    Plant No.

    Equipment No.

    Service

    External Appearance of Vessel:

    a) Clean fins (no significant dust accumulation)

    b) Cleanliness of fins found acceptable as it is

    c) Cleanliness of fins found acceptable after

    washing with detergent and water

    d) Properly screwed plugs

    e) Top of fin tube bundle clean

    f) Fan blades in good condition

    g) Fan box/plenum (if any) in good condition

    h) Equipment identification and number available

    i) Name plate available and readable

    j) Nozzles in good condition

    k) Coating in good condition, (if no, check below)

    (i) Isolated coating failure

    (ii) Widespread coating failure(iii) General Corrosion

    (iv) Isolated pitting

    (v) Widespread pitting

    Supports:

    a) Bolts properly installed and in good condition

    b) Support structures in good condition

    c) Welds on structural support(s) in good condition

    d) Non-restrained end is free to move

    Nozzles/Flanges:

    a) Nozzle and flanges in good condition (no leak)

    b) Bolts and nuts in good condition

    c) Flanges in good alignment

    Drain/Vent/Blinds/Lifting Lugs:

    a) Drain/vent plug(s) installed

    b) Nipples/root valve(s) seal welded

    c) Drain valve blinded at end

    d) Spectacle blind installed for positive isolation

    NAPHTA PRODUCT COOLER EXTERNAL INSPE

    INSPECTION UNIT DE

    Insp

    Las

    NO. DESCRIPTION Yes

    3

    4

    1

    2

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    2/51

    f) Lifting lugs in good condition

    Miscellaneous Items:

    a) Instrumentation:

    (i) Pressure gage(s) in good condition

    (ii) Temperature gage(s) in good condition

    (i) Tags for gages installed

    (ii) Thermowells thread properly engage

    a) Relief Valves:

    (i) Acceptable per SAEP 319 checklist

    b) Connected Piping:

    (ii) Piping flow direction arrow stenciled

    (iii) Piping identification stenciled

    (iv) Adequate supports (no vibration)

    (v) Smooth fluid flow (no vibration)Access Ladder/Platforms/Walkways:

    b) Gratings in good condition

    c) Bolts/clips on grating

    d) Safety drop-bar(s) in good condition

    e) Stairway tread(s) in good condition -

    g) Stairway access color-coded

    h) Ladder rung(s) in good condition

    i) Cage(s) in good condition

    j) Platform(s) clean (no debris accumulation)

    INSPECTED BY NAME

    PIRECO-EPC CONTRACTOR

    VENDOR-(NAME)

    SOC-PROJECT

    SOC-PR0CESS

    SOC -OPERAION

    6

    5

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    3/51

    CTION CHECKLIST

    CRIPTION CHECKLIST

    Naphtha Cooler-E772A/B/C

    REMARKS

    ection Date

    InspectionDate

    No N/A

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    4/51

    SIGNATUREDATE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    5/51

    Plant No.

    Equipment No.

    Service

    External Appearance of Vessel:

    a) Mechanically sound (no damages such as

    scratches, grooves, dents)

    b) Equipment identification and number available

    c) Name plate available and readable

    d) Tight Nozzles (no leaks)

    e) Good welds (no cracks)

    f) Good coating appearance (no discoloration due

    to overheating)

    g) Good alignment

    h) Good surface appearance (no signs of blisters or

    bulges)

    i) Good coating (no failure; if no , check below :)

    (i) Isolated coating failure

    (i) Widespread coating failure(ii) General corrosion

    (iii) Isolated pitting

    (iv) Widespread pitting

    Vessel Skirts/Supports:

    a) Skirt mechanically sound

    b) Skirt coating good

    c) Skirt clean inside

    d) Support sliding pad good condition

    e) Saddle shoe aligned with the supports

    f) Support guides available and mechanically sound

    g) Welds on structure support(s)

    h) Pipe support base /I beam in good condition ( no

    gap)

    i) Structure component(s) in good condition

    j) Space between the saddle base and support beam

    clean (no rust scales)

    k) Dummy leg support in good condition

    l) Base plate(s) in good condition

    REBOILER EXTERNAL INSPECTION C

    INSPECTION UNIT DE

    Insp

    Las

    NO. DESCRIPTION Yes

    1

    2

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    6/51

    m) Non-restrained end is free to move

    Nozzles /Flanges:

    a) Nozzle and flanges in good condition (no leak)

    b) No corrosion between flanges

    c) Flanges no signs of mechanical damage

    d) Uneven or loose stud bolts

    e) Stud bolts of proper length

    f) Bolts and nuts in good conditiong) Weep holes of reinforcing pad properly greased

