 Metadata
Draft AMC-GM to Reg. 139/2014
Evidence of Compliance
1. Existing data storage solutions.
2. Management system manual(s) and supporting documents (including work instructions and IT protocols).
Known Issues
1. Data storage solutions do not meet safety and security objectives (data is not protected from interference and only restricted to those authorised while in storage and therefore the risk of any aviation incident arising from data errors - intentional or accidental - is not minimised).
Recommendations
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 180 Released Issue Edition : 1.0
2. Do not delete data to help meet retention requirements.
3. Backup data regularly.
4. Test backups to ensure that they have worked.
The following flow diagram provides a graphical representation of the Scenario 3 Objective 15 steps.
Data approved?
Yes
No
S3O15.1
Confirm readiness for storage
S3O15.2
Store data
S3O15.3
Approve data for further processing
S3O15.4
Make data available for use
Figure 62: Scenario 3 Objective 15 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 181
7.8.16 Objective 16: Transmit Data Scenario 3: Implementation by Aerodrome Operator as Data Originator
Objective 16: Transmit Data
Description The Transmit Data objective describes the activities to be undertaken to submit data to the AIS Provider in
accordance with the Formal Arrangements in place.
Step Activity
1. Determine if data is ready for transmission
1. Receive notification of data available for provision to the next intended user.
2. Confirm that the data transmission process should be initiated.
2. Assess readiness to submit data
1. Review and confirm readiness to submit data (there is a need to submit data and mechanisms are in place to transmit data to the AIS Provider).
3. Transmit data 1. Exchange data with the AIS Provider in accordance with management system documents and Formal Arrangements.
Primary Reference to Regulation
Regulation 139/2014 ADR.OPS.A.005 Aerodrome data
ADR.OPS.A.010 Data quality requirements
Proposed AMDT to Reg. 139/2014
ADR.OPS.A.010 Revised
ADR.OPS.A.050 Data transmission
ADR.OPS.A.055 Tools and software
Supporting Material
Draft AMC-GM to Reg. 139/2014
Evidence of Compliance
1. Timely submissions of data to AIS Provider.
Known Issues
1. Not allowing sufficient time for the AIS Provider to process and publish data in desired AIRAC cycle (e.g. incomplete last-minute submissions). Late delivery and late cancellations.
2. Where manual data entry is used, additional verification checks are often inappropriate to ensure that no errors have been introduced.
Recommendations
1. Share and use a common (online) AIRAC calendar.
2. Build the AIRAC cycle into the data submission component of any Data Provision Tool used so the Data Provider can only select the available AIRAC dates.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 182 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 3 Objective 16 steps.
S3O16.1
Determine if data is ready for transmission
S3O16.2
Assess readiness to submit data
S3O16.3
Transmit data
Figure 63: Scenario 3 Objective 16 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 183
7.9 Scenario 4: Obligations for Data Originator Not Regulated by EASA
7.9.1 Objective 1: Establish Verification and Validation Procedures Scenario 4: Obligations for Data Originator Not Regulated by EASA
Objective 1: Establish Verification and Validation Procedures
Description The Establish Verification and Validation Procedures objective describes the establishment of procedures to
ensure that data meets all its applicable requirements and has been processed appropriately.
Step Activity
1. Define the requirements 1. Identify11 the data quality requirements for all applicable data items.
2. Identify the procedures to be applied to validate and verify data
1. Identify the checks that may be performed for the different types of data and the different data integrity levels.
2. Document the validation and verification procedures.
Primary Regulation Leading to State Enacted Action
CIR 2017/37312 Article 3(5) DQR contained in ATM/ANS.OR.A.085, 090
Supporting Material
Supporting material will be dependent upon the Member State’s means of complying with their regulatory obligations, as addressed by Scenario 6. Reference should be made to the national aviation regulation authorities to seek guidance on compliance with this objective.
Evidence of Compliance
1. Documented processes and procedures.
2. Recorded findings of all checks performed.
Known Issues
1. Parties are not aware of their individual responsibilities for validation and verification.
Recommendations
1. In some cases, plausibility checks may need to be applied to confirm the suitability of data.
11 Relevant DQRs should have already been defined and those applicable will be identified from those established. 12 Commission Implementing Regulation 2017/373 as amended by Commission Implementing Regulation 2020/469.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 184 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 4 Objective 1 steps.
S4O1.1
Define the requirements
S4O1.2Identify the procedures to be applied to validate and verify
data
Figure 64: Scenario 4 Objective 1 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 185
7.9.2 Objective 2: Self-Assess and Monitor Compliance with Relevant Regulations
Scenario 4: Obligations for Data Originator Not Regulated by EASA
Objective 2: Self-Assess and Monitor Compliance with Relevant Regulations
Description The Self-Assess and Monitor Compliance with Relevant Regulations objective describes how the work
performed should be regularly and formally monitored and, where necessary, adapted to ensure compliance with the latest regulations.
Step Activity
1. Determine required legal baseline
1. Determine the regulations with which compliance is to be monitored.
2. Plan compliance review 1. Plan internal compliance review schedule. 2. Prepare compliance review plan. 3. Provide compliance review plan.
3. Perform compliance review
1. Perform internal compliance review as per established schedule. 2. Prepare compliance report recording all findings and
observations. 3. Publish compliance report. 4. Agree and record corrective actions to be taken (with associated
target dates). 5. Conduct follow-up review of actions.
Primary Regulation leading to Obligation
Regulation 2020/469 Article 3(5)
Supporting Material
Supporting material will be dependent upon the Member State’s means of complying with their regulatory obligations, as addressed by Scenario 6. Reference should be made to the national aviation regulation authorities to seek guidance on compliance with this objective.
Evidence of Compliance
1. Internal compliance review schedule.
2. Internal compliance review plan.
3. Reports of internal compliance reviews.
Known Issues
1. Lack of personnel trained to perform internal compliance reviews.
2. Lack of time available to perform internal compliance review activities.
3. Incomplete or incorrect legal baseline.
Recommendations
1. Make use of compliance function (compliance officer or similar) if available within the organisation.
2. Targeted self-reviews (self-audit per expert area?).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 186 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 4 Objective 2 steps.
S4O2.1
Determine required legal baseline
S4O2.2
Plan compliance review
S4O2.3
Perform compliance review
Figure 65: Scenario 4 Objective 2 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 187
7.9.3 Objective 3: Originate Data Scenario 4: Obligations for Data Originator Not Regulated by EASA
Objective 3: Originate Data
Description The Originate Data objective describes how data should be originated to meet all applicable requirements
so that compliant, approved and coordinated data is provided for further processing.
Step Activity
1. Validate Request for Origination
1. Determine if instructions are clear. 2. Determine if instructions are feasible. 3. Determine if the correct Data Originator for the items has been
identified.
2. Determine the origination requirements
1. Determine the origination requirements, including the standards to be met and the data quality requirements by referencing, as applicable: • The Formal Arrangements. • The Request for Origination. • The Data Product Specification (DPS).
3. Originate data
1. Obtain any required data sets. 2. Originate data in accordance with Request for Origination, Data
Product Specification (DPS), Formal Arrangements, applicable standards and data quality requirements.
3. Record details of origination activities. 4. Save data and metadata.
4. Process data
1. Verify and validate that data meet its quality requirements and Data Product Specification (DPS).
2. Record details of all the validation and verification activities performed, including the findings.
3. Process data (as required) or make data available for processing.
5. Coordinate data
1. Ensure consistency of originated data with other applicable data. 2. Identify parties data should be coordinated with. 3. Coordinate with other parties, including the exchange of
necessary data. 4. Document results of coordination activities.
6. Obtain approvals 1. Determine if approvals are required and have been performed. 2. Obtain and store any necessary approval(s).
