ES Implementation Process

download ES Implementation Process

of 43

Transcript of ES Implementation Process

  • 7/28/2019 ES Implementation Process

    1/43

    iGATE Global Solutions Limited

    Classification: Company Internal

    ES IMPLEMENTATION PROCESS

    Prepared by Role Date of preparation

    Sujatha Jogi Quality December 28, 2008

    Reviewed by Role Date of Review

    Lakshmi Narasimhan Komandur

    Suresh Thiagarajan

    Manager SEPG

    GQM-QualityDecember 30, 2008

    Approved by Role Date of Approval

    Elizabeth Koshy Program Manager Process & Metrics February 9, 2009

    Circulation Listhttps://my.igate.com/ipoint/quality/processes.jsp

    VersionNumber

    1.1

    https://my.igate.com/ipoint/quality/processes.jsphttps://my.igate.com/ipoint/quality/processes.jsphttps://my.igate.com/ipoint/quality/processes.jsphttps://my.igate.com/ipoint/quality/processes.jsphttps://my.igate.com/ipoint/quality/processes.jsp
  • 7/28/2019 ES Implementation Process

    2/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 2 of 43

    Classification: Company Internal

    TABLE OF CONTENTS

    1. OBJECTIVE ....................................................................................................................................... 4

    2. SCOPE ............................................................................................................................................... 4

    3. ENTRY CRITERIA ............................................................................................................................. 4

    4. INPUT ................................................................................................................................................. 4

    5. PARTICIPANTS ................................................................................................................................. 4

    6. HIGH LEVEL PROCESS STEPS ...................................................................................................... 4

    7. OUTPUT ............................................................................................................................................. 5

    8. EXIT CRITERIA ................................................................................................................................. 6

    9. METRICS ........................................................................................................................................... 6

    9.1 EFFORT VARIANCE ...................................................................................................................... 69.2 SCHEDULE VARIANCE ................................................................................................................. 69.3 DEFECT REMOVAL EFFICIENCY ................................................................................................ 6

    9.4

    DEFECT INJECTION RATE ........................................................................................................... 69.5 PRODUCTIVITY ............................................................................................................................. 6

    9.6 COST OF QUALITY ....................................................................................................................... 6

    10. IMPLEMENTATION PROCESS ORACLE & PEOPLESOFT PRACTICE .................................... 6

    10.1 DEFINITION PHASE .................................................................................................................. 610.2 OPERATIONS ANALYSIS .......................................................................................................... 710.3 SOLUTION DESIGN ................................................................................................................... 810.4 BUILD ........................................................................................................................................ 1010.5 TRANSITION ............................................................................................................................ 1210.6 TRAINING ................................................................................................................................. 1310.7 PRODUCTION .......................................................................................................................... 14

    11. IMPLEMENTATION PROCESS SAP PRACTICE ....................................................................... 16

    11.1

    PROJECT PREPARATION ...................................................................................................... 16

    11.2 SIZING & BLUEPRINT ............................................................................................................. 2011.3 FUNCTIONAL DEVELOPMENT ............................................................................................... 2311.4 FINAL PREPARATION ............................................................................................................. 2811.5 GO-LIVE & SUPPORT .............................................................................................................. 30

    12. IMPLEMENTATION PROCESS SIEBEL PRACTICE.................................................................. 31

    12.1 SCOPING & ANALYSIS ........................................................................................................... 3112.2 DESIGN .................................................................................................................................... 3312.3 CONFIGURATION & BUILD ..................................................................................................... 3512.4 TESTING ................................................................................................................................... 3612.5 DEPLOYMENT, SUPPORT & MAINTENANCE ....................................................................... 38

    13.