    Drain/Vent/Lifting Lugs:

    a) Drain/vent plug available

    b) Nipples/root valve properly seal welded

    c) Weep holes of reinforcing pads in good condition (no

    signs of leak)

    d) Welds on reinforcing pads in good condition

    e) Drain valve blinded at end

    f) Spectacle blind installed for positive isolation

    g) Drain/vent nipple or other fittings in good condition

    h) Davits/lifting lugs fully operationalIsolation Valves:

    a) Proper rating installed

    b) Gland in good condition

    c) Gland stud/eye bolt in good condition

    d) Hand wheel in good condition

    e) Valve body in good condition

    f) Horizontal Valve position indicator with safety caution

    Hot/Cold Insulation:

    a) Metal jackets and insulation (hot) in good condition

    b) Aluminum cladding, vapor barrier and insulation

    (cold) in good condition

    c) Correct insulation material/sufficient thickness

    d) Insulation straps properly installed

    e) Insulation at OSI points covered

    Miscellaneous Items:

    a) Instrumentation:

    (i) Pressure gage(s) in good condition

    (ii) Temperature gage(s) in good condition

    (iii) Tags for gages installed properly

    (iv) Thermowells thread properly engage

    (v) Thermal relief valve(s) in good condition

    b) Relief Valves:

    (i) Acceptable per SAEP 319 checklist

    c) Connected Piping:

    (i) Drain/vent /welding boss/RV piping in

    good condition

    (ii) Piping flow direction arrow stenciled

    (iii) Piping identification stenciled

    (iv) Adequate supports (no vibration)

    6

    3

    4

    5

    7

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    7/51

    (v) Smooth fluid flow ( no vibration)

    Access Ladder/Platforms/Walkways:

    b) Gratings in good condition

    c) Bolts/clips on grating installed properly

    d) Safety drop-bar(s) in good condition

    e) Stairway tread(s) in good condition

    -g) Stairway access color-coded

    h) Ladder rung(s) in good condition

    i) Cage(s) in good condition

    j) Platform(s) clean (no debris accumulation)

    INSPECTED BY NAME

    PIRECO-EPC CONTRACTOR

    VENDOR-(NAME)

    SOC-PROJECT

    SOC-PR0CESS

    SOC -OPERAION

    8

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    8/51

    ECKLIST

    CRIPTION CHECKLIST

    Reboilerr-E770

    N/A REMARKS

    ection Date

    InspectionDate

    No

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    9/51

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    10/51

    SIGNATUREDATE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    11/51

    Plant No.

    Equipment No.

    Service

    External Appearance of Vessel:

    a) Clean fins (no significant dust accumulation)

    b) Cleanliness of fins found acceptable as it is

    c) Cleanliness of fins found acceptable after

    washing with detergent and water

    d) Properly screwed plugs

    e) Top of fin tube bundle clean

    f) Fan blades in good condition

    g) Fan box/plenum (if any) in good condition

    h) Equipment identification and number available

    i) Name plate available and readable

    j) Nozzles in good condition

    k) Coating in good condition, (if no, check below)

    (i) Isolated coating failure

    (ii) Widespread coating failure(iii) General Corrosion

    (iv) Isolated pitting

    (v) Widespread pitting

    Supports:

    a) Bolts properly installed and in good condition

    b) Support structures in good condition

    c) Welds on structural support(s) in good condition

    d) Non-restrained end is free to move

    Nozzles/Flanges:

    a) Nozzle and flanges in good condition (no leak)

    b) Bolts and nuts in good condition

    c) Flanges in good alignment

    Drain/Vent/Blinds/Lifting Lugs:

    a) Drain/vent plug(s) installed

    b) Nipples/root valve(s) seal welded

    c) Drain valve blinded at end

    d) Spectacle blind installed for positive isolation

    STEAM CONDENSATE COOLER EXTERNAL INSP

    INSPECTION UNIT DE

    Insp

    Las

    NO. DESCRIPTION Yes

    1

    2

    3

    4

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    12/51

    f) Lifting lugs in good condition

    Miscellaneous Items:

    a) Instrumentation:

    (i) Pressure gage(s) in good condition

    (ii) Temperature gage(s) in good condition

    (i) Tags for gages installed

    (ii) Thermowells thread properly engage

    a) Relief Valves:

    (i) Acceptable per SAEP 319 checklist

    b) Connected Piping:

    (ii) Piping flow direction arrow stenciled

    (iii) Piping identification stenciled

    (iv) Adequate supports (no vibration)

