ERL Maintenance Support Sdn Bhd Environmental Achievements.

14
ERL Maintenance Support Sdn Bhd Environmental Achievements

Transcript of ERL Maintenance Support Sdn Bhd Environmental Achievements.

  • Slide 1
  • ERL Maintenance Support Sdn Bhd Environmental Achievements
  • Slide 2
  • REDUCE REDUCE REUSE REUSE RECYCLE RECYCLE E-MAS continues its 3R Philosphy as part of its commitment to environmental protection.
  • Slide 3
  • Modified existing installations to reduce building facilities power supply consumption Reduced operation time for lighting and air- conditioning system; timer-controlled Switched to energy saving lighting Building Energy Saving Programme
  • Slide 4
  • Lower building energy consumption RM800,000 less electricity used per year
  • Slide 5
  • Building Energy Saving Programme Main Workshop
  • Slide 6
  • Trains are switched off during stabling As much driving as possible in coasting mode Brake early, with not more that 40% braking force Use the electrical regenerative brake Traction effort not more than 80% Train Operations Energy Saving
  • Slide 7
  • Lower energy cost per trip 5.3% reduction RM487,000 less electricity used per year
  • Slide 8
  • Note : kWh increased after introduction of speed restrictions & additional train trips
  • Slide 9
  • Introduced environmental friendly train washing system 70-90% less chemicals, water & electricity used Looking into rain water collection from building roofs Train Washing Plant
  • Slide 10
  • Comparison between Krcher & Britannia Train Washing System Train Washing System
  • Slide 11
  • Replacement of wheel from 200,000 kilometres to 2 million kilometres Purchase of new wheels reduced from 480 wheels to 50 per year Wheel Life Extension
  • Slide 12
  • Extending wheel life Savings of 120 tonnes of steel per year
  • Slide 13
  • Replacement of dampers from 1 million kilometres to 1.4 million kilometres, resulting in annual saving of RM80,000 Replacement of primary suspension from 600,000 kilometres to 1.4 million kilometres, giving annual saving of RM560,000 Dampers & Primary Suspension Life Extension
  • Slide 14
  • Overhaul exercise from 1.5 million kilometres to 3.0 million kilometres, resulting in saving of RM1.3 million per overhaul Gearbox Life Extension