ESIC udyogamandal

download ESIC udyogamandal

of 15

Transcript of ESIC udyogamandal

  • 8/13/2019 ESIC udyogamandal

    1/15

    Diagram

    Server room

    Google maps

    Customer building ground

    floor only

  • 8/13/2019 ESIC udyogamandal

    2/15

  • 8/13/2019 ESIC udyogamandal

    3/15

  • 8/13/2019 ESIC udyogamandal

    4/15

  • 8/13/2019 ESIC udyogamandal

    5/15

    andal

  • 8/13/2019 ESIC udyogamandal

    6/15

  • 8/13/2019 ESIC udyogamandal

    7/15

  • 8/13/2019 ESIC udyogamandal

    8/15

    WO No

    Company Name & Contact person Name

    ESIC BO,UP

    X/383,Udyogamandal,683501

    WO DateSurvey completed Date 12/7/2010

    Parameters for RELIANCE BTS & CPE

    BTS Name &BTS Address with Site ID Near IOB bank,udyogamandal.

    BTS Lat Long 10 04 21.9 76 18 33.8

    BTS TOWER Height from the Ground 35mtr

    Is there any PTP Links existing in the BTSEnd?(Y/N) No

    If "Yes" how many? And what Polarization NA

    Is there any PTP Links existing in the Customer

    End? No

    If "Yes" how many? And what Polarization NA

    Is there any High power tension wire near by

    the customer No

    If yes,How many meter from the customer?

    and what is the hight of HT Line? & Photgraph

    need to attached herewith NA

    Is there any River,Lake or Sea in RF Path? If yes

    , what is the % of RF path, Need to attach the

    Google Map and Photgraph No

    Distance between CPE location and nearest

    Airport. 50km

    Is direct Line Of Sight available? No

    Is building owned by customer (Y/N) yes

    Is access to terrace of building freely available

    (Y/N) NO

    Is there any existing Pole/Mast in customer

    Place ? NO

    Mounting of ODU on Pole/Mast Mast

    Mast/Pole position agreed by the customer or

    not? Na

    What is the Pole/Mast height recommended. 24m

    Note:- Reports validity 3 months only-It starts from

    BTS

    CPE

    COMMON I

  • 8/13/2019 ESIC udyogamandal

    9/15

    What is the type of pole erection

    recommended?(floor mount/Wall mount) NA

    Erection of Mast (roof based/ground based) Ground Based

    Is customer place in Costal Area(Near by sea

    shore) NoLocation of Server Room( IDU Place) Ground floor

    Cable Length CAT 5e (App.) Not more than 95

    M. 90MCustomer agreed to route cable from terrace to

    customer premises (Server Room) (Y/N) Na

    Is Earthling Point near ODU available at the

    terrace?(Y/N)If yes length of earthing cable) No

    Length of Earth Cable from IDU to Earth

    Strip/Earth Pit Na

    Is space for mounting IDU provided in server

    room *(Y/N) Yes

    Is stabilized 230 Volts AC Power Supply with

    UPS back up available with back up time) * No

    Whether the Block Diagram of the Pole

    Location Attached with customer

    acknowledgement? ( Diagram is

    Mandatory) Yes

    Remarks

    Site is feasible with 24 mt mast,

    due to Trees obstructions are

    there.

    Additional Remarks

    All the new P2P surveys that it is valid for three

  • 8/13/2019 ESIC udyogamandal

    10/15

    Zone/Region/Location South/Kerala/Cochin

    Engineer Name Jagan kumar

    Technician name NAContact number 8086848815

    Remarks

    ate when the feasibility reports reached the customer.

    ETAILS

    ETAILS

    FORMATION

  • 8/13/2019 ESIC udyogamandal

    11/15

    there is no UPS power

    months from date of submission of correct reports

  • 8/13/2019 ESIC udyogamandal

    12/15

    U LINK Engineering Tool Rev_00Data Input Site A (NW Uplink ) Site B

    Site Name

    Near IOBbank,udyogamandal.

    ESIC BO,UP

    X/383,Udyogamandal,683501

    Co-ordinate

    Latitude DD MM SS 10 04 21.9 10 04 29.3

    Longitude DD MM SS 76 18 33.8 76 18 47.5

    Elevation m 14 8

    Tower Height m 35 24

    Building Height m 0 0

    Frequency Band GHz

    Frequency Spots MHz 5835 5835

    Antenna Type (Main) Built In Built InAntenna CL (AGL) m 27 21

    Antenna Size m 5.8 GHz Built In 5.8 GHz Built In

    Polarization (CAPITAL)

    Interface Required

    IDD Model

    Customer BW(Kbps)

    RF Channel

    Type

    MaxTx Power At Ant Port dBm 16 16

    Rx Threshold @ 10^-6 dBm

    Field Tx Power Reqd 16 16

    Fresnel Zone Clearance Criteria dB

    Diffraction Loss dB

    Radio Model

    Tx Loss/100 m dB

    Tx Line Length (Main) m

    Customer Type m

    Availability Objective %

    Field Margin dB

    Type of Terrain

    PL

    Annual Avg Temp( F)

    Interference Fade Margin

    Dispersive Fade Occurrence Factor

    VARIABLES Near IOB bank,udyoga ESIC BO,UP X/383,Ud

    Co-Ordinates

    Lat (Decimal) 10.0728 10.0748

    Long (Decimal) 76.3094 76.3132

    Azimuth 61.25033498 -118.7489994

    61.25033498 241.2510006

    Degree 61 241

    Min 15 15

    Sec 1 4

    C0 dB

    Clat

    Clon

    PathSlop (m/Km)

    Path Inclination Degree

    -25.24966749

    1.446392053

    -86.0

    0

    0

    FA4824

    Enterprise

    99.9

    75

    5.8

    V

    Ethernet

    12 Mbps

    5

    6

    64

    10

    Ptp Radio

    2

    400-700 m - Hills

    50

    60%

    0.0

  • 8/13/2019 ESIC udyogamandal

    13/15

    U LINK Engineering Tool Rev_00Work Sheet

    Near IOB

    bank,udyoga

    mandal.