    (v) Smooth fluid flow (no vibration)Access Ladder/Platforms/Walkways:

    b) Gratings in good condition

    c) Bolts/clips on grating

    d) Safety drop-bar(s) in good condition

    e) Stairway tread(s) in good condition -

    g) Stairway access color-coded

    h) Ladder rung(s) in good condition

    i) Cage(s) in good condition

    j) Platform(s) clean (no debris accumulation)

    INSPECTED BY NAME

    PIRECO-EPC CONTRACTOR

    VENDOR-(NAME)

    SOC-PROJECT

    SOC-PR0CESS

    SOC -OPERAION

    5

    6

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    13/51

    ECTION CHECKLIST

    CRIPTION CHECKLIST

    Steam Condensing Cooler-E774

    REMARKS

    ection Date

    InspectionDate

    No N/A

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    14/51

    SIGNATUREDATE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    15/51

    Plant No.

    Equipment No.

    Service

    External Appearance of Vessel:

    a) Clean fins (no significant dust accumulation)

    b) Cleanliness of fins found acceptable as it is

    c) Cleanliness of fins found acceptable after

    washing with detergent and water

    d) Properly screwed plugs

    e) Top of fin tube bundle clean

    f) Fan blades in good condition

    g) Fan box/plenum (if any) in good condition

    h) Equipment identification and number available

    i) Name plate available and readable

    j) Nozzles in good condition

    k) Coating in good condition, (if no, check below)

    (i) Isolated coating failure

    (ii) Widespread coating failure(iii) General Corrosion

    (iv) Isolated pitting

    (v) Widespread pitting

    Supports:

    a) Bolts properly installed and in good condition

    b) Support structures in good condition

    c) Welds on structural support(s) in good condition

    d) Non-restrained end is free to move

    Nozzles/Flanges:

    a) Nozzle and flanges in good condition (no leak)

    b) Bolts and nuts in good condition

    c) Flanges in good alignment

    Drain/Vent/Blinds/Lifting Lugs:

    a) Drain/vent plug(s) installed

    b) Nipples/root valve(s) seal welded

    c) Drain valve blinded at end

    d) Spectacle blind installed for positive isolation

    COMPRESSOR AFTER COOLER EXTERNAL INSP

    INSPECTION UNIT DE

    Insp

    Las

    NO. DESCRIPTION Yes

    1

    2

    3

    4

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    16/51

    f) Lifting lugs in good condition

    Miscellaneous Items:

    a) Instrumentation:

    (i) Pressure gage(s) in good condition

    (ii) Temperature gage(s) in good condition

    (i) Tags for gages installed

    (ii) Thermowells thread properly engage

    a) Relief Valves:

    (i) Acceptable per SAEP 319 checklist

    b) Connected Piping:

    (ii) Piping flow direction arrow stenciled

    (iii) Piping identification stenciled

    (iv) Adequate supports (no vibration)

    (v) Smooth fluid flow (no vibration)Access Ladder/Platforms/Walkways:

    b) Gratings in good condition

    c) Bolts/clips on grating

    d) Safety drop-bar(s) in good condition

    e) Stairway tread(s) in good condition -

    g) Stairway access color-coded

    h) Ladder rung(s) in good condition

    i) Cage(s) in good condition

    j) Platform(s) clean (no debris accumulation)

    INSPECTED BY NAME

    PIRECO-EPC CONTRACTOR

    VENDOR-(NAME)

    SOC-PROJECT

    SOC-PR0CESS

    SOC -OPERAION

    5

    6

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    17/51

    ECTION CHECKLIST

    CRIPTION CHECKLIST

    Compressor After Cooler-E773

    REMARKS

    ection Date

    InspectionDate

    No N/A

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    18/51

    SIGNATUREDATE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    19/51

    Plant No.

    Equipment No.

    Service

    External Appearance of Vessel:

    a) Mechanically sound (no damages such as

    scratches, grooves, dents)

    b) Equipment identification and number available

    c) Name plate available and readable

    d) Tight Nozzles (no leaks)

    e) Good welds (no cracks)

    f) Good coating appearance (no discoloration due

    to overheating)

    g) Good alignment

    h) Good surface appearance (no signs of blisters or

    bulges)

    i) Good coating (no failure; if no , check below :)