7. Prepare origination report 1. Finalise origination report and data, if required.
8. Close request 1. If relevant, notify the process initiator about the outcome.
9. Reject Request for Origination If step 1 fails: 1. Record reasons for rejecting Request for Origination. 2. Inform the party requesting data origination.
Primary Regulation leading to Obligation
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 188 Released Issue Edition : 1.0
CIR 2017/373 Article 3(5) DQR contained in ATM/ANS.OR.A.085, 090
Supporting Material
Supporting material will be dependent upon the Member State’s means of complying with their regulatory obligations, as addressed by Scenario 6. Reference should be made to the national aviation regulation authorities to seek guidance on compliance with this objective.
Evidence of Compliance
1. Data origination standards.
2. Formal Arrangements.
3. Requests for Origination.
4. Origination reports.
5. National Data Catalogue.
Known Issues
1. Lack of awareness of requirements for data origination.
2. Ambiguous Requests for Origination.
Recommendations
1. Greater granularity is recommended for National Data Catalogues so that the Data Provider and Data Originator(s) and any Regulator approvals are clearly defined.
2. Awareness session (familiarisation training for Data Originators).
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 189
The following flow diagram provides a graphical representation of the Scenario 4 Objective 3 steps.
Validatedrequest?
Yes
No
S4O3.1
Validate Request for Origination
S4O3.3
Originate data
S4O3.2
Determine the origination requirements
S4O3.9
Reject Request for Origination
S4O3.4
Process data
S4O3.5
Coordinate data
S4O3.6
Obtain approvals
S4O3.7
Prepare origination report
S4O3.8
Close request
Figure 66: Scenario 4 Objective 3 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 190 Released Issue Edition : 1.0
7.9.4 Objective 4: Transmit Data Scenario 4: Obligations for Data Originator Not Regulated by EASA
Objective 4: Transmit Data
Description The Transmit Data objective describes the activities to be undertaken to provide data to the body requesting
it.
Step Activity
1. Determine if data is ready for transmission
1. Receive notification of data available for provision to the next intended user.
2. Confirm that the data transmission process should be initiated.
2. Assess readiness to submit data 1. Review and confirm readiness to provide data.
3. Transmit data 1. Exchange data with the body requesting it in accordance with data quality requirements and any Formal Arrangements.
Primary Regulation leading to Obligation
Regulation 2020/469 Article 3(5) DQR contained in ATM/ANS.OR.A.085, 090
Supporting Material
Supporting material will be dependent upon the Member State’s means of complying with their regulatory obligations, as addressed by Scenario 6. Reference should be made to the national aviation regulation authorities to seek guidance on compliance with this objective.
Evidence of Compliance
1. Timely submissions of data to body requesting the provision.
Known Issues
1. Not allowing sufficient time for data to be processed and published in desired AIRAC cycle (e.g. incomplete, last-minute submissions). Late delivery and late cancellations.
2. Were manual data entry is used, additional verification checks are often inappropriate to ensure that no errors have been introduce
Recommendations
1. Share and use a common (online) AIRAC calendar.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 191
The following flow diagram provides a graphical representation of the Scenario 4 Objective 4 steps.
S4O4.1
Determine if data is ready for transmission
S4O4.2
Assess readiness to submit data
S4O4.3
Transmit data
Figure 67: Scenario 4 Objective 4 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 192 Released Issue Edition : 1.0
7.10 Scenario 5: Implementation by Competent Authority 7.10.1 Objective 1: Establishment of Certification and Oversight
Processes Scenario 5: Implementation by Competent Authority
Objective 1: Establishment of Certification and Oversight Processes
Description The Establishment of Certification and Oversight Processes objective describes the activities required to
establish processes to perform an initial certification of ATM/ANS Providers and Aerodrome Operators and the processes required to subsequently audit and oversee them.
Step Activity
1. Establish coordination with other relevant competent authorities
1. Identify relevant competent authorities and establish points of contact for others.
2. Establish and document procedures for coordination.
3. Perform coordination activities.
2. Establish certification process for ATM/ANS Providers and Aerodrome Operators
1. Prepare process for ATM/ANS Providers.
2. Review process for ATM/ANS Providers.
3. Notify affected parties of process for ATM/ANS Providers.
4. Prepare process for Aerodrome Operators.
5. Review process for Aerodrome Operators.
6. Notify affected parties of process for Aerodrome Operators.
3. Establish audit process
1. Prepare process.
2. Review process.
3. Notify affected parties of process.
4. Establish process for oversight of changes
1. Prepare process.
2. Review process.
3. Notify affected parties of process.
5. Establish process to issue safety directives
1. Prepare process.
2. Review process.
3. Notify affected parties of process.
Primary Reference to Regulation
Annex II to CIR 2017/37313
ATM/ANS.AR.A.005 Certification, oversight and enforcement tasks
ATM/ANS.AR.C.010 Oversight
ATM/ANS.AR.C.020 Issue of certificates
13 Commission Implementing Regulation 2017/373 as amended by Commission Implementing Regulation 2020/469.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 193
Annex II to Regulation 139/2014 ADR.AR.A.005 Competent Authority
ADR.AR.C.005 Oversight
Supporting Material
AMC-GM to Annex II (Part-ATM/ANS.AR) to CIR 2017/373
AMC1 ATM/ANS.AR.A.005(b)
Certification, oversight and enforcement tasks
GM1 ATM/ANS.AR.A.005(b) Certification, oversight and enforcement tasks
GM2 ATM/ANS.AR.A.005(b) Certification, oversight and enforcement tasks
GM1 ATM/ANS.AR.A.005(c) Certification, oversight and enforcement tasks
AMC-GM to Annex II (Part-ADR.AR) to Regulation 139/2014
AMC1 ADR.AR.C.005 Oversight
GM1 ADR.AR.C.005 Oversight
Evidence of Compliance
1. Coordination process.
2. Certification process.
3. Defined audit process.
4. Process for oversight of systems.
5. Process to issue safety directives.
Known Issues
N/A
Recommendations
N/A
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 194 Released Issue Edition : 1.0
The following flow diagram provides a graphical representation of the Scenario 5 Objective 1 steps.
S5O1.1Establish coordination with other relevant competent
authorities
S5O1.2Establish certification process for ATM/ANS Providers and
Aerodrome Operators
S5O1.3
Establish audit process
S5O1.4
Establish process for oversight of changes
S5O1.5
Establish process to issue safety directives
Figure 68: Scenario 5 Objective 1 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 195
7.10.2 Objective 2: Certification of ATM/ANS Providers and Aerodrome Operators
Scenario 5: Implementation by Competent Authority
Objective 2: Certification of ATM/ANS Providers and Aerodrome Operators
Description The Certification of ATM/ANS Providers and Aerodrome Operators objective describes the activities
required to certify ATM/ANS Providers and Aerodrome Operators, from application to issue of a certificate.
Step Activity
1. Initiate certification process
1. Receive application for certification.
2. Record application.
3. Initiate initial audit process.
2. Issue certificate
1. Examine initial audit results to confirm minimum compliance required.
2. Examine required corrective actions being implemented.
3. Issue certificate.
Primary Reference to Regulation
Annex II to CIR 2017/373 ATM/ANS.AR.A.005 Certification, oversight and
enforcement tasks
ATM/ANS.AR.C.020 Issue of certificates
Annex II to Regulation 139/2014 ADR.AR.A.005 Competent Authority
ADR.AR.C.015 Initiation of certification process
Supporting Material
AMC-GM to Annex II (Part-ATM/ANS.AR) to Regulation 2017-373
GM1 ATM/ANS.AR.C.020 Issue of certificates
GM2 ATM/ANS.AR.C.020 Issue of certificates
AMC-GM to Annex II (Part-ADR.AR) to Regulation 139/201
AMC1 ADR.AR.C.015(a) Initiation of certification process
AMC1 ADR.AR.C.015(c) Initiation of certification process
AMC2 ADR.AR.C.015(c) Initiation of certification process
GM1 ADR.AR.C.015 Initiation of certification process
GM1 ADR.AR.C.015(b) Initiation of certification process
G M1 ADR.AR.C.015(c) Initiation of certification process
Evidence of Compliance
1. Audit reports.
2. Certificates.
Known Issues
N/A
Recommendations
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 196 Released Issue Edition : 1.0
N/A
The following flow diagram provides a graphical representation of the Scenario 5 Objective 2 steps.
