Transcript of ES Implementation Process
-
7/28/2019 ES Implementation Process
1/43
iGATE Global Solutions Limited
Classification: Company Internal
ES IMPLEMENTATION PROCESS
Prepared by Role Date of preparation
Sujatha Jogi Quality December 28, 2008
Reviewed by Role Date of Review
Lakshmi Narasimhan Komandur
Suresh Thiagarajan
Manager SEPG
GQM-QualityDecember 30, 2008
Approved by Role Date of Approval
Elizabeth Koshy Program Manager Process & Metrics February 9, 2009
Circulation Listhttps://my.igate.com/ipoint/quality/processes.jsp
VersionNumber
1.1
https://my.igate.com/ipoint/quality/processes.jsphttps://my.igate.com/ipoint/quality/processes.jsphttps://my.igate.com/ipoint/quality/processes.jsphttps://my.igate.com/ipoint/quality/processes.jsphttps://my.igate.com/ipoint/quality/processes.jsp -
7/28/2019 ES Implementation Process
2/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 2 of 43
Classification: Company Internal
TABLE OF CONTENTS
1. OBJECTIVE ....................................................................................................................................... 4
2. SCOPE ............................................................................................................................................... 4
3. ENTRY CRITERIA ............................................................................................................................. 4
4. INPUT ................................................................................................................................................. 4
5. PARTICIPANTS ................................................................................................................................. 4
6. HIGH LEVEL PROCESS STEPS ...................................................................................................... 4
7. OUTPUT ............................................................................................................................................. 5
8. EXIT CRITERIA ................................................................................................................................. 6
9. METRICS ........................................................................................................................................... 6
9.1 EFFORT VARIANCE ...................................................................................................................... 69.2 SCHEDULE VARIANCE ................................................................................................................. 69.3 DEFECT REMOVAL EFFICIENCY ................................................................................................ 6
9.4
DEFECT INJECTION RATE ........................................................................................................... 69.5 PRODUCTIVITY ............................................................................................................................. 6
9.6 COST OF QUALITY ....................................................................................................................... 6
10. IMPLEMENTATION PROCESS ORACLE & PEOPLESOFT PRACTICE .................................... 6
10.1 DEFINITION PHASE .................................................................................................................. 610.2 OPERATIONS ANALYSIS .......................................................................................................... 710.3 SOLUTION DESIGN ................................................................................................................... 810.4 BUILD ........................................................................................................................................ 1010.5 TRANSITION ............................................................................................................................ 1210.6 TRAINING ................................................................................................................................. 1310.7 PRODUCTION .......................................................................................................................... 14
11. IMPLEMENTATION PROCESS SAP PRACTICE ....................................................................... 16
11.1
PROJECT PREPARATION ...................................................................................................... 16
11.2 SIZING & BLUEPRINT ............................................................................................................. 2011.3 FUNCTIONAL DEVELOPMENT ............................................................................................... 2311.4 FINAL PREPARATION ............................................................................................................. 2811.5 GO-LIVE & SUPPORT .............................................................................................................. 30
12. IMPLEMENTATION PROCESS SIEBEL PRACTICE.................................................................. 31
12.1 SCOPING & ANALYSIS ........................................................................................................... 3112.2 DESIGN .................................................................................................................................... 3312.3 CONFIGURATION & BUILD ..................................................................................................... 3512.4 TESTING ................................................................................................................................... 3612.5 DEPLOYMENT, SUPPORT & MAINTENANCE ....................................................................... 38
13.
PROCESS FLOW CHARTS ............................................................................................................ 40
13.1 PROCESS FLOW CHART ORACLE & PEOPLESOFT PRACTICE ..................................... 4013.2 PROCESS FLOW CHART SAP PRACTICE ......................................................................... 4113.3 PROCESS FLOW CHART SIEBEL PRACTICE .................................................................... 41
14. GLOSSARY ..................................................................................................................................... 42
REVISION HISTORY .................................................................................................................................. 43
-
7/28/2019 ES Implementation Process
3/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 3 of 43
Classification: Company Internal
-
7/28/2019 ES Implementation Process
4/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 4 of 43
Classification: Company Internal
1. OBJECTIVE
The objective of the Enterprise Solutions (referred as ES in the rest of this manual)Implementation Process is to define the execution approach for all implementation projects fallingunder each of the practice areas in ES, namely Oracle, PeopleSoft, SAP & Siebel.