    (i) Isolated coating failure

    (i) Widespread coating failure(ii) General corrosion

    (iii) Isolated pitting

    (iv) Widespread pitting

    Vessel Skirts/Supports:

    a) Skirt mechanically sound

    b) Skirt coating good

    c) Skirt clean inside

    d) Support sliding pad good condition

    e) Saddle shoe aligned with the supports

    f) Support guides available and mechanically sound

    g) Welds on structure support(s)

    h) Pipe support base /I beam in good condition ( no

    gap)

    i) Structure component(s) in good condition

    j) Space between the saddle base and support beam

    clean (no rust scales)

    k) Dummy leg support in good condition

    l) Base plate(s) in good condition

    HEAT EXCHANGER EXTERNAL INSPECTI

    INSPECTION UNIT DE

    DESCRIPTION

    Insp

    Las

    NO. Yes

    1

    2

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    20/51

    m) Non-restrained end is free to move

    Nozzles /Flanges:

    a) Nozzle and flanges in good condition (no leak)

    b) No corrosion between flanges

    c) Flanges no signs of mechanical damage

    d) Uneven or loose stud bolts

    e) Stud bolts of proper length

    f) Bolts and nuts in good conditiong) Weep holes of reinforcing pad properly greased

    Drain/Vent/Lifting Lugs:

    a) Drain/vent plug available

    b) Nipples/root valve properly seal welded

    c) Weep holes of reinforcing pads in good condition (no

    signs of leak)

    d) Welds on reinforcing pads in good condition

    e) Drain valve blinded at end

    f) Spectacle blind installed for positive isolation

    g) Drain/vent nipple or other fittings in good condition

    h) Davits/lifting lugs fully operationalIsolation Valves:

    a) Proper rating installed

    b) Gland in good condition

    c) Gland stud/eye bolt in good condition

    d) Hand wheel in good condition

    e) Valve body in good condition

    f) Horizontal Valve position indicator with safety caution

    Hot/Cold Insulation:

    a) Metal jackets and insulation (hot) in good condition

    b) Aluminum cladding, vapor barrier and insulation

    (cold) in good condition

    c) Correct insulation material/sufficient thickness

    d) Insulation straps properly installed

    e) Insulation at OSI points covered

    Miscellaneous Items:

    a) Instrumentation:

    (i) Pressure gage(s) in good condition

    (ii) Temperature gage(s) in good condition

    (iii) Tags for gages installed properly

    (iv) Thermowells thread properly engage

    (v) Thermal relief valve(s) in good condition

    b) Relief Valves:

    (i) Acceptable per SAEP 319 checklist

    c) Connected Piping:

    (i) Drain/vent /welding boss/RV piping in

    good condition

    (ii) Piping flow direction arrow stenciled

    (iii) Piping identification stenciled

    (iv) Adequate supports (no vibration)

    7

    3

    4

    6

    5

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    21/51

    (v) Smooth fluid flow ( no vibration)

    Access Ladder/Platforms/Walkways:

    b) Gratings in good condition

    c) Bolts/clips on grating installed properly

    d) Safety drop-bar(s) in good condition

    e) Stairway tread(s) in good condition

    -g) Stairway access color-coded

    h) Ladder rung(s) in good condition

    i) Cage(s) in good condition

    j) Platform(s) clean (no debris accumulation)

    INSPECTED BY NAME

    PIRECO-EPC CONTRACTOR

    VENDOR-(NAME)

    SOC-PROJECT

    SOC-PR0CESS

    SOC -OPERAION

    8

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    22/51

    N CHECKLIST

    CRIPTION CHECKLIST

    Heat Exchanger-E771 A/B

    REMARKS

    ection Date

    InspectionDate

    No N/A

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    23/51

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    24/51

    SIGNATUREDATE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    25/51

    Plant No.

    Equipment No.

    Service

    External Appearance of Vessel:

    a) Mechanically sound (no damages such as

    scratches, grooves, dents)

    b) Equipment identification and number available

    c) Name plate available and readable

    d) Tight nozzles (no Leaks)

    e) Good welds ( no Cracks)

    f) Good coating appearance ( no discoloration due to

    overheating)

    g) Good alignment

    h) Good surface appearance ( no signs of blisters,

    bulges)

    i) Good coating (no failure; if no , check below:)