S5O2.1
Initiate certification process
S5O2.2
Issue certificate
Figure 69: Scenario 5 Objective 2 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 197
7.10.3 Objective 3: Oversight of ATM/ANS Providers and Aerodrome Operators
Scenario 5: Implementation by Competent Authority
Objective 3: Oversight of ATM/ANS Providers and Aerodrome Operators
Description The Oversight of ATM/ANS Providers and Aerodrome Operators objective describes the activities required to oversee ATM/ANS Providers and Aerodrome Operators through audit and, where required, the issue of
safety directives.
Step Activity
1. Plan audit or follow-up audit
1. Identify audit scope.
2. Establish draft audit plan.
3. Issue audit plan and request evidence material.
2. Conduct audit
1. Receive evidence material.
2. Examine and ensure completeness of evidence material received.
3. Perform desktop audit.
4. Identify areas for on-site audit and update audit plan.
5. Issue final audit plan.
6. Perform on-site audit.
7. Document audit findings.
8. Provide audit report to audited organisation.
3. Manage audit findings
1. Issue Corrective Action Requests.
2. Receive Corrective Action Proposal.
3. Review Corrective Action Proposal.
4. Accept Corrective Action Proposal.
5. Track implementation.
6. Receive evidence of implementation of Corrective Action Proposal.
7. Verify compliance by desktop and/or on-site audit.
8. Close Corrective Action Proposal and notify closure.
4. Issue safety directive
1. Identify unsafe condition requiring immediate action.
2. Identify affected functional system.
3. Identify required action.
4. Issue safety directive to ATM/ANS Service Provider and/or Aerodrome Operator or relevant functional system.
5. Inform relevant concerned competent authorities.
6. Verify compliance to directive of ATM/ANS Service Provider and/or Aerodrome Operator.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 198 Released Issue Edition : 1.0
Primary Reference to Regulation
Annex II to CIR 2017/373 ATM/ANS.AR.A.005 Certification, oversight and enforcement tasks
Annex II to CIR 2017/373 ATM/ANS.AR.C.010 Oversight
Annex II to Regulation 139/2014 ADR.AR.A.005 Competent Authority
ADR.AR.C.005 Oversight
Supporting Material
AMC-GM to Annex II (Part-AIS) to CIR 2017/373
AMC1 ATM/ANS.AR.A.005(b)
Certification, oversight and enforcement tasks
GM1 ATM/ANS.AR.A.005(b) Certification, oversight and enforcement tasks
GM2 ATM/ANS.AR.A.005(b) Certification, oversight and enforcement tasks
GM1 ATM/ANS.AR.A.005(c) Certification, oversight and enforcement tasks
AMC-GM to Annex II (Part-ADR.AR) to Regulation 139/2014
AMC1 ADR.AR.C.005 Oversight
GM1 ADR.AR.C.005 Oversight
Evidence of Compliance
1. Audit plans.
2. Audit reports.
3. Safety directives.
4. Corrective Action Proposals.
Known Issues
N/A
Recommendations
N/A
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 199
The following flow diagram provides a graphical representation of the Scenario 5 Objective 3 steps.
S5O3.1
Plan audit or follow-up audit
S5O3.3
Manage audit findings
S5O3.2
Conduct audit
S5O3.4
Issue safety directive
Figure 70: Scenario 5 Objective 3 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 200 Released Issue Edition : 1.0
7.11 Scenario 6: Implementation for Member States 7.11.1 Objective 1: Establish National Policy and Regulatory Framework
Scenario 6: Implementation for Member States
Objective 1: Establish National Policy and Regulatory Framework
Description The Establish National Policy and Regulatory Framework objective describes the activities required to plan
and establish a regulatory framework and national implementation plan for the provision of aeronautical data by non-regulated parties.
Step Activity
1. Establish policy
1. Review new international requirements and guidance material.
2. Establish regulatory framework for out-of-scope Data Providers in accordance with CIR 2017/373 Article 3(5).
3. Establish national adjustments / extensions required to Data Catalogue (data and data quality requirements).
4. Establish implementation concept and plan.
5. Adopt policy.
6. Notify parties of revised policy and implementation plan.
2. Adapt regulatory framework
1. Define required changes to regulatory framework.
2. Establish required means of compliance.
3. Adapt regulatory framework.
4. Notify parties of revised regulatory framework and available means of compliance.
3. Establish national implementation plan
1. Establish national implementation concept and plan.
2. Notify parties of national implementation plan.
Primary Reference to Regulation
CIR 2017/37314 Article 3(5)
Supporting Material
Evidence of Compliance
1. National Policy.
2. Regulatory Framework.
3. Implementation Plan.
Known Issues
1. The AIS Provider is not able to fully validate and verify data provided to it. It can only perform plausibility checks.
14 Commission Implementing Regulation 2017/373 as amended by Commission Implementing Regulation 2020/469.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 201
2. The validation and verification of accuracy can only be performed by the Data Originator.
Recommendations
1. Parties should be made aware of and fulfil their responsibilities.
The following flow diagram provides a graphical representation of the Scenario 6 Objective 1 steps.
S6O1.1
Establish policy
S6O1.2
Adapt regulatory framework
S6O1.3
Establish national implementation plan
Figure 71: Scenario 6 Objective 1 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 202 Released Issue Edition : 1.0
7.11.2 Objective 2: Oversight of Out-of-Scope Data Providers Scenario 6: Implementation for Member States
Objective 2: Oversight of Out-of-Scope Data Providers
Description The Oversight of Out-of-Scope Data Providers objective describes the activities required to oversee Data
Providers through planning and implementation of oversight activities and the management of their findings.
Step Activity
1. Plan oversight activity or follow-up activity
1. Identify scope and Data Provider.
2. Establish draft oversight plan.
3. Issue oversight plan and request evidence material.
2. Conduct oversight activity
1. Receive evidence material.
2. Examine and ensure completeness of evidence material received.
3. Perform desktop review.
4. Identify areas for on-site activity and update oversight plan, if required.
5. Issue final oversight plan.
6. Perform on-site oversight activity, if required.
7. Document findings.
8. Provide oversight activity report to the Data Provider.
3. Manage findings
1. Issue Corrective Action Requests.
2. Receive Corrective Action Proposal.
3. Review Corrective Action Proposal.
4. Accept Corrective Action Proposal.
5. Track implementation.
6. Receive evidence of implementation of Corrective Action Proposal.
7. Verify compliance by desktop and/or on-site oversight activity.
Primary Reference to Regulation
CIR 2017/373 Article 3(5) Provision of ATM/ANS and ATM network functions regulation
Supporting Material
Evidence of Compliance
1. Oversight plan
2. Oversight reports
3. Oversight actions and follow-up
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 203
4. Corrective Action Proposals.
Known Issues
N/A
Recommendations
1. It is recommended that the oversight of out-of-scope Data Providers is delegated to the Competent Authority.
The following flow diagram provides a graphical representation of the Scenario 6 Objective 2 steps.