Each of the practice areas have been provided specific individual implementation frame works assequence of execution for Oracle & PeopleSoft are different from that of SAP or Siebel.
While Oracle & PeopleSoft practice will follow one common implementation framework, SAP & Siebelpractice areas have their own implementation frameworks.
Based on the individual implementation framework for each practice, this process manual hasprovided separate sections for each practice area and the inputs, the set of tasks to be carried out ineach phase and the outputs at the end of each phase have been clearly articulated in each of thesections.
Templates, forms, guidelines and checklists have been provided under the respective sections foreach of the practice areas.
2. SCOPE
In Scope Out of Scope
All Implementation Projects inOracle Apps, SAP, PeopleSoft &Siebel practice units
All Customer managed projects in ES business unit. All Upgrade projects in ES business unit.
All application support and maintenance projects inES business unit.
All projects falling outside the ES Business unit in theorganization.
3. ENTRY CRITERIA
3.1 Signed-off Contract / SOW
4. INPUT
4.1 Signed-off Contract / SOW
5. PARTICIPANTS
Delivery Manager, Group Project Manager, Project Manager, Business Process Analyst (BPA),Configuration Manager(CM), Tech Lead, Developer, Quality Facilitator, Networks & Customerrepresentative (SME, SPOC)
6. HIGH LEVEL PROCESS STEPS
SlNo.
ORACLE &PEOPLESOFT
PRACTICE
SAP PRACTICE SIEBEL PRACTICE RELATEDPROCESS IN QMS
1. Definition Phase Project Preparation Scoping & Analysis -Project Initiation-Project Planning-Project Progressmonitoring
http://ixchange.igate.com/sites/intranet/quality/Processes/pi.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/pi.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/pi.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Project%20Planning.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Project%20Planning.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Project%20Planning.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ppm.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Project%20Planning.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/pi.doc -
7/28/2019 ES Implementation Process
5/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 5 of 43
Classification: Company Internal
2. Operations Analysis Business Blueprint Design -Estimation process
3. Solution Design Realization Configuration &Build
-DevelopmentProcess
4. Build Final Preparation Testing -Functional Testingprocess
5. Transition &
Training
Training Deployment -Development
Process6. Production Go-live & support Support &
Maintenance-AMO process
For a detailed flow, refer toProcess flow chartof the respective practice in Section 13 of this manual
7. OUTPUT
The outputs from each phase for all the practices have been detailed in the respective sectionsbelow. Documented below are the key outputs for all the practices.
ORACLE & PEOPLESOFTPRACTICE
SAP PRACTICE SIEBEL PRACTICE
Project Management Plandocument
Current Business baseline
Future process model
High Level Gap AnalysisDocument
Application Setupsdocument
Conversion ProgramDesign
Functional Design
Document Technical Design
Document
Test plans
Test scripts
Test reports
Risk and Issue Log
Production supportinfrastructure document
UAT Sign Off
Training Documents.
Trained key & end users
Project Closure report
Customer Satisfactionsurvey
Defined company businessdrivers
Defined company businessmeasurements
Defined projectimplementation goals
Implementation strategy &document
Rollout strategy
Approved project plan andschedule
Project team training plan
Communication plan
Change management plan Quality assurance plan
Configuration managementplan
Test plan
Post implementation supportstrategy
IT Infrastructure document
Release plan
Completed requirementsdocument
Completed businessblueprint
End user training &documentation plan
Final test design
Service level strategy
Production system design
Test results
Final integration test report
Refined production support
Signed-off project scopedocument
Project plan
Communication plan
Gap analysis
Requirement specifications
Identified data migrationrequirements
Signed-off functionalspecification document
Signed off design documents
Test strategy
Test plans
CRP Plan Test reports
Signed off UAT
Trained end users
Successful deployment ofapplication as per FS inproduction
Open issues resolved andclosed
Stable application inproduction
Knowledge documentshanded over and completedKT sessions
Lessons learnt report
Signed off project closuredocument
http://ixchange.igate.com/sites/intranet/quality/Processes/ESTPROC.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ESTPROC.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ESTPROC.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/amo.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/amo.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/amo.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/amo.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Functional%20Testing%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/Development%20Process.dochttp://ixchange.igate.com/sites/intranet/quality/Processes/ESTPROC.doc -