    PROCESS FLOW CHARTS ............................................................................................................ 40

    13.1 PROCESS FLOW CHART ORACLE & PEOPLESOFT PRACTICE ..................................... 4013.2 PROCESS FLOW CHART SAP PRACTICE ......................................................................... 4113.3 PROCESS FLOW CHART SIEBEL PRACTICE .................................................................... 41

    14. GLOSSARY ..................................................................................................................................... 42

    REVISION HISTORY .................................................................................................................................. 43

  • 7/28/2019 ES Implementation Process

    3/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 3 of 43

    Classification: Company Internal

  • 7/28/2019 ES Implementation Process

    4/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 4 of 43

    Classification: Company Internal

    1. OBJECTIVE

    The objective of the Enterprise Solutions (referred as ES in the rest of this manual)Implementation Process is to define the execution approach for all implementation projects fallingunder each of the practice areas in ES, namely Oracle, PeopleSoft, SAP & Siebel.

    Each of the practice areas have been provided specific individual implementation frame works assequence of execution for Oracle & PeopleSoft are different from that of SAP or Siebel.

    While Oracle & PeopleSoft practice will follow one common implementation framework, SAP & Siebelpractice areas have their own implementation frameworks.

    Based on the individual implementation framework for each practice, this process manual hasprovided separate sections for each practice area and the inputs, the set of tasks to be carried out ineach phase and the outputs at the end of each phase have been clearly articulated in each of thesections.

    Templates, forms, guidelines and checklists have been provided under the respective sections foreach of the practice areas.

    2. SCOPE

    In Scope Out of Scope

    All Implementation Projects inOracle Apps, SAP, PeopleSoft &Siebel practice units

    All Customer managed projects in ES business unit. All Upgrade projects in ES business unit.

    All application support and maintenance projects inES business unit.

    All projects falling outside the ES Business unit in theorganization.

    3. ENTRY CRITERIA

    3.1 Signed-off Contract / SOW

    4. INPUT

    4.1 Signed-off Contract / SOW

    5. PARTICIPANTS

    Delivery Manager, Group Project Manager, Project Manager, Business Process Analyst (BPA),Configuration Manager(CM), Tech Lead, Developer, Quality Facilitator, Networks & Customerrepresentative (SME, SPOC)

    6. HIGH LEVEL PROCESS STEPS

    SlNo.

    ORACLE &PEOPLESOFT

    PRACTICE

    SAP PRACTICE SIEBEL PRACTICE RELATEDPROCESS IN QMS

    1. Definition Phase Project Preparation Scoping & Analysis -Project Initiation-Project Planning-Project Progressmonitoring

    http://ixchange.igate.com/sites/intranet/quality/Processes/pi.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/pi.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/pi.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Project%20Planning.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Project%20Planning.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Project%20Planning.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Project%20Planning.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/pi.doc
  • 7/28/2019 ES Implementation Process

    5/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 5 of 43

    Classification: Company Internal

    2. Operations Analysis Business Blueprint Design -Estimation process

    3. Solution Design Realization Configuration &Build

    -DevelopmentProcess

    4. Build Final Preparation Testing -Functional Testingprocess

    5. Transition &

    Training

    Training Deployment -Development

    Process6. Production Go-live & support Support &

    Maintenance-AMO process

    For a detailed flow, refer toProcess flow chartof the respective practice in Section 13 of this manual

    7. OUTPUT

    The outputs from each phase for all the practices have been detailed in the respective sectionsbelow. Documented below are the key outputs for all the practices.

    ORACLE & PEOPLESOFTPRACTICE

    SAP PRACTICE SIEBEL PRACTICE

    Project Management Plandocument

    Current Business baseline

    Future process model

    High Level Gap AnalysisDocument

    Application Setupsdocument

    Conversion ProgramDesign

    Functional Design

    Document Technical Design

    Document

    Test plans

    Test scripts

    Test reports

    Risk and Issue Log

    Production supportinfrastructure document

    UAT Sign Off

    Training Documents.