S6O2.1
Plan oversight activity or follow-up activity
S6O2.3
Manage findings
S6O2.2
Conduct oversight activity
Figure 72: Scenario 6 Objective 2 Flow Diagram
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 204 Released Issue Edition : 1.0
Annex A Differences ADQ vs Part-AIS A.1 General
Chapter 6 provided a high-level overview of the conceptual differences between Commission Regulation (EU) 73/2010 [Ref 1] and Part-AIS. It is appreciated that users of the AIR Guide who have achieved a degree of compliance to Commission Regulation (EU) 73/2010 [Ref 1], be it minor or full, will wish to better understand how the work that has been undertaken to date contributes towards compliance with Part-AIS. The following two tables present a mapping between the two regulations, firstly Part-AIS to Commission Regulation (EU) 73/2010 [Ref 1] and then secondly Commission Regulation (EU) 73/2010 [Ref 1] to CIR 2017/373 [Ref 3]. In the latter case, it should be noted that some of the requirements of Commission Regulation (EU) 73/2010 have equivalents in either CIR 2017/373 [Ref 3] or its Annexes. In these cases, this is highlighted. The user may clearly identify which requirements do not have a direct equivalent in the corresponding regulation.
A.2 Mapping of Part-AIS to Commission Regulation (EU) 73/2010 Part-AIS 73/2010
Identifier Title
AIS.OR.100 Aeronautical information management
Article 6(2) Article 6(7) Article 10(1) Annex IV Part B Annex IV Part E
AIS.OR.105
Responsibilities of aeronautical information services (AIS) providers
Article 2(1) Article 2(2) Article 6(8) Article 10(2) Annex IV Part F Annex VII Part B
AIS.OR.200 General
Article 6(1) Article 6(2) Article 6(7) Article 8 Annex IV Part A Annex IV Part B Annex IV Part E Annex V
AIS.OR.205 Formal Arrangements Article 6(3) Annex IV Part C
AIS.OR.210 Exchange of aeronautical data and aeronautical information
Article 5 Annex II
AIS.OR.215 Tools and software Article 8
AIS.OR.220 Validation and verification
Article 6(2) Article 6(5) Annex IV Part B (e) Annex IV Part C (i)
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 205
Part-AIS 73/2010
Identifier Title
AIS.OR.225 Metadata
Article 4 Article 5(2) Annex I Part C
AIS.OR.230 Data error detection and authentication
Article 9(1) Article 9(2) Annex VI
AIS.OR.235
Error reporting, error measurement, and corrective actions
Article 6(8) Annex IV Part F
AIS.OR.240 Data limitations Article 7(2)
AIS.OR.250 Consistency requirement Article 7(1)
AIS.OR.300 General — Aeronautical information products
Article 6(7) Article 7(1) Annex IV Part E
AIS.OR.305 Aeronautical information publication (AIP)
Article 2(1)(a) Article 5(4)
AIS.OR.310 AIP amendments Article 2(1)(a) Article 5(4)
AIS.OR.315 AIP supplements Article 2(1)(a) Article 5(4)
AIS.OR.320 Aeronautical information circular (AIC) Out of scope
AIS.OR.325 Aeronautical charts Only partially in scope through Article 2(1)(a)
AIS.OR.330 NOTAM Article 2(1)(a) Article 5(4)
AIS.OR.335 General — Digital data sets
Article 2(1)(b) Article 2(1)(c) Article 2(1)(d)
AIS.OR.340 Metadata requirements
Article 5(2) Annex I Part A Annex I Part C Annex II(1)
AIS.OR.345 AIP data set
Article 5(4)(c) Annex I Part A Annex I Part C Annex II(1)
AIS.OR.350 Terrain and obstacle data — General requirements
Article 5(2) Annex I Part A Annex I Part C Annex II(1)
AIS.OR.355 Terrain data sets
Article 5(2) Annex I Part B Annex I Part C Annex II(1)
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 206 Released Issue Edition : 1.0
Part-AIS 73/2010
Identifier Title
AIS.OR.360 Obstacle data sets
Article 5(2) Annex I Part A Annex I Part C Annex II(1)
AIS.OR.365 Aerodrome mapping data sets
Article 5(2) Annex I Part A Annex I Part C Annex II(1)
AIS.OR.370 Instrument flight procedure data sets Out of scope
AIS.OR.400 Distribution services Article 5(4) (Partially)
AIS.OR.405 Pre-flight information services Not specifically covered
AIS.OR.500 General — Aeronautical information products updates
Article 6(1) Article 7(3) Article 7(4) Annex IV Part A(5)(d)
AIS.OR.505 Aeronautical information regulation and control (AIRAC) Not specifically covered
AIS.OR.510 NOTAM Not specifically covered
AIS.OR.515 Data set updates Not specifically covered
AIS.OR.600 General requirements
Article 7(4) Article 7(5) Article 10(1) Annex VII, Part A
AIS.TR.200 General
Article 6(1) Article 6(2) Article 6(7) Annex IV Part A Annex IV Part B Annex IV Part E
AIS.TR.210 Exchange of aeronautical data and aeronautical information
Article 5(2) Annex II
AIS.TR.220 Verification
Article 6(2) Annex IV Part B (e) Annex IV Part C (i)
AIS.TR.225 Metadata
Article 4 Article 5(2) Annex I Part C
AIS.TR.235
Error reporting, error measurement and corrective actions
Article 6(8) Annex IV Part F
AIS.TR.240 Data limitations Article 7(2)
AIS.TR.300 General — Aeronautical information products Not specifically covered
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 207
Part-AIS 73/2010
Identifier Title
AIS.TR.305 Aeronautical information publication (AIP)
Article 5(4)(a) Article 5(4)(b)
AIS.TR.310 AIP amendments Article 5(4)(a) Article 5(4)(b)
AIS.TR.315 AIP supplements Article 5(4)(a) Article 5(4)(b)
AIS.TR.320 Aeronautical information circular (AIC) Out of scope
AIS.TR.330 NOTAM Not specifically covered
AIS.TR.335 General — Digital data sets
Article 4 Article 5(4) Annex I Part A(g) Annex II Part A(1) Annex II Part B(1)
AIS.TR.340 Metadata requirements
Article 4 Article 5(2) Article 5(4)(c) Annex I Part C Annex II Part A Annex II Part B
AIS.TR.345 AIP data set
Article 2(1) Article 4 Article 5(2) Article 5(4)(c) Annex I Part A Annex II Part A
AIS.TR.350 Terrain and obstacle data — General requirements
Article 2(1)(c) Article 4 Article 5(2) Annex I Part B Annex II Part B
AIS.TR.355 Terrain data sets
Article 2(1)(c) Article 4 Article 5(2) Annex I Part B Annex II Part B
AIS.TR.360 Obstacle data sets
Article 2(1)(b) Article 4 Article 5(2) Annex I Part B Annex II Part B
AIS.TR.365 Aerodrome mapping data sets Only partially covered by inference Article 2(1)(d)
AIS.TR.370 Instrument flight procedure data sets Out of scope
AIS.TR.400 Distribution services Article 5(4) (Partially)
AIS.TR.405 Pre-flight information services Not specifically covered
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 208 Released Issue Edition : 1.0
Part-AIS 73/2010
Identifier Title
AIS.TR.500 General — Aeronautical information products updates
Article 7(3) Article 7(4)
AIS.TR.505 AIRAC
Article 6(1) Article 7(3) Article 7(4) Annex IV Part A(5)(d)
AIS.TR.510 NOTAM Not specifically covered
AIS.TR.515 Data set updates Not specifically covered
Table 7 - Mapping of Part-AIS to Commission Regulation (EU) 73/2010
A.3 Mapping of Commission Regulation (EU) 73/2010 to CIR 2017/373
73/2010 2017/373
Identifier Title
Article 1 Article 1 of 2017/373 Subject Matter
Article 2(1) AIS.OR.105 Responsibilities of aeronautical information
services (AIS) providers
AIS.TR.345 AIP data set
Article 2(1)(a)
AIS.OR.305 Aeronautical information publication (AIP)
AIS.OR.310 AIP amendments
AIS.OR.315 AIP supplements
AIS.OR.330 NOTAM
Article 2(1)(b) AIS.OR.335 General — Digital data sets
AIS.TR.360 Obstacle data sets
Article 2(1)(c)
AIS.OR.335 General — Digital data sets
AIS.TR.350 Terrain and obstacle data — General requirements
AIS.TR.355 Terrain data sets
Article 2(1)(d) AIS.OR.335 General — Digital data sets
Article 2(2) AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
Article 3 Annex 1 of 2017/373 Definitions
