1 Nigeria OPL 209 PROPRIETARY FPSO Offsh or e Execut ion Week Ending 31 Mar-06 Drill Center East - Risers Fir st Oil – 27 March-2006 Drill Cent er East Well Start up Sequence Opened PE15 Well: 8:15 am Opened PE 18 Well: 9:15 am Flowing throu gh 6 in. Test Riser  First Oil Received onboard th e FPSO at 10:40 am March 27, 2006 6 in. Test Riser 

Transcript of Erha Execution Photos 06-03-31[1]

Page 1: Erha Execution Photos 06-03-31[1]

8/18/2019 Erha Execution Photos 06-03-31[1]

http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 1/7

1

Nigeria OPL 209PROPRIETARY

FPSO Offshore Execution

Week Ending 31 Mar-06

Drill Center East - Risers

First Oil – 27 March-2006

Drill Center East

Well Startup Sequence

Opened PE15 Well: 8:15 am

Opened PE 18 Well: 9:15 am

Flowing through 6 in. Test Riser 

First Oil Received onboard the

FPSO at 10:40 am March 27, 2006 6 in. Test Riser 

Page 2: Erha Execution Photos 06-03-31[1]

8/18/2019 Erha Execution Photos 06-03-31[1]

http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 2/7

2

Nigeria OPL 209PROPRIETARY

FPSO Offshore Execution

Week Ending 31 Mar-06

Valve Lineup to Test Separator 

Verifying Separator Levels

Page 3: Erha Execution Photos 06-03-31[1]

8/18/2019 Erha Execution Photos 06-03-31[1]

http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 3/7

3

Nigeria OPL 209PROPRIETARY

FPSO First Oil – 27 March 2006

First Oil in Separator – 10:40 am

Crude to Cargo Oil Tank 4

Center 

Page 4: Erha Execution Photos 06-03-31[1]

8/18/2019 Erha Execution Photos 06-03-31[1]

http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 4/7

4

Nigeria OPL 209PROPRIETARY

FPSO Offshore Execution

Drill Center West SCR Completion

DLB Seaway Polaris – Laying

DCW – 10 In. Production SCR

towards FPSO

M/V Milton McCall

 Approaching

FPSO SIMOPS

Zone (500 Meter )

Riser Pull in

system ready

for Handoff to

FPSO

Page 5: Erha Execution Photos 06-03-31[1]

8/18/2019 Erha Execution Photos 06-03-31[1]

http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 5/7

5

Nigeria OPL 209PROPRIETARY

FPSO Offshore Execution

Week Ending 31-Mar-06

Preparing HP Gas

Compressor No. 2 for

Commissioning

Multi-Purpose Pump – Opened for Plunger

inspection after riser pigging

Page 6: Erha Execution Photos 06-03-31[1]

8/18/2019 Erha Execution Photos 06-03-31[1]

http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 6/7

6

Nigeria OPL 209PROPRIETARY

FPSO Flare Ignition – 31 March 2006

FPSO Offshore Execution

Week Ending 31-Mar-06

Page 7: Erha Execution Photos 06-03-31[1]

8/18/2019 Erha Execution Photos 06-03-31[1]

http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 7/7

7

Nigeria OPL 209PROPRIETARY

FPSO Offshore Execution

Week Ending 31-Mar-06

 Ar rival of the PO1B Replacement

Jumper to Onne Quay via Panelpina

Trailers

Load out of the PO1B Replacement

Jumper onto the CB19 in Onne