    Trained key & end users

    Project Closure report

    Customer Satisfactionsurvey

    Defined company businessdrivers

    Defined company businessmeasurements

    Defined projectimplementation goals

    Implementation strategy &document

    Rollout strategy

    Approved project plan andschedule

    Project team training plan

    Communication plan

    Change management plan Quality assurance plan

    Configuration managementplan

    Test plan

    Post implementation supportstrategy

    IT Infrastructure document

    Release plan

    Completed requirementsdocument

    Completed businessblueprint

    End user training &documentation plan

    Final test design

    Service level strategy

    Production system design

    Test results

    Final integration test report

    Refined production support

    Signed-off project scopedocument

    Project plan

    Communication plan

    Gap analysis

    Requirement specifications

    Identified data migrationrequirements

    Signed-off functionalspecification document

    Signed off design documents

    Test strategy

    Test plans

    CRP Plan Test reports

    Signed off UAT

    Trained end users

    Successful deployment ofapplication as per FS inproduction

    Open issues resolved andclosed

    Stable application inproduction

    Knowledge documentshanded over and completedKT sessions

    Lessons learnt report

    Signed off project closuredocument

    http://ixchange.igate.com/sites/intranet/quality/Processes/ESTPROC.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ESTPROC.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ESTPROC.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/amo.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/amo.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/amo.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/amo.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ESTPROC.doc
  • 7/28/2019 ES Implementation Process

    6/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 6 of 43

    Classification: Company Internal

    ORACLE & PEOPLESOFTPRACTICE

    SAP PRACTICE SIEBEL PRACTICE

    plan

    Ready production system

    Open issues resolved andclosed

    Project sign-off and closure

    8. EXIT CRITERIA

    Project Support period over

    9. METRICS

    9.1 EFFORT VARIANCE

    9.2 SCHEDULE VARIANCE

    9.3 DEFECT REMOVAL EFFICIENCY

    9.4 DEFECT INJECTION RATE9.5 PRODUCTIVITY

    9.6 COST OF QUALITY

    10. IMPLEMENTATION PROCESS ORACLE & PEOPLESOFT PRACTICE

    Note: Since the implementation steps are similar to Oracle & PeopleSoft, both practices will followone single implementation process detailed below; however the templates, guidelines, checklists& standards are different for each practice and the same have been provided under the headingsof respective practice areas

    For a detailed flow, refer to Process flow chart of the respective practice in Section 13 of this manual

    10.1 DEFINITION PHASE

    During Definition phase, the project management team plans the implementation project to definethe Project Work Plan. The goals are to identify business and system requirements, propose thefuture business model, and propose the application and information technology architecture. Theproject team is organized and oriented. The team develops a plan to ensure team members receivethe training and support necessary to perform their roles on the project.

    Tasks Responsibility

    Templates/Forms

    Guidelines Checklists Standards

    Inputs Client Current TechnicalArchitecture

    Client current financialsand operating structures

    Existing systemarchitecture

    Current Business model

    High level processdesigns

    ORACLE:Technicalarchitecturebaseline (TMP1)

    Financial &OperatingStructure(TMP2)

    ORACLE:ProjectStart-upchecklist(TMP3)

    Tasks Prepare / procure the

    Business Process

    PM

    http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.doc
  • 7/28/2019 ES Implementation Process

    7/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 7 of 43

    Classification: Company Internal

    Tasks Responsibility

    Templates/Forms

    Guidelines Checklists Standards

    Architecture

    Prepare / procure theCurrent Business

    baseline document

    Prepare the WorkManagement Plans andProcedures

    Prepare the Projectmanagement plan

    PM

    Product Walk-through bythe client to project teammembers

    SME/SPOC

    Review and Obtain Sign-Off on

    Project plan &

    Current businessbaselinedocuments

    PM

    Outputs Project Management

    Plan document

    Work ManagementProcedures Document

    Current Businessbaseline

    ORACLE:

    Projectmanagementplan (TMP4)

    Workmanagementprocedures(TMP5)

    Currentbusinessbaseline (TMP6)

    PS:Projectmanagementplan in QMS

    Project Statusreport (TMP3)

    ORACLE:

    Meetingagenda(TMP7)

    Meetingminutes

    Projectprogressreport(TMP8)

    ORACLE:

    Projectmanagementchecklist(TMP9)