7/28/2019 ES Implementation Process
6/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 6 of 43
Classification: Company Internal
ORACLE & PEOPLESOFTPRACTICE
SAP PRACTICE SIEBEL PRACTICE
plan
Ready production system
Open issues resolved andclosed
Project sign-off and closure
8. EXIT CRITERIA
Project Support period over
9. METRICS
9.1 EFFORT VARIANCE
9.2 SCHEDULE VARIANCE
9.3 DEFECT REMOVAL EFFICIENCY
9.4 DEFECT INJECTION RATE9.5 PRODUCTIVITY
9.6 COST OF QUALITY
10. IMPLEMENTATION PROCESS ORACLE & PEOPLESOFT PRACTICE
Note: Since the implementation steps are similar to Oracle & PeopleSoft, both practices will followone single implementation process detailed below; however the templates, guidelines, checklists& standards are different for each practice and the same have been provided under the headingsof respective practice areas
For a detailed flow, refer to Process flow chart of the respective practice in Section 13 of this manual
10.1 DEFINITION PHASE
During Definition phase, the project management team plans the implementation project to definethe Project Work Plan. The goals are to identify business and system requirements, propose thefuture business model, and propose the application and information technology architecture. Theproject team is organized and oriented. The team develops a plan to ensure team members receivethe training and support necessary to perform their roles on the project.
Tasks Responsibility
Templates/Forms
Guidelines Checklists Standards
Inputs Client Current TechnicalArchitecture
Client current financialsand operating structures
Existing systemarchitecture
Current Business model
High level processdesigns
ORACLE:Technicalarchitecturebaseline (TMP1)
Financial &OperatingStructure(TMP2)
ORACLE:ProjectStart-upchecklist(TMP3)
Tasks Prepare / procure the
Business Process
PM
http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP3_CR010%20Project%20Start%20up%20checklisk.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP2_RD010%20Financial%20&%20Operating%20Structure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP1_TA020%20Technical%20Architecture%20Baseline.doc -
7/28/2019 ES Implementation Process
7/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 7 of 43
Classification: Company Internal
Tasks Responsibility
Templates/Forms
Guidelines Checklists Standards
Architecture
Prepare / procure theCurrent Business
baseline document
Prepare the WorkManagement Plans andProcedures
Prepare the Projectmanagement plan
PM
Product Walk-through bythe client to project teammembers
SME/SPOC
Review and Obtain Sign-Off on
Project plan &
Current businessbaselinedocuments
PM
Outputs Project Management
Plan document
Work ManagementProcedures Document
Current Businessbaseline
ORACLE:
Projectmanagementplan (TMP4)
Workmanagementprocedures(TMP5)
Currentbusinessbaseline (TMP6)
PS:Projectmanagementplan in QMS
Project Statusreport (TMP3)
ORACLE:
Meetingagenda(TMP7)
Meetingminutes
Projectprogressreport(TMP8)
ORACLE:
Projectmanagementchecklist(TMP9)
10.2 OPERATIONS ANALYSIS
During the Operations Analysis phase, the project team collects management, technical, and end-user business process information and requirements. The project team develops businessrequirements scenarios used to assess the level of fit between the detailed business requirementsand standard application functionality. The project team also creates a model for the application
http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP3_Project%20Status%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP3_Project%20Status%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP3_Project%20Status%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/FORMS/MEETMINS.xlshttp://ixchange.igate.com/sites/intranet/quality/FORMS/MEETMINS.xlshttp://ixchange.igate.com/sites/intranet/quality/FORMS/MEETMINS.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP9_Project%20Management%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP8_Project%20Progress%20report.dochttp://ixchange.igate.com/sites/intranet/quality/FORMS/MEETMINS.xlshttp://ixchange.igate.com/sites/intranet/quality/FORMS/MEETMINS.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP7_%20Meeting%20agenda%20template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP3_Project%20Status%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP3_Project%20Status%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PP%20Template.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP6_RD020%20Current%20Business%20Baseline.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP5_WM010%20Work%20Management%20procedures.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP4_CR010%20Project%20Management%20Plan.doc -
7/28/2019 ES Implementation Process
8/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 8 of 43
Classification: Company Internal
structure and suggests an overall technical architecture. Prototyping of business processes maybegin in this phase to aid in analysis and demonstrate feasibility of design options.
