Transcript of ESO eHealth-INTEROP FinalReport ... eHealth-INTEROP Report Page vii Foreword to the eHealth-INTEROP...

  • eeHHeeaalltthh--IINNTTEERROOPP RReeppoorrtt

    iinn rreessppoonnssee ttoo eeHHeeaalltthh IInntteerrooppeerraabbiilliittyy SSttaannddaarrddss

    MMaannddaattee ((SSAA//CCEENN//EENNTTRR//000000//22000077--2200 eeHHeeaalltthh MMaannddaattee MM//440033 –– PPhhaassee 11))

    hhttttpp::////wwwwww..eehheeaalltthh--iinntteerroopp..eeuu

    httttp::////www..ehealltth--iintterrop..eu

  • eHealth-INTEROP Report

    Page ii

  • eHealth-INTEROP Report

    Page iii

    Document Information: SA/CEN/ENTR/000/2007-20 eHealth Mandate M/403 – Phase 1 Report

    Warning

    This Report was produced under a contract from the European Commission, managed by NEN. 5

    The views expressed may not in any circumstances be regarded as stating an official position.

    Neither the European Commission, nor NEN, nor any person acting on behalf of either, is responsible for the opinions expressed or the use that might be made of the material included.

    10

    Document Location: http://www.ehealth-interop.eu Validity: From date of publication until approval by ESOs, EC and EFTA. File name: ESO_eHealth-INTEROP_FinalReport_v1000-plain-cover.doc

    Change History Summary:

    Date Version (n.Nnn)

    Changes file name format: ESO_eHealth-

    INTEROP_v0Nnn_CCYYMMDD.doc

    2008-04-01 < 2008-05-19 0.001 – 0.024 Internal PT drafts.

    2008-05-19 0.025 Interim draft as background information to Wider Co-ordination Group meeting on 2008-05-28.

    2008-06-06 < 2008-06-24 0.100 – 0.117 Responses to Gothenburg consultation included – much re-organised and new content added.

    2008-06-24 0.200 Second draft to Wider Co-ordination Group meeting and for general comment.

    2008-07-15 0.300 Third draft as pdf file to website for general comment.

    2008-08-25 0.400 For i2010 and WCG review.

    2008-09-19 0.500 v0454 saved as v0500 and converted to pdf for public comment.

    2008-11-26 < 2008-12-18 0.600 – 0.623 Post-comment internal editing.

    2008-12-19 0.700 - 0.703 Final internal editing.

    2008-12-23 0.920 Pre-approval Report to ESO TCs – Refs completed

    2009-02-10 1.000 Final version approved by CEN, CENELEC and ETSI 15

    Editorial project team:

    Pantelis Evangelidis, Georg Heidenreich, Charles Parisot, Melvin Reynolds (lead editor). 20

    Please submit any comments on this document to:

    Ms Mary van den Berg Standardization administrator

    [email protected] Tel.+ 31 152 690390 Fax + 31 152 690190

    Ms. Shirin Golyardi Standardization consultant

    [email protected] Tel.+ 31 152690313 Fax + 31 152690563

    NEN-Healthcare Vlinderweg 6 NL-2623 AX Delft

    http://www.ehealth-interop.eu

  • eHealth-INTEROP Report

    Page iv

  • eHealth-INTEROP Report

    Page v

    Contents Contents ................................................................................................................................... v Foreword to the eHealth-INTEROP Report.............................................................................vii Guide to the reader ................................................................................................................. ix Summary of the eHealth-INTEROP Report............................................................................. xi 5 eHealth-INTEROP Report ........................................................................................................1

    1 Scope..............................................................................................................................3 2 Background.....................................................................................................................5

    2.1 Market influences...............................................................................................................5 2.2 Definitions ........................................................................................................................12 10

    3 Standards......................................................................................................................21 3.1 General introduction to standards activities.....................................................................21 3.2 ESO Standards activities .................................................................................................21 3.3 Other Standards activities................................................................................................24 3.4 SDO coordination in eHealth ...........................................................................................37 15 3.5 Standards deliverables ....................................................................................................38 3.6 Standards process...........................................................................................................39 3.7 Barriers to standards adoption.........................................................................................41 3.8 Standards inventory .........................................................................................................44 3.9 The safety / security, privacy dilemma.............................................................................46 20

    4 Standards Adoption and Lifecycle ................................................................................47 4.1 General considerations....................................................................................................47 4.2 Achieving interoperability in eHealth................................................................................47 4.3 The different classes of standards-related specifications................................................49 4.4 From standards-related specifications to quality implementations..................................53 25 4.5 Establishing organisation, coordination and governance ................................................57 4.6 International experience ..................................................................................................63

    5 Inventory of requirements .............................................................................................65 5.1 Requirements analysis ....................................................................................................65 5.2 Business requirements and use cases............................................................................66 30 5.3 Requested eHealth application topics .............................................................................67

    6 Proposed workplan strategy .........................................................................................75 6.1 General strategy ..............................................................................................................75 6.2 Overall coordination and governance strategy................................................................75 6.3 Use cases strategy ..........................................................................................................78 35 6.4 Base standards development and maintenance strategy ...............................................80 6.5 Profile development and maintenance strategy ..............................................................82 6.6 Profile implementation quality assurance strategy ..........................................................83 6.7 Best Practice Forum strategy ..........................................................................................84 6.8 Workplan summarised .....................................................................................................84 40

    7 Conclusions ..................................................................................................................87 7.1 General ............................................................................................................................87 7.2 Background – conclusions...............................................................................................87 7.3 Existing standards activity – conclusions ........................................................................87 7.4 Standards adoption and lifecycle – conclusions..............................................................88 45 7.5 Inventory of requirements – conclusions .........................................................................89 7.6 Workplan strategy – conclusions.....................................................................................90 7.7 EU Study on the specific policy needs for ICT standardization.......................................91

    8 Proposals ......................................................................................................................93 8.1 General proposals............................................................................................................93 50 8.2 Business use case definition and prioritisation................................................................93

  • eHealth-INTEROP Report

    Page vi

    8.3 Base Standards development..........................................................................................94 8.4 Profile development and maintenance ............................................................................95 8.5 Profile quality assurance, test plans and tools ................................................................95 8.6 Sharing of best practices in deploying eHea