    10.2 OPERATIONS ANALYSIS

    During the Operations Analysis phase, the project team collects management, technical, and end-user business process information and requirements. The project team develops businessrequirements scenarios used to assess the level of fit between the detailed business requirementsand standard application functionality. The project team also creates a model for the application

    http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP3_Project%20Status%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP3_Project%20Status%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP3_Project%20Status%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/FORMS/MEETMINS.xlshttp://ixchange.igate.com/sites/intranet/quality/FORMS/MEETMINS.xlshttp://ixchange.igate.com/sites/intranet/quality/FORMS/MEETMINS.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/FORMS/MEETMINS.xlshttp://ixchange.igate.com/sites/intranet/quality/FORMS/MEETMINS.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP3_Project%20Status%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP3_Project%20Status%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.doc
  • 7/28/2019 ES Implementation Process

    8/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 8 of 43

    Classification: Company Internal

    structure and suggests an overall technical architecture. Prototyping of business processes maybegin in this phase to aid in analysis and demonstrate feasibility of design options.

    Tasks Responsibility

    Templates/Forms

    Guidelines Checklists Standard

    Inputs Current Business Baseline(As Is Process)

    Tasks Analyze Current Businessoperations

    PM PS:Businessrequirementgathering(TMP9)

    Gather accurate informationand define detailed function,data and operationalrequirements

    PM

    Design business processes indetail, covering variants ofthe high level processes.

    PM

    Prepare businessrequirements mapping andconduct gap analysis

    PM PS:Fit-gapanalysis(TMP2)

    Review and Sign-Off onFuture process model, Gapanalysis document andReports list documents

    PM

    Outputs Future process model

    High Level Gap AnalysisDocument

    Master Reports tracking list

    ORACLE:

    Futurebusinessmodel

    (TMP10)

    High levelgapanalysis(TMP11)

    Masterreporttrackinglist(TMP12)

    10.3 SOLUTION DESIGN

    The goal of the Solution Design phase is to create the optimal business process solution to meet thecurrent and future business requirements. During Solution Design, project team members designapplication configuration options and detailed business procedure documentation. Detailed design ofany custom extensions, interfaces and data conversions occur during this phase. The team alsoidentifies process and organizational changes required for implementation.

    http://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.doc
  • 7/28/2019 ES Implementation Process

    9/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 9 of 43

    Classification: Company Internal

    Tasks Responsibility

    Templates/Forms

    Guidelines Checklists Standads

    Inputs Current Business Baseline

    Future process model

    High Level Gap AnalysisDocument

    Master Report TrackingReport list

    Tasks Prepare the Module Designand Application setups

    PM &Tech lead

    Prepare Conversionenvironment

    PM &Tech lead

    PS:Dataconversionrequirements & strategy(TMP6)

    Dataconversion

    specification(TMP7)

    Prepare/define Conversionstandards

    PM &Tech lead

    Prepare design Conversionprograms

    PM &Tech lead

    Prepare data Conversion PM &Tech lead

    Conduct first CRP(Conference Room Pilot)

    GPM &PM

    Review and Sign-Off onApplication setup document,security profile document,

    Conversion environment,Conversion program designs,Functional design document,technical design documentand Security profilesDocument.

    PM

    Outputs Application Setups document

    Conversion Environment

    Conversion Program Design

    Functional Design Document

    Technical Design Document

    Security Profiles

    ORACLE:

    Conversionenvironment(TMP13)

    Conversion

    Programdesign(TMP 14)

    Applicationextensionsfunctionaldesign(TMP15)

    http://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.doc
  • 7/28/2019 ES Implementation Process

    10/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 10 of 43

    Classification: Company Internal

    Tasks Responsibility

    Templates/Forms

    Guidelines Checklists Standads

    Applicationextensiontechnical

    design(TMP16)

    SecurityProfile(TMP34)

    BR100Applicationsetupdocumentset {zip file}(TMP35)

    S:

    echnicalpecificationocumentTMP5)

    unctionalesignocument(TM4)

    10.4 BUILDDuring the Build phase, the development team codes and tests all custom extensions includingapplication enhancements, conversions, and interfaces. The team creates and executesperformance, integration and business system tests. This phase of the project is focused mostly onquality control, testing and documentation of the solution. Whether the code is an extension of thepackaged application or custom development quality is paramount to the success of this phase ofthe project.