Article 4
AIS.OR.225 Metadata
AIS.TR.225 Metadata
AIS.TR.335 General— Digital data sets
AIS.TR.340 Metadata requirements
AIS.TR.345 AIP data set
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 209
73/2010 2017/373
Identifier Title
AIS.TR.350 Terrain and obstacle data — General requirements
AIS.TR.355 Terrain data sets
AIS.TR.360 Obstacle data sets
Article 5 AIS.OR.210 Exchange of aeronautical data and aeronautical information
Article 5(2)
AIS.OR.225 Metadata
AIS.OR.340 Metadata requirements
AIS.OR.350 Terrain and obstacle data — General requirements
AIS.OR.355 Terrain data sets
AIS.OR.360 Obstacle data sets
AIS.OR.365 Aerodrome mapping data sets
AIS.TR.210 Exchange of aeronautical data and aeronautical information
AIS.TR.225 Metadata
AIS.TR.340 Metadata requirements
AIS.TR.345 AIP data set
AIS.TR.350 Terrain and obstacle data — General requirements
AIS.TR.355 Terrain data sets
AIS.TR.360 Obstacle data sets
Article 5(3) No specific requirement
Article 5(4)
AIS.OR.305 Aeronautical information publication (AIP)
AIS.OR.310 AIP amendments
AIS.OR.315 AIP supplements
AIS.OR.330 NOTAM
AIS.TR.335 General— Digital data sets
AIS.OR.400 Distribution services
AIS.TR.400 Distribution services
Article 5(4)(a)
AIS.TR.305 Aeronautical information publication (AIP)
AIS.TR.310 AIP amendments
AIS.TR.315 AIP supplements
Article 5(4)(b)
AIS.TR.305 Aeronautical information publication (AIP)
AIS.TR.310 AIP amendments
AIS.TR.315 AIP supplements
Article 5(4)(c) AIS.OR.345 AIP data set
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 210 Released Issue Edition : 1.0
73/2010 2017/373
Identifier Title
AIS.TR.340 Metadata requirements
AIS.TR.345 AIP data set
Article 6(1)
AIS.OR.200 General
AIS.OR.500 General — Aeronautical information products updates
AIS.TR.200 General
AIS.TR.505 AIRAC
Article 6(2)
AIS.OR.100 Aeronautical information management
AIS.OR.200 General
AIS.OR.220 Validation and verification
AIS.TR.200 General
AIS.TR.220 Verification
Article 6(3) AIS.OR.205 Formal Arrangements
Article 6(4) ATM/ANS.OR.A.085 of Annex III to 2017/373 Aeronautical data quality management
Article 6(5) Article 3(5) of 2017/373
Provision of ATM/ANS and ATM network functions
AIS.OR.220 Validation and verification
Article 6(6) ATM/ANS.OR.A.085 of Annex III to 2017/373 Aeronautical data quality management
Article 6(7)
AIS.OR.100 Aeronautical information management
AIS.OR.200 General
AIS.OR.300 General — Aeronautical information products
AIS.TR.200 General
Article 6(8)
AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
AIS.OR.235 Error reporting, error measurement, and corrective actions
AIS.TR.235 Error reporting, error measurement and corrective actions
Article 7(1) AIS.OR.250 Consistency requirement
AIS.OR.300 General — Aeronautical information products
Article 7(2) AIS.OR.240 Data limitations
AIS.TR.240 Data limitations
Article 7(3) AIS.OR.500 General — Aeronautical information products updates
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 211
73/2010 2017/373
Identifier Title
AIS.TR.500 General — Aeronautical information products updates
AIS.TR.505 AIRAC
Article 7(4)
AIS.OR.500 General — Aeronautical information products updates
AIS.OR.600 General requirements
AIS.TR.500 General — Aeronautical information products updates
AIS.TR.505 AIRAC
Article 7(5) AIS.OR.600 General requirements
Article 8 AIS.OR.200 AIS.OR.215
General Tools and software
Article 9(1) AIS.OR.230 Data error detection and authentication
Article 9(2) AIS.OR.230 Data error detection and authentication
Article 10(1)
AIS.OR.600 General requirements
ATM/ANS.OR.B.005 of Annex III to 2017/373 ATM/ANS.OR.B.010 of Annex III to 2017/373
Management system Change management procedures
Article 10(2)
AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
ATM/ANS.OR.B.005 ATM/ANS.OR.D.010 of Annex III to 2017/373
Management system Security management
Article 10(3) ATM/ANS.OR.B.005 Management system
Article 10(4) No specific requirement
Article 11 ATM/ANS.AR.C.005 of Annex III to 2017/373
Certification, declaration, and verification of service providers' compliance with the requirements
Article 12(1) No specific requirement
Article 12(2) No specific requirement
Article 13 No specific requirement
Article 14(1) No specific requirement
Article 14(2) No specific requirement
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 212 Released Issue Edition : 1.0
73/2010 2017/373
Identifier Title
Article 15(1) Date not yet known
Article 15(2) No specific requirement
Annex I Part A
AIS.OR.340 Metadata requirements
AIS.OR.345 AIP data set
AIS.OR.350 Terrain and obstacle data — General requirements
AIS.OR.355 Terrain data sets
AIS.OR.360 Obstacle data sets
AIS.OR.365 Aerodrome mapping data sets
AIS.TR.345 AIP data set
Annex I Part A(g) AIS.TR.335 General— Digital data sets
Annex I Part B
AIS.TR.350 Terrain and obstacle data — General requirements
AIS.TR.355 Terrain data sets
AIS.TR.360 Obstacle data sets
Annex I Part C
AIS.OR.225 Metadata
AIS.OR.340 Metadata requirements
AIS.OR.345 AIP data set
AIS.OR.350 Terrain and obstacle data — General requirements
AIS.OR.355 Terrain data sets
AIS.OR.360 Obstacle data sets
AIS.OR.365 Aerodrome mapping data sets
AIS.TR.225 Metadata
AIS.TR.340 Metadata requirements
Annex II AIS.TR.210 Exchange of aeronautical data and aeronautical information
Annex II Part A AIS.TR.340 Metadata requirements
AIS.TR.345 AIP data set
Annex II Part A(1) AIS.TR.335 General— Digital data sets
Annex II Part B
AIS.TR.340 Metadata requirements
AIS.TR.350 Terrain and obstacle data — General requirements
AIS.TR.355 Terrain data sets
AIS.TR.360 Obstacle data sets
Annex II Part B(1) AIS.TR.335 General— Digital data sets
Annex II(1) AIS.OR.340 Metadata requirements
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 213
73/2010 2017/373
Identifier Title
AIS.OR.345 AIP data set
AIS.OR.350 Terrain and obstacle data — General requirements
AIS.OR.355 Terrain data sets
AIS.OR.360 Obstacle data sets
AIS.OR.365 Aerodrome mapping data sets
Annex IV Part A AIS.OR.200 General
AIS.TR.200 General
Annex IV Part A(5)(d) AIS.OR.500 General — Aeronautical information products
updates
AIS.TR.505 AIRAC
Annex IV Part B
AIS.OR.100 Aeronautical information management
AIS.OR.200 General
AIS.TR.200 General
Annex IV Part B (e) AIS.OR.220 Validation and verification
AIS.TR.220 Verification
Annex IV Part C AIS.OR.205 Formal Arrangements
Annex IV Part C (i) AIS.OR.220 Validation and verification
AIS.TR.220 Verification
Annex IV Part E
AIS.OR.100 Aeronautical information management
AIS.OR.200 General
AIS.OR.300 General — Aeronautical information products
AIS.TR.200 General
Annex IV Part F
AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
AIS.OR.235 Error reporting, error measurement, and corrective actions
AIS.TR.235 Error reporting, error measurement and corrective actions
Annex V AIS.OR.200 General
Annex VI AIS.OR.230 Data error detection and authentication
Annex VII Part B AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
Annex VII, Part A AIS.OR.600 General requirements
Table 8 - Mapping of Commission Regulation (EU) 73/2010 to CIR 2017/373
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 214 Released Issue Edition : 1.0
Annex B Compliance Matrix for AIS Providers B.1 General
This Annex provides a compliance matrix listing all the regulatory provisions of Annexes III and VI of CIR 2017/373 [Ref 3] applicable to AIS Providers and which may be used by an AIS Provider to record its level of compliance.
