1 EQUIPMENT USING SELF DRILLING BOLTS TO MINIMISE EXPOSURE TO STRATA HAZARDS IN UNDERGROUND COAL MINING Peter Corbett Technical Services Manager Centennial Angus Place

Transcript of EQUIPMENT USING SELF DRILLING BOLTS TO …€¦ · Peter Corbett Technical Services Manager...

1

EQUIPMENT USING SELFDRILLING BOLTS TO MINIMISE

EXPOSURE TO STRATA HAZARDSIN UNDERGROUND COAL MINING

Peter CorbettTechnical Services Manager

Centennial Angus Place

2

BACKGROUND• Centennial Angus Place (3Mtpa Longwall Mine)

• History of difficult strata conditions and injuries

• Underground Coal Industry – history of fatalities and injuries from strata failure

• Projects to reduce operator exposure to hazardous strata conditions

• Issues and project results to date

3

TASKS WHERE OPERATOR EXPOSURE COULD BE REDUCED

1. Roof Cavities in Roadway Development

2. Longwall Recovery Face Rib Bolting

4

NORMAL UNDERGROUND ROADWAY

Normal Roadway Driven by

Continuous Miner Rectangular Section

5

GEOLOGICAL ZONE ROOF CONDITIONS

“Guttering” Roof Falls Out Before It Can Be Supported

6

MAJOR ROOF CAVITY FORMATION

Cavity 4m above normal roof horizon

Roof Cavity

7

STRATA HAZARD TO OPERATORS

Face

Normal Roof Cavity Forms

Continuous Miner

Roof Falls Out Before Support – Hazard to

Operators

Continuous Miner

Continuous Miner

Cavity Gets Too Large to Control

8

PREVIOUS CAVITY SUPPORT METHOD

Hand Held Roofbolter

Elevated Work Platform

Drill Rotation Torque

Reaction Torque Transferred

Though Bolter Handle to Operator

9

STRATA SUPPORT HAZARDS

• Falling objects (coal or rock) can strike operators

• Working at heights (beyond limits of equipment) – operators can fall

• Operators struck by hand held roof or rib bolters

10

MAJOR GEOLOGICAL ZONE

WolganZone

Future Longwalls

Past Longwalls

11

SPILING PROCESS

~300mm

12

THE SOLUTION

Spiling from the Continuous Miner:

– Ensure operators not exposed to hazardous strata conditions

– Use self drilling & self grouting bolts

– Design a custom drill rig for installation

– Integrate Spiling into development process

13

CONCEPT- MINER MOUNTED SPILING RIG

Continuous Miner Cutter Head

Face

Spiling Rig

Spiling BoltRoof

CavitySpiles in Face

Subsequent Roof Level

Below Spiles

14

The OneStep system.

OneStep Bolt

Dispenser

Intensifier

USE OF SELF DRILLING BOLTS

15

RIG MOUNTED FOR SPILING

16

INSTALLATION OF SPILES

Normal Roof Horizon

Cavity

Spiling Area

17

MINING IN SPILED AREA

Back to Normal Roof Horizon

From Roof Cavity

Spiling Area

18

MINING IN SPILED AREAS (2)

From4.5m High

To Normal Height

Spiled Area

Roof Profile

19

BENEFITS & EFFECTS• No accidents / incidents (spiling process)

• Effectively stopped cavity propagation

• Operators not exposed to unstable roof

• Integrated part of development process

• Spiling cycle time reduced (from 6.7 to 1.2 shifts)

• Equipment Design / Supply Cost $100, 000

• Implementation September 2006

20

ISSUE 2: LONGWALL RECOVERY FACE RIB BOLTING

• Required to protect operators during longwall equipment recovery

• Unable to use conventional resin anchored bolts – drill hole closure

• Sprayed products ineffective - convergence

• Split set friction bolts – installation issues

21

LONGWALL RECOVERY FACE RIB

3.2mFractured coal can fall from heights and

strike operators

22

HAND HELD RIB BOLTING

Hand Held Rib Borer

23

3 D MODEL- SHEARER MOUNTED RIB BOLTER

24

SHEARER MOUNTED LW FACE DRILL RIG

Longwall Shearer

Longwall Face Drilling Rig

Carriage / Slide Assembly

25

INSTALLED LONGWALL FACE RIB BOLTS

Longwall Recovery Mesh

Face Rib Bolts

26

BENEFITS / EFFECTS• No injuries

• Most effective face rib support to date

• Highly productive (100 bolts in 8hr shift)

• Implemented February 2007

• Design / Supply Cost $70, 000 (2 Rigs)

• Review meeting – several improvements

27

RISK MANAGEMENT PROCESS• Project Team (Process Based)

• Consultation with Workforce Representatives

• Pre-design Meetings & Underground Visits

• Preliminary Equipment Design

• Presentation to Project Team (3D Modelling)

• Risk Assessments (FMEA / WRAC / JSA)

• SWP Preparation for Trial Operation

28

RISK MANAGEMENT PROCESS• Compliance Standards of Engineering Practice

• Pre-Commissioning Trials – modifications

• Certificate of Compliance

• Operator training / assessment / authorisation

• Commissioning Process - “fine tune” SWP’s

• JSA’s during commissioning

• Review operations after use

29

INNOVATIVE CONCEPTS USED FOR EQUIPMENT / PROCESS IMPROVEMENT

• Use of self drilling / self resin anchoring bolts in areas with high risk of strata failure

• Equipment designed to allow operator to drill / install support remotely from hazardous strata conditions

30

SIGNIFICANCE• First operational uses of Hilti One-Step bolts

• Equipment designed to minimise operator exposure to hazardous strata conditions with major risk reduction

• Equipment / Methods transferable to other operations

• Successful partnering between industry and suppliers – further projects planned

31

TRANSFERABILITY ACROSS INDUSTRY

• Other mines looking at these new equipment / processes

– Continuous Miner Mounted Spiling Rig– Shearer Mounted Longwall Face Drilling Rig

• These items have Copyright by Rambor

• Application of Hilti One-Step bolts