ETAEnvironmental Health and Safety Monthly Metrics
October, 2015
ETA Accidents- 10/15
Type Date Div. Description Severity Status
There were no new ETA injuries reported in October
ETA Accidents- By Type
ETA Accidents- Severity
ETA Emergency Incidents- 10/15
Date Incident Area Status
10/20/15 (ESDR) Pressure reactor vessel explosion inside furnace.
70-295 Formal LBNL investigation being conducted. ORPS submitted. Corrective action plan being developed.
ETA Ergonomic Assessments- By Month
Open ETA Ergonomic Assessments
Date Requested
Div. Type Status
10/26/15 ESDR Preventative Assigned
9/24/15 ESDR Discomfort Actions Pending
8/17/15 EAEI Discomfort Actions Pending
8/17/15 BTUS Discomfort Actions Pending
ETA Incomplete Training Assignments
Training % Completion Status
Incomplete Training by Course Type(Total Incomplete Assignments = 81 )
Training Assignments Due (Total = 81)
Open Assignments by Division Open Assignments by Hire Date
ETA Training Assignments Due
ETA Activity Manager Status(109 Total Work Activities)
ETA “Activity Manager” AssignmentsETA Total Personnel- 692
Electrical Equipment Inspection Failure Status (Red Dot)
Equipment listed in the EEIP database as “failed” and requires repair prior to use.
ETA Failed Electrical Equipment Status (11/2/15)
Barcode Building Room Equipment Name Responsible Person DIV
41961 70 289 Pump Destaillats, Hugo EAEI
45082 71 210 Emitters Iain Walker BTUS
39288 70 278 Power Source Maddalena, Randy EAEI
39289 70 278 AC Line Conditioner Maddalena, Randy EAEI
39304 70 278 Transistorized Power Supply Maddalena, Randy EAEI
28735 70 278 AC Power Source 400-5D Maddalena, Randy EAEI
38777 70 289 Blower Maddalena, Randy EAEI
2444 51F 101 Aethalometer Singer, Brett EAEI
2892 70 173 Power Supply Therkelsen, Peter BTUS
SAA Overall ComplianceHazardous Waste Accumulation
SAA Issues by QuarterHazardous Waste Accumulation
Cumulative SAA Issues (FY Q1 ’12 – Q1 ‘16)
Corrective Action Reports (CATS)- 10/15
CAT #
Date Description Lead Status
9819 4/17/15 Transfer of ownership for existing radiation authorization when PI retires
M. Foure/R. Scholtz
HR exit checkout sheet modified to account for change in ownership.
9881 8/31/15 Ensure all glove boxes are NRTL approved or EEIP inspected.
R. Scholtz Self-assessment action item
9882 8/31/15 Ensure all glove boxes have hazard and e-power information affixed.
R. Scholtz Self-assessment action item
9899 10/8/15 Proper storage of round bottom reaction flasks in 62-308
B. McCloskey Self-assessment action item
9900 10/8/15 Proper storage of solvents located under 70-206 sink
V. Battaglia Self-assessment action item
ORPS 10/21/15 70-295 pressure reactor explosion incident
W. Wells/R. Scholtz/E. Cairns
Formal LBNL incident investigation being performed
Audits and Inspection Status- 10/15
Type Date Lead Status
Quarterly SAA Inspections
10/26/15 R. Scholtz Completed
Fire Marshal Inspection- Building 51F
10/8/15 S. Synarski Completed
Lab Area Stand-down (ESDR)
11/13/15 R. Kostecki Scheduled. Check sheet being developed.
Lab Area Stand-down (EAEI & BTUS)
11/20/15 A. Lekov/R. Diamond
Scheduled. Check sheet being developed.
DOE Lab Area NFPA 45 Walkthrough
11/16/15 DOE/BSO Lab Areas TBD
Significant Safety Achievements- 10/15• Follow-up regarding the 70-295 pressure reactor incident is on-going:
– All ETA technical areas were searched for pressure reactors. Several found.
– All ETA lab areas surveyed for pressure/high temperature equipment.
– ETA Work Activities with high pressure hazards were reviewed and areas visited.
– Participated in the LBNL incident review.
– Safety Alert issued regarding requirements for pressure reactors.
• The old chemical clean-out in 70-264 has been completed and made ready for new occupants.
• The 2016 Self Assessment Plan has been completed and submitted to OCA.
• The Chemical Spill Preparedness Self Assessment project report has been completed and submitted to OCA.
• All ETA work activities were migrated to their individual divisions.
• All ETA chemical inventories in CMS were migrated to their individual divisions.
• Quarterly SAA hazardous waste inspections were completed.
• An ETA Safety Committee meeting was held.
Short Term Safety Outlook 11/15
• Participate in the lab area stand-downs scheduled for 11/13 and 11/20.
• Participate in the DOE lab area NFPA 45 walkthroughs of ETA lab areas.
• Provide follow-up regarding the 70-295 pressure reactor incident as required. Work Activity updates, training, etc. planned.
• Continue to address ETA equipment on the electrical equipment “fail” list.
• Complete the final 5 Work Activities pending in EHS collaboration. These are for B33 JCESR.
• Complete the set-up for new lab areas B33 JCESR and B60 air conditioning test chambers.
• Complete CATS items identified from glove box self-assessment project.
• Develop standardized spill cleanup kits for ETA lab areas.