Erection Welding Schedule (8.1.1) Engineering Centres provide site with Erection welding schedule, which needs to be captured in system for further monitoring of weld joints. This interface enables user to capture relevant data from Erection welding schedule received from Engineering centres. Pre-requisite: Purchase Order (4.3.1) Entry in Material Specification master(2.8.2) Following information is captured in this form Description Source Remarks/ Explanation

Transcript of Erection Welding Schedule (8 - BHEL PSWR Monitoring... · Web viewO.D (mm)* User Input Enter the...

Page 1: Erection Welding Schedule (8 - BHEL PSWR Monitoring... · Web viewO.D (mm)* User Input Enter the outer diameter in mm. Thickness (mm)* User Input Enter the thickness in mm. Welding

Erection Welding Schedule (8.1.1)

Engineering Centres provide site with Erection welding schedule, which needs to be captured in system for further monitoring of weld joints. This interface enables user to capture relevant data from Erection welding schedule received from Engineering centres.

Pre-requisite: Purchase Order (4.3.1) Entry in Material Specification master(2.8.2)

Following information is captured in this form

Description Source Remarks/ ExplanationSch.No* Display

Information Allots the Schedule No after new enter is saved.

Sch Date* User Input Enter the Schedule Date.

Page 2: Erection Welding Schedule (8 - BHEL PSWR Monitoring... · Web viewO.D (mm)* User Input Enter the outer diameter in mm. Thickness (mm)* User Input Enter the thickness in mm. Welding

Sch Rev No Display Information

Displays the information of schedule revise no.

Sch Rev Date Display Information

Displays the information of schedule revise date.

Product Ref User Input Enter the Product reference no e.g. (PG/MA, Drawing No.etc)

Drawing No User Input Enter the drawing number.Drawing Rev. no

User Input Enter the drawing revision number.

Po.Tr.No. Purchase order

Select the Purchase order transaction number from the list of values.

Po.Sr.No. Purchase order Select the Purchase Order Serial number from the list of values.

Service Code Displays Information

Displays the information about the services.

Remarks User Input Enter the remarks.Technical Specification

Display Information

Displays the information about the technical specification.

Sr. No. Display Information

Automatically displays the serial number.

Drawg No User Input Enter the drawing number.Drawing Rev. No

User Input Enter the drawing revision number.

Material Code*

Material Specification Master

Select the material from the list of the values.

O.D (mm)* User Input Enter the outer diameter in mm.Thickness (mm)*

User Input Enter the thickness in mm.

Welding Specification

User Input Enter the welding specification.

Temp(C){Pre Heat}

User Input Enter the Temperature in Celsius

Time (Min) User Input Enter the Time in minuteTemp(C){Post Heat}

User Input Enter the Temperature in Celsius

Time (min) User Input Enter the Time in minute.From {PWHT Temp (C)}

User Input Enter the Temperature in Celsius

From {PWHT Time (min)}

User Input Enter the Time in Celsius

Total Joints* User Input Enter the total jointsTotal Length User Input Enter the lengthWPS User Input Enter the Welder Procedure

Specification.Material Description

Display Information

Displays the information about the material.

Page 3: Erection Welding Schedule (8 - BHEL PSWR Monitoring... · Web viewO.D (mm)* User Input Enter the outer diameter in mm. Thickness (mm)* User Input Enter the thickness in mm. Welding

Following information is captured in this form

Description Source Remarks/ ExplanationMu* EC/Mu

DefinitionSelect the Mu from the list of values.

Work Order* Project Master Select the Work order from the list of values.

Unit* Project Master Select the Unit from the list of values.

Following information is captured in this form

Description Source Remarks/ ExplanationMu* EC/Mu

Definition Select the Mu from the list of values.

Recommended Material Select the recommended material from

Page 4: Erection Welding Schedule (8 - BHEL PSWR Monitoring... · Web viewO.D (mm)* User Input Enter the outer diameter in mm. Thickness (mm)* User Input Enter the thickness in mm. Welding

Material* Specification Master

the list of values.

Size User Input Enter the size.

Process* Process Master Select the process from the list of values.

Quantity User Input Enter the quantity

UOM* UOM Master Select the UOM from the list of values.

Conversion Display Information

Display the information about the conversion.

LP(%) User Input Enter liquid Penetrant test (%)

MP(%) User Input Enter magnetic particle test.

RT(%) User Input Enter radiography test.

UT(%) User Input Enter ultrasonic test.

Remarks User Input Enter remarks.