    (i) Isolated coating failure

    (ii) Widespread coating failure

    (iii) General Corrosion(iv) Isolated pitting

    Vessel Skirts/Supports:

    a) Skirt mechanically sound

    b) Skirt coating good

    c) Skirt clean inside

    d) Fireproofing in good condition

    e) Skirt drain is clean (no debris)

    f) Support sliding pad good condition

    g) Saddle shoe aligned with the supports

    h) Support guides available and mechanically sound

    i) Welds on structural support(s) in good condition

    j) Pipe support base /I beam in good condition (no

    gap)

    k) Structural component(s) in good condition

    l) Space between the saddle base and the support

    beam clean ( no rust scales)

    m) Dummy leg supports in good condition

    NO. DESCRIPTION Yes

    1

    2

    Insp

    Las

    COMPRESSOR DISCHARGE DRUM EXTERNAL INS

    INSPECTION UNIT DE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    26/51

    n) Base plate(s) in good condition

    Nozzles/Manways/Flanges:

    a) Nozzle and flanges in good condition (no leak)

    b) Special leak protection cover (caustic/chemical) in

    good condition

    c) Flange coating in good condition (no corrosion)

    d) Flanges no signs of mechanical damage

    e) Stud bolts tight

    f) Stud bolts of proper length

    g) Jack screws available and serviceable

    h) Bolts and nuts in good condition

    i) Weep holes of reinforcing pad properly greased

    Drain/Vent/Blinds/Lifting Lugs:

    a) Drain/vent plug available

    b) Nipples/root valve properly seal welded

    c) Reinforcing pads in good condition (no signs of

    leaks on weep holes)d) Welds on reinforcing pads in good condition

    e) Drain valve blinded at end

    f) Spectacle blind installed for positive isolation

    g) Drain/vent nipple or other fittings in good

    condition

    h) Davits/ lifting lugs fully operational

    i) Dead legs not present or removed

    5 Isolation Valves:

    a) Proper rating

    b) Gland in good condition

    c) Gland stud/eye bolt in good condition

    d) Hand wheel available and mechanically sound

    e) Valve body in good condition

    f) Horizontal valve position indicator with safety

    caution

    Hot/Cold Insulation:

    a) Metal jackets and insulation (hot) good condition

    b) Aluminum cladding, vapor barrier and insulation

    (cold) in good condition

    c) Correct insulation material/sufficient thickness

    d) All insulation straps available and fully tight

    e) Insulation at OSI points coveredMiscellaneous Items:

    a) Instrumentation:

    (i) Pressure gage(s) in good condition

    (ii) Temperature gage(s) in good condition

    (iii) Tags for gages available

    (iv) Thermowells thread properly engage

    (v) Thermal relief valve(s) in good condition

    3

    4

    6

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    27/51

    (vi) Level sight glasses in good condition

    b) Relief valves: (Use SAEP-319 Checklist)

    (i) Acceptable per SAEP 319 checklist

    c) Connected piping:

    (i) Drain/vent /welding boss/RV piping in

    good condition

    (ii) Piping flow direction arrow stenciled

    (iii) Piping identification stenciled

    (iv) Utility piping (steam etc.) has working

    check valve

    (v) Corrosion monitoring Cosasco fitting

    location marked

    (vi) Piping adequately supported

    (vii) Fluid flow smooth (no vibration)

    Underground to Aboveground Transition Sections of

    Vessel:

    a) Coating of above ground section in good condition

    b) Coating on the transition section in good condition

    c) Coating properly applied on buried or transition

    section

    d) Warning signs to indicate underground vessel

    available

    INSPECTED BY NAME

    PIRECO-EPC CONTRACTOR

    VENDOR-(NAME)

    SOC-PROJECT

    SOC-PR0CESS

    SOC -OPERAION

    8

    7

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    28/51

    No N/A REMARKS

    ection Date

    InspectionDate

    PECTION CHECKLIST

    CRIPTION CHECKLIST

    Discharge Drum-D 772

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    29/51

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    30/51

    SIGNATUREDATE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    31/51

    Plant No.

    Equipment No.

    Service

    External Appearance of Vessel:

    a) Mechanically sound (no damages such as

    scratches, grooves, dents)

    b) Equipment identification and number available

    c) Name plate available and readable

    d) Tight nozzles (no Leaks)

    e) Good welds ( no Cracks)

    f) Good coating appearance ( no discoloration due to

    overheating)

    g) Good alignment

    h) Good surface appearance ( no signs of blisters,

    bulges)

    i) Good coating (no failure; if no , check below:)

