ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design...

25
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski

Transcript of ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design...

Page 1: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

ESS Cryogenic Distribution Systemfor the Elliptical Linac

CM - CDS requirements

Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden

J. Polinski

Page 2: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_010

The physical interface between the CDS and medium beta cryomodules shall include the connection of a four-channel branch cryoline (jumper connection) and the connections of the cryomodule auxiliary process lines to the SV relief line, the recovery line and the purge return line.

CTL

Aux. Lines

Valve Box

Page 3: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_020

Connection between the vacuum jackets of the cryomodule and valve box shall be demountable

The connection will be realized with a demountable bolted flange

Page 4: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_025

The leak rate through the vacuum jacket connection shall not exceed 1.0E-10 mbar*l/sec

The specified max leakage level is a few orders of the magnitude too low for the large-diameter elastomer seals. This value should be revised.

NASA Technical Note D-4394, An Investigation of o Large-dimeter O-ring Seals On Spacecraft Air-lock Hatches

Page 5: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_030, 040

Connection between the process pipes of the cryomodule and valve box shall be permanently welded

Connection between the process pipes of the cryomodule and valve box shall allow for cutting and rewelding at least two times such that no cutting shavings and/or chips will get into the process pipes.

Using the special designed welding flanges on the process pipes

Page 6: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_035

The leak rate through each pipe connection shall not be higher than 1.0E-10 mbar*l/sec

1.Appropriate welding technique, 2.Non-destructive (X-ray, leak tightness) test after the weld realization

Page 7: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_050

The vacuum barrier that separates the insulation vacuum of the cryomodule and cryogenic distribution system shall be located in the jumper connection on the CDS side.

1.Appropriate design, 2.Inspection during the installation

Page 8: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_055

The leak rate through the vacuum barrier shall not be higher than 1.0E-8 mbar*l/sec

Leak tightness test during the production and commissioning

Page 9: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_060

Process pipe connections in the valve box jumper connection shall allow for adjustments of +/- 15 mm radially w.r.t. the pipe center line and + 20/- 35 mm longitudinally w.r.t. the process pipe interface plane

For process pipes up to DN10 - using the pipe elasticity, for larger pipe size - application of the elastic hose.

Page 10: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_070

Vacuum jacket (external envelope) in the valve box jumper connection shall allow for adjustments of +/- 5 mm radially w.r.t. vacuum jacket center line and +/- 10 mm longitudinally w.r.t. the vacuum jacket interface plane

Using the bellows in the valve box jumper connection vacuum jacket

Page 11: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_080

The thermal shield inlet line (BE) shall supply helium at a maximum operating temperature of 45 K

1. Requirement of 38K temperature helium inlet to the TS Supply line from the ACCP side ACCP-CDS-L4-190

2. Limitation of the heat flux to the CDS ME process line by the mechanical optimization of the pipe support system,

3. Thermo-mechanical optimization of the supports design and appropriate thermal insulation system design.

4. Requirement of the specific helium flow at the inlet to the CDS ME line from the ACCP side.

Page 12: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_090

The thermal shield inlet line (BE) shall supply helium at a maximum operating pressure of 19.5 bara

1. Requirement of max 19.5 bara of helium pressure at inlet to the TS Supply line from the ACCP side - ACCP-CDS-L4-210

2. Calculation of the pipe wall thickness in accordance with EN 13480-3

Page 13: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_100, 110

The thermal shield inlet line (BE) shall supply helium a minimum operating mass-flow of 0.93 g/s (nominal operation)

The thermal shield inlet line (BE) shall supply helium a minimum operating mass-flow of 2.2 g/s (cool-down phase)

Calculation of the required cross-section area (diameter) of the BE and ME lines with respect of allowed flow pressure drop.

Verification method – Measurement??? -TBD

Page 14: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_120, 130

The thermal shield circuit shall be protected by a safety valve with a set pressure of xxx barg

The thermal shield circuit shall be protected by a safety valve with a minimum relieving diameter equal to xxx

This information shall be provided by the CM manufacturer by the end of the June 2015

Page 15: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_140

The supercritical inlet line (BC) shall supply helium at a maximum operating temperature of 5.5 K – contradiction with CDS-HBL-L4-050 where Tmax is 5.2

1. Requirement of 4.5K temperature helium inlet to the He Supply line from the ACCP side ACCP-CDS-L4-060

2. Limitation of the heat flux to the CDS MC process line by the mechanical optimization of the pipe support system,

3. Thermo-mechanical optimization of the supports design and appropriate thermal insulation system design.

4. Requirement of the specific helium flow at the inlet to the CDS MC line from the ACCP side.

Page 16: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_150

The supercritical inlet line (BC) shall supply supercritical helium at a maximum of 3 bara

1. Requirement of max 3.0 bara of helium pressure at inlet to the He Supply line from the ACCP side - ACCP-CDS-L4-080

2. Calculation of the pipe wall thickness in accordance with EN 13480-3

Page 17: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_160

The supercritical inlet line (BC) shall supply helium at a minimum operating mass-flow of xxx g/s

1. Calculation of the required cross-section area (diameter) of the MC and BC lines with respect of allowed flow pressure drop.

2. The mass flow shall be provided by the CM manufacturer by the end of the June 2015

Page 18: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_160

The supercritical inlet line (BC) shall supply helium at a minimum operating mass-flow of xxx g/s

1. Calculation of the required cross-section area (diameter) of the MC and BC lines with respect of allowed flow pressure drop.

2. The mass flow shall be provided by the CM manufacturer by the end of the June 2015

Page 19: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_170

Vapor Low Pressure (VLP) line (BB) shall return helium at a maximum operating pressure of 30 mbara

Calculation of the pipe wall thickness in accordance with EN 13480-3

Page 20: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_180

CM safety valve relief lines (BS3 and SS2) shall return helium at a maximum operating pressure of 1.1 bara

Calculation of the pipe wall thickness in accordance with EN 13480-3

Page 21: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_190

CM safety valve relief lines (BS3 and SS2) shall return helium at a maximum operating mass-flow of xxx g/s

1. Calculation of the required cross-section area (diameter) of the pipe with respect of allowed flow pressure drop.

2. The mass flow shall be provided by the CM manufacturer by the end of the June 2015

Page 22: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_200

Power-coupler return line (SR1) shall return helium at a maximum operating pressure of 1.1 bara

Calculation of the pipe wall thickness in accordance with EN 13480-3

Page 23: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_210

Power-coupler return line (SR1) shall return helium at a maximum operating mass-flow of xxx g/s

1. Calculation of the required cross-section area (diameter) of the pipe with respect of allowed flow pressure drop.

2. The mass flow shall be provided by the CM manufacturer by the end of the June 2015

Page 24: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_220

Cavity purge return line (SP) shall return helium at a maximum operating pressure of 1.1 bara

Calculation of the pipe wall thickness in accordance with EN 13480-3

Page 25: ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.

L4-CDS-MBL_230

The allowable working pressure of the VLP return line, measured at the valve box side of the heat exchanger, shall be minimum 1430 mbar(a) (Requirements valid during warm up and cool down phases)

Calculation of the pipe wall thickness in accordance with EN 13480-3