    ESIC BO,UP

    X/383,Udyoga

    mandal 68350Co-ordinate

    Latitude DD MM SS 10 04 21.9 10 04 29.3

    Longitude DD MM SS 76 18 33.8 76 18 47.5

    Elevation m 14 8

    True Azimuth Degree 61.25 241.25

    Tower Height m 35.00 24.00

    Building Height m 0.00 0.00

    Radio Model FA4824 FA4824

    Tx Loss/100 m dB 0 0

    Tx Line Length m 0 0

    Tx Line loss dB 0 0

    Antenna Type Built In Built InAntenna CL m 27 21

    Antenna Size m 5.8 GHz Built In 5.8 GHz Built In

    Antenna Gain dBi 22 22

    Path Length Km 0.48

    Frequency Band GHz 5.8

    Frequency Spots MHz 5835 5835

    Polarization V

    Radio Model Ethernet Ethernet

    Capacity Mbps 12 Mbps 12 Mbps

    Type Ptp Radio Ptp Radio

    Tx Power dBm 16 16

    Rx Threshold @ 10^-6 dBm -86.0 -86.0

    Dispersive Fade Margin dBmFresnel Zone Clearance Criteria dB 0.6

    Diffraction Loss dB 0.0

    Free Space Loss dB 101.21

    DESIGNRSL dBm -43.21

    Dispersive Fade Occurrence Factor 5.0

    Thermal Fade Margin dB 42.79

    Flat Fade Margin dB 42.79

    Effective Fade Margin dB 42.79

    Geoclimatic Factor 4.4404E-05

    T0 0.3750

    Path Inclination mrad 25.24Worst month % Outage (ITU-R-P.530- % 7.9043E-12

    Worst Month Availability % 100.00000

    Worst Month Unavailability Seconds 0.00

    Annual % Mulipath Outage 2.9641E-12

    Annual Availability (Multipath) % 100.00000

    Annual Unvailability (Multipath) Seconds 0.00

    MESSAGE BOARDDesign

    Min Antenna Clearance is

    LOS Clearance

    Receiver Overload No

    3.0

    YES

    Okay

  • 8/13/2019 ESIC udyogamandal

    14/15

    U LINK Engineering Tool Rev_00

    Sr.No

    Dista

    nce

    From

    Site1

    Eleva

    tion

    Dista

    nce

    FromOther

    En

    d

    Obstru

    ction

    Height

    Obstru

    ction

    Type

    EarthBulge

    Effec

    tive

    EarthBulge

    ForK=1.33

    Effec

    tive

    EarthBulge

    ForK=0.67

    FresnelZone

    Clear.

    Effec

    tive

    Eleva

    tion

    LO

    S

    Eleva

    tion

    A B C D E F G H I G

    PL-B

    0.0785*B*D

    F/1.33

    F/0.67

    17.32*sqrt

    ((B*D)/

    (Freq*PL))

    C+MAX((G+I),

    (H+0.60*I))+E

    (H2-H1)/PL*B

    (Km) m m m m m

    1 0.00 14 0.48 0.00 0 0 0.00 14.0 41.0

    2 0.13 13 0.35 18 Trees 0.00 0.00 0.01 1.33 32.3 37.7

    3 0.17 12 0.31 18 Trees 0.00 0.00 0.01 1.43 31.4 36.7

    4 0.19 11 0.29 18 Trees 0.00 0.00 0.01 1.46 30.5 36.2

    5 0.21 10 0.27 21 Trees 0.00 0.00 0.01 1.48 32.5 35.7 6 0.24 8 0.24 20 Trees 0.00 0.00 0.01 1.49 29.5 34.9

    7 0.36 6 0.12 15 Trees 0.00 0.00 0.00 1.27 22.3 31.9

    8 0.39 7 0.09 18 Trees 0.00 0.00 0.00 1.14 26.1 31.2

    9 0.45 8 0.03 18 Trees 0.00 0.00 0.00 0.67 26.7 29.6

    10 0.48 0.00 0.00 0.00 0.00 0.0 41.0

    11 0.48 8 0.00 0.00 0.00 0 0.00 8.0 29.0

    2.570992

    Note (i) Profile must be plotted for distance between the points less than 1 Km.

    (ii) Pls do not delete the ROWS if the intermediate points are less than 10Also do not enter zero in unused rows. Leave them as it is

    (iii) Do not delete the formulas if you do not enter any values in the intermediate po

    Surveyors Name:-

    Contact Details:- Jagan

    Terrain Roughness

    Profile For Near IOB bank,udyogamandal. To ESIC BO,UP X/383,Udyoga

  • 8/13/2019 ESIC udyogamandal

    15/15

    U LINK Engineering Tool Rev_00

    0.0

    5.0

    10.0

    15.0

    20.0

    25.0

    30.0

    35.0

    40.0

    45.0

    0.

    00

    16.

    30

    Profile From Site A to Site B

    Designed by NPE LMDS 208259242.xls.ms_office Page:15/15