    (i) Isolated coating failure

    (ii) Widespread coating failure

    (iii) General Corrosion(iv) Isolated pitting

    Vessel Skirts/Supports:

    a) Skirt mechanically sound

    b) Skirt coating good

    c) Skirt clean inside

    d) Fireproofing in good condition

    e) Skirt drain is clean (no debris)

    f) Support sliding pad good condition

    g) Saddle shoe aligned with the supports

    h) Support guides available and mechanically sound

    i) Welds on structural support(s) in good condition

    j) Pipe support base /I beam in good condition (no

    gap)

    k) Structural component(s) in good condition

    l) Space between the saddle base and the support

    beam clean ( no rust scales)

    m) Dummy leg supports in good condition

    NO. DESCRIPTION Yes

    1

    2

    Insp

    Las

    COMPRESSOR SUCTION DRUM EXTERNAL INSP

    INSPECTION UNIT DE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    32/51

    n) Base plate(s) in good condition

    Nozzles/Manways/Flanges:

    a) Nozzle and flanges in good condition (no leak)

    b) Special leak protection cover (caustic/chemical) in

    good condition

    c) Flange coating in good condition (no corrosion)

    d) Flanges no signs of mechanical damage

    e) Stud bolts tight

    f) Stud bolts of proper length

    g) Jack screws available and serviceable

    h) Bolts and nuts in good condition

    i) Weep holes of reinforcing pad properly greased

    Drain/Vent/Blinds/Lifting Lugs:

    a) Drain/vent plug available

    b) Nipples/root valve properly seal welded

    c) Reinforcing pads in good condition (no signs of

    leaks on weep holes)d) Welds on reinforcing pads in good condition

    e) Drain valve blinded at end

    f) Spectacle blind installed for positive isolation

    g) Drain/vent nipple or other fittings in good

    condition

    h) Davits/ lifting lugs fully operational

    i) Dead legs not present or removed

    5 Isolation Valves:

    a) Proper rating

    b) Gland in good condition

    c) Gland stud/eye bolt in good condition

    d) Hand wheel available and mechanically sound

    e) Valve body in good condition

    f) Horizontal valve position indicator with safety

    caution

    Hot/Cold Insulation:

    a) Metal jackets and insulation (hot) good condition

    b) Aluminum cladding, vapor barrier and insulation

    (cold) in good condition

    c) Correct insulation material/sufficient thickness

    d) All insulation straps available and fully tight

    e) Insulation at OSI points coveredMiscellaneous Items:

    a) Instrumentation:

    (i) Pressure gage(s) in good condition

    (ii) Temperature gage(s) in good condition

    (iii) Tags for gages available

    (iv) Thermowells thread properly engage

    (v) Thermal relief valve(s) in good condition

    3

    4

    6

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    33/51

    (vi) Level sight glasses in good condition

    b) Relief valves: (Use SAEP-319 Checklist)

    (i) Acceptable per SAEP 319 checklist

    c) Connected piping:

    (i) Drain/vent /welding boss/RV piping in

    good condition

    (ii) Piping flow direction arrow stenciled

    (iii) Piping identification stenciled

    (iv) Utility piping (steam etc.) has working

    check valve

    (v) Corrosion monitoring Cosasco fitting

    location marked

    (vi) Piping adequately supported

    (vii) Fluid flow smooth (no vibration)

    Underground to Aboveground Transition Sections of

    Vessel:

    a) Coating of above ground section in good condition

    b) Coating on the transition section in good condition

    c) Coating properly applied on buried or transition

    section

    d) Warning signs to indicate underground vessel

    available

    INSPECTED BY NAME

    PIRECO-EPC CONTRACTOR

    VENDOR-(NAME)

    SOC-PROJECT

    SOC-PR0CESS

    SOC -OPERAION

    8

    7

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    34/51

    No N/A REMARKS

    ection Date

    InspectionDate

    CTION CHECKLIST

    CRIPTION CHECKLIST

    Suction Drum-D 771

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    35/51

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    36/51

    SIGNATUREDATE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    37/51

    Plant No.

    Equipment No.

    Service

    External Appearance of Vessel:

    a) Mechanically sound (no damages such as

    scratches, grooves, dents)

    b) Equipment identification and number available

    c) Name plate available and readable

    d) Tight nozzles (no Leaks)

    e) Good welds ( no Cracks)

    f) Good coating appearance ( no discoloration due to

    overheating)

    g) Good alignment

    h) Good surface appearance ( no signs of blisters,

    bulges)

    i) Good coating (no failure; if no , check below:)

