ESR ISOLATION CURB RT-7 FLOOR - Kinetics Noise · 2020. 5. 20. · rt-7 panels rt-7 panels...

5
DRAWN BY LAST DATE REVISED DRAWING NO. SS-ESSR / RT-7 JMP 3/26/20 SS-11 ESR ISOLATION CURB ESR ISOLATION CURB ROOF OPENING RT-7 PANELS RT-7 PANELS NOTE: UNLESS OTHERWISE NOTED, FLOOR PANELS ARE TO BE FIELD INSTALLED, AFTER ESR CURB ASSEMBLY. Transmission Loss dB Frequency Hz Calculated TL 63 16* 125 24 250 26 500 32 1000 42 2000 56 4000 62 8000 59* STC 37 *ASHRAE HANDBOOK 2017, CHAPTER 8, EQUATION 39 RT-7 FLOOR

Transcript of ESR ISOLATION CURB RT-7 FLOOR - Kinetics Noise · 2020. 5. 20. · rt-7 panels rt-7 panels...

  • DRAWN BYLAST DATEREVISED DRAWING NO.

    SS-ESSR / RT-7JMP3/26/20SS-11

    ESR ISOLATION CURB

    ESR ISOLATION CURB

    ROOFOPENING

    RT-7 PANELS

    RT-7 PANELS

    NOTE: UNLESS OTHERWISE NOTED,FLOOR PANELS ARE TO BE FIELDINSTALLED, AFTER ESR CURB ASSEMBLY.

    Transmission Loss dB

    Frequency Hz

    Calculated TL

    63

    16*

    125

    24

    250

    26

    500

    32

    1000

    42

    2000

    56

    4000

    62

    8000

    59*

    STC

    37

    *ASHRAE HANDBOOK 2017, CHAPTER 8, EQUATION 39

    RT-7 FLOOR

  • DRAWN BYLAST DATEREVISED DRAWING NO.

    SS-FCBO / RT-7JMP3/26/20SS-11

    FACTORY CURB

    FACTORY CURB(BY OTHERS)

    (CURB DESIGN MAY VARY)

    ROOFOPENING

    RT-7 PANELS

    RT-7 PANELS

    Transmission Loss dB

    Frequency Hz

    Calculated TL

    63

    16*

    125

    24

    250

    26

    500

    32

    1000

    42

    2000

    56

    4000

    62

    8000

    59*

    STC

    37

    *ASHRAE HANDBOOK 2017, CHAPTER 8, EQUATION 39

    NOTE: UNLESS OTHERWISE NOTED,FLOOR PANELS ARE TO BE FIELDINSTALLED, AFTER ESR CURB ASSEMBLY.

    RT-7 FLOOR

  • DRAWN BYLAST DATEREVISED DRAWING NO.

    SS-KSR / RT-7JMP3/26/20SS-11

    KSR ISOLATION RAIL

    FACTORY CURB(BY OTHERS)(CURB DESIGN MAY VARY)

    ROOFOPENING

    RT-7 PANELS

    RT-7 PANELS

    Transmission Loss dB

    Frequency Hz

    Calculated TL

    63

    16*

    125

    24

    250

    26

    500

    32

    1000

    42

    2000

    56

    4000

    62

    8000

    59*

    STC

    37

    *ASHRAE HANDBOOK 2017, CHAPTER 8, EQUATION 39

    NOTE: UNLESS OTHERWISE NOTED,FLOOR PANELS ARE TO BE FIELDINSTALLED, AFTER ESR CURB ASSEMBLY.

    RT-7 FLOOR

    KSR ISOLATION RAIL

  • DRAWN BYLAST DATEREVISED DRAWING NO.

    SS-KIP / RT-7JMP3/26/20SS-11

    KIP-RT ISOLATION STRIPS

    FACTORY CURB(BY OTHERS)(CURB DESIGN MAY VARY)

    ROOFOPENING

    RT-7 PANELS

    RT-7 PANELS

    Transmission Loss dB

    Frequency Hz

    Calculated TL

    63

    16*

    125

    24

    250

    26

    500

    32

    1000

    42

    2000

    56

    4000

    62

    8000

    59*

    STC

    37

    *ASHRAE HANDBOOK 2017, CHAPTER 8, EQUATION 39

    NOTE: UNLESS OTHERWISE NOTED,FLOOR PANELS ARE TO BE FIELDINSTALLED, AFTER ESR CURB ASSEMBLY.

    RT-7 FLOOR

    KIP-RT ISOLATION STRIP

  • DRAWN BYLAST DATEREVISED DRAWING NO.

    SS-KSCR / RT-7JMP3/26/20SS-11

    KSCR ISOLATION CURB

    ROOFOPENING

    RT-7 PANELS

    RT-7 PANELS

    Transmission Loss dB

    Frequency Hz

    Calculated TL

    63

    16*

    125

    24

    250

    26

    500

    32

    1000

    42

    2000

    56

    4000

    62

    8000

    59*

    STC

    37

    *ASHRAE HANDBOOK 2017, CHAPTER 8, EQUATION 39

    NOTE: UNLESS OTHERWISE NOTED,FLOOR PANELS ARE TO BE FIELDINSTALLED, AFTER ESR CURB ASSEMBLY.

    RT-7 FLOOR

    KSCR ISOLATION CURB