Rob Connatser Chief Instrument Project Engineer
ESS Fundamentals
Baseline Parameter Unit Value
Average beam power MW 5
Number of target stations 1
Number of instruments in construction budget 22
Number of beam port positions 50
Number of moderators (bi-spectral: thermal & cold) 2
Separation of beam ports positions ° 5
Proton kinetic energy GeV 2.5
Average macro-pulse current mA 50
Macro-pulse length ms 2.86
Pulse repetition rate Hz 14
Maximum linac length m 482.5
ESS: The Artists
Version
Target Module
• Rotating tungsten target • Proposed He cooling • Moderators: Cold & thermal • Image of target wheel removal
(preliminary)
Key Parameters
Parameter Unit Value Average beam power MW 5 Number of target stations 1
Number of beam port positions 50
Number of beam ports by 2025 22
Number of instruments in construction budget 22
Separation of beam ports degrees 5
Number of moderators (bi-spectral: thermal & cold) 2
Proton kinetic energy GeV 2.5 Average macro-pulse current mA 50
Macro-pulse length ms 2.86 Pulse repetition rate Hz 14 Maximum linac length m 482.5
Long-Pulse Principle
0 1 2 3 time (ms)"
Cold coupled moderators λ=5Å
Brightness (n/cm2/s/ster/Å)
1014
ISIS TS1 ISIS TS2 SNS ILL
Schedule
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Commissioning and Initial Ops Full Operations Instrument Construction Phase
Instruments 4-‐7 Instruments 1-‐3
Instruments 8-‐9 Instruments 10-‐12
Instruments 13-‐14 Instruments 15-‐17
Instruments 18-‐20 Instruments 21-‐22
ScientiBic Operations
Programme Organization ESS
Programme
Accelerator Systems
Conventional Facilities Energy Integrated Control
Systems Neutron
Scattering Systems
Instrument Concepts
SANS
Concept #1
Concept #N
Instrument Construction
Instrument #1
Component 1
Component N e.g. detector
Instrument #2-22 + Test beamline
Neutron Technologies
Chopper systems
Detector systems
Sample Environment
Neutron Optics & Polarisation
Electrical Engineering
Neutron Science Support Facilities DMSC
Target Station Systems
Support
• Develop Systems Engineering processes and documentation
• Develop Engineering processes • Coordinate and negotiate interfaces with
Target Systems and Conventional Facilities • Develop requirements for conventional
facilities
Current Activities
Layout of Potential Instruments
• Develop Systems Engineering processes and documentation
• Develop Engineering processes • Coordinate and negotiate interfaces with
Target Systems and Conventional Facilities • Develop requirements for conventional
facilities • Write processes
Current Activities
Decision to move forward
Approved Baseline Design, Cost
and Schedule
Readiness for “Hot”
Commissioning
“Hot” Commissioning and Operations
Accepted instrument
Phase 1 – Preliminary Engineering Design and Baseline
Phase 2 – Final Engineering Design and Installation Plan
Engineering Review
Phase 3 – Construction and Installation
Phase 4 – Beam Testing and cold Commissioning
Safety Systems Review
• Develop Systems Engineering processes and documentation
• Develop Engineering processes • Coordinate and negotiate interfaces with Target
Systems and Conventional Facilities • Develop requirements for conventional facilities • Write processes • Hire people:
ess-scandinavia.eu/open-positions
Current Activities
• Thanks to many colleagues for contributions to slides and for whole slides. – Ken Anderson – Arno Hiess – Erik Nilsson – Oliver Kirstein