    (i) Isolated coating failure

    (ii) Widespread coating failure

    (iii) General Corrosion(iv) Isolated pitting

    Vessel Skirts/Supports:

    a) Skirt mechanically sound

    b) Skirt coating good

    c) Skirt clean inside

    d) Fireproofing in good condition

    e) Skirt drain is clean (no debris)

    f) Support sliding pad good condition

    g) Saddle shoe aligned with the supports

    h) Support guides available and mechanically sound

    i) Welds on structural support(s) in good condition

    j) Pipe support base /I beam in good condition (no

    gap)

    k) Structural component(s) in good condition

    l) Space between the saddle base and the support

    beam clean ( no rust scales)

    m) Dummy leg supports in good condition

    1

    2

    Insp

    Las

    NO. DESCRIPTION Yes

    STEAM DISENGAGING DRUM EXTERNAL INSP

    INSPECTION UNIT DE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    38/51

    n) Base plate(s) in good condition

    Nozzles/Manways/Flanges:

    a) Nozzle and flanges in good condition (no leak)

    b) Special leak protection cover (caustic/chemical) in

    good condition

    c) Flange coating in good condition (no corrosion)

    d) Flanges no signs of mechanical damage

    e) Stud bolts tight

    f) Stud bolts of proper length

    g) Jack screws available and serviceable

    h) Bolts and nuts in good condition

    i) Weep holes of reinforcing pad properly greased

    Drain/Vent/Blinds/Lifting Lugs:

    a) Drain/vent plug available

    b) Nipples/root valve properly seal welded

    c) Reinforcing pads in good condition (no signs of

    leaks on weep holes)d) Welds on reinforcing pads in good condition

    e) Drain valve blinded at end

    f) Spectacle blind installed for positive isolation

    g) Drain/vent nipple or other fittings in good

    condition

    h) Davits/ lifting lugs fully operational

    i) Dead legs not present or removed

    5 Isolation Valves:

    a) Proper rating

    b) Gland in good condition

    c) Gland stud/eye bolt in good condition

    d) Hand wheel available and mechanically sound

    e) Valve body in good condition

    f) Horizontal valve position indicator with safety

    caution

    Hot/Cold Insulation:

    a) Metal jackets and insulation (hot) good condition

    b) Aluminum cladding, vapor barrier and insulation

    (cold) in good condition

    c) Correct insulation material/sufficient thickness

    d) All insulation straps available and fully tight

    e) Insulation at OSI points coveredMiscellaneous Items:

    a) Instrumentation:

    (i) Pressure gage(s) in good condition

    (ii) Temperature gage(s) in good condition

    (iii) Tags for gages available

    (iv) Thermowells thread properly engage

    (v) Thermal relief valve(s) in good condition

    4

    6

    3

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    39/51

    (vi) Level sight glasses in good condition

    b) Relief valves: (Use SAEP-319 Checklist)

    (i) Acceptable per SAEP 319 checklist

    c) Connected piping:

    (i) Drain/vent /welding boss/RV piping in

    good condition

    (ii) Piping flow direction arrow stenciled

    (iii) Piping identification stenciled

    (iv) Utility piping (steam etc.) has working

    check valve

    (v) Corrosion monitoring Cosasco fitting

    location marked

    (vi) Piping adequately supported

    (vii) Fluid flow smooth (no vibration)

    Underground to Aboveground Transition Sections of

    Vessel:

    a) Coating of above ground section in good condition

    b) Coating on the transition section in good condition

    c) Coating properly applied on buried or transition

    section

    d) Warning signs to indicate underground vessel

    available

    INSPECTED BY NAME

    PIRECO-EPC CONTRACTOR

    VENDOR-(NAME)

    SOC-PROJECT

    SOC-PR0CESS

    SOC -OPERAION

    7

    8

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    40/51

    REMARKS

    ection Date

    InspectionDate

    No N/A

    CTION CHECKLIST

    CRIPTION CHECKLIST

    Steam Disengaging Drum-D 770

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    41/51

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    42/51

    SIGNATUREDATE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    43/51

    Plant No.

    Equipment No.

    Service

    External Appearance of Columns:

    a) Mechanically sound (no damages such as

    scratches, grooves, dents)

    b) Equipment identification and number available

    c) Name plate available and readable

    d) Tight nozzles (no leaks)

    e) Good welds (no cracks)

    f) Good coating appearance (no discoloration due to

    overheating)

    g) Good alignment

    h) Good surface appearance (no signs of blisters,

    bulges)

    i) Good coating (no failure; if no , check below:)

    (i) Isolated coating failure

    (ii) Widespread coating failure

    (iii) General corrosion(iv) Isolated pitting

    (v) Widespread pitting

    Vessel Skirts/Supports:

    a) Skirt mechanically sound

    b) Skirt coating good

    c) Skirt clean inside

    d) Fireproofing in good condition

    e) Skirt drain is clean (no debris)

    f) Support sliding pad good condition

    g) Saddle shoe aligned with the supports

    h) Support guides available and mechanically sound

    i) Welds on structural support(s) in good condition

    j) Pipe support base /I beam in good condition (no

    gap)

    k) Structural component(s) in good condition

    l) Space between the saddle base and the support

    beam clean ( no rust scales)