Tasks Responsibility
Templates/Forms
Guidelines Checklists Standard
Inputs Current Business Baseline(As Is Process)
Tasks Analyze Current Businessoperations
PM PS:Businessrequirementgathering(TMP9)
Gather accurate informationand define detailed function,data and operationalrequirements
PM
Design business processes indetail, covering variants ofthe high level processes.
PM
Prepare businessrequirements mapping andconduct gap analysis
PM PS:Fit-gapanalysis(TMP2)
Review and Sign-Off onFuture process model, Gapanalysis document andReports list documents
PM
Outputs Future process model
High Level Gap AnalysisDocument
Master Reports tracking list
ORACLE:
Futurebusinessmodel
(TMP10)
High levelgapanalysis(TMP11)
Masterreporttrackinglist(TMP12)
10.3 SOLUTION DESIGN
The goal of the Solution Design phase is to create the optimal business process solution to meet thecurrent and future business requirements. During Solution Design, project team members designapplication configuration options and detailed business procedure documentation. Detailed design ofany custom extensions, interfaces and data conversions occur during this phase. The team alsoidentifies process and organizational changes required for implementation.
http://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP12_RD080%20Master%20Report%20Tracking%20List.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP11_BR010%20High-level%20Gap%20analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP10_BP080%20Future%20process%20model.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP2_fit-gap_Analysis.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP9_Business%20Requirements%20Gathering.doc -
7/28/2019 ES Implementation Process
9/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 9 of 43
Classification: Company Internal
Tasks Responsibility
Templates/Forms
Guidelines Checklists Standads
Inputs Current Business Baseline
Future process model
High Level Gap AnalysisDocument
Master Report TrackingReport list
Tasks Prepare the Module Designand Application setups
PM &Tech lead
Prepare Conversionenvironment
PM &Tech lead
PS:Dataconversionrequirements & strategy(TMP6)
Dataconversion
specification(TMP7)
Prepare/define Conversionstandards
PM &Tech lead
Prepare design Conversionprograms
PM &Tech lead
Prepare data Conversion PM &Tech lead
Conduct first CRP(Conference Room Pilot)
GPM &PM
Review and Sign-Off onApplication setup document,security profile document,
Conversion environment,Conversion program designs,Functional design document,technical design documentand Security profilesDocument.
PM
Outputs Application Setups document
Conversion Environment
Conversion Program Design
Functional Design Document
Technical Design Document
Security Profiles
ORACLE:
Conversionenvironment(TMP13)
Conversion
Programdesign(TMP 14)
Applicationextensionsfunctionaldesign(TMP15)
http://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP15_MD050%20Application%20Extensions%20Functional%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP14_CV060%20Conversion%20Program%20Designs.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP13_CV030%20Conversion%20Environment.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP7_Data%20Conversion%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP6_Data%20conversion%20req%20and%20strategy.doc -
7/28/2019 ES Implementation Process
10/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 10 of 43
Classification: Company Internal
Tasks Responsibility
Templates/Forms
Guidelines Checklists Standads
Applicationextensiontechnical
design(TMP16)
SecurityProfile(TMP34)
BR100Applicationsetupdocumentset {zip file}(TMP35)
S:
echnicalpecificationocumentTMP5)
unctionalesignocument(TM4)
10.4 BUILDDuring the Build phase, the development team codes and tests all custom extensions includingapplication enhancements, conversions, and interfaces. The team creates and executesperformance, integration and business system tests. This phase of the project is focused mostly onquality control, testing and documentation of the solution. Whether the code is an extension of thepackaged application or custom development quality is paramount to the success of this phase ofthe project.
Tasks Responsibility
Templates/Forms
Guidelines
Checklists Standard
Inputs Application Setups document
Gap Analysis document
Development Environment
Conversion Program designs
Functional Design Document
Technical Design Document
CRP Comments
Tasks Develop ConversionPrograms
PM &Tech lead
Ensure to accommodate CRP Tech lead
http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP5_Technical%20Specification.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_UPG&IMP_TMP35_BR100Application%20Setup%20Documents%20set.ziphttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP34_BR110%20Security%20Profiles.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP16_MD070%20Application%20extension%20technical%20design.doc -
7/28/2019 ES Implementation Process
11/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 11 of 43
Classification: Company Internal
Tasks Responsibility
Templates/Forms
Guidelines
Checklists Standard
comments
Develop Business systemtest plans and perform testing
Tech lead&
Develope
rs
PS:Test plan(TMP10)
Unit testplantemplate(TMP15)
Perform Conversion unittests, business object testsand validation tests.