B.2 Annex III to CIR 2017/373 Identifier Description
ATM/ANS.OR.A.005 General Requirements - Application for a service provider certificate
ATM/ANS.OR.A.020 General Requirements - Means of compliance
ATM/ANS.OR.A.025 General Requirements - Continued validity of a certificate
ATM/ANS.OR.A.035 General Requirements - Demonstration of compliance
ATM/ANS.OR.A.040 General Requirements - Changes — general
ATM/ANS.OR.A.045 General Requirements - Changes to a functional system
ATM/ANS.OR.A.050 General Requirements - Facilitation and cooperation
ATM/ANS.OR.A.055 General Requirements - Findings and corrective actions
ATM/ANS.OR.A.060 General Requirements - Immediate reaction to a safety problem
ATM/ANS.OR.A.065 General Requirements - Occurrence reporting
ATM/ANS.OR.A.070 General Requirements - Contingency plans
ATM/ANS.OR.A.080 Provision of aeronautical data
ATM/ANS.OR.A.085 Aeronautical data quality management
ATM/ANS.OR.A.090 Common reference systems for air navigation
ATM/ANS.OR.B.005 Management - Management system
ATM/ANS.OR.B.010 Management - Change management procedures
ATM/ANS.OR.B.015 Management - Contracted activities
ATM/ANS.OR.B.020 Management - Personnel requirements
ATM/ANS.OR.B.025 Management - Facilities requirements
ATM/ANS.OR.B.030 Management - Record-keeping
ATM/ANS.OR.B.035 Management - Operations manuals
ATM/ANS.OR.C.005 Specific Organisation Requirements for Service Providers Other Than ATS Providers - Safety support assessment and assurance of changes to the functional system
ATM/ANS.OR.D.010 Specific Organisational Requirements for ANS and ATFM Providers and The Network Manager - Security management
Table 9 – Compliance Matrix: Annex III to CIR 2017/373
B.3 Annex VI to CIR 2017/373 Identifier Description
AIS.OR.100 Aeronautical information management
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 215
Identifier Description
AIS.OR.105 Responsibilities of aeronautical information services (AIS) providers
AIS.OR.200 General
AIS.OR.205 Formal Arrangements
AIS.OR.210 Exchange of aeronautical data and aeronautical information
AIS.OR.215 Tools and software
AIS.OR.220 Validation and verification
AIS.OR.225 Metadata
AIS.OR.230 Data error detection and authentication
AIS.OR.235 Error reporting, error measurement, and corrective actions
AIS.OR.240 Data limitations
AIS.OR.250 Consistency requirement
AIS.OR.300 General — Aeronautical information products
AIS.OR.305 Aeronautical information publication (AIP)
AIS.OR.310 AIP amendments
AIS.OR.315 AIP supplements
AIS.OR.320 Aeronautical information circular (AIC)
AIS.OR.325 Aeronautical charts
AIS.OR.330 NOTAM
AIS.OR.335 General — Digital data sets
AIS.OR.340 Metadata requirements
AIS.OR.345 AIP data set
AIS.OR.350 Terrain and obstacle data — General requirements
AIS.OR.355 Terrain data sets
AIS.OR.360 Obstacle data sets
AIS.OR.365 Aerodrome mapping data sets
AIS.OR.370 Instrument flight procedure data sets
AIS.OR.400 Distribution services
AIS.OR.405 Pre-flight information services
AIS.OR.500 General — Aeronautical information products updates
AIS.OR.505 Aeronautical information regulation and control (AIRAC)
AIS.OR.510 NOTAM
AIS.OR.515 Data set updates
AIS.OR.600 General requirements
AIS.TR.200 General
AIS.TR.210 Exchange of aeronautical data and aeronautical information
AIS.TR.220 Verification
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 216 Released Issue Edition : 1.0
Identifier Description
AIS.TR.225 Metadata
AIS.TR.235 Error reporting, error measurement and corrective actions
AIS.TR.240 Data limitations
AIS.TR.300 General — Aeronautical information products
AIS.TR.305 Aeronautical information publication (AIP)
AIS.TR.310 AIP amendments
AIS.TR.315 AIP supplements
AIS.TR.320 Aeronautical information circular (AIC)
AIS.TR.330 NOTAM
AIS.TR.335 General— Digital data sets
AIS.TR.340 Metadata requirements
AIS.TR.345 AIP data set
AIS.TR.350 Terrain and obstacle data — General requirements
AIS.TR.355 Terrain data sets
AIS.TR.360 Obstacle data sets
AIS.TR.365 Aerodrome mapping data sets
AIS.TR.370 Instrument flight procedure data sets
AIS.TR.400 Distribution services
AIS.TR.405 Pre-flight information services
AIS.TR.500 General — Aeronautical information products updates
AIS.TR.505 AIRAC
AIS.TR.510 NOTAM
AIS.TR.515 Data set updates
Table 10 – Compliance Matrix: Annex VI to CIR 2017/373
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 217
Annex C Scenario / Objective Mapping C.1 General
This Annex provides a simple means of cross-referencing scenarios to objectives and vice versa. This allows an easy identification of where common objectives exist in more than one scenario.