    DESCRIPTION

    Insp

    Las

    1

    2

    STABILIZER TOWER EXTERNAL INSPECTI

    INSPECTION UNIT DE

    NO. Yes

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    44/51

    m) Dummy leg supports in good condition

    n) Base plate(s) in good condition

    o) Fireproofing in good condition

    Nozzles/Manways/Flanges:

    a) Nozzle and flanges in good condition

    b) Special leak protection cover (caustic/chemical) in

    good condition

    c) Flange coating in good condition (no corrosion)

    d) Flanges mechanically sound (no signs damage)

    e) Stud bolts tight

    f) Stud bolts of proper length

    g) Jack screws available and serviceable

    h) Bolts and nuts in good condition

    i) Weep holes of reinforcing pad properly greased

    Drain/Vent/Blinds/Lifting Lugs:

    a) Drain/vent plug availableb) Nipples/root valve properly seal welded

    c) Reinforcing pads in good condition (no signs of

    leaks on weep holes)

    d) Welds on reinforcing pads in good condition

    e) Drain valve blinded at end

    f) Spectacle blind installed for positive isolation

    h) Davits/lifting lugs fully operational

    i) Dead legs not present or removed

    Isolation Valves:

    a) Proper rating

    b) Gland in good condition

    c) Gland stud/eye bolt in good condition

    d) Hand wheel available and mechanically sound

    e) Valve body in good condition

    f) Horizontal valve position indicator with safety

    caution

    Hot/Cold Insulation:

    a) Metal jackets and insulation good condition

    b) Aluminum cladding, vapor barrier, sealant and

    insulation in good condition

    c) Correct insulation material/sufficient thicknessd) All insulation straps available and fully tight

    e) Insulation at OSI points covered

    Miscellaneous Items:

    a) Instrumentation:

    (i) Pressure gage(s) in good condition

    (ii) Temperature gage(s) in good condition

    (iii) Tags for gages available

    (iv) Thermowells thread properly engaged

    3

    4

    5

    6

    g) Drain/vent nipple or other fittings in good

    condition

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    45/51

    (v) Thermal relief valve(s) in good condition

    (vi) Level sight glasses in good condition

    b) Relief valves: (Use SAEP-319 Checklist)

    (i) Acceptable per SAEP 319 checklist

    c) Connected piping:

    (i) Drain/vent /welding boss/RV piping in

    good condition

    (ii) Piping flow direction arrow stenciled

    (iii) Piping identification stenciled

    (iv) Utility piping (steam etc.) has working

    check valve

    (v) Corrosion monitoring Cosasco fitting

    location marked

    (vi) Piping adequately supported

    (vii) Fluid flow smooth (no vibration)

    INSPECTED BY NAME

    PIRECO-EPC CONTRACTOR

    VENDOR-(NAME)

    SOC-PROJECTSOC-PR0CESS

    SOC -OPERAION

    7

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    46/51

    NOT YET DONE

    ection Date

    InspectionDate

    N CHECKLIST

    Tower-T 770

    CRIPTION CHECKLIST

    REMARKSNo N/A

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    47/51

    NOT YET DONE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    48/51

    SIGNATUREDATE

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    49/51

    Department Name: Plant No.: Plant/Unit No

    RV No. Old RV RV Test Due

    (from SAP) No. Location CDTP Date Date

    PZV tag

    No.

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    Block valve legend

    O = Open, C = Close, A = Atmosphere

    Checked By (Area Inspector): _______________________________ Inspection Field Supervisor:_

    Verified by (RV Coordinator): _______________________________ Corrective Action made by: __

    Painted Green

    RV Checklist

    (EquipmentNo.)

    Set Pres.Bello

    Ty

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    50/51

    .: ______________

    Safe Position Car Stem Painted Position Car Stem Painted

    Vent O/C Sealed Position Orange O/C/A Sealed Position Orange

    Stem Position Legend

    V = Vertical, H = Horizontal, SA = Sloping Away from valve

    (Vertical stem is not to be allowed per SAES-J-600)

    ________________________________

    ____________________Date: _____________

    Block Valve

    or External Inspection

    Downstream

    Block Valve

    RV

    pe

    Upstream

  • 8/10/2019 EQPT CHECK LIST-PRE INSPECTION.xlsx

    51/51

    Remarks