    Tasks Responsibility

    Templates/Forms

    Guidelines

    Checklists Standard

    Inputs Application Setups document

    Gap Analysis document

    Development Environment

    Conversion Program designs

    Functional Design Document

    Technical Design Document

    CRP Comments

    Tasks Develop ConversionPrograms

    PM &Tech lead

    Ensure to accommodate CRP Tech lead

    http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.doc
  • 7/28/2019 ES Implementation Process

    11/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 11 of 43

    Classification: Company Internal

    Tasks Responsibility

    Templates/Forms

    Guidelines

    Checklists Standard

    comments

    Develop Business systemtest plans and perform testing

    Tech lead&

    Develope

    rs

    PS:Test plan(TMP10)

    Unit testplantemplate(TMP15)

    Perform Conversion unittests, business object testsand validation tests.

    PM &Tech led

    Conduct second CRP(Conference Room Pilot)

    PM &Tech lead

    Resolve the CRP commentsand migrate the applicationalong with customizations to

    UAT instance

    PM &Tech lead

    Obtain Sign Off PM &Tech lead

    Review the Test documentsand obtain Sign-Off.

    PM PS:Testprogressreport(TMP17)

    Testclosurereport(TMP16)

    Design Production supportinfrastructure

    GPM &PM

    RACLE:roductionupport

    nfrastructur(TMP23)

    Develop Transition Plan PM &Tech lead

    Outputs System Test Script

    Conversion Test Plans

    Performance Test Scripts

    Performance Test Report

    Risk and Issue Form

    Risk and Issue Log

    Production supportinfrastructure document

    Develop Transition Plandocument

    RACLE:

    ystem testcriptTMP17)

    onversionest plansTMP18)

    erformanceest scriptsTMP19)

    http://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP10_Test%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP10_Test%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP10_Test%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP10_Test%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP10_Test%20Plan.doc
  • 7/28/2019 ES Implementation Process

    12/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 12 of 43

    Classification: Company Internal

    Tasks Responsibility

    Templates/Forms

    Guidelines

    Checklists Standard

    erformanceest reportTMP20)

    isk & issueormTMP21)

    isk & issueog (TMP22)

    ransaction

    ontingencylanTMP24)

    S:ssue trackerTMP1)

    unctionalesignocumentTMP4)

    estcripts(TMP

    11)

    10.5 TRANSITION

    During the Transition phase, the project team deploys the finished application into the customersorganization. The transition phases success depends on the Build phase for the fully tested qualitybusiness system. The project team fully executes data conversion and uses the developeddocumentation to train end users and support staff. The project team conducts a productionreadiness check with the business user and technical community. There should also be multiple trailruns before the final version is released to the user community. If the implementation includes aphased deployment, transition will occur multiple times with subsets of the applications deployed tovarious geographical sites and/or business units at different times.

    Tasks Responsibility Templates/Forms Guidelines Checklists Standard

    Inputs Solution Design Document

    Application Setups document

    Tasks Conduct UAT (UserAcceptance Testing)

    PM &Tech lead

    Prepare Production PM &Tech lead

    http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP22_Risk%20&%20Issue%20log.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP22_Risk%20&%20Issue%20log.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP22_Risk%20&%20Issue%20log.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP1_Issue%20tracker.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP1_Issue%20tracker.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP1_Issue%20tracker.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP1_Issue%20tracker.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP1_Issue%20tracker.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP22_Risk%20&%20Issue%20log.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP22_Risk%20&%20Issue%20log.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.doc
  • 7/28/2019 ES Implementation Process

    13/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 13 of 43

    Classification: Company Internal

    Tasks Responsibility

    Templates/Forms

    Guidelines Checklists Standard

    Environment

    Setup applications and verifyproduction readiness

    PM &Tech lead

    Implement production support

    infrastructure

    PM &

    Tech leadOutputs

    UAT Sign Off

    Production Environment

    Go Live readiness checklist

    RACLE:nstallationAhecklistTMP25)

    roductionupport

    nfrastructur(TMP23)

    ransition

    trategyTMP26)

    nternalransitionlanTMP27)

    S:

    utoverpproachlanTMP14)

    10.6 TRAINING

    During this phase, Project manager will identify the clients technical staff and Key users to providethe training. Training will be given on Functional business flows based on the key users roles.

