EU Environmental Regulations: EU Environmental Regulations: Benefits and Challenges to the Thai Electrical Benefits and Challenges to the Thai Electrical
& Electronic Industry& Electronic Industry
Dr. Chirapat PopuangDr. Chirapat Popuang
Director of Information and Technical Service DepartmentDirector of Information and Technical Service DepartmentElectrical and Electronics Institute, ThailandElectrical and Electronics Institute, Thailand
3
Thai Electrical & Electronic Industry Benefits & Challenges Conclusions & Pending Issues
4
Local 49%Foreign / Joint venture 51%
Local 54%Foreign / Joint venture 46%
No.of Factories, 2006S = 1,619M = 389L = 287
Total = 2,295
Thai Electrical & Electronic Industry
Export Value: 2001-2007
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
Mill
ion U
S$
Electrical
Electronics
E&E
Electrical 8,503 9,682 10,750 13,428 13,467 14,751 11973 16,226
Electronics 14,498 14,863 17,032 18,974 21,553 26,264 21164 29,153
E&E 23,002 24,546 27,783 32,403 35,020 41,016 33,137 45,379
2001 2002 2003 2004 2005 2006 2007/09 2007F
5
Source: EEI and the Customs Department
11+%17%
8+%
Thai Electrical & Electronic Industry
Import Value: 2001-2007
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
Mill
ion U
S$
ElectricalElectronicsE&E
Electrical 4,723.53 6,524.44 7,383.59 8,114.38 10,141.95 11,289.20 9,213.51 12,177.88
Electronics 8,013.82 13,179.87 14,085.49 16,492.49 18,468.64 20,332.13 16,150.93 21,053.29
E&E 12,737.34 19,704.31 21,469.08 24,606.87 28,610.59 31,621.33 25,364.44 33,226.97
2001 2002 2003 2004 2005 2006 2007/09 2007F
6
Source: EEI and the Customs Department
+5.11%10%
12%
Thai Electrical & Electronic Industry
Electrical Export Value to EU
0
1000
2000
3000
2002 2003 2004 2005 2006
Millio
n US
$
SME L N/A
7
Thai Electrical & Electronic Industry
Electronics Export Value to EU
0
1000
2000
3000
4000
5000
2002 2003 2004 2005 2006
Millio
n US
$
SME L N/A
8
Thai Electrical & Electronic Industry
9
E lectronics Export by key Product
IC31%
Diode Semicon
4%
PCB4%
Misc.6%
Computer
Part &
Component
51%
Radio & Etc 4%
Electrical Export by key Product
Small Motors4%
COMPR4%
Cable & Wire4%
TV Component
4%
Color TV5%
Refrig.5%
TV/VDO5%
C/B9%
A/C21%
Misc.36%
Wash machin
3%
Export Products
Thai Electrical & Electronic Industry
10
E lectronics Import by key Product
IC31%
Diode Semicon
4%
PCB4%
Misc.6%
Computer
Part &
Componen
t
51%
Radio & Etc 4%
Electrical Import by key Product
Small Motors4%
COMPR4%
Cable & Wire4%
TV Component
4%Color TV
5%
Refrig.5%
TV/VDO5%
C/B9%
A/C21%
Misc.36%
Wash machin3%
Import Products
Thai Electrical & Electronic Industry
Trade Volume
11
Thai Electrical & Electronic Industry
TV
0
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
16,000,000
2001 2002 2003 2004 2005 2006
Year
Set
Production
New Import
New Export
Domestic Shipment
Used Import
Used Export
Estimated Generation of Waste TVs in the Future
395 446 502563
628699
775856
9401,026
1,1131,200
1,2841,364
1,437
0
200
400
600
800
1,000
1,200
1,400
1,600
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Year
Uni
t (1,
000)
12
Thai Electrical & Electronic Industry
Trade Volume
13
Thai Electrical & Electronic Industry
RF
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
2001 2002 2003 2004 2005 2006
Year
Set
Production
Import
Export
Domestic Shipment
Used Import
Used Export
Estimated Generation of Waste RFs in the Future
138 159 183 208 236 266 298 333 370410
453498
547600
656
0
100
200
300
400
500
600
700
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Year
Uni
t (1,
000)
14
Thai Electrical & Electronic Industry
Trade Volume
15
Thai Electrical & Electronic Industry
AC
0
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
16,000,000
18,000,000
2001 2002 2003 2004 2005 2006
Year
se
t
Production
Import
Export
Domestic Shipment
Used Import
Used Export
Estimated Generation of Waste ACs in the Future
56 64 72 81 90 101 113 128 145 165190
219255
298
350
050
100150200250300350400
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Year