PM &Tech led
Conduct second CRP(Conference Room Pilot)
PM &Tech lead
Resolve the CRP commentsand migrate the applicationalong with customizations to
UAT instance
PM &Tech lead
Obtain Sign Off PM &Tech lead
Review the Test documentsand obtain Sign-Off.
PM PS:Testprogressreport(TMP17)
Testclosurereport(TMP16)
Design Production supportinfrastructure
GPM &PM
RACLE:roductionupport
nfrastructur(TMP23)
Develop Transition Plan PM &Tech lead
Outputs System Test Script
Conversion Test Plans
Performance Test Scripts
Performance Test Report
Risk and Issue Form
Risk and Issue Log
Production supportinfrastructure document
Develop Transition Plandocument
RACLE:
ystem testcriptTMP17)
onversionest plansTMP18)
erformanceest scriptsTMP19)
http://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP10_Test%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP10_Test%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP10_Test%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP19_PT040%20Performance%20Test%20Scripts.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP18_CV070%20Conversion%20Test%20Plans.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP17_TE040%20System%20Test%20Script.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP16_Test_Closure%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP17_Test_Progress_Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP15_Unit%20Test%20Plan%20Template.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP10_Test%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP10_Test%20Plan.doc -
7/28/2019 ES Implementation Process
12/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 12 of 43
Classification: Company Internal
Tasks Responsibility
Templates/Forms
Guidelines
Checklists Standard
erformanceest reportTMP20)
isk & issueormTMP21)
isk & issueog (TMP22)
ransaction
ontingencylanTMP24)
S:ssue trackerTMP1)
unctionalesignocumentTMP4)
estcripts(TMP
11)
10.5 TRANSITION
During the Transition phase, the project team deploys the finished application into the customersorganization. The transition phases success depends on the Build phase for the fully tested qualitybusiness system. The project team fully executes data conversion and uses the developeddocumentation to train end users and support staff. The project team conducts a productionreadiness check with the business user and technical community. There should also be multiple trailruns before the final version is released to the user community. If the implementation includes aphased deployment, transition will occur multiple times with subsets of the applications deployed tovarious geographical sites and/or business units at different times.
Tasks Responsibility Templates/Forms Guidelines Checklists Standard
Inputs Solution Design Document
Application Setups document
Tasks Conduct UAT (UserAcceptance Testing)
PM &Tech lead
Prepare Production PM &Tech lead
http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP22_Risk%20&%20Issue%20log.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP22_Risk%20&%20Issue%20log.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP22_Risk%20&%20Issue%20log.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP1_Issue%20tracker.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP1_Issue%20tracker.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP1_Issue%20tracker.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP11_Test%20Scripts.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP4_Functional%20design%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP1_Issue%20tracker.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP1_Issue%20tracker.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP24_PM030%20Transaction%20&%20Contingency%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP22_Risk%20&%20Issue%20log.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP22_Risk%20&%20Issue%20log.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP21_%20Risk%20&%20Issue%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP20_PT130%20Performance%20Test%20report.doc -
7/28/2019 ES Implementation Process
13/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 13 of 43
Classification: Company Internal
Tasks Responsibility
Templates/Forms
Guidelines Checklists Standard
Environment
Setup applications and verifyproduction readiness
PM &Tech lead
Implement production support
infrastructure
PM &
Tech leadOutputs
UAT Sign Off
Production Environment
Go Live readiness checklist
RACLE:nstallationAhecklistTMP25)
roductionupport
nfrastructur(TMP23)
ransition
trategyTMP26)
nternalransitionlanTMP27)
S:
utoverpproachlanTMP14)
10.6 TRAINING
During this phase, Project manager will identify the clients technical staff and Key users to providethe training. Training will be given on Functional business flows based on the key users roles.
Tasks Responsibility
Templates/Forms
Guidelines Checklists Standard
Inputs Application setups document
Technical Design Document
Functional Design Document
Testing Document
PS:Application setup
document(TMP13)
Tasks Identify Key Users and Endusers.
