Ethernet Switch Upgrade Kit Install Instructions
A99-BAI-ACSF-UGKIT
Step-by-Step ProcessThe following instructions describes how to field install a second 6
port Ethernet switch into Access Point cabinet, part number
A99-APC1BAI-ACSF.
Note: Access Point cabinets, part number A99-APC1BAI-ACSF that
are revision V and below must have the 2nd Ethernet switch installed
in the vacant AP2 radio location. Each method is described within this
document.Access Point cabinets, part number A99-APC1BAI-ACSF that
are revision W and above can have the 2nd Ethernet switch installed
above the first Ethernet switch using the existing DIN rail.
contents include one each of the following:
• 6 port GigE Ethernet switch, part number A90-ESP8266G
• 1 Gig 20Km 1310 Nm SFP, part number A90-SFP01G-20-31
• 2 meter LC to LC SM fiber patch cord
• 20” Red 14 AWG wire
• 20” Black 14 AWG wire
• 60” Green 14 AWG wire
• 20” spiral sleeving
Caution: Remove Power Before Attempting to Service
• Prepare the frame ground wire
• Strip 1/4” of insulation from the green frame ground wire
Step B: Wire power & frame ground to the Ethernet Switch
• Important - Remove Power - from the cabinet before service
• Attached the power and frame ground wires to the Ethernet
Switch
•Attach the red 14 AWG wire to the +-V input of the A PWR
connector
•Attach the black 14 AWG wire to the G input of the A PWR
connector
•Attach the green 14 AWG wire to the FG input of the A PWR
connector
Step C1: Install 2nd Ethernet Switch using plate method for part number A99-APC1BAI-ACSF revision V and below.
Step A: Prepare the power & frame ground wires
• Prepare the power cord
• Strip 1/4” of insulation from the red and black wires
•Cut the spiral sleeving to 16” and install over red and black wires
Page 1 of 3
*Note: This upgrade kit is only applicable with BA AC cabinet part number A99-APC1BAI-ACSF revision W and above.
westell .com
Ethernet Switch Upgrade Kit Install Instructions
A99-BAI-ACSF-UGKIT
Page 2 of 3
Copyright © 2016 by Westell, Inc. All Rights Reserved. Westell, ClearLink, Kentrox, and Optima
Management System are registered trademarks of Westell, Inc. All other names are trademarks of their
respective owners. Information is correct at time of printing and is subject to change without notice.
Westell, Inc. is an Equal Opportunity/Affirmative Action employer.
westell .com
Ethernet Switch Upgrade Kit Install Instructions
A99-BAI-ACSF-UGKIT
Step 2: Install the second Ethernet switch over the first and re-
install the DIM rail stop
Step D: Connect power and frame ground
•Route and connect the green 14 AWG wire from the Ethernet
switch to the frame ground of the cabinet
•Route and connect the black 14 AWG wire from the Ethernet
switch to the bottom row terminal strip (GND) of the DC power
supply. Install in an open position next to the existing black wire
Step E: Verify work and re-apply power
•Double check the installation and wiring of the second
Ethernet switch
•Re-apply power to the cabinet
Customer & Technical ServicesIf Technical or customer assistance is required, contact Westell by
calling or using one of the following options:
• Call: (800) 377-8766
• Email: [email protected]
Warranty & RepairsWestell warrants this product to be defect-free at shipment time.
Westell also warrants this product to be fully functional for the
time period specified by the terms and conditions governing the
sale of the product. Equipment repairs/modification attempts by
an unauthorized person will void the warranty.
030-300732 rB 04/29/16
Page 3 of 3
Step C2: Install 2nd Ethernet Switch using plate method for part number A99-APC1BAI-ACSF revision W and above.
Step 1: Remove the existing end stop from the Ethernet DIN rail
•Route and connect the red 14 AWG wire from the Ethernet
switch to the top row terminal strip (48DC) of the DC power
supply. Install in an open position next to the existing red
wire