Un
it (
1,00
0)
16
Thai Electrical & Electronic Industry
Trade Volume
17
Thai Electrical & Electronic Industry
WM
-
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
2001 2002 2003 2004 2005 2006
Year
set
Production
Import
Export
Domestic Shipment
Used Import
Used Export
Estimated Generation of Waste WMs in the Future
199 226 256 288323
362404
450501
557618
685758
838926
0
100
200300
400500600
700800
9001,000
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Year
Uni
t (1,
000)
18
Thai Electrical & Electronic Industry
Trade Volume
19
Thai Electrical & Electronic Industry
PC
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
2001 2002 2003 2004 2005 2006
Year
set
Production
New Import
New Export
Domestic Shipment
Used Import
Used Export
Estimated Generation of Waste PCs in the Future
622 700 799 930 1,1091,351
1,6642,046
2,4832,950
3,4193,876
4,3224,777
5,260
0
1,000
2,000
3,000
4,000
5,000
6,000
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Year
Uni
t (1,
000)
20
Thai Electrical & Electronic Industry
Trade Volume
21
Thai Electrical & Electronic Industry
MP
-
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
40,000,000
45,000,000
2001 2002 2003 2004 2005 2006
Year
set
Production
Import
Export
Domestic Shipment
Used Import
Used Export
Estimated Generation of Waste MPs in the Future
12,47414,55417,58121,782
27,03432,850
38,62944,010
49,05854,126
59,55765,514
72,06579,272
87,199
010,00020,00030,00040,00050,00060,00070,00080,00090,000
100,000
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020Year
Uni
t (1
,000
)
22
Thai Electrical & Electronic Industry
• Cost and Availability of Recycle Plant in EU
• Appropriate Local WEEE Regulation & Management System, Product Stds. to leverage NTBs while build up local capacity
• Cost and availability of HS-Free parts/material and mfg. process
• Reporting system for self-declaration and cost of product liability
• Stds., test method, test cost, and Certification of Conformity / Compliance for market access 23
WEEWEEEE
RoHSRoHS
Benefits & Challenges
• Eco Design Capability & Experience
• Development of Quality Management System, Energy Saving Stds., Environmental Product Labeling
• Availability of LCI Database• Competency in LCA
• Registration & Evaluation Cost Burden
• Availability & Cost of “AUTHORIZED” Chemicals
• Cost & Burden in Conformity / Compliance Assessment
24
EuPEuPREACREACHH
“Local SMEs not in “Branded” supply chain will be suffered”
Benefits & Challenges
25
Raw MatProcessTransportationRetailer/
Wholesaler Use
Repair
RecyclingLCI
Life Cycle AssessmentEco-design
Clean Productivity
Refurbishment
Green
Product
Thai WEEE? Thai WEEE?
ThaiRoHSGreen ProcurementGreen Purchasing
LCI
Education Public(Eco-Products
International Fair )
Benefits & Challenges
Glass57%Plastic
23%
Fe10%
Cu3%
Al2%
Others5%
Plastic40%
Fe50%
Cu4%
Al3%
Others3% Glass
0%
Glass Plastic Fe Cu Al Others
Glass0%
Plastic11%
Fe55%
Cu17%
Al7%
Others10%
Plastic36%
Fe53%
Cu4%
Al3%
Others4% Glass
0%
26
TVRefrigerator
Air Con Washing Machine
Recycled Material ProportionRecycled Material Proportion
Source: Matsushita Eco Technology Center
Benefits & Challenges
Estimated Precious Metals Market (2003)Silver 5,870 tons (332 Euro/kg, Sep. 07)Gold 160 tons (17,620 Euro/kg, Sep. 07)Platinum11 tons (31,800 Euro/kg, Sep. 07)Palladium 22 tons (8,300 Euro/kg, Sep. 07)Rhodium5.5 tons (156,500 Euro/kg, Sep. 07)
(Estimated from figures of precious metal producer)
27
Benefits & Challenges
28
WEEE Recyclable Non-recyclable(Tons) (tons)* (tons)**
TVs 8,201 2,542 5,659Refrigertors 17,763 16,342 1,421Washing machines 11,370 8,073 3,297Air Conditions 17,407 17,407 -Computers 2,105 2,105 -
total 57,934 (100%) 47,577 (82.1%) 10,377 (17.9%)
ประเภท
• High potential to be recycledHigh potential to be recycled
Source:Source: PCD, 2004 PCD, 2004
Benefits & Challenges
29
Foreign
Domestic
Import used/ low quality parts/
componentImported part/
component
Imported product
Returnoff-spec
E-wasteUsed product
Component
Mfg.
E-waste
Fluid waste
ScrapOff-spec
Product
Export
Domestic user
Scrap Scrap
Semi precious
metal
Repair shop
Recondition/ Refurbish
Recycleplant
Precious metal
Sell to local/Export mkt
WasteWaste
treatment /Landfill /Cement
plant
Benefits & Challenges
30
(2)EEE import
EEE retailer/dealer
(5)
Consumer
(6)
Collection(7)
EEE repair shop (10)
Separation(Tri-cycler/
Used materials trader)
(11)
Project 3R
(8)
Permitted treatment
plant
(15)
Under supervision of MOI
WEEE import
(4) Parts retailer
(9)
Offspec. parts/ products
EEE production(1)
Under market mechanismUnder market mechanismUnder Local Administration
Organization
Valuable materials/ metals
Residues from 3R processNon-valuable materials/ metals
repair repair
dispose
Reusable parts
Residues
Under supervision of MOI
reusable
Non-reusable
Sell
Inappropriate treatment of
WEEE
(12)
Need improvement
LawStrategy
Sell
Pilot project
Import of used EEE
(3)
Offspec. parts/ products
EEE
(16)/ WEEE export
Benefits & Challenges
Related Envi. Issues/Directive
“Key” Capacity Building
Experiences
00
01
02
03
04
05
06
07
08
09
National Subcommittee for impact follow up and policy determination to EU Directives on WEEE and RoHS
Pilot project : LCA study (electricity grid mix) by Thai Env Inst
Establishment of Office of Import Policy Admin Committee : Import stewardship on used & waste EEE
RoHS : impact survey by Nat Metal & Mat Tech Center
Feasibility study project on EE recycling plant by Dep of Indus Works
National Subcommittee for EU–IPP
EEI study project (Dep of Foreign Trade)
- Study & research: legislative study, economic impact, LCA, eco-design, WEEE, RoHS, impacts and measures (ASEAN and EU), existing and suggested local e-waste mgmt.
31
WE
EE Ro
HS
Eu
PE
coD
esig
n
RE
AC
H
Benefits & Challenges
Related Envi. Issues/Directive
“Key” Capacity Building
Experiences
00
01
02
03
04
05
06
07
08
09
PM’s special meeting on inter-ministerial env. legislative update
DIW notificatn on import used EEE
Study trip : recycling plants, e-waste mgmt, research lab, RoHS reporting s/w (Japan, Korea and EU)
E-waste mgmt.: TV, RF, WM, AC, PC, CRT wastes collection survey (PCD/ METI)
National case study on environmental requirements, market access, and competitiveness in the electronics sector (UNCTAD/EEI)
Guideline on develop’t of envi. mgmt. via business partners and appropriate GSC process in Thai context (TEI)
Framework & RM Development to Support GP & Service (MTEC/TRF)
EEE pilot project (mobile phone, battery, F/L)
(PCD)
32
WE
EE Ro
HS
Eu
PE
coD
esig
n
RE
AC
H
Benefits & Challenges
Related Envi. Issues/Directive
“Key” Capacity Building
Experiences
00
01
02
03
04
05
06
07
08
09
Recycling plant feasibility study F/L (PCD)
Survey of the import and the environmentally sound management of the electronic wastes in Thailand (BCRC/PCD/EEI)
Thailand sustainable production & consumption (Thai Res Fund/ TEI)
Training : LCA and eco-design by
(GAP/METI/MTEC)
Green Procurement Management Model Demonstration Project (EEI/METI-JETRO/Toshiba)
Thai-RoHS voluntary networking initiative (MTEC/EEI)
Pilot project on EE recycling system (Fed of Thai Ind / EEI / Thai Inst of Sci & Tec Res / MTEC)
Min of Ind established Committee (24 inter-ministerial members) to follow-up & handle EU environmental directives, will propose action plans for further Cabinet approval.
33
WE
EE Ro
HS
Eu
PE
coD
esig
n
RE
AC
H
Benefits & Challenges
Related Envi. Issues/Directive
“Key” Capacity Building
Experiences
00
01
02
03
04
05
06
07
08
09
Development of Government green procurement mechanism
(TEI, TRF, Min of Fin)
EEE Green Camp Project (Nat Econ & Soc Dev Board/EEI/MTEC)
International meeting on IEC TC111/WG2 (FTI/EEI), Bangkok
Impact Assessment of REACH on the supply chain of export industry in Thailand (TRF/TEI)
Development of Policy Framework in Response to REACH Enforcement: Preparedness of Laboratory Services for Thai Industries (TRF/Dep Sci Serv)
International Conference on Green & Sustainable Innovation 2006 – 2007 (Chiengmai Uni/EEI/MTEC)
Established REACH Committee (Off of Ind Econ/TRF)
34
WE
EE Ro
HS
Eu
PE
coD
esig
n
RE
AC
H
Benefits & Challenges
Related Envi. Issues/Directive
“Key” Capacity Building
Experiences
00
01
02
03
04
05
06
07
08
09
SPF: Cap. building on LCA/eco-design for EEI
SPF: Cap. building on testing & compliance assessment related to WEEE & RoHS for EEI
Promotion of advanced waste management based on 3R concept in the three countries (UNEP/ PCD/TEI)
Development of “Thai WEEE”
SPF: Practical Guideline to become RoHS/ELV compliance producers & preparation for EuP directive (MTEC/EEI/Inst SME Devel/FTI/King Mong Inst of Tech at Nor Bk)
SPF: Capacity build up for the determination of levels of regulated substances in electrical, electronic and automotive parts (MTEC)
SPF: REACH Capacity building (TRF) 35
WE
EE Ro
HS
Eu
PE
coD
esig
n
RE
AC
H
Benefits & Challenges
Complete
Incomplete No
Related Envi. Issues/Directive
“Key” Capacity Building
Experiences
00
01
02
03
04
05
06
07
08
09
International Conference “THAILAND ELECTRICAL AND ELECTRONICS GREEN SOCIETY (EEI/FTI/Dep of Exp Pro)
Thai WEEE manual (MTEC/PCD)
OIE & Poll Con Dep: National Strategy on “Thai” WEEE
APE: Asia Eco-Design Electronics (AEDE) Centre for Sus Design/ Linkoping/ The Ener & Rerources Inst/ Electronic Industries Aassoc of India/ Renmin Univ of China/ EEI/ Gandhi Foundation
JAPAN-MOE: National E-waste inventory development (PCD/EEI)
APE II “Sustainable Production and Consumption as the Long-term Solution to Reduce Urban Environmental Degradation Developing a Reference Framework for Electrical and Electronic Products” (TEI, SIRIM, IZM Fraunhofer, CITQ)
36
WE
EE Ro
HS
Eu
PE
coD
esig
n
RE
AC
H
Benefits & Challenges
Complete
Incomplete No
Related Envi. Issues/Directive
“Key” Capacity Building
Experiences
00
01
02
03
04
05
06
07
08
09
Training in Recycling Technology of E&E Products (AOTS/EEI)
KOSAKA-DOWA-BCRCSEA: Pilot Project on Tran boundary movement of eol mobile phone in east Asian countries TH/SIN/MA (PCD)
Thai – RoHS std development by Thai Indus Stand Inst
Potential enhancement of used electronics under plc tracking system of WEEE (DIW/Kasetsart Univ)
Eco-Town (Dep of Pri Indus & Mines)
Potential enhancement of SMEs for IMS (TEI/Off of SME Pro)
Integrated project for national information center under sustainable national resources & env strategy (Mahidol Univ/ Nat Stat Off)
Survey of quantities & types of EEE (PCD/TESCO)
37
WE
EE Ro
HS
Eu
PE
coD
esig
n
RE
AC
H
Benefits & Challenges
Complete
Incomplete No
• WEEE• Early setup of National Sub. comm• Thai WEEE development• Pilot collection projects• Development of informal/private collectors / recycling
plants• Ongoing WEEE inventory survey• DIW/MOI’s Notification to regulate 2nd hand
EEE/WEEE cross boundary movement
38
Conclusions & Pending Issues
+ ?
• RoHS• Awareness raising, C/B activities, voluntary
Thai-RoHS N/W• Thai-RoHS development• Government & EU supports on C/Bs
• EuP• Proactive C/Bs activities with government
and EU supports
• Overall• Setting up new committee in MOI to support
further needs in capacity bldg. across ministries.
• Effective date of implementation
• Appropriate WEEE system management (collection, separation, recycling tech., refurbishment, etc.) & sustainable operations
• 3-R movement VS.BC-Cross Boundary movement issue
• Harmonization of other ”RoHS”• Effective date of implementation
&enforcement
• Availability of LCI data base & LCA competency to support Eco Design
• MRA on Energy Saving Std. and Green Labeling, & etc.
• Need of influential focal pt./powerful catalysts to follow up/coordinate for concerted effort and strategically focus
• WEEE
Capacity building
39
+ ?
RoHS Capacity building
EuP Capacity building
REACH Capacity building Infrastructure
Precious metal recycling Infrastructure: HW/SW/Law International cooperation
Green procurement/ JGPSSI Infrastructure: Regulations
Technical requirements
Knowledge-base Need of lab International cooperation
Conclusions & Pending Issues
Benefits
40
Conclusions & Pending Issues
• Capacity Building: Expert Training/ Trainer Training/ Worker Training/ Factory Consulting/ Implementation in Factories
• Investment • Technology Transfer• Production Improvement: HS free/ CP• R & D/ Educational Institutions-Factories: Development of
green products/ LCA-ED have been included in university curricula
• Information Dissemination: Eco-products international fair• Environmental Preservation
Challenges
41
Conclusions & Pending Issues
• Capacity Building: Thai WEEE (System)/ Thai RoHS/ Thai GPN/ Government GP/ Thai GDN
• Technology Transfer• Improvement of Infrastructure: National
foreground-background DB & WEEE inventory creation/ Legal improvement