WESTELL.COM Ethernet Switch Upgrade Kit Install Instructions A99-BAI-ACSF-UGKIT Step-by-Step Process The following instructions describes how to field install a second 6 port Ethernet switch into Access Point cabinet, part number A99-APC1BAI-ACSF. Note: Access Point cabinets, part number A99-APC1BAI-ACSF that are revision V and below must have the 2nd Ethernet switch installed in the vacant AP2 radio location. Each method is described within this document.Access Point cabinets, part number A99-APC1BAI-ACSF that are revision W and above can have the 2nd Ethernet switch installed above the first Ethernet switch using the existing DIN rail. Contents include one each of the following: 6 port GigE Ethernet switch, part number A90-ESP8266G 1 Gig 20Km 1310 Nm SFP, part number A90-SFP01G-20-31 2 meter LC to LC SM fiber patch cord 20” Red 14 AWG wire 20” Black 14 AWG wire 60” Green 14 AWG wire 20” spiral sleeving Cauon: Remove Power Before Aempng to Service Prepare the frame ground wire Strip 1/4” of insulation from the green frame ground wire Step B: Wire power & frame ground to the Ethernet Switch Important - Remove Power - from the cabinet before service Attached the power and frame ground wires to the Ethernet Switch Attach the red 14 AWG wire to the +-V input of the A PWR connector Attach the black 14 AWG wire to the G input of the A PWR connector Attach the green 14 AWG wire to the FG input of the A PWR connector Step C1: Install 2nd Ethernet Switch using plate method for part number A99-APC1BAI-ACSF revision V and below. Step A: Prepare the power & frame ground wires Prepare the power cord Strip 1/4” of insulation from the red and black wires Cut the spiral sleeving to 16” and install over red and black wires Page 1 of 3 *Note: This upgrade kit is only applicable with BA AC cabinet part number A99-APC1BAI-ACSF revision W and above.

Transcript of Ethernet Switch Upgrade Kit Install Instructions A99-BAI-ACSF...

Page 1: Ethernet Switch Upgrade Kit Install Instructions A99-BAI-ACSF …support.westell.com/documents/Installation-Guides/030... · 2016-05-11 · 030-300732 rB 04/29/16 Page 3 of 3 Step

westell .com

Ethernet Switch Upgrade Kit Install Instructions

A99-BAI-ACSF-UGKIT

Step-by-Step ProcessThe following instructions describes how to field install a second 6

port Ethernet switch into Access Point cabinet, part number

A99-APC1BAI-ACSF.

Note: Access Point cabinets, part number A99-APC1BAI-ACSF that

are revision V and below must have the 2nd Ethernet switch installed

in the vacant AP2 radio location. Each method is described within this

document.Access Point cabinets, part number A99-APC1BAI-ACSF that

are revision W and above can have the 2nd Ethernet switch installed

above the first Ethernet switch using the existing DIN rail.

contents include one each of the following:

• 6 port GigE Ethernet switch, part number A90-ESP8266G

• 1 Gig 20Km 1310 Nm SFP, part number A90-SFP01G-20-31

• 2 meter LC to LC SM fiber patch cord

• 20” Red 14 AWG wire

• 20” Black 14 AWG wire

• 60” Green 14 AWG wire

• 20” spiral sleeving

Caution: Remove Power Before Attempting to Service

• Prepare the frame ground wire

• Strip 1/4” of insulation from the green frame ground wire

Step B: Wire power & frame ground to the Ethernet Switch

• Important - Remove Power - from the cabinet before service

• Attached the power and frame ground wires to the Ethernet

Switch

•Attach the red 14 AWG wire to the +-V input of the A PWR

connector

•Attach the black 14 AWG wire to the G input of the A PWR

connector

•Attach the green 14 AWG wire to the FG input of the A PWR

connector

Step C1: Install 2nd Ethernet Switch using plate method for part number A99-APC1BAI-ACSF revision V and below.

Step A: Prepare the power & frame ground wires

• Prepare the power cord

• Strip 1/4” of insulation from the red and black wires

•Cut the spiral sleeving to 16” and install over red and black wires

Page 1 of 3

*Note: This upgrade kit is only applicable with BA AC cabinet part number A99-APC1BAI-ACSF revision W and above.

Page 2: Ethernet Switch Upgrade Kit Install Instructions A99-BAI-ACSF …support.westell.com/documents/Installation-Guides/030... · 2016-05-11 · 030-300732 rB 04/29/16 Page 3 of 3 Step

westell .com

Ethernet Switch Upgrade Kit Install Instructions

A99-BAI-ACSF-UGKIT

Page 2 of 3

Page 3: Ethernet Switch Upgrade Kit Install Instructions A99-BAI-ACSF …support.westell.com/documents/Installation-Guides/030... · 2016-05-11 · 030-300732 rB 04/29/16 Page 3 of 3 Step

Copyright © 2016 by Westell, Inc. All Rights Reserved. Westell, ClearLink, Kentrox, and Optima

Management System are registered trademarks of Westell, Inc. All other names are trademarks of their

respective owners. Information is correct at time of printing and is subject to change without notice.

Westell, Inc. is an Equal Opportunity/Affirmative Action employer.

westell .com

Ethernet Switch Upgrade Kit Install Instructions

A99-BAI-ACSF-UGKIT

Step 2: Install the second Ethernet switch over the first and re-

install the DIM rail stop

Step D: Connect power and frame ground

•Route and connect the green 14 AWG wire from the Ethernet

switch to the frame ground of the cabinet

•Route and connect the black 14 AWG wire from the Ethernet

switch to the bottom row terminal strip (GND) of the DC power

supply. Install in an open position next to the existing black wire

Step E: Verify work and re-apply power

•Double check the installation and wiring of the second

Ethernet switch

•Re-apply power to the cabinet

Customer & Technical ServicesIf Technical or customer assistance is required, contact Westell by

calling or using one of the following options:

• Call: (800) 377-8766

• Email: [email protected]

Warranty & RepairsWestell warrants this product to be defect-free at shipment time.

Westell also warrants this product to be fully functional for the

time period specified by the terms and conditions governing the

sale of the product. Equipment repairs/modification attempts by

an unauthorized person will void the warranty.

030-300732 rB 04/29/16

Page 3 of 3

Step C2: Install 2nd Ethernet Switch using plate method for part number A99-APC1BAI-ACSF revision W and above.

Step 1: Remove the existing end stop from the Ethernet DIN rail

•Route and connect the red 14 AWG wire from the Ethernet

switch to the top row terminal strip (48DC) of the DC power

supply. Install in an open position next to the existing red

wire