PM &Tech lead
Prepare training material PM, Techlead &Developers
PS:TrainingPlan(TMP8)
http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP8_Training%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP13_Application%20Setup%20Document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP14_Cutover%20Approach%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP27_Internal%20Transition%20Plan.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP26_PM010%20Transition%20Strategy.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP23_PM020%20Production%20support%20infrastructure.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP25_PM040%20Installation%20QA%20Checklist.doc -
7/28/2019 ES Implementation Process
14/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 14 of 43
Classification: Company Internal
Tasks Responsibility
Templates/Forms
Guidelines Checklists Standard
Trainingmanual(TMP12)
Provide training PM &Tech lead
Outputs Training Documents.
Trained key & end users
ORACLE:
Sampletrainingdocument{Filledtemplate}(TMP28)
Train thetrainerManual(TMP29)
10.7 PRODUCTION
The Production phase starts immediately with the production cutover. Production marks the lastphase of the implementation and the beginning of the system support cycle. Included in this finalphase is a series of refinement and measurement activities. The Information Systems (IS) personnelwork quickly to fine-tune the system and begin regular maintenance. The group will also provideongoing support to the organization for the remaining life of the application
Tasks Responsibility
Templates/Forms
Guidelines Checklists Standard
Inputs Refine production system Production issue resolution
process flow
Support Resource Plan
Tasks Resolve Stabilization issues PM &Techlead
Fix Production bugs PM &Techlead
Provide function support tousers and technical team
PM &Techlead
Close Project
Initiate the Customersatisfaction survey
DM,GPM &
PM
CSStemplate
Outputs Issue resolution plan
Project Closure report
Customer Satisfaction Report
ORACLE:
Accepta
http://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Train%20the%20trainer%20manual%20sample.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP28_Sample%20Training%20document.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/PS_IMP_TMP12_End%20user%20Training%20Manual.doc -
7/28/2019 ES Implementation Process
15/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 15 of 43
Classification: Company Internal
Tasks Responsibility
Templates/Forms
Guidelines Checklists Standard
ncecertificate
(TMP29)
ClientSatisfactionreport(TMP30)
Endreport(TMP31)
Projectclosure
details(TMP32)
iGatescustomersatisfactionsurveyform(TMP33)
http://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP33_Customer%20Satsifactin%20survey.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP32_Project%20Closure%20Details%20form.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP31_CR080%20End%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP30_CR080%20Client%20Satisfaction%20Report.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.dochttp://ixchange.igate.com/sites/intranet/quality/Templates/ORA_IMP_TMP29_Acceptance%20Certificate.doc -
7/28/2019 ES Implementation Process
16/43
iGATE Global Solutions Limited ES IMPLEMENTATION PROCESS
February 9, 2009 Version No. 1.1 Page 16 of 43
Classification: Company Internal
11. IMPLEMENTATION PROCESS SAP PRACTICE
For a detailed flow, refer to Process flow chart of the respective practice in Section 13 of this manual
11.1 PROJECT PREPARATION
The purpose of this phase is to provide initial planning and preparation for SAP ERP (formerly
called as SAP R/3) implementation project. Although each implementation project has its ownunique objectives, scope, and priorities, the steps in this Phase help identify and plan the primary
focus areas to be considered. By following these early in an implementation project, it will help the
project manager to ensure that the project proceeds efficiently, and that a solid foundation for asuccessful implementation project is laid.
Tasks Responsibility
Templates/Forms
Guidelines Checklists Standards
Inputs Signed SOW/Contract
Documented list of thecustomers strategicobjectives and businessmeasurements forimplementation
Data gathered from the salescycle
Project scope document
Tasks Define project missionstatement
PM
Define business drivers PM
Identify businessmeasurements
PM
Identify projectmeasurements
PM
Develop change charter PM Refer to
SAPs 1)Guidelinesforcreating achangecharter(TMP1)
Assemble project chartercomponents
PM
Approve project charter PM
Review implementationproposal
PM, BPA,Tech lead
Refer toSAPs 1)Enterprise
processareascopedocument(TMP2)
Confirm implementationmethodology
PM
Check strategy for rollout PM, BPA,Tech lead
http://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP2_Enterprise%20process%20area%20scope%20doc.xlshttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtfhttp://ixchange.igate.com/sites/intranet/quality/Templates/SAP_IMP_TMP1_Creating%20the%20Change%20charter%20guidelines.rtf