C.2 Scenario to Objective Mapping Scenario Objective
Implementation by AIS Provider Apply for Service Provider Certificate
Implement and Maintain Management System
Define and Implement Processes and Procedures
Establish Verification and Validation Procedures
Assure Tools and Software
Establish Process to Monitor Data
Establish and Manage Formal Arrangements
Establish Process to Ensure Consistency of Data and Products
Establish Contingency Plans
Define and Implement Training Programme
Self-Assess and Monitor Compliance With Relevant Regulations
Error Reporting, Measurement and Corrective Actions
Provide and Maintain Operations Manuals
Define Catalogue of AIS Products and Services
Manage Requests for Data Changes
Request Data Origination / Provision
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 218 Released Issue Edition : 1.0
Scenario Objective
Originate Data
Collect Data
Apply Data Assurance Process
Store Data
Assemble AIS Products
Annotate AIS Data / Products for Limitations
Distribute AIS Products
Manage Occurrence Reporting
Manage Changes to the Functional System
Implementation by ATM/ANS Provider as Data Originator
Define and Implement Processes and Procedures
Establish Verification and Validation Procedures
Assure Tools and Software
Establish Process to Monitor Data
Establish and Manage Formal Arrangements
Coordinate With AIS Provider
Self-Assess and Monitor Compliance With Relevant Regulations
Error Reporting, Measurement and Corrective Actions
Request Data Origination / Provision
Originate Data
Collect Data
Transmit Data
Manage Occurrence Reporting
Implement and Maintain Management System
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 219
Scenario Objective
Implementation by Aerodrome Operator as Data Originator
Define and Implement Processes and Procedures
Establish Verification and Validation Procedures
Assure Tools and Software
Establish Process to Monitor Data
Establish and Manage Formal Arrangements
Coordinate With AIS Provider
Define and Implement Training Programme
Self-Assess and Monitor Compliance with Relevant Regulations
Error Reporting, Measurement and Corrective Actions
Manage Requests for Data Changes
Request Data Origination / Provision
Originate Data
Collect Data
Store Data
Transmit Data
Obligations for Data Originator Not Regulated by EASA
Establish Verification and Validation Procedures
Self-Assess and Monitor Compliance with Relevant Regulations
Originate Data
Transmit Data
Implementation by Competent Authority Establishment of Certification and Oversight Processes
Certification of ATM/ANS Providers and Aerodrome Operators
Oversight of ATM/ANS Providers and Aerodrome Operators
Implementation for Member States Establish National Policy and Regulatory Framework
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 220 Released Issue Edition : 1.0
Scenario Objective
Oversight of Out-of-Scope Data Providers
Table 11 – Scenario to Objective Mapping
C.3 Objective to Scenario Mapping Objective Scenario Annotate AIS Data / Products for Limitations Implementation by AIS Provider Apply Data Assurance Process Implementation by AIS Provider Apply for Service Provider Certificate Implementation by AIS Provider Assemble AIS Products Implementation by AIS Provider Assure Tools and Software Implementation by AIS Provider
Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator
Certification of ATM/ANS Providers and Aerodrome Operators
Implementation by Competent Authority
Collect Data Implementation by AIS Provider Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator
Coordinate With AIS Provider Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator
Define and Implement Processes and Procedures Implementation by AIS Provider Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator
Define and Implement Training Programme Implementation by AIS Provider Implementation by Aerodrome Operator as Data Originator
Define Catalogue of AIS Products and Services Implementation by AIS Provider
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 221
Objective Scenario Distribute AIS Products Implementation by AIS Provider Error Reporting, Measurement and Corrective Actions
Implementation by AIS Provider Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator
Establish and Manage Formal Arrangements Implementation by AIS Provider Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator
Establish Contingency Plans Implementation by AIS Provider Establish National Policy and Regulatory Framework
Implementation for Member States
Establish Process to Ensure Consistency of Data and Products
Implementation by AIS Provider
Establish Process to Monitor Data Implementation by AIS Provider Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator
Establish Verification and Validation Procedures Implementation by AIS Provider Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator Obligations for Data Originator Not Regulated by EASA
Establishment of Certification and Oversight Processes
Implementation by Competent Authority
Implement and Maintain Management System Implementation by AIS Provider Implementation by Aerodrome Operator as Data Originator
Manage Changes to the Functional System Implementation by AIS Provider Manage Occurrence Reporting Implementation by AIS Provider
Implementation by ATM/ANS Provider as Data Originator Manage Requests for Data Changes Implementation by AIS Provider
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 222 Released Issue Edition : 1.0
Objective Scenario Implementation by Aerodrome Operator as Data Originator
Originate Data Implementation by AIS Provider Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator Obligations for Data Originator Not Regulated by EASA
Oversight of ATM/ANS Providers and Aerodrome Operators
Implementation by Competent Authority
Oversight of Out-of-Scope Data Providers Implementation for Member States Provide and Maintain Operations Manuals Implementation by AIS Provider Request Data Origination / Provision Implementation by AIS Provider
Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator
Self-Assess and Monitor Compliance With Relevant Regulations
Implementation by AIS Provider Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator Obligations for Data Originator Not Regulated by EASA
Store Data Implementation by AIS Provider Implementation by Aerodrome Operator as Data Originator
Transmit Data Implementation by ATM/ANS Provider as Data Originator Implementation by Aerodrome Operator as Data Originator Obligations for Data Originator Not Regulated by EASA
Table 12 – Objective to Scenario Mapping
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 223
Annex D Reference Documents Ref. Document Number Title Link
1. Commission Regulation (EU) No 73/2010
Laying down requirements on the quality of aeronautical data and aeronautical information for the single European sky 73/2010
2.
Commission Regulation (EU) No 139/2014*
Laying down requirements and administrative procedures related to aerodromes pursuant to Regulation (EC) No 216/2008 * as amended by Commission Implementing Regulation (EU) 2020/469 of 14 February 2020. Note: Further consequential changes are proposed based on EASA Opinion 03/2019 (Delegated Act in final process of adoption).
139/2014
3. Commission Implementing Regulation (EU) 2017/373*
Laying down common requirements for providers of air traffic management/air navigation services and other air traffic management network functions and their oversight, repealing Regulation (EC) No 482/2008, Implementing Regulations (EU) No 1034/2011, (EU) No 1035/2011 and (EU) 2016/1377 and amending Regulation (EU) No 677/2011 * as amended by Commission Implementing Regulation (EU) 2020/469 of 14 February 2020 and as amended by Commission Implementing Regulation (EU) 2020/1177 of 7 August 2020 (replacing article 5) – in short called CIR 2017/373.
2017/373
4. Annex III to CIR 2017/373
Common Requirements for Service Providers (Part-ATM/ANS.OR) * as amended by Commission Implementing Regulation (EU) 2020/469
2017/373
5. Annex VI to CIR 2017/373
Specific Requirements for Providers of Aeronautical Information Services (Part-AIS) * as amended by Commission Implementing Regulation (EU) 2020/469
2017/373
6. Commission Implementing Regulation (EU) 2020/469
amending Regulation (EU) No 923/2012, Regulation (EU) No 139/2014 and Regulation (EU) 2017/373 as regards requirements for air traffic management/air navigation services, design of airspace structures and data quality, runway safety and repealing Regulation (EC) No 73/2010
2020/469
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 224 Released Issue Edition : 1.0
Ref. Document Number Title Link as amended by Commission Implementing Regulation (EU) 2020/1177 of 7 August 2020 (replacing article 5)
7. AMC-GM to Annex II — (Part-ATM/ANS.AR) to CIR 2017/373
Decision 2020/008/R Amendments to the Acceptable Means of Compliance and Guidance Material to Regulation (EU) 2017/373 - Annex II
ED 2020/008
8. AMC-GM to Annex III (Part-ATM/ANS.OR) to CIR 2017/373
Decision 2020/008/R Amendments to the Acceptable Means of Compliance and Guidance Material to Regulation (EU) 2017/373 - Annex III
ED 2020/008
9. AMC-GM to Annex VI (Part-AIS) to CIR 2017/373
Decision 2020/008/R Amendments to the Acceptable Means of Compliance and Guidance Material to Regulation (EU) 2017/373 – Annex VI
ED 2020/008
10. ICAO Annex 15 Aeronautical Information Services Annex 15
11. ICAO Doc 8126 - Volume I
AIS Manual : Regulatory Framework for Aeronautical Information Services To be released
12. ICAO Doc 8126 - Volume II
AIS Manual : Processing Aeronautical Data To be released
13. ICAO Doc 8126 - Volume III
AIS Manual : Aeronautical Information in a Standardized Presentation and Services To be released
14. ICAO Doc 10066 Procedure for Air Navigation Services Aeronautical Information Management (PANS-AIM) Doc 10066
15. EUROCONTROL-GUID-0121
EUROCONTROL Guidelines Operating Procedures for AIS Dynamic Data (OPADD) OPADD
16. EUROCONTROL-SPEC-146
EUROCONTROL Specification for the Electronic Aeronautical Information Publication (eAIP) eAIP Specification
17. EUROCONTROL-SPEC-151
EUROCONTROL Specification for Aeronautical Information Exchange (AIX) AIX Specification
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 225
Ref. Document Number Title Link
18. EUROCONTROL-SPEC-154
EUROCONTROL Specification for the Origination of Aeronautical Data Volume 2: Guidance Material (DO) DO Specification Volume 2
19. EUROCONTROL-GUID-0158
EUROCONTROL Terrain and Obstacle Data Manual TOD Manual
20. EUROCONTROL-GUID-0182
EUROCONTROL Guidelines on the Implementation of Safety Support Assessment for AIS
21. EUROCAE ED-76A Standards for Processing Aeronautical Data ED-76A
22. EUROCAE ED-215 Software Tool Qualification Considerations ED-215
23. EUROCONTROL ADQ Formal Arrangements Template ADQ Formal Arrangements Template
24. AIXM 5.1 Data Model (UML)
AIXM UML
25. AIXM 5.1 XML Schema (XSD)
AIXM XML
26. EUROCONTROL Aeronautical Data Processes ADP
27. EUROCONTROL Specification for AIP Data Set Coding using AIXM 5.1.1 To be released
28. EUROCONTROL Specification for Obstacle Data Set Coding using AIXM 5.1.1 To be released
29. EUROCONTROL Specification for Instrument Flight Procedures Design Data Set Coding using AIXM 5.1.1 To be released
30. EUROCONTROL Specification for Digital NOTAM Data Set Coding using AIXM 5.1.1 To be released
31. EUROCONTROL Guidelines on Safety Support Assessments performed by AIS Providers To be released
32. EUROCONTROL Guidelines for the Annotation of data not compliant with Commission Regulation (EU) No 73/2010 (ADQ) Guidelines
Table 13 - Referenced Documents
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 226 Released Issue Edition : 1.0
Annex E Auditing Checklist As part of its work, the AIRI SG has developed a compliance checklist to support both auditors and auditees in the demonstration of compliance. The material is provided in the form of a Microsoft Excel spreadsheet comprising eight worksheets, each addressing a different function of Commission Implementing Regulation (EU) 2017/373 [Ref 3], as follows:
• COVER; • OR; • GEN; • DQR; • AI PRODUICT; • DISTRIB, Pre-flight; • Product Updates; • Personnel.
In turn, each worksheet comprises six columns as follows: Column A ARTICLE / NMB REG:
A reference to the relevant regulatory article, AR, OR or TR. Column B: PARAGRAPH / TITLE:
The title or provision reference of the regulatory article, AR, OR or TR. Column C: COMMON REQUIREMENT:
The text of the provision, AR, OR or TR. Column D: IMPLEMENTATION QUESTION
A suggested question or question that may be asked to aid the auditor and auditee in ascertaining whether compliance has been achieved.
Column E: KEY ELEMENTS Key elements that may be assessed to determine if evidence exists to confirm compliance.
Column F: REFERENCES Any useful references to other material that may assist in assessing compliance.
The checklists may be downloaded at https://www.eurocontrol.int/service/aeronautical-data-and-information-quality.
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 227
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 228 Released Issue Edition : 1.0
Annex F Terms and Definitions Term Definition
Acceptable Means of Compliance (non-binding)
The AMC serves as a means by which the requirements contained in the Basic Regulation, and the IR, can be met. However, applicants may decide to show compliance with the requirements using other means. Both NAAs and organisations may propose alternative means of compliance. ‘Alternative Means of Compliance’ are those that propose an alternative to an existing AMC. Those Alternative Means of Compliance proposals must be accompanied by evidence of their ability to meet the intent of the IR. Use of an existing AMC gives the user the benefit of compliance with the IR. [ EASA]
Guidance Material (non-binding)
Non-binding explanatory and interpretation material on how to achieve the requirements contained in the Basic Regulation, the IRs, the AMCs and the CSs. It contains information, including examples, to assist the user in the interpretation and application of the Basic Regulation, its Implementing Rules, AMCs and the Community Specifications. [EASA]
Safety Support Assessment
The set of activities carried out in order to study the impact on service behaviour resulting from any change in the AIS functional system or any new parts or components of the functional system.
Safety Assessment / Assurance
Planned and systematic actions necessary to provide adequate confidence that a product, a service, an organisation or a functional system achieves acceptable or tolerable safety.
Validation
The confirmation through the provision of objective evidence that the requirements for a specific intended use or application have been fulfilled [ISO].
Verification The conformation through the provision of objective evidence that specified requirements have been fulfilled [ISO].
Table 14 – Terms and Definitions
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 229
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 230 Released Issue Edition : 1.0
Annex G Abbreviations Abbreviation Meaning
AMC Acceptable Means of Compliance
ADQ Aeronautical Data Quality
ADR Aerodrome
AIM Aeronautical Information Management
AIP Aeronautical Information Publication
AIS Aeronautical Information Services
AIRAC Aeronautical Information Regulation And Control
AIRI Aeronautical Information Regulations Implementation
AIRI SG Aeronautical Information Regulations Implementation Sub-group
AMDT Amendment
ANS Air Navigation Services
ANSP Air Navigation Service Provider
ATM Air Traffic Management
ATSEP Air Traffic Safety Electronics Personnel
AMC Acceptable Means of Compliance
AR Authority Requirement
CIR Commission Implementing Regulation
CS Community Specification
DPS Data Product Specification
DQR Data Quality Requirements
EAR Easy Access Rule
EASA European Union Aviation Safety Agency
ERAF EUROCONTROL Regulatory and Advisory Framework
EU European Union
EUROCONTROL European Organisation for the Safety of Air Navigation
GM Guidance Material
ICAO International Civil Aviation Organisation
IR Implementing Rule
ISO International Organisation for Standardisation
OPADD EUROCONTROL Guidelines Operating Procedures for AIS Dynamic Data
OR Organisation Requirement
PANS Procedures for Air Navigation Services
TR Technical Requirement
Table 15 – Abbreviations
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Page : 232 Released Issue Edition : 1.0
EUROCONTROL Guidelines Supporting the Implementation of Aeronautical Information Requirements
Edition : 1.0 Released Issue Page : 232
Annex H Document Update Procedure It is necessary to periodically check these EUROCONTROL Guidelines document for consistency with referenced material, notably the evolution of the regulatory package of CIR 2017/373 including the related AMC/GM. The Guidance material is also expected to evolve following implementation progress and field experience. The main objectives of a regular review are:
• to improve the quality and clarity;• to verify that the level of detail published is adequate and up to date; and• to make all stakeholders aware of the latest developments.
The update of the AIR Guide can be initiated by the AIRI SG or the AIM/SWIM Team as key working arrangement. Stakeholders are advised to provide a change request (CR) through the AIRI SG. However, any stakeholder that wishes to request a change to these guidelines can submit a change request (CR) either directly to the identified document editor (Contact Person) or via the generic email address: [email protected] . The CR needs to provide following minimum elements:
• Originator information (name, organisation, contact details)• Doc title, number and edition date• Page, chapter, section/subsection, scenario/objective numbers, step numbers etc. where the
issue/change appears• Description of the issue/change and reason for change• Specific change proposal text (incl. potential alternatives, if any).
Main steps towards a revised edition: • AIRI SG secretariat will assess each CR and classify the CR impact category (major, minor or
editorial).• AIRI SG secretariat will then prepare resolution proposal(s) and, if needed, discuss those with
the originator.• AIRI SG will discuss and agree resolution proposal(s) covering at least major changes.• Agreed changes will be integrated into a revised edition “Proposed Issue” including a
summarised list of changes.• The “Proposed Issue” will be consulted at AIRI SG and AIM/SWIM Team level before release.
Note: Identified errors which may cause potential problems when implementing, may be corrected directly via separate “Corrigendum”.
– END –
Edition number: 1.0 Edition date: 07 December 2020 Document reference: EUROCONTROL-GUID-0181
EUROCONTROL Specifications
Subtitle Roboto Light 24pt Second line Date, period or phase Roboto Regular 14pt