    Tasks Responsibility

    Templates/Forms

    Guidelines Checklists Standard

    Inputs Application setups document

    Technical Design Document

    Functional Design Document

    Testing Document

    PS:Application setup

    document(TMP13)

    Tasks Identify Key Users and Endusers.

    PM &Tech lead

    Prepare training material PM, Techlead &Developers

    PS:TrainingPlan(TMP8)

    http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.doc
  • 7/28/2019 ES Implementation Process

    14/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 14 of 43

    Classification: Company Internal

    Tasks Responsibility

    Templates/Forms

    Guidelines Checklists Standard

    Trainingmanual(TMP12)

    Provide training PM &Tech lead

    Outputs Training Documents.

    Trained key & end users

    ORACLE:

    Sampletrainingdocument{Filledtemplate}(TMP28)

    Train thetrainerManual(TMP29)

    10.7 PRODUCTION

    The Production phase starts immediately with the production cutover. Production marks the lastphase of the implementation and the beginning of the system support cycle. Included in this finalphase is a series of refinement and measurement activities. The Information Systems (IS) personnelwork quickly to fine-tune the system and begin regular maintenance. The group will also provideongoing support to the organization for the remaining life of the application

    Tasks Responsibility

    Templates/Forms

    Guidelines Checklists Standard

    Inputs Refine production system Production issue resolution

    process flow

    Support Resource Plan

    Tasks Resolve Stabilization issues PM &Techlead

    Fix Production bugs PM &Techlead

    Provide function support tousers and technical team

    PM &Techlead

    Close Project

    Initiate the Customersatisfaction survey

    DM,GPM &

    PM

    CSStemplate

    Outputs Issue resolution plan

    Project Closure report

    Customer Satisfaction Report

    ORACLE:

    Accepta

    http://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.doc
  • 7/28/2019 ES Implementation Process

    15/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 15 of 43

    Classification: Company Internal

    Tasks Responsibility

    Templates/Forms

    Guidelines Checklists Standard

    ncecertificate

    (TMP29)

    ClientSatisfactionreport(TMP30)

    Endreport(TMP31)

    Projectclosure

    details(TMP32)

    iGatescustomersatisfactionsurveyform(TMP33)

    http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.doc
  • 7/28/2019 ES Implementation Process

    16/43

    iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS

    February 9, 2009 Version No. 1.1 Page 16 of 43

    Classification: Company Internal

    11. IMPLEMENTATION PROCESS SAP PRACTICE

    For a detailed flow, refer to Process flow chart of the respective practice in Section 13 of this manual

    11.1 PROJECT PREPARATION

    The purpose of this phase is to provide initial planning and preparation for SAP ERP (formerly

    called as SAP R/3) implementation project. Although each implementation project has its ownunique objectives, scope, and priorities, the steps in this Phase help identify and plan the primary

    focus areas to be considered. By following these early in an implementation project, it will help the

    project manager to ensure that the project proceeds efficiently, and that a solid foundation for asuccessful implementation project is laid.

    Tasks Responsibility

    Templates/Forms

    Guidelines Checklists Standards

    Inputs Signed SOW/Contract

    Documented list of thecustomers strategicobjectives and businessmeasurements forimplementation

    Data gathered from the salescycle

    Project scope document

    Tasks Define project missionstatement

    PM

    Define business drivers PM

    Identify businessmeasurements

    PM

    Identify projectmeasurements

    PM

    Develop change charter PM Refer to

    SAPs 1)Guidelinesforcreating achangecharter(TMP1)

    Assemble project chartercomponents

    PM

    Approve project charter PM

    Review implementationproposal

    PM, BPA,Tech lead

    Refer toSAPs 1)Enterprise

    processareascopedocument(TMP2)

    Confirm implementationmethodology

    PM

    Check strategy for rollout PM, BPA,Tech lead

    http://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtf