EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed:...

25
EU GCC CLEAN ENERGY NETWORK II Join us: www.eugcc-cleanergy.net Contact us: [email protected]

Transcript of EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed:...

Page 1: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

EU GCC CLEAN ENERGY NETWORK IIJoin us: www.eugcc-cleanergy.net Contact us: [email protected]

Page 2: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Content

2

1. Changing Energy Paradigm

2. Energy in the GCC

3. The New Oil

Page 3: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Changing Energy Paradigm

Page 4: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Cost of energy

Page 5: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

ONSHORE WINDSOLAR PV

Location:

Bidder:

Signed:

Construction:

Price:

Morocco

Enel Green Power

January 2016

2018

US$ 3.0 c/kWh

Location:

Bidder:

Signed:

Construction:

Price:

Dubai

Masdar Consortium

May 2016

2019

US$ 2.99 c/kWh

Source: Bloomberg New Energy Finance; ImagesSiemens; Wikimedia Commons

2016 unsubsidised clean energy world records

Page 6: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

OFFSHORE WINDCSP

Location:

Bidder:

Signed:

Construction:

Price:

German North Sea

Dong

April 2017

2021-2025

US$ 5.2 c/kWh

Location:

Bidder:

Signed:

Construction:

Price:

Dubai

Acwa Power

September 2017

2020

US$ 7.3 c/kWh

Source: Bloomberg New Energy Finance; ImagesSiemens; Wikimedia Commons

2017 unsubsidised clean energy world records

Page 7: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

ONSHORE WINDSOLAR PV

Location:

Report:

Signed:

Construction:

Price:

USA average

NREL

Average 2017

2018

<US$ 2.0 c/kWh

Location:

Bidder:

Signed:

Construction:

Price:

Dubai

Acwa Power Consortium

Nov 2018

2020

US$ 2.4 c/kWh

Source: Bloomberg New Energy Finance; ImagesSiemens; Wikimedia Commons

2018 unsubsidised clean energy world records

Page 8: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Shell Sky Scenario

• “From now to 2070, the rate of electrification of final energy more than triples, with global electricity generation reaching a level nearly five times today’s level”

• “Hydrogen grows as an energy carrier from 2040 in Sky, with 800 million tonnes per year global capacity by 2070 – more than double the current global LPG market.”

Decarbonization

Page 9: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Power to Gas: Electrolyser

Page 10: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Hydrogen, what’s new?

1. Renewable energy revolution and increasing electrification

2. Several major scenarios (Shell, BP, Hydrogen Council) feature hydrogen

3. New hydrogen ambitions in Korea, Japan, the Netherlands, South Australia, Europe etc.

4. New fuel cell vehicles by Toyota, Honda, Hyundai

Page 11: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Energy in the GCC

Page 12: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

GCC electricity mix (2015)

Electricity Demand [TWH] OVERALL Oil Gas

Bahrain 28 28Kuwait 58 37 21Oman 30 1 29Qatar 39 39Saudi Arabia 313 138 175UAE 118 118

GCC 586 176 41130% 70%

Page 13: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

PV (and CSP) already competitive with new gas

LCOE ($/MWh nominal)

300

250

200

150

100

50

0 2 4 6 8 10 12 14 16 18 20

Price of gas ($/mmbtu)

Solar

KSAdomestic gas price(2017)

US HH(March 2018)

Global LNG prices (2018)

Open Cycle

Gas Turbine

Combined Cycle

Gas Turbine

Source: BNEF

Page 14: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Saudi Arabia’s 200GW plan

Page 15: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

The New Oil

Page 16: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Largest single solar site in the world:

projected to be 5 GW by 2030

• Phase I: solar PV 13 MW

• Phase II: solar PV 200 MW

• Phase III: solar PV 800 MW

• Phase IV: CSP 700 MW

Maktoum Solar Park Dubai

Page 17: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Largest CSP project in the world

• 700MW CSP (+250MW PV) 15 hours storage

• $3.9 billion investment

• Central Tower 100 MW

• Parabolic Troughs 3x200 MW

• Auxiliary solar PV 4x33 MW

• Tariff 7.3 ct/kWh

• PPA 35 years

• Dispatch: between 4pm and 10am

Maktoum Solar Park Dubai, Phase IV

Page 18: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

0

20

40

60

80

100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hybrid PV-CSP dispatch profile

PV CSP Combined

Hybrid PV-CSP

At scale, 24/7 solar in the Gulf could cost as little as 3$ct/kWh

Green hydrogen would cost $2/kg

Page 19: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Green Hydrogen Roadmap - GCC

1. Introduce green hydrogen for use in the domestic transport sector

2. Introduce green hydrogen in the power and ammonia sector

3. Introduce green hydrogen for export markets

Page 20: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Green Hydrogen Roadmap - GCC

1. Introduce green hydrogen in the ammonia sector

2. Introduce green hydrogen for use in the domestic power and transport sector

3. Introduce green hydrogen for export markets

Page 21: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

1. Green Ammonia

• Fertilizers:

• SAFCO IV, Saudi Arabia

– 1.1 million ton of ammonia/year

– 190,000 ton of hydrogen

• Green hydrogen, required:

– 1.3 GW of solar PV

– 1.3 GW of CSP

Page 22: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

2. Domestic hydrogen pathways

Page 23: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

3. Export

Page 24: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

3. Export

Page 25: EU GCC CLEAN ENERGY NETWORK II · 2018. 12. 4. · SOLAR PV ONSHORE WIND Location: Bidder: Signed: Construction: Price: Morocco Enel Green Power January 2016 2018 US$ 3.0 c/kWh Construction:

Thank You